a.
Reinforced concrete Density = 24 KN/m3
Live load = 3 KN/m2

Slab length (L) = 5000 mm


Slab breath (B) = 2500 mm
Slab thickness = 150mm

Slab live load = 33 × 2500 × 10−3 = 7.5 KN/m

Slab self-weight = 150 × 2500 × 24 × 10−6 = 9 KN/m


Beam self-weight = 300 × 600 × 24 × 10−6 = 4.32 KN/m
Total Dead load = 9 + 4.32 = 13.32 KN/m

Serviceability Load = Dead load + Live load


= 13.32 + 7.5 = 20.82 KN/m

Ultimate Load = Dead load × 1.35 + Live load × 1.5


= 13.32 × 1.35 + 7.5 × 1.35 = 29.23 KN/m

Considering 5 load cases,

b. Case 1
AB – Max

29.23KN/m 17.982KN/m 17.982KN/m

A 5m B 6m C 5m D
Project Rev. Page

Made by Date

Order no. Checked by Date

Case 2
AD – Max

29.23KN/m 29.23KN/m 29.23KN/m

A 5m B 6m C 5m D

Case 3
AC- Max

29.23KN/m 29.23KN/m 17.982KN/m

A 5m B 6m C 5m D

Case 4
AB-CD –Max

29.23KN/m 17.982KN/m 29.23KN/m

A 5m B 6m C 5m D

Case 5
BC-Max

17.982KN/m 29.23KN/m 17.982KN/m

A 5m B 6m C 5m D
Project Rev. Page

Made by Date

Order no. Checked by Date

Maximum shear diagram for 5 load cases

Max Shear - 5 load cases


110
100
90 91.3 90.8
80
70
60 59.7
50
40
Shear force

30
20
10
0 0 0 0
-10 Series2
-20 0 2.5 5 7.5 10 12.5 15 17.5
-30
-40
-50
-60 -59.7
-70
-80 -87.7
-90 -91.7
-100
-110
span lengh

Maximum bending moment diagram

Max Bending moment - 5 load


cases
100 93.2
90 88.7
80
70
60
50
40
Moment

30
20
10 Series1
0 0 0
-10
-20 0 2.5 5 7.5 10 12.5 15 17.5
-30
-40
-50 -55.4
-60 -59.1 -60.9
-70
Span lengh
Project Rev. Page

Made by Date

Order no. Checked by Date

Max shear Max sagging Max hogging


91.7 60.9KNm 60.9KNm

Span length = 16m


c. Continues beam, two equal spans.
Beam height (h)= 600m
Beam width= 300m
Fck=30N/mm²
Assume T16 bars and T8 shear links
IstructE Cover =35mm
manual
5.11table asd = a+10mm
asd = 12+10=22mm axis distance : it should be larger than 22mm,
Minimum cover = 22+8=30mm

4.4.1.2 EC2
Table Hence cover 35mm
4.4/4.1/

5.3.2.1(3)
EC2
Effective depth (d)= 600-(35+8+6)=551mm

For max hogging moment

Max hog = 93.2 KNm

Hogging reinforcement is provide as the top layer.


Reynold’s
hand book
11th edition,
table 4.8 K= M / (bd²fck)
= 93.2x10⁶/ 300x(551)²x30
= 0.0344 < 0.167 ; hence singly r/f section

Z = d (0.5+(0.25-K/1.134) ½)
= 0.96d > 0.95d hence
Z = 0.95d
=0.95x551mm=523.45mm
Projec Rev. Page

Made by Date

Order no. Checked by Date

For max
As= M/0.87fykZ hog
= 93.2x 10⁶/0.87x500x523.45 required
= 410.8mm² bars =
2T16
T16 area= Ꙥr²= Ꙥ(8)²=201.062mm²

Required bars = 410.8/201.062


= 2.04
Hence 2T16

Note : hogging r/f is provided to top layer hence considering practicalities (eg:
inserting the pockervibrater) it is advisable to only have two bars in the top layer of
bars,
Hence = 2T16

Spacing = 300-(35x2+8x2)=214mm
=214-32=182mm=180mm
Hence = 180mm space between bars.
180@T16
For max sagging moment

K= M / (bd²fck)
= 60.9x10⁶/ 300x(551)²x30
= 0.022 < 0.167
Single r/f

Z= d (0.5+(0.25-K/1.134) ½)
= 0.96d > 0.95d hence
Z = 0.95d
=0.95x551mm=523.45mm

As= M/0.87fykZ
= 60.9x 10⁶/0.87x500x523.45
= 268.431mm²
Assume T12 bars for bottom r/f
Area T12= Ꙥr²= 113.097mm²
Project Rev. Page

Made by Date

Order no. Checked by Date

For max
Required bars = 268.431/113.097 hog
= 2.4 required
Hence 3T12 bars =
Spacing = 300-(35x2+8x2)=214mm 3T12
=214-12=202/2mm=101mm
Hence = 100mm space between bars
100@ T12

Check for main r/f arrangement


9.2.1(1) EC2 Table 3.1
Fck=30, fctm=2.9 N/mm²
b = 300mm
d=551mm

9.2.1.1 EC2 0.26xfctmxbxd/fyk


=0.26x2.9x300x551/500
248.36mm²<268.431<410.8
Hence check is ok
Project Rev. Page

Made by Date

Order no. Checked by Date

Mosly’s 7.6.1 Design for shear


188pg

= 0.5sin−1 (91.7x10³/0.18x300x549x(1-30/250)x30)
=3.3<22̊ hence consider θ= 22
Hence cotθ = cot 22= 2.5
6.2.3(3) EC2
VRd, max= 0.124bd (1-fck/250)fck
= 0.124x300x551(1-30/250)30
=524.928N/mm²

6.2.3(3) EC2
VRd,s = AswxZxFywd cot θ
s
Asw= 2Ꙥr²= 2xꙤx (8/2)²=100.53mm²
Fywd = 500

S = 100.53x0.95x551x500/524.928x 10³
=125.309mm

T8 links @ 125mm spacing 16000/125=128-2=126 links


125@ 126T8

9.2.2(5) EC2 Check


R/f percentage

Ƥw= Asw/Sxb=100.53/125x300=0.00268
Ƥmin= 0.08 (fck)½/fyk
=0.08(30)½/500=0.00087<0.00268
Check ok
9.2.2(6)EC2
Max spacing= 0.75d (1+cot)
=0.75x0.95x551
= 392.58mm > 125mm
Project Rev. Page

Made by Date

Order no. Checked by Date

Istruct E Lap length


5.12.3 table
5.24 l = 66x16 l = 66x10
=1056 =660mm

Hence lap length =660=700

Anchorage =58

l = 58x16 l = 58x12
=928 = 696=700mm

Curtailment length=
Project Rev. Page

Made by Date

Order no. Checked by Date


Project Rev. Page

Made by Date

Order no. Checked by Date


Project Rev. Page

Made by Date

Order no. Checked by Date


Project Rev. Page

Made by Date

Order no. Checked by Date


Project Rev. Page

Made by Date

Order no. Checked by Date


Project Rev. Page

Made by Date

Order no. Checked by Date

Você também pode gostar