Sl.No Main Item of work Unit Qty Rate in Amount in Rs
Rs

1 Clearing of Jungle, bushes, cutting trees upto 15 cm girth


including disposing off the material etc., complete with
initial lead upto 50 m and all lifts and compacting in the Sqm 359104.98
Reservoir bed by Road Roller before placing the concrete

2
Excavation in all kinds of soils including boulders not
exceeding 0.15 cum but not exceeding 1 cum in volume
including placing neately or disposing off the excavated Cum 179610.22
stuff etc., as directed including cost of all materials,
machinery, labour,dewatering, desilting, bailing out water
etc., complete with all leads and lifts

3
Providing embankment with homogenous soil from
approved borrow areas in layers of 25 to 30 cm including
cost of all materials, machinery, labour, all operations
such as excavation, sorting transportation, dozing to the Cum 736237
required depth, breaking clods, sectioning, watering &
compaction to the required density control not less than
97% using sheep foot / pad foot roller as stipulated etc.
complete with all leads and lifts.

4 Providing approved LDPE (250 microns)GEO


MEMBRANE to the outer surface of perforated M.S
Radial Pipe of collector well, including cost of all Sqm 275002.20
materials, labour, etc. complete with all leads and lifts.

5 Casing (Screened Earth) (0.6m Thick) Cum 119985.97

6 Clay trench at bottom reservior Cum 1640.40

7 Providing & placing graded filter consisting of following


materials including, watering, compacting etc., with all
labour & machineries & with all leads & lifts
a) 300mm THK Metal Cum 19751.36
b) 200mm THK Sand Cum 30285.42

8 Dowel Wall (350wide x750 high) Rm 2194.60

9 Drainage Hole (150 x150 @ 3mc/c) nos 731.53


PROJECT: BUNGI RAJGARH WATER SUPPLY
PROJECT PACKAGE-I Gammon India Ltd.,
Document Title: BOQ FOR 1.3MCM RAW WATER RESERVIOR AT TARANAGAR
Document No: DG/PHED/BRWSP/RWR/BOQ/9a Rev: 02 Date: 04-08-2012 Mumbai.

10
Providing and constructing rock toe with rubble from
approved quarry including placing, hand[packing and
handfinishing the top and sides to requried slopoes Cum 10972.98
including cost of all materials, machinery labouretc.,
complete with initial lead upto 1 km and all lifts.

11 Parapet Wall (350wide x 450 high) Cum 3025.60

12 Double Layered Clay tiles for lining

13 Anti Termite Treatment below LDPE Sqm 275002.20

14 Anti Salt Treatment Below LDPE Sqm 275002.20

15 Steps Cum 272.06

18 Rcc work for Toe wall & Circular Stilling Wall (M25) Cum 1390.83

19 Reinforcing steel ( for toe wall and Stilling wall) MT 100.58

20 Pcc work for Toe wall & Circular Stilling Wall Cum 116.31

21 D/S protection Sqm 75653.33

22 Masonry apron Sqm 62.08


Total
Grand Total
PROJECT: BUNGI RAJGARH WATER SUPPLY
PROJECT PACKAGE-I Gammon India Ltd.,
Document Title: BOQ FOR 1.3MCM RAW WATER RESERVIOR AT TARANAGAR Mumbai.
Document No: DG/PHED/BRWSP/RWR/BOQ/9 b Rev: 00 Date: 23-07-2012

9 b BOQ OF ROADS FOR RWR AT TARANAGAR

Sl. No. Particulars Total Rate in Amount


Unit
Quantity Rs. in Rs.

ROADS
1 Preparation of Subgrade by trimming earth in all types of soil,
dressing to required cambers and consolidating with vibrator roller,
duly adding water to get 97% degree of compaction, including
carting away the excavated earth within or away from the site; sqm 12240.38 0.00
loading and unloading, spreading and levelling, making good the
undulations if any, the cost of water etc, complete.

2 Providing and laying Water Bound Macadam as sub base of 75mm


thick totalling 200mm using Grade 2 MORT&H HBG, as per
details shown in the drawings as per Clause 404 of MORT&H cum 2448.08 0.00
specifications etc., complete and as directed.

3 Providing and laying Bituminous Macadam as base of 100mm thk.


Of grade 2 MORTH Aper details shown in drawing as per clause cum 1224.04 0.00
504 of MORTH Specifications etc., complete and as directed

4 Providing and laying Surface dressing in two coats using Bitumen


as per clause 508 of MORTH Specifications etc., complete and as sqm 12240.38 0.00
directed Ist coat of 13.2mm thk

5 Providing and laying Surface dressing in two coats using Bitumen


as per clause 508 of MORTH Specifications etc., complete and as sqm 12240.38 0.00
directed 2nd coat 11.2mm thk

6 Binding material (0.15cum / 10sqm) Cum 1836.06

7 Tack Coat (2.5kg / 10Sqm) Kg 30600.96

SUB TOTAL 0.00


PROJECT: BUNGI RAJGARH WATER SUPPLY
PROJECT PACKAGE-I Gammon India Ltd.,
Document Title: BOQ FOR 1.3MCM RAW WATER RESERVIOR AT TARANAGAR Mumbai.
Document No: DG/PHED/BRWSP/RWR/BOQ/9 c Rev: 00 Date: 23-07-2012

Annexure-VIII
10 c Split Up For LIGHTING SYSYTEM RWR at Taranagar as per Specification -15.3.2
UNIT EX TOTAL
QUANTITY
SL NO DESCRIPTION UNITS WORKS PRICE
LENGTH IN M
PRICE IN IN

Weather proof outdoor ,Street light, pole


mounted, die cast aluminium housing,
aluminium reflector, acrylic cover,
1 40 NO's 3000 120000
metal reflector, control gear, suitable for
250W HPSV Lamps for RWR , Road
Lighting etc.

Lighting poles(hot dip galvanised


swaged and welded steel pole 12m
2 hieght with overhang 1.5m with fixing 40 NO's 10000 400000
brackets ,weather proof junction box and
all other accessories
3 Cables
Incomer - 4C X 16 Sqmm 2500 M 460 1150000
2C X 2.5 Sqmm 1000 M 80 80000
4 Distribution Board 1 NO's 20000 20000
Sub-Total 1770000
PROJECT: BUNGI RAJGARH WATER SUPPLY
PROJECT PACKAGE-I Gammon India Ltd.,
Document Title: BOQ FOR 1.3MCM RAW WATER RESERVIOR AT TARANAGAR Mumbai.
Document No: DG/PHED/BRWSP/RWR/BOQ/9 Rev: 02 Date: 04-08-2012

DETAIL CLACULATION OF QUANTIES

1.0 Site Clearence


Depth of Excavation 0.5 m
Area of Site Clearence 359066.50 Sqmt
7 333.5
Qty 179533.25 Cum Bund RWR

2.0 Earthen Bund (Alround except Ramp)


C / S Area 361.687 Sqm
Length of Bund 1688.77 m 65.5 275
no of bunds 1 nos
Qty 610806.15499 Cum

3.0 Earthen Bund (Intermidiate)


C / S Area 361.687 Sqm
Length of Bund 415.50 m
no of bunds 1 nos
Qty 150280.9485 Cum

4.0 Earthen Bund (Ramp Area)


Area at different section 1-1 399.382 Sqm
section 2-2 389.972 Sqm
section 3-3 381.043 Sqm
section 4-4 372.595 Sqm
section 5-5 364.628 Sqm
section 6-6 357.137 Sqm
section 7-7 350.137 Sqm
section 8-8 343.612 Sqm
section 10-10 361.687 Sqm
section 11-11 409.272 Sqm
section 12-12 412.563 Sqm
section 13-13 384.000 Sqm
4526.028 Sqm

Avg Area 377.169 Sqm

Length of Bund 200.00 m (In the drg the the point where the qty of bund
no of bunds 2 nos excluding ramp is ended from there the length of
Qty 150867.6 Cum bund is 200m is considered and actual length of
Ramp is 146.25)
Total Bund Area 911954.70349 Cum

5.0 Quantity of Filters in the Bund

Thickness of Filter 0.7 m


where, Metal 0.3 m
Sand 0.2 m on either side of metal
Total Length of Bund 2194.596 m
Length of Metal Portion 30 m
Length of Sand Portion 69 m (688.37m includes both sand portion on
either side of Metal)
PROJECT: BUNGI RAJGARH WATER SUPPLY
PROJECT PACKAGE-I Gammon India Ltd.,
Document Title: BOQ FOR 1.3MCM RAW WATER RESERVIOR AT TARANAGAR Mumbai.
Document No: DG/PHED/BRWSP/RWR/BOQ/9 Rev: 02 Date: 04-08-2012
(688.37m includes both sand portion on
either side of Metal)

Total Qty of Metal 19751.364 Cum


Total Qty of Sand 30285.4248 Cum

6.0 Quantity of Rock Fill Toe


Area of Rock fill toe 5 Sqm 14
Total Length of Bund 2194.596 m

Total Qty of Rock Fill Toe 10972.98 Cum

7.0 Quantity of Screened Earth on sides of Outer Bunds


Thickness of Earth 0.6 m
Length of Bund 2194.60 m
Inclined Length of Bund 45 m (from drg)
Nos 1 nos (on single face only)
Qty of Screened Earth 59254.092 Cum

8.0 Quantity of Screened Earth on sides of Intermdiate Bund


Thickness of Earth 0.6 m
Length of Bund 415.50 m
Inclined Length of Bund 30.8 m (from drg)
Nos 2 nos (on both face)
Qty of Screened Earth 15356.88 Cum

9.0 Quantity of Screened Earth on bottom of Reservior

Plan Area of Reserviovr 75625 Sqm


Thiockness of Earth 0.6 m
Qty of Screened Earth 45375 Cum

Total Qty of Screened Earth 119985.972 Cum

10.0 Quantity of LDPE


Trapezoidal length 336.6 m (from drg)
Width 408.5 m (from drg)
nos 2
275002.2 Sqm

11.0 Clay Qty on Bottom of Reservior


Width of Trench 2 m
Thickness of Clay 0.3 m
Length of Trench 683.5 m (from drg)
Nos 4 nos
Total Qty of Clay 1640.4 Cum

12.0 Qty of Steps


Width of Stairs 8.00 m
C / S Area 8.50 Sqm (from drg)
PROJECT: BUNGI RAJGARH WATER SUPPLY
PROJECT PACKAGE-I Gammon India Ltd.,
Document Title: BOQ FOR 1.3MCM RAW WATER RESERVIOR AT TARANAGAR Mumbai.
Document No: DG/PHED/BRWSP/RWR/BOQ/9 Rev: 02 Date: 04-08-2012

Nos 4 nos
Total Qty of Stairs 272.06229792 Cum

13.0 Lining (Double Clay tiles Lining)


Inclined length 45 m
Length of Bund 2610.10 m
Total Qty of Tiles 117454.32 Sqm

14.0 Anti Termite Treatment 275002.2 Sqm


15.0 Anti Salt Treatment 275002.2 Sqm

16.0 Qty of Road Work


Width of Road 4.00 m
Length of Road 3060.10 m (3060.10 Length includes road on top of bund +
ramp into RWR+ ramp from outside to reach top of
bund)
12240.384 Sqm

Sub base Thickness 0.2 m


Base Thickness 0.1 m

Surface Finish
1st coat 13.2mm
2nd coat 11.2mm

17.0 Ramp from outside to top of Bund


Ht of Bund 9.75 m
Width of Ramp 6.00 m
Slope of Road 15: 1
Length of Ramp 146.25 m
Area of Ramp 712.96875 Sqm
Qty of Ramp 4277.8125 Cum

18.0 Toe Wall on Down Stream Side

Length of Toe Wall 2456.277 m


Size Breadth 0.6 m
High 0.9 m
Extended toe wall below bed
width 0m
thickness 0m

Qty of Toe Wall 1326.38958 Cum


Pcc Qty of toe wall 110.532465 Cum
Rcc Qty of toe wall extended 0 Cum

19.0 Quantity of Down Stream Protection


Inclined length 30.8 m
Full width of bund 2456.277 m
Qty 75653.3316 Sqm

20.0 RCC Circular Stilling well


PROJECT: BUNGI RAJGARH WATER SUPPLY
PROJECT PACKAGE-I Gammon India Ltd.,
Document Title: BOQ FOR 1.3MCM RAW WATER RESERVIOR AT TARANAGAR Mumbai.
Document No: DG/PHED/BRWSP/RWR/BOQ/9 Rev: 02 Date: 04-08-2012

Dia of wall 5 m
Height of Wall 8 m
Well inside NGL 2 m
Thickness of Wall 0.30 m
Thickness of footing 0.45
Projection of footing 1 m on either side
21.0 Masonry apron alround well Dia 10.2 m

Site clearence 38.48411 Sqm


Excavation for Well 76.968 Cum
Pcc for Well 5.773 Cum
Rcc works
Qty of Stilling Well 47.124 Cum
Qty of Footing for Well 17.318 Cum
Qty of masonry apron 62.0772256 Sqm

Final Quantities of Bund


1.0 Net Qty of Earthen Bund 736236.77519 Cum
2.0 Qty of Filter Material 50836.7888 Cum
3.0 Qty of Rock Fill Toe 10972.98 Cum
4.0 Screened Earth 119985.972 Cum
5.0 LDPE 275002.2 Sqm
6.0 Clay Qty 1640.4 Cum
7.0 Steps 272.06229792 Cum
8.0 Double Layered Clay Tiles 117454.32 Sqm
9.0 Anti Termite Treatment 275002.2 Sqm
10.0 Anti Salt Treatment 275002.2 Sqm
11.0 Road 12240.384 Sqm
12.0 Earth work 179610.218 Cum
13.0 Pcc 116.305 Cum
14.0 Masonry apron 62.0772256 Sqm
15.0 Rcc Stilling Wall 64.442 Cum 7.73 (120kg/cum for Stilling Wall)
16.0 Rcc Toe Wall 1326.390 Cum 92.85 (70kg/cum for Toe Wall)
17.0 D/S protection 75653.3316 Sqm
PROJECT: BUNGI RAJGARH WATER SUPPLY
PROJECT PACKAGE-I Gammon India Ltd.,
Document Title: BOQ FOR 1.3MCM RAW WATER RESERVIOR AT TARANAGAR Mumbai.
Document No: DG/PHED/BRWSP/RWR/BOQ/9 Rev: 02 Date: 04-08-2012

7
Bund

65.5

re the qty of bund


m there the length of
and actual length of
PROJECT: BUNGI RAJGARH WATER SUPPLY
PROJECT PACKAGE-I Gammon India Ltd.,
Document Title: BOQ FOR 1.3MCM RAW WATER RESERVIOR AT TARANAGAR Mumbai.
Document No: DG/PHED/BRWSP/RWR/BOQ/9 Rev: 02 Date: 04-08-2012

ad on top of bund +
outside to reach top of

Você também pode gostar