5112 / 1 : رقم
5112 / 2 / 8 : التاريخ
: العرض الفني:أوال
1. Scope:
1.1 This Method Statement covers the various
methods utilized to control water in excavation.
2. Products:
2.1 Filter Material (3- 5mm Aggregates)
4. Safety
4.1 TPS Section : Site Safety and Security
4.2 CSM Construction Safety Manual
5. Prior Activities:
5.1 A “Dewatering Plan” will be submitted showing
typical well points system, sumps, pumps, discharge
lines, silt traps and monitoring equipment.
5.2 Earth berms of cut-off ditches will be provided to
prevent surface water from entering the excavation
where needed.
5.3 Proper discharge away from work area will be
provided and Permits will be obtained where needed.
5.5 A checking for existing utilities will be conducted
before drilling or excavating.
6. Procedure:
A)- Selection of dewatering method depends on
the following :-
.After well points are driven into the ground they are
surrounded with a filter layer (5mm sand) to facilitate
suction.
7. Responsibilities:
7.1 It is the Site Manager’s duty to ensure that all
necessary safety and protective equipment are
provided along with properly trained and qualified
personnel.
Consultants
- مدينــه ركن حلوان الجديـــدة- ح تقسيــم جمعيـــة النصر4 قطعة
المعــــادى- كورنيش النيـــل
Mobile : 01014555350
5
Consultants
- مدينــه ركن حلوان الجديـــدة- ح تقسيــم جمعيـــة النصر4 قطعة
المعــــادى- كورنيش النيـــل
Mobile : 01014555350