PRESUPUESTO DE OBRA

PROYECTO : "AMPLIACIÓN, MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LAS COMUNIDADES DE
ACOMAYO Y PACHACHUPAN DISTRITO DE CHINCHAO- HUÁNUCO- HUÁNUCO" SALDO DE OBRA ADICIONAL 2
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE CHINCHAO
UBICACION : DPTO:HUANUCO PROV:HUANUCO DIST:CHINCHAO LOC:PACHACHUPAN
FECHA PROYECTO : 09/06/2018
Item Descripción Unid. Cant. Precio Parcial Sub Total

1.0 PARTIDAS GENERALES 34,290.00


1.1 FLETE HUANUCO ACOMAYO gbl 1.00 19,688.52 19,688.52
1.2 FLETE RURAL gbl 1.00 14,601.48 14,601.48
2.0 RED COLECTOR 266,230.36
2.1 RED DE ALCANTARILLADO 41,731.65
2.1.1 OBRAS PRELIMINARES 1,320.49
2.1.1.1 TRAZO Y REPLANTEO m 547.92 2.41 1,320.49
2.1.2 MOVIMIENTO DE TIERRA 25,195.91
2.1.2.1 EXCACION DE ZANJA MANUAL EN TERRENO NORMAL m 547.92 8.29 4,542.26
2.1.2.2 REFINE DE ZANJA EN TERRENO NORMAL m 547.92 3.19 1,747.86
2.1.2.3 CAMA DE APOYO m 547.92 8.62 4,723.07
2.1.2.4 PRIMER RELLENO m 547.92 6.55 3,588.88
2.1.2.5 SEGUNDO RELLENO m 547.92 7.01 3,840.92
2.1.2.6 ELIMINACION DE DESMONTE RADIO 5 (KM) m³ 460.95 14.65 6,752.92
2.1.3 SUMINISTRO E INSTALACION DE TUBERIAS 15,215.25
2.1.3.1 SUMINISTRO DE TUBERIA 160 mm. S - 25 m 484.92 22.25 10,789.47
2.1.3.2 INSTALACION DE TUBERIA 160 MM. H=1.00 - 2.00 M m 484.92 2.64 1,280.19
2.1.3.3 SUMINISTRO DE TUBERIA 250 mm. S - 25 m 63.00 44.67 2,814.21
2.1.3.4 INSTALACION TUBERIA PVC KM ISO 4435 UF- 250 MM. S-25 m 63.00 5.26 331.38
2.2 BUZONES 27,767.04
2.2.1 MOVIMIENTO DE TIERRAS 3,285.29
2.2.1.1 EXCAVACION DE ZANJA PARA BUZONES EN TN DE H=1.20m. und 15.00 127.59 1,913.85
- 2.00m.
2.2.1.2 EXCAVACION DE ZANJA PARA BUZONES EN TN DE H=2.00m. und 3.00 170.11 510.33
- 3.00m.
2.2.1.3 REFINE DE ZANJA DE BUZON und 18.00 6.38 114.84
2.2.1.4 ELIMINACION DESMONTE CARG. Y VOLQ. 10M3 TN (RADIO 5 m³ 50.94 14.65 746.27
KM)
2.2.2 OBRA DE CONCRETO 24,481.75
2.2.2.1 SOLADO PARA BUZONES Fc=100 kg/cm2... m² 31.86 22.91 729.91
2.2.2.2 CONCRETO PARA BUZONES - INCLUYE ENCOF. MARCO DE und 15.00 1,197.21 17,958.15
FºFº Y TAPA DE CºRº (f'c=210kg/cm2) H=1.20M. - 2.00M.
2.2.2.3 CONCRETO PARA BUZONES - INCLUYE ENCOF. MARCO DE und 3.00 1,440.31 4,320.93
FºFº Y TAPA DE CºRº (f'c=210kg/cm2) H=2.00M. - 3.00M.
2.2.2.4 DADOS DE ANCLAJE DE TUBERIA 0.40X0.40X0.30 M. und 36.00 40.91 1,472.76
f'c=140kg/xm2
2.3 REPOSICION DE TUB. AGUA POTABLE 138,896.60
2.3.1 OBRAS PRELIMINARES 6,639.65
2.3.1.1 TRAZO Y REPLANTEO m 2,755.04 2.41 6,639.65
2.3.2 MOVIMIENTO DE TIERRA 116,951.38
2.3.2.1 EXCACION DE ZANJA MANUAL EN TERRENO NORMAL m 2,755.04 8.29 22,839.28
2.3.2.2 REFINE DE ZANJA EN TERRENO NORMAL m 2,755.04 3.19 8,788.58
2.3.2.3 CAMA DE APOYO m 2,755.04 8.62 23,748.44
2.3.2.4 PRIMER RELLENO m 2,755.04 6.55 18,045.51
2.3.2.5 SEGUNDO RELLENO m 2,755.04 7.01 19,312.83
2.3.2.6 ELIMINACION DE DESMONTE RADIO 5 (KM) m³ 1,653.02 14.65 24,216.74
2.3.3 SUMINISTRO E INSTALACION DE TUBERIAS 14,428.15
2.3.3.1 SUMINISTRO DE TUB. PVC AGUA SAP C-10 DE 1" m 1,000.24 2.89 2,890.69
2.3.3.2 SUMINISTRO DE TUB. PVC AGUA SAP C-10 DE 3/4" m 1,754.80 2.43 4,264.16
2.3.3.3 INSTALACION DE TUB. PVC AGUA SAP C-10 DE 1" m 1,000.24 2.64 2,640.63
2.3.3.4 INSTALACION DE TUB. PVC AGUA SAP C-10 DE 3/4" m 1,754.80 2.64 4,632.67
2.3.4 SUMINISTRO E INSTALACION DE ACESORIOS 877.42
2.3.4.1 CODO PVC DE 11.25° 1" und 11.00 2.98 32.78
2.3.4.2 CODO PVC DE 22.5° 1" und 8.00 3.38 27.04
2.3.4.3 REDUCCION DE 3/4" A 1" und 1.00 2.38 2.38
2.3.4.4 REDUCCION DE 3/4" A 1/2" und 1.00 2.38 2.38
2.3.4.5 CODO PVC DE 11.25° 3/4" und 19.00 2.98 56.62
2.3.4.6 CODO PVC DE 22.5° 3/4" und 11.00 3.38 37.18

Gracias por su compra


Item Descripción Unid. Cant. Precio Parcial Sub Total
2.3.4.7 VALVULAS 719.04
2.3.4.7.1 VALVULA DE CONTROL TIPO ESFERA DE PASO 1" und 13.00 25.25 328.25
2.3.4.7.2 VALVULA DE CONTROL TIPO ESFERA DE PASO 3/4" und 13.00 23.25 302.25
2.3.4.7.3 VALVULA DE PURGA 1" und 1.00 46.27 46.27
2.3.4.7.4 VALVULA DE PURGA 3/4" und 1.00 42.27 42.27
2.4 PASE AEREO DE 19 ML RETICULADO (1UND) 23,255.37
2.4.1 OBRAS PRELIMINARES 270.92
2.4.1.1 TRAZO Y REPLANTEO m² 81.60 2.41 196.66
2.4.1.2 LIMPIESA Y DEFORESTACION MANUAL m² 81.60 0.91 74.26
2.4.2 MOVIMIENTO DE TIERRA 267.11
2.4.2.1 EXCACION DE ZANJA CON MAQUINARIA EN TN m³ 2.29 14.32 32.79
2.4.2.2 EXACACION DE ZANJA PARA ZAPATAS und 3.56 14.32 50.98
2.4.2.3 RELLENO COMPACTADO c/ MAT PROPIO m³ 0.72 34.70 24.98
2.4.2.4 ELIMINACION DE MATERIAL EXEDENTE m³ 7.61 20.81 158.36
2.4.3 CONCRETO SIMPLE 339.99
2.4.3.1 ESTRIBOS 104.61
2.4.3.1.1 SOLADO DE CONCRETO F´C 100KG/CM2 m² 1.76 59.44 104.61
2.4.3.2 ZAPATA 235.38
2.4.3.2.1 SOLADO DE CONCRETO F´C 100KG/CM2 m² 3.96 59.44 235.38
2.4.4 CONCRETO ARMADO 3,469.31
2.4.4.1 ESTRIBOS 1,000.77
2.4.4.1.1 ENCOFRADO Y DESENCOFRADO m² 7.04 56.07 394.73
2.4.4.1.2 ACERO FY= 4200 KG/CM2 GRADO 60 kg 28.89 4.44 128.27
2.4.4.1.3 CONCRETO F´C= 210 KG/CM2 m³ 1.27 376.20 477.77
2.4.4.2 ZAPATA 1,029.40
2.4.4.2.1 ACERO FY= 4200 KG/CM2 GRADO 60 kg 30.19 4.44 134.04
2.4.4.2.2 CONCRETO F´C= 210 KG/CM2 m³ 2.38 376.20 895.36
2.4.4.3 COLUMNA 1,439.14
2.4.4.3.1 ENCOFRADO Y DESENCOFRADO m² 21.78 56.07 1,221.20
2.4.4.3.2 ACERO FY= 4200 KG/CM2 GRADO 60 kg 6.72 4.44 29.84
2.4.4.3.3 CONCRETO F´C= 210 KG/CM2 m³ 0.50 376.20 188.10
2.4.5 REBOQUES 304.95
2.4.5.1 TARRAJEO Y FROTACHADO EN EXTERIORES m² 3.52 29.78 104.83
2.4.5.2 TARRAJEO Y FROTACHADO COLUMNAS m² 6.72 29.78 200.12
2.4.6 PINTURA 300.34
2.4.6.1 PINTURA LATEX ESTRIBOS m² 3.52 29.33 103.24
2.4.6.2 PINTURA LATEX COLUMNA m² 6.72 29.33 197.10
2.4.7 SUMINISTRO E INSTALACION DE PASE AEREO 18,302.75
2.4.7.1 ESTRUCTURA RETICULADA DE ACERO PREFARICADO m 19.00 343.09 6,518.71
2.4.7.2 INTALACION ESTRUCTURA RETICULADA DE ACERO m 19.00 446.97 8,492.43
2.4.7.3 SUMINISTRO DE TUB. HDPE 160 MM m 29.50 69.50 2,050.25
2.4.7.4 INSTALACION DE TUB. HDPE 160 MM m 29.50 42.08 1,241.36
2.5 PASE AEREO DE 28.5 ML RETICULADO (1UND) 30,110.19
2.5.1 OBRAS PRELIMINARES 120.56
2.5.1.1 TRAZO Y REPLANTEO m 28.50 2.41 68.69
2.5.1.2 LIMPIESA Y DEFORESTACION MANUAL m² 57.00 0.91 51.87
2.5.2 MOVIMIENTO DE TIERRA 193.34
2.5.2.1 EXCACION DE ZANJA CON MAQUINARIA EN TN m³ 2.29 14.32 32.79
2.5.2.2 EXACACION DE ZANJA PARA ZAPATAS und 1.78 14.32 25.49
2.5.2.3 RELLENO COMPACTADO c/ MAT PROPIO m³ 0.72 34.70 24.98
2.5.2.4 ELIMINACION DE MATERIAL EXEDENTE m³ 5.29 20.81 110.08
2.5.3 CONCRETO SIMPLE 222.30
2.5.3.1 ESTRIBOS 104.61
2.5.3.1.1 SOLADO DE CONCRETO F´C 100KG/CM2 m² 1.76 59.44 104.61
2.5.3.2 ZAPATA 117.69
2.5.3.2.1 SOLADO DE CONCRETO F´C 100KG/CM2 m² 1.98 59.44 117.69
2.5.4 CONCRETO ARMADO 2,912.66
2.5.4.1 ESTRIBOS 1,000.77
2.5.4.1.1 ENCOFRADO Y DESENCOFRADO m² 7.04 56.07 394.73
2.5.4.1.2 ACERO FY= 4200 KG/CM2 GRADO 60 kg 28.89 4.44 128.27
2.5.4.1.3 CONCRETO F´C= 210 KG/CM2 m³ 1.27 376.20 477.77
2.5.4.2 ZAPATA 581.72
2.5.4.2.1 ACERO FY= 4200 KG/CM2 GRADO 60 kg 30.19 4.44 134.04
2.5.4.2.2 CONCRETO F´C= 210 KG/CM2 m³ 1.19 376.20 447.68
2.5.4.3 COLUMNA 1,330.17

Gracias por su compra


Item Descripción Unid. Cant. Precio Parcial Sub Total
2.5.4.3.1 ENCOFRADO Y DESENCOFRADO m² 21.78 56.07 1,221.20
2.5.4.3.2 ACERO FY= 4200 KG/CM2 GRADO 60 kg 3.36 4.44 14.92
2.5.4.3.3 CONCRETO F´C= 210 KG/CM2 m³ 0.25 376.20 94.05
2.5.5 REBOQUES 204.89
2.5.5.1 TARRAJEO Y FROTACHADO EN EXTERIORES m² 3.52 29.78 104.83
2.5.5.2 TARRAJEO Y FROTACHADO COLUMNAS m² 3.36 29.78 100.06
2.5.6 PINTURA 201.79
2.5.6.1 PINTURA LATEX ESTRIBOS m² 3.52 29.33 103.24
2.5.6.2 PINTURA LATEX COLUMNA m² 3.36 29.33 98.55
2.5.7 SUMINISTRO E INSTALACION DE PASE AEREO 26,254.65
2.5.7.1 ESTRUCTURA RETICULADA DE ACERO PREFARICADO m 28.50 343.09 9,778.07
2.5.7.2 INTALACION ESTRUCTURA RETICULADA DE ACERO m 28.50 446.97 12,738.65
2.5.7.3 SUMINISTRO DE TUB. HDPE 160 MM m 33.50 69.50 2,328.25
2.5.7.4 INSTALACION DE TUB. HDPE 160 MM m 33.50 42.08 1,409.68
2.6 REPOCICION DE PAVIMENTO 3,166.10
2.6.1 OBRAS PRELIMINARES 27.96
2.6.1.1 TRAZO Y REPLANTEO m 11.60 2.41 27.96
2.6.2 MOVIMIENTO DE TIERRA 449.36
2.6.2.1 CONFORMACION Y COMPACTACION DE SUB RAZANTE m² 11.60 4.85 56.26
2.6.2.2 DEMOLICION DE PAVIMENTO ASFALTICO m² 6.40 17.64 112.90
2.6.2.3 BASE GRANULAR e=20cm m² 16.40 12.25 200.90
2.6.2.4 ELIMINACION DE MATERIAL DEMOLIDO m² 6.40 12.39 79.30
2.6.3 OBRAS DE CONCRETO 1,881.74
2.6.3.1 CONCRETO F´C= 210 KG/CM2 m³ 3.75 376.20 1,410.75
2.6.3.2 ENCOFRADO Y DESENCOFRADO m² 8.40 56.07 470.99
2.6.4 CAPA ASFALTICA 807.04
2.6.4.1 CARPETA ASFALTICA e=2" m² 6.40 126.10 807.04
2.7 REPOCICION DE CUNETA 1,303.41
2.7.1 OBRAS PRELIMINARES 19.28
2.7.1.1 TRAZO Y REPLANTEO m 8.00 2.41 19.28
2.7.2 MOVIMIENTO DE TIERRA 73.62
2.7.2.1 DEMOLICION DE CUNETA EXISTENTE m² 1.60 31.12 49.79
2.7.2.2 RELLENO Y COMPACTADO m² 0.80 4.85 3.88
2.7.2.3 ELIMINACION DE MATERIAL DEMOLIDO m² 1.61 12.39 19.95
2.7.3 OBRAS DE CONCRETO 1,210.51
2.7.3.1 CONCRETO F´C= 210 KG/CM2 m³ 2.24 376.20 842.69
2.7.3.2 ENCOFRADO Y DESENCOFRADO m² 6.56 56.07 367.82
3.0 RED EMISOR 154,961.87
3.1 REPOSICION DE TUB. AGUA POTABLE 108,760.11
3.1.1 OBRAS PRELIMINARES 5,017.52
3.1.1.1 TRAZO Y REPLANTEO m 2,081.96 2.41 5,017.52
3.1.2 MOVIMIENTO DE TIERRA 88,379.21
3.1.2.1 EXCACION DE ZANJA MANUAL EN TERRENO NORMAL m 2,081.96 8.29 17,259.45
3.1.2.2 REFINE DE ZANJA EN TERRENO NORMAL m 2,081.96 3.19 6,641.45
3.1.2.3 CAMA DE APOYO m 2,081.96 8.62 17,946.50
3.1.2.4 PRIMER RELLENO m 2,081.96 6.55 13,636.84
3.1.2.5 SEGUNDO RELLENO m 2,081.96 7.01 14,594.54
3.1.2.6 ELIMINACION DE DESMONTE RADIO 5 (KM) m³ 1,249.18 14.65 18,300.43
3.1.3 SUMINISTRO E INSTALACION DE TUBERIAS 14,865.19
3.1.3.1 SUMINISTRO DE TUB. PVC AGUA SAP C-10 DE 1/2" m 2,081.96 4.50 9,368.82
3.1.3.2 INSTALACION DE TUB. PVC AGUA SAP C-10 DE 1/2" m 2,081.96 2.64 5,496.37
3.1.4 SUMINISTRO E INSTALACION DE ACESORIOS 92.38
3.1.4.1 CODO PVC DE 11.25° 1/2" und 21.00 2.98 62.58
3.1.4.2 CODO PVC DE 22.5° 1/2" und 6.00 3.38 20.28
3.1.4.3 CODO PVC DE 90° 1/2" und 4.00 2.38 9.52
3.1.5 VALVULAS 405.81
3.1.5.1 VALVULA DE CONTROL TIPO ESFERA DE PASO 1/2" und 12.00 23.25 279.00
3.1.5.2 VALVULA DE PURGA 1/2" und 3.00 42.27 126.81
3.2 PASE AEREO DE 25 ML RETICULADO (1UND) 28,265.16
3.2.1 OBRAS PRELIMINARES 96.65
3.2.1.1 TRAZO Y REPLANTEO m 25.00 2.41 60.25
3.2.1.2 LIMPIESA Y DEFORESTACION MANUAL m² 40.00 0.91 36.40
3.2.2 MOVIMIENTO DE TIERRA 267.11
3.2.2.1 EXCACION DE ZANJA CON MAQUINARIA EN TN m³ 2.29 14.32 32.79
3.2.2.2 EXACACION DE ZANJA PARA ZAPATAS und 3.56 14.32 50.98

Gracias por su compra


Item Descripción Unid. Cant. Precio Parcial Sub Total
3.2.2.3 RELLENO COMPACTADO c/ MAT PROPIO m³ 0.72 34.70 24.98
3.2.2.4 ELIMINACION DE MATERIAL EXEDENTE m³ 7.61 20.81 158.36
3.2.3 CONCRETO SIMPLE 339.99
3.2.3.1 ESTRIBOS 104.61
3.2.3.1.1 SOLADO DE CONCRETO F´C 100KG/CM2 m² 1.76 59.44 104.61
3.2.3.2 ZAPATA 235.38
3.2.3.2.1 SOLADO DE CONCRETO F´C 100KG/CM2 m² 3.96 59.44 235.38
3.2.4 CONCRETO ARMADO 3,469.31
3.2.4.1 ESTRIBOS 1,000.77
3.2.4.1.1 ENCOFRADO Y DESENCOFRADO m² 7.04 56.07 394.73
3.2.4.1.2 ACERO FY= 4200 KG/CM2 GRADO 60 kg 28.89 4.44 128.27
3.2.4.1.3 CONCRETO F´C= 210 KG/CM2 m³ 1.27 376.20 477.77
3.2.4.2 ZAPATA 1,029.40
3.2.4.2.1 ACERO FY= 4200 KG/CM2 GRADO 60 kg 30.19 4.44 134.04
3.2.4.2.2 CONCRETO F´C= 210 KG/CM2 m³ 2.38 376.20 895.36
3.2.4.3 COLUMNA 1,439.14
3.2.4.3.1 ENCOFRADO Y DESENCOFRADO m² 21.78 56.07 1,221.20
3.2.4.3.2 ACERO FY= 4200 KG/CM2 GRADO 60 kg 6.72 4.44 29.84
3.2.4.3.3 CONCRETO F´C= 210 KG/CM2 m³ 0.50 376.20 188.10
3.2.5 REBOQUES 304.95
3.2.5.1 TARRAJEO Y FROTACHADO EN EXTERIORES m² 3.52 29.78 104.83
3.2.5.2 TARRAJEO Y FROTACHADO COLUMNAS m² 6.72 29.78 200.12
3.2.6 PINTURA 300.34
3.2.6.1 PINTURA LATEX ESTRIBOS m² 3.52 29.33 103.24
3.2.6.2 PINTURA LATEX COLUMNA m² 6.72 29.33 197.10
3.2.7 SUMINISTRO E INSTALACION DE PASE AEREO 23,486.81
3.2.7.1 ESTRUCTURA RETICULADA DE ACERO PREFARICADO m 25.00 343.09 8,577.25
3.2.7.2 INTALACION ESTRUCTURA RETICULADA DE ACERO m 25.00 446.97 11,174.25
3.2.7.3 SUMINISTRO DE TUB. HDPE 250 MM m 32.60 72.50 2,363.50
3.2.7.4 INSTALACION DE TUB. HDPE 250 MM m 32.60 42.08 1,371.81
3.3 PASE AEREO DE 14 ML RETICULADO (1UND) 17,157.56
3.3.1 OBRAS PRELIMINARES 70.14
3.3.1.1 TRAZO Y REPLANTEO m 14.00 2.41 33.74
3.3.1.2 LIMPIESA Y DEFORESTACION MANUAL m² 40.00 0.91 36.40
3.3.2 MOVIMIENTO DE TIERRA 193.34
3.3.2.1 EXCACION DE ZANJA CON MAQUINARIA EN TN m³ 2.29 14.32 32.79
3.3.2.2 EXACACION DE ZANJA PARA ZAPATAS und 1.78 14.32 25.49
3.3.2.3 RELLENO COMPACTADO c/ MAT PROPIO m³ 0.72 34.70 24.98
3.3.2.4 ELIMINACION DE MATERIAL EXEDENTE m³ 5.29 20.81 110.08
3.3.3 CONCRETO SIMPLE 222.30
3.3.3.1 ESTRIBOS 104.61
3.3.3.1.1 SOLADO DE CONCRETO F´C 100KG/CM2 m² 1.76 59.44 104.61
3.3.3.2 ZAPATA 117.69
3.3.3.2.1 SOLADO DE CONCRETO F´C 100KG/CM2 m² 1.98 59.44 117.69
3.3.4 CONCRETO ARMADO 2,912.66
3.3.4.1 ESTRIBOS 1,000.77
3.3.4.1.1 ENCOFRADO Y DESENCOFRADO m² 7.04 56.07 394.73
3.3.4.1.2 ACERO FY= 4200 KG/CM2 GRADO 60 kg 28.89 4.44 128.27
3.3.4.1.3 CONCRETO F´C= 210 KG/CM2 m³ 1.27 376.20 477.77
3.3.4.2 ZAPATA 581.72
3.3.4.2.1 ACERO FY= 4200 KG/CM2 GRADO 60 kg 30.19 4.44 134.04
3.3.4.2.2 CONCRETO F´C= 210 KG/CM2 m³ 1.19 376.20 447.68
3.3.4.3 COLUMNA 1,330.17
3.3.4.3.1 ENCOFRADO Y DESENCOFRADO m² 21.78 56.07 1,221.20
3.3.4.3.2 ACERO FY= 4200 KG/CM2 GRADO 60 kg 3.36 4.44 14.92
3.3.4.3.3 CONCRETO F´C= 210 KG/CM2 m³ 0.25 376.20 94.05
3.3.5 REBOQUES 204.89
3.3.5.1 TARRAJEO Y FROTACHADO EN EXTERIORES m² 3.52 29.78 104.83
3.3.5.2 TARRAJEO Y FROTACHADO COLUMNAS m² 3.36 29.78 100.06
3.3.6 PINTURA 201.79
3.3.6.1 PINTURA LATEX ESTRIBOS m² 3.52 29.33 103.24
3.3.6.2 PINTURA LATEX COLUMNA m² 3.36 29.33 98.55
3.3.7 SUMINISTRO E INSTALACION DE PASE AEREO 13,352.44
3.3.7.1 ESTRUCTURA RETICULADA DE ACERO PREFARICADO m 14.00 343.09 4,803.26
3.3.7.2 INTALACION ESTRUCTURA RETICULADA DE ACERO m 14.00 446.97 6,257.58

Gracias por su compra


Item Descripción Unid. Cant. Precio Parcial Sub Total
3.3.7.3 SUMINISTRO DE TUB. HDPE 250 MM m 20.00 72.50 1,450.00
3.3.7.4 INSTALACION DE TUB. HDPE 250 MM m 20.00 42.08 841.60
3.4 DADOS DE ANCLAJE TUBERIA 779.04
3.4.1 DADOS DE ANCLAJE DE TUBERIA 0.40X0.40X0.30 M. und 12.00 64.92 779.04
f'c=210kg/xm2
4.0 MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE 135,780.57
4.1 SISTEMA DE CLORACION POR GOTEO ACOMAYO 2,543.81
4.1.1 OBRAS PRELIMINARES 41.52
4.1.1.1 TRAZO Y REPLANTEO m 17.23 2.41 41.52
4.1.2 CARPINTERIA METALICA 1,358.91
4.1.2.1 BASTIDOR METALICO gbl 1.00 214.54 214.54
4.1.2.2 PUERTA METALICA LIVIANA PRE FABRICADA und 1.00 444.37 444.37
4.1.2.3 REJA DE PROTECCION m 4.96 141.13 700.00
4.1.3 TANQUE DE IPOCLORITO 1,047.47
4.1.3.1 TANQUE CLORADOR und 1.00 1,047.47 1,047.47
4.1.4 COVERTURAS 50.74
4.1.4.1 COVERTURA LIVIVANA und 1.00 50.74 50.74
4.1.5 PINTURAS 45.17
4.1.5.1 PINTURA LATEX m² 1.54 29.33 45.17
4.2 SISTEMA DE CLORACION POR GOTEO PACHACHUPAN 2,506.00
4.2.1 OBRAS PRELIMINARES 3.71
4.2.1.1 TRAZO Y REPLANTEO m 1.54 2.41 3.71
4.2.2 CARPINTERIA METALICA 1,358.91
4.2.2.1 BASTIDOR METALICO gbl 1.00 214.54 214.54
4.2.2.2 PUERTA METALICA LIVIANA PRE FABRICADA und 1.00 444.37 444.37
4.2.2.3 REJA DE PROTECCION m 4.96 141.13 700.00
4.2.3 TANQUE DE IPOCLORITO 1,047.47
4.2.3.1 TANQUE CLORADOR und 1.00 1,047.47 1,047.47
4.2.4 COVERTURAS 50.74
4.2.4.1 COVERTURA LIVIVANA und 1.00 50.74 50.74
4.2.5 PINTURAS 45.17
4.2.5.1 PINTURA LATEX m² 1.54 29.33 45.17
4.3 MEJORAMIENTO DEL SEDIMENTADOR 27,515.41
4.3.1 CAJA DE VALVULA 4" (2 und) 3,592.42
4.3.1.1 OBRAS PRELIMINARES 6.27
4.3.1.1.1 TRAZO Y REPLANTEO m 2.60 2.41 6.27
4.3.1.2 MOVIMIENTO DE TIERRA 18.27
4.3.1.2.1 EXCACION DE ZANJA CON MAQUINARIA EN TN m³ 0.52 14.32 7.45
4.3.1.2.2 ELIMINACION DE MATERIAL EXEDENTE m³ 0.52 20.81 10.82
4.3.1.3 CONCRETO SIMPLE 54.68
4.3.1.3.1 SOLADO DE CONCRETO F´C 100KG/CM2 m² 0.92 59.44 54.68
4.3.1.4 CONCRETO ARMADO 1,284.74
4.3.1.4.1 CONCRETO F´C= 210 KG/CM2 m³ 1.05 376.20 395.01
4.3.1.4.2 ENCOFRADO Y DESENCOFRADO m² 8.72 56.07 488.93
4.3.1.4.3 ACERO FY= 4200 KG/CM2 GRADO 60 kg 90.27 4.44 400.80
4.3.1.5 ACESORIOS 1,737.36
4.3.1.5.1 ADAPTADOR DE PVC DE 4" und 4.00 25.28 101.12
4.3.1.5.2 UNION UNIVERSAL und 4.00 55.28 221.12
4.3.1.5.3 NIPLE DE PVC 4"X3" und 4.00 25.28 101.12
4.3.1.5.4 Válvula cpta.CC, ho.dúctil cierre elást. vástago acero inoxidable und 2.00 372.00 744.00
DN 100
4.3.1.5.5 TEE 4X4 DE PVC und 2.00 14.28 28.56
4.3.1.5.6 CODO 90° 4" DE PVC und 4.00 56.69 226.76
4.3.1.5.7 REDUCCION DE 4 A 2" DE PVC und 2.00 15.28 30.56
4.3.1.5.8 CODO 90° DE 2" DE PVC und 4.00 10.61 42.44
4.3.1.5.9 ABRASADERA DE TUBERIA DE 2" und 6.00 40.28 241.68
4.3.1.6 REBOQUES 315.12
4.3.1.6.1 TARRAJEO Y FROTACHADO SEDIMENTADOR m² 6.00 24.85 149.10
4.3.1.6.2 PULIDO SEDIMENTADOR + CAJA m² 6.00 15.03 90.18
4.3.1.6.3 BRUÑA MAS SEDIMENTADOR m 12.00 6.32 75.84
4.3.1.7 PINTURA 175.98
4.3.1.7.1 PINTURA LATEX m² 6.00 29.33 175.98
4.3.2 CAJA DE VALVULA 6" (2 und) 4,392.68
4.3.2.1 OBRAS PRELIMINARES 16.07
4.3.2.1.1 TRAZO Y REPLANTEO m 6.67 2.41 16.07

Gracias por su compra


Item Descripción Unid. Cant. Precio Parcial Sub Total
4.3.2.2 MOVIMIENTO DE TIERRA 258.09
4.3.2.2.1 EXCACION DE ZANJA CON MAQUINARIA EN TN m³ 8.33 14.32 119.29
4.3.2.2.2 ELIMINACION DE MATERIAL EXEDENTE m³ 6.67 20.81 138.80
4.3.2.3 CONCRETO SIMPLE 54.68
4.3.2.3.1 SOLADO DE CONCRETO F´C 100KG/CM2 m² 0.92 59.44 54.68
4.3.2.4 CONCRETO ARMADO 1,716.70
4.3.2.4.1 CONCRETO F´C= 210 KG/CM2 m³ 2.00 376.20 752.40
4.3.2.4.2 ENCOFRADO Y DESENCOFRADO m² 10.05 56.07 563.50
4.3.2.4.3 ACERO FY= 4200 KG/CM2 GRADO 60 kg 90.27 4.44 400.80
4.3.2.5 ACESORIOS 1,856.04
4.3.2.5.1 ADAPTADOR DE PVC DE 6" und 2.00 25.28 50.56
4.3.2.5.2 UNION UNIVERSAL und 5.00 55.28 276.40
4.3.2.5.3 NIPLE DE PVC 6"X3" und 4.00 25.28 101.12
4.3.2.5.4 Válvula cpta.CC, ho.dúctil cierre elást. vástago acero inoxidable und 2.00 632.92 1,265.84
DN 150
4.3.2.5.5 TEE 6X6 DE PVC und 2.00 14.28 28.56
4.3.2.5.6 CODO 90° 4" DE PVC und 2.00 30.28 60.56
4.3.2.5.7 REDUCCION DE 6 A 2" DE PVC und 2.00 15.28 30.56
4.3.2.5.8 CODO 90° DE 4" DE PVC und 4.00 10.61 42.44
4.3.2.6 REBOQUES 315.12
4.3.2.6.1 TARRAJEO Y FROTACHADO SEDIMENTADOR m² 6.00 24.85 149.10
4.3.2.6.2 PULIDO SEDIMENTADOR + CAJA m² 6.00 15.03 90.18
4.3.2.6.3 BRUÑA MAS SEDIMENTADOR m 12.00 6.32 75.84
4.3.2.7 PINTURA 175.98
4.3.2.7.1 PINTURA LATEX m² 6.00 29.33 175.98
4.3.3 BY PASS 2,616.43
4.3.3.1 OBRAS PRELIMINARES 31.81
4.3.3.1.1 TRAZO Y REPLANTEO m 13.20 2.41 31.81
4.3.3.2 MOVIMIENTO DE TIERRA 320.34
4.3.3.2.1 EXCACION DE ZANJA CON MAQUINARIA EN TN m³ 7.92 14.32 113.41
4.3.3.2.2 REFINE DE ZANJA EN TERRENO NORMAL m 13.20 3.19 42.11
4.3.3.2.3 ELIMINACION DE MATERIAL EXEDENTE m³ 7.92 20.81 164.82
4.3.3.3 SUMINISTRO E INSTALACION DE TUBERIAS 2,112.88
4.3.3.3.1 SUMINISTRO DE TUBERIA HDPE160 mm. S - 25 m 28.30 72.02 2,038.17
4.3.3.3.2 INSTALACION DE TUBERIA 160 MM. H=1.00 - 2.00 M m 28.30 2.64 74.71
4.3.3.4 ACESORIOS 151.40
4.3.3.4.1 CODO 90° 6" DE PVC und 5.00 30.28 151.40
4.3.4 PANTALLA DIFUSORA 1,006.36
4.3.4.1 CONCRETO ARMADO 1,000.77
4.3.4.1.1 ENCOFRADO Y DESENCOFRADO m² 7.04 56.07 394.73
4.3.4.1.2 ACERO FY= 4200 KG/CM2 GRADO 60 kg 28.89 4.44 128.27
4.3.4.1.3 CONCRETO F´C= 210 KG/CM2 m³ 1.27 376.20 477.77
4.3.4.2 VARIOS 5.59
4.3.4.2.1 NIPLE PVC D=2" X 015m. und 1.00 5.59 5.59
4.3.5 REBOQUES Y PINTURA SEDIMENTADOR 15,907.52
4.3.5.1 REBOQUES 9,337.60
4.3.5.1.1 TARRAJEO Y FROTACHADO SEDIMENTADOR m² 224.00 24.85 5,566.40
4.3.5.1.2 PULIDO SEDIMENTADOR + CAJA m² 224.00 15.03 3,366.72
4.3.5.1.3 BRUÑA MAS SEDIMENTADOR m 64.00 6.32 404.48
4.3.5.2 PINTURA 6,569.92
4.3.5.2.1 PINTURA LATEX m² 224.00 29.33 6,569.92
4.4 CERCO PERIMETRICO DE LA PRE CAPTACION 19,702.83
4.4.1 OBRAS PRELIMINARES 217.47
4.4.1.1 TRAZO Y REPLANTEO m 65.50 2.41 157.86
4.4.1.2 LIMPIESA Y DEFORESTACION MANUAL m² 65.50 0.91 59.61
4.4.2 MOVIMIENTO DE TIERRA 113.63
4.4.2.1 EXCACION DE ZANJA CON MAQUINARIA EN TN m³ 2.82 14.32 40.38
4.4.2.2 ELIMINACION DE MATERIAL EXEDENTE m³ 3.52 20.81 73.25
4.4.3 CONCRETO SIMPLE 1,850.35
4.4.3.1 CONCRETO F´C= 210 KG/CM2 m³ 2.82 376.20 1,060.88
4.4.3.2 ENCOFRADO Y DESENCOFRADO m² 14.08 56.07 789.47
4.4.4 CARPINTERIA METALICA 17,521.38
4.4.4.1 PUERTA METALICA LIVIANA PRE FABRICADA und 1.00 444.37 444.37
4.4.4.2 MALLA OLIMPICA m 54.50 235.79 12,850.56
4.4.4.3 PINTURA LATEX m² 144.10 29.33 4,226.45

Gracias por su compra


Item Descripción Unid. Cant. Precio Parcial Sub Total
4.5 MEJORAMIENTO DE LA LINEA DE CONDUCION 83,512.52
PACHACHUPAN ACOMAYO
4.5.1 OBRAS PRELIMINARES 2,410.00
4.5.1.1 TRAZO Y REPLANTEO m 1,000.00 2.41 2,410.00
4.5.2 MOVIMIENTO DE TIERRA 48,310.00
4.5.2.1 EXCACION DE ZANJA MANUAL EN TERRENO NORMAL m 1,000.00 8.29 8,290.00
4.5.2.2 REFINE DE ZANJA EN TERRENO NORMAL m 1,000.00 3.19 3,190.00
4.5.2.3 CAMA DE APOYO m 1,000.00 8.62 8,620.00
4.5.2.4 PRIMER RELLENO m 1,000.00 6.55 6,550.00
4.5.2.5 SEGUNDO RELLENO m 1,000.00 7.01 7,010.00
4.5.2.6 ELIMINACION DE DESMONTE RADIO 5 (KM) m³ 1,000.00 14.65 14,650.00
4.5.3 SUMINISTRO E INSTALACION DE TUBERIAS 31,930.00
4.5.3.1 SUMINISTRO DE TUB. PVC AGUA SAP C-10 DE 114mm m 1,000.00 26.67 26,670.00
4.5.3.2 INSTALACION DE TUB. PVC AGUA SAP C-10 DE 3/4" m 1,000.00 5.26 5,260.00
4.5.4 SUMINISTRO E INSTALACION DE ACESORIOS 862.52
4.5.4.1 CODO PVC DE 11.25° 1" und 6.00 2.98 17.88
4.5.4.2 CODO PVC DE 22.5° 1" und 8.00 3.38 27.04
4.5.4.3 REDUCCION DE 3/4" A 1" und 1.00 2.38 2.38
4.5.4.4 REDUCCION DE 3/4" A 1/2" und 1.00 2.38 2.38
4.5.4.5 CODO PVC DE 11.25° 3/4" und 19.00 2.98 56.62
4.5.4.6 CODO PVC DE 22.5° 3/4" und 11.00 3.38 37.18
4.5.4.7 VALVULAS 719.04
4.5.4.7.1 VALVULA DE CONTROL TIPO ESFERA DE PASO 1" und 13.00 25.25 328.25
4.5.4.7.2 VALVULA DE CONTROL TIPO ESFERA DE PASO 3/4" und 13.00 23.25 302.25
4.5.4.7.3 VALVULA DE PURGA 1" und 1.00 46.27 46.27
4.5.4.7.4 VALVULA DE PURGA 3/4" und 1.00 42.27 42.27

Costo Directo 591,262.80


Gastos Generales 7.00% 41,388.40
Utilidad 7.00% 41,388.40
Parcial 674,039.60
I.G.V. 18.00% 121,327.13
TOTAL : 795,366.73

[Son: setecientos noventa y cinco mil trescientos sesenta y seis Soles con setenta y tres céntimos]