Accesorios
1 GLB
MO 4 HH OFICIAL
MO 4 HH OPERARIO
MO 1 HH PEON
MA 6 U GRAMPAS GROSVI � 1/2"
MA 30 U GRAMPAS GROSVI � 1/4"
MA 2 GL PINTURA ESMALTE SINTETICO
MA 2 U PLANCHA GALV. C/CANALETA � 3/16"
MA 2 U TENSOR DE OJO � 1/2"
MA 2 U VARILLA F�G� � 1"*2.30 M
MA 15 U ABRAZADERA PLATINO � 8"
MA 40 M CABLE ACERO TIPO BOA � 1/4" PEND.
MA 19 PZA CALAMINA
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Acero de refuerzo fy = 4200 Kg/cm2
160 KG
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 1 HH PEON
MA 1.07 KG ACERO DE REFUERZO FY=4200 GRADO 60
MA 0.06 KG ALAMBRE NEGRO RECOCIDO # 16
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Cama de apoyo mat.seleccionado e = 0.10 m
50 M
MO 0.1 HH OPERARIO
MO 1 HH PEON
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Campamento de calamina
25 M2
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 4 HH PEON
MA 0.14 KG CLAVOS PARA CALAMINA
MA 0.08 KG CLAVOS PARA MADERA C/C 3"
MA 0.48 UND MADERA DE EUCALIPTO 4" X 3m
MA 0.32 UND MADERA DE EUCALIPTO 4" X 5m
MA 1.53 PZA CALAMINA
MA 0.0666 UND CANDADO MEDIANO
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Cartel de obra
2 U
MO 1 HH OFICIAL
MO 2 HH PEON
MA 0.2 M3 HORMIGON
MA 2 UND MADERA EUCALIPTO 4"*5 m
MA 1 UND CARTEL DE OBRA
MA 0.9 BOL CEMENTO PORTLAND TIPO I (42.5KG)
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Compactaci�n material propio
4 M3
MO 0.1 HH OPERARIO
MO 1 HH PEON
************************************************************
Compuerta met�lica y tapa met�lica
2 U
MO 1 HH OPERARIO
MO 1 HH PEON
MA 1 U COMPUERTA METALICA 0.30*0.30 *3/16" TIPO TARJETA
MA 1 UND TAPA METALICA 0.90 X 0.90 X 1/8"
MA 0.002 M3 ARENA FINA
MA 0.05 BOL CEMENTO PORTLAND TIPO I (42.5KG)
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Concreto f'c = 140 Kg/cm2
6 M3
MO 1 HH OFICIAL
MO 2 HH OPERARIO
MO 8 HH PEON
MA 1.25 M3 HORMIGON
MA 6.825 BOL CEMENTO PORTLAND TIPO I (42.5KG)
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Concreto f'c = 175 Kg/cm2
6 M3
MO 1 HH OFICIAL
MO 2 HH OPERARIO
MO 8 HH PEON
MA 1.25 M3 HORMIGON
MA 7.875 BOL CEMENTO PORTLAND TIPO I (42.5KG)
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Concreto simple f'c= 140kg/cm2+30% PG
8 M3
MO 1 HH OFICIAL
MO 2 HH OPERARIO
MO 8 HH PEON
MA 0.875 M3 HORMIGON
MA 0.39 M3 PIEDRA GRANDE DE 8"
MA 4.778 BOL CEMENTO PORTLAND TIPO I (42.5KG)
************************************************************
Encofrado y desencofrado en canales
10 M2
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 1 HH PEON
MA 0.2 KG CLAVOS 2, 2/1/2", 3 Y 4"
MA 1.1 P2 MADERA PARA ENCOFRADO
MA 0.02 GL PETROLEO
MA 0.1 KG ALAMBRE NEGRO RECOCIDO # 8
************************************************************
Encofrado y desencofrado en obras de arte
8 M2
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 1 HH PEON
MA 0.2 KG CLAVOS 2, 2/1/2", 3 Y 4"
MA 3.2 P2 MADERA PARA ENCOFRADO
MA 0.02 GL PETROLEO
MA 0.15 KG ALAMBRE NEGRO RECOCIDO # 8
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Excavaci�n en conglomerado
3 M3
MO 0.1 HH OPERARIO
MO 1 HH PEON
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Excavaci�n en roca dura
20 M3
MO 1 HH OFICIAL
MO 10 HH PEON
MA 1 M3 SERVICIO DE VOLADURA DE ROCA
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Excavaci�n en roca suelta
25 M3
MO 1 HH OFICIAL
MO 10 HH PEON
MA 0.75 M3 SERVICIO DE VOLADURA DE ROCA
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Flete rural
1 GLB
MA 1 GBL FLETE RURAL
************************************************************
Flete terrestre
1 GLB
MA 1 GBL FLETE TERRESTRE
************************************************************
Tuber�a PVC S-25 � 160 mm
360 M
MO 2 HH OFICIAL
MO 1 HH OPERARIO
MO 4 HH PEON
MA 0.024 U CODOS PVC S-25 U/F 160 MM*45�
MA 0.0016 GH LUBRICANTE PARA TUB.PVC UF
MA 1.05 M TUBO PVC S-25 U/F 160 MM
MA 0.215 U ANILLO JEBE TUB. PVC S-25 � 160 MM
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Tuber�a PVC S-25 � 200 mm
300 M
MO 2 HH OFICIAL
MO 1 HH OPERARIO
MO 4 HH PEON
MA 0.024 U CODOS PVC S-25 U/F 200 MM*45�
MA 0.002 GH LUBRICANTE PARA TUB.PVC UF
MA 1.05 M TUBO PVC S-25 U/F 200 MM
MA 0.215 U ANILLO JEBE TUB. PVC S-25 � 200 MM
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Junta asfaltica
40 M
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 2 HH PEON
MA 0.05 GL KEROSENE
MA 0.002 M3 ARENA FINA
MA 0.1 GL ASFALTO RC- 250
************************************************************
Limpieza de terreno
100 M2
MO 0.1 HH OFICIAL
MO 2 HH PEON
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Maestro de obra
1 MES
MO 0.125 HH MAESTRO DE OBRA
************************************************************
Mamposter�a de piedra
32 M3
MO 1 HH OFICIAL
MO 2 HH OPERARIO
MO 8 HH PEON
MA 0.075 M3 HORMIGON
MA 1.1 M3 PIEDRA GRANDE DE 8"
MA 0.473 BOL CEMENTO PORTLAND TIPO I (42.5KG)
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Prueba hidr�ulica
200 M
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 2 HH PEON
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Relleno y compactaci�n con material propio
4 M3
MO 0.1 HH OPERARIO
MO 4 HH PEON
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Tarrajeo con impermeabilizante
6 M2
MO 1 HH OPERARIO
MO 1 HH PEON
MA 0.114 GL IMPERMEABILIZANTE PARA CONCRETO
MA 0.025 P2 REGLA DE MADERA
MA 0.025 M3 ARENA FINA
MA 0.2 BOL CEMENTO PORTLAND TIPO I (42.5KG)
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Tendido de cable tipo BOA � 1/2"
50 M
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 1 HH PEON
MA 1.05 M CABLE DE ACERO TIPO BOA � 1/2"
HE 5 %MO HERRAMIENTAS MANUALES
EQ 0.3 HM EQUIPO DE INSTALACION DE CABLE (tecle)
************************************************************
Trazo nivelaci�n y replanteo en l�nea de conducci�n
250 M
MO 1 HH OFICIAL
MO 4 HH PEON
MO 1 HH TOPOGRAFO
MA 0.001 GL PINTURA ESMALTE SINTETICO
MA 0.05 UND ESTACAS DE MADERA
HE 5 %MO HERRAMIENTAS MANUALES
EQ 1 HM MIRA TOPOGRAFICA
EQ 1 HM NIVEL TOPOGRAFICO
EQ 1 HM TEODOLITO
************************************************************
Trazo nivelaci�n y replanteo en obras de arte
150 M2
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 4 HH PEON
MO 1 HH TOPOGRAFO
MA 0.001 GL PINTURA ESMALTE SINTETICO
MA 0.0015 BL YESO (BOLSA 20 KG)
HE 5 %MO HERRAMIENTAS MANUALES
EQ 1 HM MIRA TOPOGRAFICA
EQ 1 HM NIVEL TOPOGRAFICO
EQ 1 HM TEODOLITO
************************************************************
Tuber�a PVC S-25 � 160 mm
360 M
MO 2 HH OFICIAL
MO 1 HH OPERARIO
MO 4 HH PEON
MA 0.001 GH LUBRICANTE PARA TUB.PVC UF
MA 1.05 M TUBO PVC S-25 U/F 160 MM
MA 0.167 U ANILLO JEBE TUB. PVC S-25 � 160 MM
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Compuerta met�lica y accesorios
4 UND
MO 1 HH OPERARIO
MO 1 HH PEON
MA 1 UND COMPUERTA METALICA 0.30x0.40x3/16" CON TORNILLO SIN FIN
MA 1 UND HOJA METALICA VERTEDOR DE 3/16"
MA 1 UND REGLA DE ALUMINIO MILIMETRADA
MA 0.002 M3 ARENA FINA
MA 0.05 BOL CEMENTO PORTLAND TIPO I (42.5KG)
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Acero de refuerzo
160 KG
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 0.5 HH PEON
MA 1.07 KG ACERO DE REFUERZO FY=4200 GRADO 60
MA 0.06 KG ALAMBRE NEGRO RECOCIDO # 16
HE 5 %MO HERRAMIENTAS MANUALES
************************************************************
Campamento de adobe techo calamina
40 M2
MO 1 HH OFICIAL
MO 4 HH PEON
MA 1 PZA CALAMINAS GALVANIZADAS
MA 0.5 KG ALAMBRE GALVANIZADO #18
MA 6 P2 MADERA NACIONAL P/ENCOFRADO-CARPINTERIA
MA 0.33 M3 PIEDRA GRANDE
MA 29 UND ADOBE 0.50x0.24x0.12M
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Campamento de adobe techo calamina
12 M2
MO 0.3 HH OFICIAL
MO 6 HH PEON
MA 1.2 PZA CALAMINAS GALVANIZADAS
MA 0.05 GK CLAVOS PARA CALAMINA
MA 8.5 P2 MADERA 2"x3"
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Caminos de acceso - apertura de trocha carrozable
0.1 KM
MO 0.5 HH OFICIAL
MO 10 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Caminos de acceso - mejoramiento de trocha carrozable
1.5 KM
MO 0.5 HH OFICIAL
MO 10 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Caminos de acceso - mejoramiento de camino de herradura
2 KM
MO 0.5 HH OFICIAL
MO 10 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Trazo y replanteo
0.7 KM
MO 3 HH PEON
MO 1 HH TOP�GRAFO
MA 0.027 M3 HORMIGON
MA 0.2 GLN PINTURA ESMALTE P/METAL-MADERA
HE 3 %MO HERRAMIENTAS MANUALES
EQ 1 HM TEODOLITO
EQ 1 HM NIVEL
************************************************************
Trazo y replanteo
400 M2
MO 1 HH OFICIAL
MO 2 HH PEON
MO 1 HH TOP�GRAFO
MA 0.02 P2 ESTACA DE MADERA
MA 0.01 BOL YESO DE 28 KG
MA 0.003 UND WINCHA
MA 0.002 M CORDEL
HE 3 %MO HERRAMIENTAS MANUALES
EQ 1 HM TEODOLITO
EQ 1 HM NIVEL
************************************************************
Trazo, nivelaci�n y replanteo
0.35 KM
MO 2 HH PEON
MO 1 HH TOP�GRAFO
MA 0.02 P2 ESTACA DE MADERA
MA 0.005 BOL YESO DE 28 KG
HE 3 %MO HERRAMIENTAS MANUALES
EQ 1 HM TEODOLITO
EQ 1 HM MIRAS Y JALONES
************************************************************
Cartel de obra de adobe
0.5 UND
MO 1 HH OFICIAL
MO 4 HH PEON
MA 1.5 M3 ARENA GRUESA
MA 5 KG ALAMBRE NEGRO # 16
MA 0.5 M3 PIEDRA GRANDE
MA 15 UND ADOBE 0.50x0.24x0.12M
MA 1 GLN PINTURA ESMALTE P/METAL-MADERA
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Transporte de cemento
600 BOL
MO 2 HH PEON
MA 1 BOL FLETE CEMENTO A-B
MA 1 BOL FLETE CEMENTO B-C
************************************************************
Transporte de madera
7500 P2
MO 2 HH PEON
MA 1 KG FLETE MADERA A-B
MA 1 KG FLETE MADERA B-C
************************************************************
Transporte de fierro
18000 KG
MO 3 HH PEON
MA 1 KG FLETE FIERROS A-B
MA 1 KG FLETE FIERROS B-C
************************************************************
Transporte de tuber�a PVC
12000 M
MO 3 HH PEON
MA 1.6 KG FLETE TUBOS PVC A-B
MA 1.6 KG FLETE TUBOS PVC B-C
************************************************************
Transporte de varios
15000 KG
MO 2 HH PEON
MA 1 KG FLETE VARIOS A-B
MA 1 KG FLETE VARIOS B-C
************************************************************
Excavaci�n no clasificada bajo agua (20%T, 40%RS, 40%RF)
15 M3
MO 1 HH OPERARIO
MO 8 HH PEON
MA 0.15 KG DINAMITA
MA 1 UND FULMINANTE
MA 0.5 M GUIA LENTA PENTACORD
HE 3 %MO HERRAMIENTAS MANUALES
EQ 1 HM COMPRESORA 250
EQ 0.1 HM MOTOBOMBA 17HP D=6"
************************************************************
Excavaci�n de plataforma en roca suelta (a mano)
2 M3
MO 1 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Excavaci�n de tierra bajo agua
17 M3
MO 0.5 HH OFICIAL
MO 10 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Excavaci�n de tierra en material saturado
25 M3
MO 0.5 HH OFICIAL
MO 10 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Excavaci�n de plataforma en tierra (lampa y pico)
2.5 M3
MO 1 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Excavaci�n de caja de canal en tierra (a mano)
2 M3
MO 1 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Perfilado e=0.15m
20 M2
MO 1 HH PEON
HE 2 %MO HERRAMIENTAS MANUALES
************************************************************
Excavaci�n
2.5 M3
MO 1 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Excavaci�n en roca
250 M3
MO 1 HH OPERARIO
MO 14 HH PEON
MO 1 HH CONTROLADOR OFICIAL
MO 2 HH PERFORISTA OFICIAL
MA 0.2 KG DINAMITA
MA 1 UND FULMINANTE
MA 0.75 M GUIA LENTA PENTACORD
MA 0.004 UND BARRENO 5�x1/8"
HE 3 %MO HERRAMIENTAS MANUALES
EQ 2 HM MARTILLO NEUMATICO DE 25 KG
************************************************************
Enrocado
1 M3
MO 1 HH OFICIAL
MO 2 HH PEON
MA 1 M3 PIEDRA GRANDE
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Relleno compactado a mano
4 M3
MO 1 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Relleno compactado a mano con arcilla imperm.
3 M3
MO 1 HH PEON
MA 1 M3 ARCILLA IMPERMEABILIZANTE
HE 3 %MO HERRAMIENTAS MANUALES
EQ 1 HM COMPACTADOR VIBR. TIPO PLANCHA 4 HP
************************************************************
Relleno y compactado manual - mat. de prestamo
15 M3
MO 1 HH OFICIAL
MO 1 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
EQ 1 HM COMPACTADOR VIBR. TIPO PLANCHA 4 HP
************************************************************
Lecho filtrante con material seleccionado
1.2 M3
MO 0.15 HH PEON
MA 1.3 M3 MATERIAL CLASIFICADO GRANULAR LECHO FILTRANTE
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Eliminaci�n de material excedente
25 M3
MO 5 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Eliminaci�n de material excedente en carretilla (50m)
14 M3
MO 10 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Refine y nivelaci�n en terreno normal
20 M2
MO 1 HH PEON
HE 2 %MO HERRAMIENTAS MANUALES
************************************************************
Refine, nivelaci�n y fondos tuber�a hasta 6" incluido cama de apoyo
38 M
MO 1 HH PEON
MA 0.065 M3 ARENA GRUESA
************************************************************
Demolici�n de estructura de concreto
10 M3
MO 10 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Eliminaci�n de maleza
30 M2
MO 1 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Picado y raspado de piedra
30 M2
MO 10 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Limpieza de canal
80 M
MO 1 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Demolici�n de obras de mamposter�a
10 M3
MO 10 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Empedrado de canales asentado sobre cama de arcilla
15 M3
MO 2 HH OFICIAL
MO 1 HH OPERARIO
MO 10 HH PEON
MA 1.2 M3 PIEDRA GRANDE
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Arcilla compactada
40 M3
MO 10 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Reconstrucci�n mamposter�a de piedra asentado mezcla 1:5+70%piedra
20 M3
MO 2 HH OFICIAL
MO 2 HH OPERARIO
MO 10 HH PEON
MA 0.36 M3 HORMIGON
MA 0.84 M3 PIEDRA GRANDE
MA 0.09 M3 AGUA
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Picado de loza (lloraderos)
30 M2
MO 10 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Picado para salida de tuber�a en c�mara de carga
0.3 M3
MO 1 HH OPERARIO
MO 1 HH PEON
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Concreto ciclopeo f�c=140 kg/cm2+70%PM
20 M3
MO 2 HH OFICIAL
MO 2 HH OPERARIO
MO 10 HH PEON
MA 0.7 M3 PIEDRA MEDIANA
MA 0.42 M3 HORMIGON
MA 0.09 M3 AGUA
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Concreto ciclopeo f�c=140 kg/cm2+30%PM
20 M3
MO 2 HH OFICIAL
MO 2 HH OPERARIO
MO 10 HH PEON
MA 0.3 M3 PIEDRA MEDIANA
MA 0.97 M3 HORMIGON
MA 0.16 M3 AGUA
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Concreto ciclopeo f�c=140 kg/cm2+70%PG
24 M3
MO 2 HH OFICIAL
MO 2 HH OPERARIO
MO 10 HH PEON
MA 0.42 M3 HORMIGON
MA 0.7 M3 PIEDRA GRANDE
MA 0.09 M3 AGUA
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Concreto simple f�c=140 kg/cm2
10 M3
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 10 HH PEON
MA 0.47 M3 ARENA GRUESA
MA 0.19 M3 AGUA
MA 0.93 M3 GRAVA CANTO RODADO
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Concreto simple f�c=100 kg/cm2
10 M3
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 10 HH PEON
MA 0.5 M3 ARENA GRUESA
MA 0.2 M3 AGUA
MA 0.7 M3 GRAVA CANTO RODADO
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Concreto simple f�c=175 kg/cm2
10 M3
MO 1 HH OFICIAL
MO 2 HH OPERARIO
MO 12 HH PEON
MA 0.51 M3 ARENA GRUESA
MA 0.19 M3 AGUA
MA 0.76 M3 GRAVA CANTO RODADO
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Concreto simple f�c=175 kg/cm2+50%P.M.
10 M3
MO 1 HH OFICIAL
MO 2 HH OPERARIO
MO 12 HH PEON
MA 0.3 M3 ARENA GRUESA
MA 0.45 M3 PIEDRA MEDIANA
MA 0.1 M3 AGUA
MA 0.45 M3 GRAVA CANTO RODADO
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Concreto f�c=210 kg/cm2
12 M3
MO 3 HH OFICIAL
MO 3 HH OPERARIO
MO 9 HH PEON
MA 0.42 M3 ARENA GRUESA
MA 0.185 M3 AGUA
MA 0.85 M3 PIEDRA CHANCADA DE 3/4"
HE 3 %MO HERRAMIENTAS MANUALES
EQ 1 HM MEZCLADORA CONCRETO TROMPO 8HP 9P3
************************************************************
Concreto f�c=175 kg/cm2
10 M3
MO 1 HH OFICIAL
MO 2 HH OPERARIO
MO 12 HH PEON
MA 0.51 M3 ARENA GRUESA
MA 0.19 M3 AGUA
MA 0.76 M3 GRAVA CANTO RODADO
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Encofrado y desencofrado para estruc. concreto (obras de arte)
20 M2
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 1 HH PEON
MA 0.12 KG ALAMBRE NEGRO # 16
MA 4.04 P2 MADERA NACIONAL P/ENCOFRADO-CARPINTERIA
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Encofrado y desencofrado para vigas acueductos
8.15 M2
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MA 0.21 KG ALAMBRE NEGRO # 8
MA 6.71 P2 MADERA NACIONAL P/ENCOFRADO-CARPINTERIA
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Encofrado y desencofrado de canales
15 M2
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MO 1 HH PEON
MA 0.4 KG ALAMBRE NEGRO # 16
MA 6 P2 MADERA NACIONAL P/ENCOFRADO-CARPINTERIA
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Construcci�n doblado y colocaci�n fierro fy=4200kg/cm2
260 KG
MO 1 HH OFICIAL
MO 1 HH OPERARIO
MA 0.0025 KG ALAMBRE NEGRO # 8
MA 0.025 KG ALAMBRE NEGRO # 16
MA 1.05 KG FIERRO CORRUGADO FY=4200KG/CM2 (GRADO 60)
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Asentado con mamposter�a de piedra mezcla 1:5=70%P.G.
20 M3
MO 2 HH OFICIAL
MO 2 HH OPERARIO
MO 10 HH PEON
MA 0.36 M3 HORMIGON
MA 0.91 M3 PIEDRA GRANDE
MA 0.09 M3 AGUA
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Muro seco de piedra de 16"
20 M3
MO 5 HH OPERARIO
MO 10 HH PEON
MA 1 M3 PIEDRA GRANDE
MA 0.09 M3 AGUA
HE 3 %MO HERRAMIENTAS MANUALES
************************************************************
Tarrajeo mezcla 1:5
5 M2
MO 1 HH OPERARIO
MO 0.75 HH PEON
MA 0.07 M3 AGUA
MA 0.03 M3 ARENA FINA
HE 3 %MO HERRAMIENTAS MANUALES