Main Business Fields(Environment Business)

Water & Wastewater Treatment Plant

• Advanced Wastewater Treatment • Water Treatment


(Sewage & Industrial Wastewater) • Water Supply System
• Sewarage Pipelines & Maintenance • Pumping Station & Reservoirs
• Reuse of Wastewater

Waste to Energy Plant Desalination Plant

• MSW Incineration Plant • Reverse Osmosis (RO)


(Grate System, SRF System) • Thermal (MSF, MED)
• Sludge Incineration Plant • Concession`
(Sewage and Industrial Waste Sludge)

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Water & Wastewater Treatment
POSCO E&C 's best efforts have continued to bring the greener future with its
advanced technology and expertise

• Bio-SAC BNR Process which is our own


specialized technology

• Wide range of water & wastewater


treatment businesses by constant
attempts and innovation

• Various experiences in Korea, Saudi Arabia,


UAE, Brazil , Indonesia, Vietnam, Myanmar
and other countries.

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Desalination Plant
With experience in thermal desalination in power plant projects, desalination
business is expanding its business spectrum to SWRO

Desal. Plant for Power Plants (MVC-MED, TVC-MED)

 Capacity: 3,000 m3/d ~ 5,000 m3/d (3 plants, Chile)


 Client: AES
 Status: Completed(Under operation)

Desal. Plant for Gwangyang Steel Plant

 Size: 30,000 m³/d (Korea, SWRO)


 Location : Gwangyang , Korea
 Status: Completed(Under operation)

Desal. Plant for Indonesia Steel Plant

 Plant for Indonesian Steel Plant


 Status: Planned

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Desalination Plant

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Water Supply System
Abu Dhabi Strategic Water Storage Dubai
& Supply Project in Liwa Abu Dhabi
Mirfa
 Major purpose
Infiltration and storage of 2,700
Liwa
million tons of DSW in a shallow
dune sand aquifer
 Major Facilities
- Water Pipe 161 km
- 3 well field scheme
- 4 pumping stations
 Client : ADWEA
Abu Dhabi Water & Electricity Authority
 Project Period
Aug. 2010 ~ Mar. 2016

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Water & Wastewater Treatment
POSCO E&C has successfully carried out many projects all over the world with its
advanced technology.
Jungrang Advanced Sewage Treatment, Korea
Location Seoul Metropolitan City , Korea

Capacity 5,324 l/sec(460,000㎥/d)

Process A2O BNR

Period Feb. 2004 ~ Oct. 2007

Hakik Advanced Sewage Treatment, Korea


Location Incheon Metropolitan City , Korea

Capacity 1,447 l/sec(125,000㎥/d)

Process Bio-SAC BNR

Period Aug. 2005 ~ Aug. 2008

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Sewage Treatment Plant

Gajwa Advanced Sewage Treatment, Korea


Location Incheon Metropolitan City , Korea

Capacity 4,050 l/sec(350,000㎥/d)

Process MLE

Period Dec. 2007 ~ Oct. 2010

Gumi Advanced Sewage Treatment , Korea


Location Gumi City , Korea

Capacity 3,819 l/sec(330,000㎥/d)

Process Bio-SAC BNR

Period Aug. 2001 ~ Jul. 2005

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Major Experience References(EPC)
 Water Treatment & Supply System(Construction)
Projects[Country] Description Complete Role
Gwangyang Seawater RO
SWRO Capacity: 30,000㎥/day Jul-14 EPC
Desalination Plant [Korea]
Brazil CSP Environmental
Capacity: 74,000㎥/day Jun-16 EPC
Facilities [Brazil]

Taebak Water Distribution Distribution Pipeline: 124km


Dec-15 EPC
Pipelines [Korea] Ranging DN15 to DN400

Abu Dhabi Strategic Transmission Pipeline: 161km


Water Storage & Supply 426 Storage Well, 4 P/S Mar-16 EPC
[UAE] Ranging DN 900 to DN 1200
Jeonju Water Distribution Distribution Pipeline: 703km
Dec-16 EPC
Pipelines [Korea] Ranging DN15 to DN700

Indonesia Water Supply Facility


Capacity: 42,000㎥/day Apr-13 EPC
[Indonesia]
Exist Renovation: 250,000㎥/day
Gongchon Water Treatment,
Expansion : 163,000㎥/day Jul-11 EPC
Phase 2 [Korea]
Transmission pipeline: 2.3km
Pohang Water Treatment
Capacity: 250,000㎥/day Aug-08 EPC
Facility [Korea]

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Major Experience References(EPC)
 Sewage Treatment Plant(Construction)
Projects[Country] Description Complete Role

Hochiminh City Water


Capacity : 328,000㎥/day
Environment Improvement Jan-19 PC
Treatment Method : Activated Sludge
[Vietnam]
Anyang Bakdal Advanced STP Capacity : 250,000㎥/day
Feb-17 EPC
[Korea] Treatment Method : A2O BNR
Daegu Seobu STP
Capacity : 478,000㎥/day
Phosphorus Treatment Jun-12 EPC
Treatment Method : Chemical
[Korea]
Jungrang Advanced STP Capacity : 460,000㎥/day
Oct-07 EPC
[Korea] Treatment Method : A2O BNR
Ansan Advanced STP Capacity : 385,000㎥/day
May-09 PC
[Korea] Treatment Method : Symbio
Gajwa Advanced STP Capacity : 350,000㎥/day
Oct-10 EPC
[Korea] Treatment Method : MLE
Gumi Advanced STP Capacity : 330,000㎥/day
Jul-05 EPC
[Korea] Treatment Method : Bio-SAC BNR
Suwon Advanced STP Capacity : 220,000㎥/day
Aug-09 EPC
[Korea] Treatment Method : Tec-BNR

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Major Experience References(EPC)
 Sewage Treatment Plant(Construction)
Projects[Country] Description Complete Role

Capacity : 152,000㎥/day
Pohang STP, Phase 2
Collecting pipeline: 35.7km Nov-07 EPC
[Korea]
Treatment Method : Bio-SAC BNR

Capacity : 125,000㎥/day
Hagik STP
Collecting pipeline: 10.875km Aug-08 EPC
[Korea]
Treatment Method : Bio-SAC BNR

Expansion : 20,000㎥/day
Yanbu STP
Rehabilitation : 27,000㎥/day Mar-16 EPC
[Saudi Arabia]
Treatment Method : MLE

Capacity : 92,600㎥/day
Gimpo STP
Collecting pipeline : 28.9km Oct-12 EPC
[Korea]
Treatment Method : Bio-SAC BNR

Gongchon STP Capacity : 65,000㎥/day


Apr-12 EPC
[Korea] Treatment Method : MBR

Sungnam Pangyo STP Capacity : 47,000㎥/day


May-09 EPC
[Korea] Treatment Method : Bio-SAC BNR

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Major Experience References(EPC)
 Industrial Wastewater Treatment Plant(Construction)

Projects[Country] Description Complete Role

Brazil CSP Environmental Water Supply : 74,000㎥/day


Facilities Wastewater : 24,000㎥/day Aug-15 EPC
[Brazil] Sewage : 10,000㎥/day
Indonesia Wastewater
Wastewater : 28,000㎥/day
Treatment and Reuse Facility Apr-13 EPC
Reuse : 7,000㎥/day
[Indonesia]
Gyungsan Industrial Complex
Wastewater Advanced Capacity : 100,000㎥/day Mar-10 EPC
Treatment Plant [Korea]
Gwangyang No.4
Wastewater Treatment Plant Capacity : 34,000㎥/day Apr-10 EPC
[Korea]

Munsan Wastewater
Capacity : 10,000㎥/day Mar-08 EPC
Treatment Plant [Korea]

Paju LCD Industrial Complex


Wastewater Treatment Plant Capacity : 35,000㎥/day Sep-07 EPC
2nd phase [Korea]
Paju LCD Industrial Complex
Wastewater Treatment Plant Capacity : 70,000㎥/day Nov-06 EPC
1st phase [Korea]

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Major Experience References(EPC)
 Sewerage Pipeline & Drainage(Construction)

Projects[Country] Description Complete Role

Iksan Sewerage Pipeline BTL Sewerage Pipeline: 91.9km


Aug-14 EPC
[Korea] Drainage facility: 6,643 units
Gimpo Sewerage Pipeline BTL Sewerage Pipeline: 131km
Mar-14 EPC
[Korea] Drainage facility: 6,254 units
Mungyeong Sewerage Pipeline BTL Sewerage Pipeline: 134km
Nov-12 EPC
[Korea] Drainage facility: 13,324 units
Wonju Sewerage Pipeline BTL Sewerage Pipeline: 142.8km
Oct-12 EPC
[Korea] Drainage facility: 8,305 units
Uljin Sewerage Pipeline BTL Sewerage Pipeline: 67.6km
Mar-12 EPC
[Korea] Drainage facility: 4,384 units
Cheongju Sewerage Pipeline BTL Sewerage Pipeline: 137km
Dec-11 EPC
[Korea] Drainage facility: 12,706 units
Paju Sewerage Pipeline BTL Sewerage Pipeline: 106km
Jul-11 EPC
[Korea] Drainage facility: 6,216 units
Seogwipo Sewerage Pipeline BTL Sewerage Pipeline: 100.5Km
Apr-11 EPC
[Korea] Drainage facility: 4,884 units
Jangheung Sewerage Pipeline BTL Sewerage Pipeline: 85km
Oct-10 EPC
[Korea] Drainage facility: 1,900 units

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Major Experience References(O&M)
 Environmental Facilities Operation & Maintenance

Projects[Country] Description O&M Period Role

Jeonju Daeseong Water Treatment Nov-12 ~ Nov-13


WTP Capacity: 60,000㎥/day O&M
Plant O&M [Korea] (1 years)

Gwangyang Seawater RO Desalination SWRO Capacity: 30,000㎥/day Aug-14 ~ Jul-44


O&M
Plant O&M [Korea] Intake & Pump Station: 70,000㎥/d (30 years)

Krakatau Wastewater Treatment & WWTP Capacity: 28,000㎥/day Sep-13 ~ May-31


O&M
Reusing System O&M [Indonesia] Reusing System: 7,000㎥/day (7 years)

Gimpo STP : 80,000㎥/day


Tongjin STP : 40,000㎥/day
Gimpo City Sewerage Facilities O&M Gochon STP : 10,000㎥/day Jul-11 ~ Jul-32
O&M
[Korea] Pump Stations: 6 units (20 years)
Collecting Pipeline : 15.7km
Sunlight Generation : 1 lot

Anyang Sewage Treatment Plant O&M Seoksu STP: 300,000㎥/day Dec-14 ~ Nov-17
O&M
[Korea] Bakdal STP: 150,000㎥/day (3 years)

Cheonan Sewerage Pipeline O&M Sewerage Pipeline: 216km May-11 ~ May-31


O&M
[Korea] Drainage facilities: 8,845 units (20 years)

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Major Experience References(O&M)
 Environmental Facilities Operation & Maintenance

Projects[Country] Description O&M Period Role

Gimpo Sewerage Pipeline O&M Sewerage Pipeline: 131km Mar-14 ~ Mar-34


O&M
[Korea] Drainage facilities: 6,254 units (20 years)

Paju Sewerage Pipeline, Phase 1 O&M Sewerage Pipeline: 185km


Jul-11 ~ Jul-31 O&M
[Korea] Drainage facilities : 5,412units

Paju Sewerage Pipeline, Phase 2 O&M Sewerage Pipeline : 229km


Jan-17 ~ Dec-36 O&M
[Korea] Manhole Pump : 43 units

Sewerage Pipeline: 141km


Pohang Sewerage Pipeline O&M Apr-16 ~ Mar-36
Pump Station: 3 units O&M
[Korea] (20 years)
Drainage facilities: 4,950 units

National WWTP Sludge Facilities O&M Mar-14 ~ Mar-29


Incineration Plant: 230 ton/day O&M
[Korea] (15 years)

Yangsan Energy Recovery Plant O&M Recycling Select: 80 ton/day Jan-14 ~ Dec-16
O&M
[Korea] Incineration Plant: 200 ton/day (3 years)

Gwangju Solid Refuse Fuel Plant O&M Nov-16 ~ Nov-31


SRF Capacity: 800 ton/day O&M
[Korea] (15 years)

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
PPP(Public Private Partnership) Experiences
 Experiences as Lead Developer
Equity Construction
Projects[Country] Type Description Role
Share Period
Sangju Sewerage Pipeline Sewerage Pipeline: 98km
BTL 6.0% ‘06.05 ~ ’10.03 EPC
[Korea] Drainage facilities : 5,756units
Suwon Sewerage Pipeline
BTO 27.5% Capacity : 450ton/day ‘07.06 ~ ’09.12 EPC
[Korea]
Seoguipo Sewerage Pipeline Sewerage Pipeline : 112km
BTL 5.1% ‘08.02 ~ ’11.04 EPC
[Korea] Drainage facilities : 4,955units
Chungju Sewerage Pipeline Sewerage Pipeline : 120km
BTL 6.0% ‘08.12 ~ ’11.12 EPC
[Korea] Drainage facilities : 12,706units
Jangrang Sewage Treatment Capacity : 15,000ton/day
BTO 25.0% ‘08.04 ~ ’10.11 EPC
Plant [Korea] Main Trunk Line : 11.6km
Cheonan Sewerage Pipeline Sewerage Pipeline : 194km
BTL 13.19% ‘08.05 ~ ’11.05 EPC
[Korea] Drainage facilities : 15,386units
Paju Sewerage Pipeline Sewerage Pipeline :105km
BTL 8.83% ‘08.09 ~ ’11.07 EPC
[Korea] Drainage facilities : 6,216units
Wonju Sewerage Pipeline Sewerage Pipeline : 133km
BTL 6.34% ‘09.04 ~ ’12.10 EPC
[Korea] Drainage facilities : 8,8266units
Gimpo Sewage Treatment Capacity : 130,000ton/day
BTO 29.58% ‘09.07 ~ ’12.07 EPC
Plant [Korea] Main Trunk Line : 28.7km
Gimpo Sewerage Pipeline Sewerage Pipeline : 131km
BTL 28.79% ‘10.09 ~ ’14.03 EPC
[Korea] Drainage facilities : 6,254units
Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
PPP(Public Private Partnership) Experiences
 Experiences as Lead Developer
Equity Construction
Projects[Country] Type Description Role
Share Period
Iksan Sewerage Pipeline Sewerage Pipeline : 81.8km
BTL 23.5% ‘11.02 ~ ’14.08 EPC
[Korea] Drainage facilities : 6,643units
Pohang Sewerage Pipeline, Sewerage Pipeline : 47.7km
BTL 14.3% ‘12.06 ~ ’16.03 EPC
Phase 3 [Korea] Drainage facilities : 4,950units
Paju Sewerage Pipeline, Sewerage Pipeline : 128.4km
BTL 5.5% ‘13.05 ~ ’16.11 EPC
Phase 2 [Korea] Drainage facilities : 4,748units
Gwangju Solid Refuse Fuel
BTO 19.0% Capacity : 800ton/day ‘13.12 ~ ’16.09 EPC
[Korea]
Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
PPP(Public Private Partnership) Experiences
 Experiences as Partner Developer
Equity Construction
Projects[Country] Type Description Role
Share Period
Paju Gumchon Sewage Capacity : 27,000ton/day
BTO 40.0% ’03.03 ~ ’05.03 EPC
Treatment Plant [Korea] Main Trunk Line : 9.98km
Kimhae Sewerage Pipeline Sewerage Pipeline : 102km
BTL 3.6% ’06.05 ~ ’10.04 EPC
[Korea] Drainage facilities : 10,610units
Kyungju Sewerage Pipeline Sewerage Pipeline : 134km
BTL 8.52% ’06.10 ~ ’10.05 EPC
[Korea] Drainage facilities : 7,241units
Jeongup SSewerage Pipeline Sewerage Pipeline : 77km
BTL 19.0% ’06.06 ~ ’10.03 EPC
[Korea] Drainage facilities : 6,922units
Kangneung Sewerage Pipeline Sewerage Pipeline : 78km
BTL 2.7% ‘07.09 ~ ’10.08 EPC
[Korea] Drainage facilities : 4,014units
Ansung Sewage Treatment Capacity : 18,000ton/day
BTO 10.0% ‘08.03 ~ ’14.03 EPC
Plant [Korea] Main Trunk Line : 189km
Capacity : 15,000ton/day
Jangheung Sewage Treatment BTO/
10.32% Sewerage Pipeline : 114km ‘08.04 ~ ’11.03 EPC
Plant & Pipeline [Korea] BTL
Drainage facilities : 4,372units
Uljin Sewerage Pipeline Sewerage Pipeline : 68km
BTL 3.0% ‘09.01 ~ ’12.03 EPC
[Korea] Drainage facilities : 4,384units
Munkyung Sewerage Pipeline Sewerage Pipeline : 134km
BTL 4.17% ‘09.02 ~ ’12.11 EPC
[Korea] Drainage facilities : 13,324units

Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
PPP(Public Private Partnership) Experiences
 Experiences as Partner Developer
Equity Construction
Projects[Country] Type Description Role
Share Period
Pyungtaek Sewerage Pipeline Sewerage Pipeline : 119km
BTL 6.8% ‘09.11 ~ ’13.08 EPC
[Korea] Drainage facilities : 6,931units
Incheon Sewerage Pipeline Sewerage Pipeline : 85km
BTL 15.84% ’10.01 ~ ’13.10 EPC
[Korea] Drainage facilities : 4,961units

Tongyoung Sewerage Pipeline Sewerage Pipeline : 91km


BTL 20.4% ‘10.05 ~ ’13.06 EPC
[Korea] Drainage facilities : 10,831units

Gwangju Sewerage Pipeline Sewerage Pipeline : 150km


BTL 18.0% ’10.05 ~ ’13.05 EPC
[Korea] Drainage facilities : 12,811units
Cheonan Sewerage Pipeline, Sewerage Pipeline : 68km
BTL 12.8% ‘10.07 ~ ’13.11 EPC
Phase 2 [Korea] Drainage facilities : 3,172units
Chuncheon Sewerage Pipeline Sewerage Pipeline : 103km
BTL 15.4% ’11.02 ~ ’15.02 EPC
[Korea] Drainage facilities : 7,423units
Youngju Sewerage Pipeline Sewerage Pipeline : 87km
BTL 11.2% ’11.01 ~ ’14.03 EPC
[Korea] Drainage facilities : 6,730units
Sihoung Bangsan Sewage Capacity : 63,000ton/day
BTO 3.24% ’14.04 ~ ’16.12 EPC
Treatment Plant [Korea] Main Trunk Line : 15.6km

Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
POSCO E&C - Waste Treatment
Treatment Field
Field

Krakow Thermal Waste Treatment Plant

 Capacity : 340 ton/day x 2lines ⇒ 10.74MW


 Location : Krakow, Poland
 Incineration Type : Stoker

Yangsan Resource Recycling Facility

 Capacity : 100 ton/day x 2lines


 Location : Yangsan, Korea
 Process : Direct Melting System

Goyang Resources Recycling Facilities

 Capacity : 150 ton/day x 2lines ⇒ 5.2MW


 Location : Goyang , Korea
 Process : Direct Melting System

20

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
POSCO E&C - Waste Treatment
Treatment Field
Field

Busan RDF & RDF Power Generation facility

Capacity : 900 ton/day


RDF Production : 500ton/day ⇒ 25MW
Location : Busan , Korea

Pohang RDF & RDF Power Generation facility

 Capacity : 500 ton/day


 RDF Production : 270ton/day ⇒ 12.4MW
 Location : Pohang , Korea

Suwon Sludge fuelization Facility


 Capacity : 450 ton/day
 Location : Suwon , Korea
 Process: : Drying & Solidification Technology

21

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
POSCO E&C - Waste Treatment
Treatment Field
Field

FWW to biogas facility


- Capacity: 30ton/day
- HRT: 20days
- 50m3/ton of FWW

22

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Waste Treatment References
References

No. Name of Contract / Location Client Contract Period Remarks

Capacity: 220,000t/y(340t/d x
Krakowski Holding
1. Krakow Waste to Energy Plant (Poland) Oct. 2012 – Jun.. 2016 2lines), 10.74 MWh
Komunalny S.A.
Scope: EPC
Pipeline: 40.2km
Chungnam Naepo New Town Chungnam
2. Oct. 2010 - Dec. 2013 Collecting sites: 2 units
Automatic Clean net (Korea) Development Co.,
Scope: EPC
Pipeline: 17.5km
Songdo International City
3. Incheon City Aug. 2010 – Apr. 2013 Collecting sites: 2 units
Automatic Clean net (Korea)
Scope: EPC
Collecting sites: 4 units
Paju Unjeong Automatic Korea Land Housing
4. Sep. 2007 - Aug. 2012 Inlets: 1,282 units
Waste Collecting Facility (Korea) Corporation
Scope: EPC
Pipeline: 45.7km
Incheon Cheongna Korea Land Housing Collecting sites: 5 units
5. Apr. 2008 - Mar. 2012
Automatic Clean net (Korea) Corporation Inlets: 2,013 units
Scope: EPC
Pyrolysis & melting facility:
Korea Environment 150 t/d x 2units, 5.2 MWh
6. Goyang Incinerator (Korea) May. 2006 - Dec. 2010
Corporation Recycling facility: 50 t/d
Scope: EPC
Pyrolysis & melting facility:
7. Yangsan Recycling Facility (Korea) Yangsan City Ocr. 2004 - Feb. 2010 100t/d x 2 units
Scope: EPC

23

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Waste Treatment References
References

No. Name of Contract / Location Client Contract Period Remarks

Refused-Derived Fuel Facility : 500Ton/day


1. Pohang SRF Power Plant (Korea) Pohang City Dec. 2012 - May. 2015 Power Generation Facility : 12.1MW
Scope: EPC

Refused-Derived Fuel Facility : 900Ton/day


2. Busan SRF Power Plant (Korea) Busan City Aug. 2010 - Mar. 2013 Power Generation Facility : 25MW
Scope: EPC

SRF Power Plant Sudokwon Landfill Refused-Derived Fuel Facility : 1,800Ton/day


3. using Metropolitan Landfill Site Management Nov. 2007 - Mar. 2010 Power Generation Facility : 30MW
(Korea) Co., Scope: EPC

Suwon Sewage Sludge Suwon Green Capacity: 450㎥/day


4. Jun. 2007 - Dec. 2009
Treatment facility (Korea) Enviro. Co.,Ltd Scope: EPC

24

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Air Pollution Control References
References
Desulfurization & Denitrification Projects

No. Name of Contract / Location Client Contract Period Remarks

Cochrane 266MW x 2Unit


SDA(Semi-Dry Absorption)+Bag Filter
1. Coal fired Power Plant AES Gener S.A. Mar. 2013 - Sep. 2015
870,000Nm3/hr x 2Unit
FGD system (Chile)

An-San 834MW x 1Unit


SCR(Selective Catalytic Reduction)
2. Combined Cycle Power Plant S-Power Co.,Ltd. Jan. 2008 - Oct. 2014
1,900,000Nm3/hr x 1Unit
DeNOx system (Korea)

Compiche 270MW x 1Unit


SDA(Semi-Dry Absorption)+Bag Filter
3. Coal fired Power Plant AES Gener S.A. May. 2008 - Mar. 2013
910,000Nm3/hr x 1Unit
FGD system (Chile)

Angamos 260MW x 2Unit


SDA(Semi-Dry Absorption)+Bag Filter
4. Coal fired Power Plant AES Gener S.A. Apr. 2008 - Sep. 2011
870,000Nm3/hr x 2Unit
FGD system (Chile)

Nueva Ventanas 270MW x 1Unit


SDA(Semi-Dry Absorption)+Bag Filter
5. Coal fired Power Plant AES Gener S.A. Dec. 2006 - Dec. 2009
910,000Nm3/hr x 1Unit
FGD system (Chile)

Gwangyang 1-4 Sinter Plant


6. De-SOx, De-NOx Treatment Facility POSCO Apr. 2001 - Jul. 2009 Capacity: 1,350,000 Nm3/h
(Korea)

25

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Air Pollution Control References
References
Dust Collecting System (Bag Filter) Projects
No. Name of Contract / Location Client Contract Period Remarks
1. Pohang 2 Steel mill Dust Collector (Korea) POSCO 2012.06 Capacity: 17,000㎥/min
2. Gwangyang MINI-MILL2 Dust Collector (Korea) POSCO 1999.03 Capacity: 29,400㎥/min
3. POSCO Kanvara Reactor Plant Dust collector (Korea) POSCO 1999.01 Capacity: 7,200㎥/min
4. Gwangyang 5 Blast Furnace Cast House B/F (Korea) POSCO 1998.09 Capacity: 15,000㎥/min
5. Pohang 2 Blast Furnace 2nd renovation B/F (Korea) POSCO 1997.06 Capacity: 11,000㎥/min
6. Gwangyang 1Steel Mill ROOF B/F (Korea) POSCO 1996.06 Capacity: 27,000㎥/min
7. Gwangyang 1,2 Blast Furnace Cast House B/F (Korea) POSCO 1996.06 Capacity: 11,000㎥/min
8. STS Steel Mill Electric Furnace B/F (Korea) POSCO 1996.01 Capacity: 14,000㎥/min
9. Gwangyang Thin Slab 1 Steel Mill B/F (Korea) POSCO 1996.09 Capacity: 29,400㎥/min
10. 3 Blast Furnace Cast House B/F (Korea) POSCO 1996.01 Capacity: 11,000㎥/min

Dust Collecting System (Electric Precipitator) Projects


No. Name of Contract / Location Client Contract Period Remarks
1. Gwangyang 5 Blast Furnace Raw Material E.P (Korea) POSCO 1998.09 Capacity: 12,000㎥/min
2. 2 Sinter Furnace Process, Environment E.P (Korea) POSCO 1997.09 Capacity: 6,000㎥/min
3. Gwangyang 1,2Sinter Environment E.P renovation (Korea) POSCO 1995.04 Capacity: 12,600㎥/min
4. 3 Sinter Furnace Process E.P (Korea) POSCO 1996.03 Capacity: 11,400㎥/min
5. 2 Sinter Furnace Process E.P (Korea) POSCO 1995.03 Capacity: 6,000㎥/min

26

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Key Projects-Krakow WtE
WtE Project
Project

Category Content

Location - Krakow City, Poland

- 220,000t/y (340t/d x 2lines)


Details - Electricity Generation:
10.74MW
EPC - 36 months
Period (Completed in 2016)
- K.H.K(Krakowski Holding
Client
Komunalny S.A.)
- Sole(Shares 100%)
Consortium
☞ Technology: Stoker type
Type
(Doosan Lentjes/German)

- Poland National Fund


Budget
+ EU Fund

27 27

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Key Projects-Krakow WtE
WtE Project
Project
Category Contents

Site Area 56,737㎡


SITE Building
28.89%
Wide Area
Parking lot 83 lots(Included 3 Handicapped)
Max. Height Incinerator, Boiler: 40M, Stack : 80M
Building Combination of
Future Type Steel –Frame and Steel-Concrete
Extension
site
Vistula River

Ash Treatment
Incinerator/ Building
Management Boiler
Building

Ash Treatment Building


Management Incinerator/Boiler - Story : 2F
Building - Story : 6F - Building Area: 5,705m2
- Story : 2F - Building Area: 8,953m2 (Flue gas Treatment Facilities,
- Building Area: 852.0m2 (Boiler, Turbin/ Generation, Bottom Ash Treatment)
(Operation/Office/HR) Condensor, Coolling Tower)

28

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Key Projects-Krakow WtE
WtE Project
Project
Process Type(Grate system)
▷ Principle
- Composition of grate, incinerator which
move forward and backward by oil
Feeder NgOH pressure equipment
Nozzle
- Incinerator is divided by Dry step,
Combustion Step, After-combustion Step
Blower - Combustion Air is combusted by Heating
air from bottom of grate and radiant heat
from furnace wall.
Incinerator Burner

▷ Advantage
- Ease to burn without pre-treatment even
though the waste is huge
- Ease to recover heat by small variation of
combusting calories
- Stabilization of Technologies through
Combustion
Air to Grate numerous construction and test-run
Bottom ash experiences
Transferor

29

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Key Projects-Krakow WtE Project
Submission of Mechanical
Contract Building Permit Work Start Test Start
31/Oct. 17/May. 14/March 1/Apr.

Final
2012 2013 2014 2015 2016 Completion
June 2016
06/Nov. 23/Dec. 22/Mar.

Construction- EIC Power


Assembly Work Start Receiving
Work Start

※ As of May 2016

○ Main Event
○ Project Period
 Submission of Application for Building
 Construction Period : October 2012
Permit : May 2013
~ May 2016
 Beginning : Nov 2013
 Test : Apr. 2015
 Complete : Jun. 2016

30

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Key Projects-Kwinana WtE Project

Category Content

Location - Kwinana City, Australia

- 400,000t/y (606t/d x 2lines)


Details - Electricity Generation:
35 MW

Process Type - Stoker(Martin Grate)

Project
- BOT(30 years)
Scheme

Employer - Kwinana WtE Project Co.

- ECI(Early Contractor
Current Status Involvement) conducted by
POSCO E&C

31 31

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Key Projects-Kwinana WtE Project
Business Structure

Equity Government Off taker Loan

Kwinana
Covanta (60%) RRC Western Power SMBC/BTMU
City
Financing Arranger
WSA PPA
John Laing (30%) +
SPC
Equity Loan
Phoenix Energy (10%) (30%) (70%)
Commercial
Kwinana WtE Project Co.
Banks
• Westpac
• Metrics credit
O&M Contract ECI Contract
Covanta
(Basic Engineering)

POSCO E&C

32 32

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
Key Projects-Kwinana WtE Project
Process map

33 33

POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.
POSCO ENC CONFIDENTIAL 김재근(kjaekeun) 2018-01-15 15:20:42 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.

Você também pode gostar