Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work
Construction of Public Toilet and Shower /Market/
Contract Previous Current
Item No Item Description Unit Unit rate Amt Amount
Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
1 Earth Works
Site Clearing of an area of 13m*10.4m including for
1.1 pavement to an average depth of 20cm do remove m2 135.20 10.00 1,352.00 135.20 1,352.00
top soil & Grubbing
Excavation for Foundation Trench to a depth of not
1.2 exeeding 1 m below stripped ground level including m3 38.80 50.00 1,940.00 38.80 1,940.00
for drainage lines of wastes.
Excavation for floor slab construction to a depth of
1.3 not exeeding 20cm below stripped ground level m3 12.78 50.00 639.20 9.18 459.20
including for drainage lines of wastes.
Back filling and compacting under the foundation
1.4 with selected granular material to a final depth of m3 5.34 180.00 961.20 5.34 961.20
150 mm
Provide and fill hard-core with hard basaltic or
equivalent stone, well compacted and blinded with
1.5 m³ 25.08 130.00 3,260.40 11.48 1,492.40
crushed stone(under the floor) to a finishing
thickness of 250 mm
Cart away and disposal of surplus excavated
1.6 material to not less than 1 km as directed by the m³ 65.84 30.00 1,975.20 -
Engineer
Excavation for Footing trench to a depth of not 2.45 122.50
1.7 m³ 2.45 50.00 rate only
execeeding 1 m below stripped ground level
Back filling and compacting around the footing and
1.8 pillar foundation with selected granular material to m³ 2.11 180.00 rate only -
a final depth of 150 mm
Back filling and compacting around the footing and
30.00 - -
pillar foundation with native material
Cart away and disposal of surplus excavated
1.9 material around the footing and pillar to not less m³ 2.70 20.00 rate only -
than 1 km as directed by the Engineer
page total carried forward = 10,128.00
FOR THE CONTRACTOR SUPERVISOR
Name:- Bereket Woldesenbet Name:- Arebu A.
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work
Construction of Public Toilet and Shower /Market/
Contract Previous Current
Item No Item Description Unit Unit rate Amt Amount
Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
3 Concrete Works - -
Casting 100 mm thick Lean Concrete Grade C-10 63.92 6,392.00
3.1 m2 63.92 100.00 6,392.00
for Latrine floor slab
Casting reinforced concrete (20cm *20cm) of grade
3.2 C-20 for elevation columms and lintels as per the m3 1.74 2,300.00 4,003.84 1.74 4,003.84
drawing
Casting 10 cm thick reinforced concrete of grade
3.3 m3 6.39 2,300.00 14,701.60 6.39 14,701.60
C-20 for floor slab as per the drawing
Casting 20*30 cm thick reinforced concrete of
3.4 grade beam C-20 as per the drawing (price 3.14 2,300.00 - 3.14 7,231.20
includes form work and scaffolding)
Casting 20*20 cm thick reinforced concrete in top
3.5 tie beam C-20 as per the drawing (price includes 3.01 2,300.00 - 2.98 6,844.80
form work and scaffolding)
Footing with foundation pillar (1m in height) in C
3.6 20 to be included based on site condition - m3 2.04 2,300.00 rate only 2.05 4,719.60
including form work and scafolding
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work
Construction of Public Toilet and Shower /Market/
Contract Previous Current
Item No Item Description Unit Unit rate Amt Amount
Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
page total carried forward = 80,049.04
FOR THE CONTRACTOR SUPERVISOR
Name:- Bereket Woldesenbet Name:- Arebu A.
3.7.1 Columns
Φ12 kg 75.05 40.00 3,002.00 75.05 3,002.00
Φ8 kg 134.17 40.00 5,366.82 88.86 3,554.37
3.7.2. Beams(Grade Beams and Top tie beams0 - -
Φ12 kg 160.97 40.00 6,438.80 160.97 6,438.80
Φ10 kg 109.70 40.00 4,388.00 109.70 4,388.00
Φ6 kg 358.49 40.00 14,339.76 169.45 6,778.00
3.7.3 Slab - -
Φ8 kg 486.71 40.00 19,468.58 326.44 13,057.75
3.7.4 Footing -
Φ12 kg 103.39 40.00 rate only 103.39 4,135.60
Φ8 kg 5.00 40.00 5.00 200.00
4 Block work -
Supply and build Class B HCB 200mm external 83.27 24,979.80
4.1 m2 83.27 300.00 24,979.80
wall
Supply and build Class B HCB 150mm partition 22,429.12
4.2 m2 85.73 280.00 24,003.35 80.10
wall
5 Roofing and Drainage - -
Supply, assembly and fix in position, eucalyptus
roof truss, 9.6 m in length as per drawings. Price
5.1 should include the application of 3 coats of external No 8.00 800.00 6,400.00 8.00 6,400.00
anti-termite treatment as per drawings and
technical specifications
Supply and fix purlin in Zigba wood 50x70 mm
5.2 nailed into eucalyptus truss including 3 coats of m 100.00 60.00 6,000.00 100.00 6,000.00
anti-termite treatment
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work
Construction of Public Toilet and Shower /Market/
Contract Previous Current
Item No Item Description Unit Unit rate Amt Amount
Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
supply, assembbly and fix in position, eucalyptus
rafters DN 100 mm including 3 coats of external 720.00
5.3 m 24.00 30.00 720.00 24.00
anti-termite treatment as per drawings and
technical specifications
5.4 Vertical diagonals and chords (DN 100mm) m 24.00 30.00 720.00 24.00 720.00
page total carried forward = 115,827.11
FOR THE CONTRACTOR SUPERVISOR
Name:- Bereket Woldesenbet Name:- Arebu A.
8.5 Three coats of plastic paint to internal walls m2 171.45 60.00 10,287.15 -
9 Hydraulics and sanitary fixtures -
Supply and installation of all necessary pipes and
fittings for 6 showering units, 8 water closets ,4 -
9.1 LS 1.00 20,000.00 20,000.00
urinals and six hand washing sinks as per the
drawing
Pipe works for internal and external sanitation 10,000.00
9.2 LS 1.00 10,000.00 10,000.00 1.00
complete with fittings
Provide and fix sanitay appliances as per drawings -
9.3 -
and list below
9.3.1 Shower unit pcs 4.00 1,200.00 4,800.00 -
9.3.2 Shower unit for differently abled pcs 2.00 1,200.00 2,400.00 -
9.3.3 Hand wash basin (sink) pcs 6.00 2,500.00 15,000.00 -
Turkish flush toilet units-40cm*40cm(3 for men and -
9.3.4 pcs 6.00 1,500.00 9,000.00
3 for women)
WC units for differently abled(1 for men and 1 for -
9.3.5 pcs 2.00 3,000.00 6,000.00
women)
9.3.6 Urinal (urine collection basin) pcs 4.00 1,500.00 6,000.00 -
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work
Construction of Public Toilet and Shower /Market/
Contract Previous Current
Item No Item Description Unit Unit rate Amt Amount
Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
135.20 1,352.00
38.80 1,940.00
9.18 459.20
5.34 961.20
11.48 1,492.40
- -
2.45 122.50
- -
- -
- -
6,327.30
Todate
19.94 29,904.00
4.66 6,990.00
- -
- -
- -
63.92 6,392.00
1.74 4,003.84
6.39 14,701.60
3.14 7,231.20
2.98 6,844.80
2.05 4,719.60
Todate
80,787.04
Todate
75.05 3,002.00
88.86 3,554.37
- -
160.97 6,438.80
109.70 4,388.00
169.45 6,778.00
- -
326.44 13,057.75
- -
103.39 4,135.60
5.00 200.00
- -
83.27 24,979.80
80.10 22,429.12
- -
8.00 6,400.00
100.00 6,000.00
Todate
24.00 720.00
24.00 720.00
102,803.44
Todate
107.80 37,730.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Todate
37,730.00
Todate
- -
- -
- -
- -
- -
- -
1.00 10,000.00
- -
- -
- -
- -
- -
- -
- -
Todate
- -
10,000.00
Todate
- -
- -
- -
- -
- -
- -
- -
- -
- -
237,647.78
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work Payment sheet no. 2
Septic tank @ market
Contract Previous Current
Item No Item Description Unit Unit rate Amt
Qty Amount (Birr) Qty Qty
(Birr) (Birr)
BILL 2 : Construction Septic Tank and Soak away pits for public Toilets
1 Septic tank(6m*3m*4m)
1.1 Earth Work
1.1.1 Bulk excavation in ordinary soil m3 62.0 65 4,030.00 62.00
1.1.2 Bulk excavation in soft rock m3 31.0 10 310.00
1.1.3 Bulk excavation in hard rock m3 10.3 10 103.00
1.1.4 Cart away excavated material m3 103.4 30 3,102.00
1.1.5 Back filling with approved selected material m3 280 -
Supply and place 250 mm hard core (septic
1.1.6 m2 25.8 130 3,354.00
tank)
Supply and place 1m thick coarse gravel (soak m3
1.1.7 pit 2m*2m*2.5m internally with 40cm thick 1.6 500 800.00
masonry wall)
Supply and place 50cm thick fine gravel on top of m3
1.1.8 0.8 500 400.00
the coarse gravel
Supply and place 50cm thick fine sand on top of m3
1.1.9 0.8 500 400.00
the fine gravel
1.2 Masonry and Concrete Work m3 -
Provide and erect 1.5m height dry masonry wall m 3
1.2.1 11.5 1500 17,250.00
(40cm in width) for two soak away pits 11.50
Provide and erect 1m height masonry wall(40cm m3
1.2.2 in width) in cement mortar (1:3) for two soak away 3.8 150 570.00 3.8
pits
Provide and erect masonry wall (50cm width at m3
1.2.3 the bottom and 40cm width at the top) in cement 35.3 1500 52,950.00
mortar (1:3) for the septic tank
Provide and erect 150 mm HCB baffle wall in
1.2.4 m2 9.5 280 2,660.00
cement mortar (1:3)
1.2.5 20 mm thick cement plaster (1:3) (on septic tank in m2 72.0 1000 72,000.00
page total carried forward = 157,929.00
FOR THE CONTRACTOR SUPERVISOR
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work Payment sheet no. 2
Septic tank @ market
Contract Previous Current
Item No Item Description Unit Unit rate Amt
Qty Amount (Birr) Qty Qty
(Birr) (Birr)
Name:- Bereket Woldesenbet Name:- Arebu A.
Sig.& Date:- Sig.& Date:-
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work Payment sheet no. 2
Septic tank @ market
Contract Previous Current
Item No Item Description Unit Unit rate Amt
Qty Amount (Birr) Qty Qty
(Birr) (Birr)
1.3 Reinforced Concrete Work -
Reinforced concrete C20 into form work and
1.3.1 vibrated around reinforced bars, mix ratio should -
be 1:2:3 .
Septic tank floor slab, provide slope as shown on m3
1.3.2 the drawing in the two compartment of the septic 5.6 2300 12,880.00
tank
1.3.3 Septic tank roof slab m3 4.2 2300 9,660.00
Two 10cm thick C20 reinforced concrete cover m3
1.3.4 1.6 2300 3,680.00
slab (2.8m*2.8m in size)
1.4 Form Work -
Provide and fix formwork with planks, battens,
1.4.1 -
runners etc in:
1.4.1.1 Septic tank roof slab m2 18.0 150 2,700.00
1.5 Reinforcement -
Provide, cut, bend and fix in position reinforced
1.5.1 steel bar. All according to structural drawing. -
Price shall include tying wires
10mm deformed bar in septic tank floor slab(With
1.5.2 double reinforcement) kg 170.4 35 5,964.00
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
21,850.00
SUPERVISOR
Current Todate
Amount
Qty Amount (Birr)
(Birr)
Current Todate
Amount
Qty Amount (Birr)
(Birr)
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Current Todate
Amount
Qty Amount (Birr)
(Birr)
- - -
- - -
21,850.00
SUPERVISOR
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work
Construction of Public Toilet and Shower Stadium
Contract Previous Current
Item
Item Description Unit Unit rate Amount Amt Amount
No Qty Qty Qty
(Birr) (Birr) (Birr) (Birr)
1 Earth Works
Site Clearing of an area of 13m*10.4m including
1.1 for pavement to an average depth of 20cm do m2 135.20 10.00 1,352.00 1,352.00
remove top soil & Grubbing 135.20
Excavation for Foundation Trench to a depth of
1.2 not exeeding 1 m below stripped ground level m3 50.00 1,940.00 1,940.00
including for drainage lines of wastes. 38.80 38.80
Excavation for floor slab construction to a depth of
1.3 not exeeding 20cm below stripped ground level m3 50.00 639.20 639.20
including for drainage lines of wastes. 12.78 12.78
Back filling and compacting under the foundation
1.4 with selected granular material to a final depth of m3 180.00 961.20 961.20
150 mm and fill hard-core with hard basaltic or
Provide 5.34 5.34
equivalent stone, well compacted and blinded with 1,492.40
1.5 m³ 130.00 3,260.40
crushed stone(under the floor) to a finishing 25.08 11.48
thickness
Cart awayof 250
and mm
disposal of surplus excavated
1.6 material to not less than 1 km as directed by the m³ 65.84 30.00 1,975.20 -
Engineer
Excavation for Footing trench to a depth of not 122.50
1.7 m³ 2.45 50.00 rate only
execeeding 1 m below stripped ground level 2.45
Back filling and compacting around the footing
1.8 and pillar foundation with selected granular m³ 2.11 180.00 rate only 379.80
material to a final depth of 150 mm 2.11
Cart away and disposal of surplus excavated
1.9 material around the footing and pillar to not less m³ 2.70 20.00 rate only -
than 1 km as directed by the Engineer
page total carried forward = 10,128.00
FOR THE CONTRACTOR SUPERVISOR
Name:- Bereket Woldesenbet Name:- Arebu A.
8.5 Three coats of plastic paint to internal walls m2 171.45 60.00 10,287.15 -
9.3.2 Shower unit for differently abled pcs 2.00 1,200.00 2,400.00 -
135.20 1,352.00
38.80 1,940.00
12.78 639.20
5.34 961.20
11.48 1,492.40
- -
2.45 122.50
2.11 379.80
- -
6,887.10
SUPERVISOR
Todate
Amount
Qty
(Birr)
26.38 39,570.00
4.66 6,990.00
- -
- -
- -
63.92 6,392.00
1.74 4,003.84
6.39 14,701.60
3.14 7,231.20
2.98 6,844.80
2.05 4,719.60
90,453.04
Todate
Amount
Qty
(Birr)
SUPERVISOR
Todate
Amount
Qty
(Birr)
75.05 3,002.00
88.86 3,554.37
- -
160.97 6,438.80
109.70 4,388.00
134.52 5,380.80
- -
326.44 13,057.75
- -
103.39 4,135.60
5.00 200.00
- -
- -
- -
- -
- -
- -
- -
- -
40,157.32
SUPERVISOR
Todate
Amount
Qty
(Birr)
Todate
Amount
Qty
(Birr)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Todate
Amount
Qty
(Birr)
- -
-
SUPERVISOR
Todate
Amount
Qty
(Birr)
- -
- -
- -
- -
- -
- -
1.00 10,000.00
- -
- -
- -
- -
- -
- -
Todate
Amount
Qty
(Birr)
- -
- -
10,000.00
SUPERVISOR
Todate
Amount
Qty
(Birr)
- -
- -
- -
- -
- -
- -
- -
- -
- -
147,497.46
SUPERVISOR
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work
Septic tank @ Stadium
Contract Previous Current
Item
Item Description Unit Unit rate Amount Amt Amount
No Qty Qty Qty
(Birr) (Birr) (Birr) (Birr)
BILL 2 : Construction Septic Tank and Soak away pits for public Toilets
1.00 Septic tank(6m*3m*4m)
1.10 Earth Work
1.1.1 Bulk excavation in ordinary soil m3 62.00 65.00 4,030.00 62.00 4,030.00
1.1.2 Bulk excavation in soft rock m3 31.00 10.00 310.00 - -
1.1.3 Bulk excavation in hard rock m3 10.30 10.00 103.00 - -
1.1.4 Cart away excavated material m3 103.40 30.00 3,102.00 -
1.1.5 Back filling with approved selected material m3 280.00 -
Back filling with approved native material 30.00 - -
1.1.6 Supply and place 250 mm hard core (septic tank) m2 25.80 130.00 3,354.00 25.80 3,354.00
1.1.7 Supply and place 1m thick coarse gravel (soak pit 2m*2 m3 1.60 500.00 800.00 - -
1.1.8 Supply and place 50cm thick fine gravel on top of the co m3 0.80 500.00 400.00 - -
1.1.9 Supply and place 50cm thick fine sand on top of the fine m3 0.80 500.00 400.00 - -
1.20 Masonry and Concrete Work m3 - -
1.2.1 Provide and erect 1.5m height dry masonry wall (40cm in m3 11.50 1,500.00 17,250.00 5.89 8,831.25
1.2.2 Provide and erect 1m height masonry wall(40cm in width m3 3.80 150.00 570.00 3.80 570.00
1.2.3 Provide and erect masonry wall (50cm width at the botto m3 35.30 1,500.00 52,950.00 35.30 52,950.00
1.2.4 Provide and erect 150 mm HCB baffle wall in cement mor m2 9.50 280.00 2,660.00 -
1.2.5 20 mm thick cement plaster (1:3) (on septic tank inside w m2 72.00 1,000.00 72,000.00 65.60 65,600.00
page total carried forward = 157,929.00
FOR THE CONTRACTOR SUPERVISOR
Name:- Bereket Woldesenbet Name:- Arebu A.
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work
Septic tank @ Stadium
Contract Previous Current
Item
Item Description Unit Unit rate Amount Amt Amount
No Qty Qty Qty
(Birr) (Birr) (Birr) (Birr)
Sig.& Date:- Sig.& Date:-
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work
Septic tank @ Stadium
Contract Previous Current
Item
Item Description Unit Unit rate Amount Amt Amount
No Qty Qty Qty
(Birr) (Birr) (Birr) (Birr)
1.30 Reinforced Concrete Work -
Reinforced concrete C20 into form work and vibrated
1.3.1 -
around reinforced bars, mix ratio should be 1:2:3 .
1.3.2 Septic tank floor slab, provide slope as shown on the dr m3 5.60 2,300.00 12,880.00 5.60 12,880.00
1.3.3 Septic tank roof slab m3 4.20 2,300.00 9,660.00 -
1.3.4 Two 10cm thick C20 reinforced concrete cover slab (2.8m m 3
1.60 2,300.00 3,680.00 -
1.40 Form Work - -
1.4.1 Provide and fix formwork with planks, battens, runners etc in: - -
1.4.1.1 Septic tank roof slab m2 18.00 150.00 2,700.00 4.20 630.00
1.50 Reinforcement - -
1.5.1 Provide, cut, bend and fix in position reinforced steel bar. All according to structural drawing. Price sh - -
1.5.2 10mm deformed bar in septic tank floor slab(With double kg 170.40 35.00 5,964.00 170.40 5,964.00
1.5.3 10mm deformed bar in septic tank roof slab kg 171.30 35.00 5,995.50 -
1.5.4 8mm diameter deformed bar in the cover slab of soak aw kg 44.20 35.00 1,547.00 -
1.5.5 Provided and install access hatches constructed out of LS 1.00 1,500.00 1,500.00 -
1.60 Miscellaneous - -
1.6.1 Supply and lay 110 mm dia. PVC pipe as shown on the draw m 31.00 120.00 3,720.00 -
1.6.2 Supply and lay 50 mm dia. PVC pipe as shown on the drawing, price including excavation of earth , back - -
1.6.3 Supply and fix 110 mm dia. PVC ventilation pipe hood sh No 25.00 360.00 9,000.00 -
page total carried forward = 56,646.50
Total For One Toilet and Shower Room 214,575.50
62.00 4,030.00
- -
- -
- -
- -
25.80 3,354.00
- -
- -
- -
- -
5.89 8,831.25
3.80 570.00
35.30 52,950.00
- -
65.60 65,600.00
135,335.25
SUPERVISOR
Todate
Amount
Qty
(Birr)
Todate
Amount
Qty
(Birr)
5.60 12,880.00
- -
- -
- -
- -
4.20 630.00
- -
- -
170.40 5,964.00
- -
- -
- -
- -
- -
- -
- -
19,474.00
154,809.25
SUPERVISOR
Todate
Amount
Qty
(Birr)
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work Payment sheet no. 2
Construction of flush school toilet for girls /Carl School/
Contract Previous Current
Item
Item Description Unit Unit rate Amt
No Qty Amount (Birr) Qty Qty
(Birr) (Birr)
BILL3: Construction of flush school toilet for girls
A. Sub structure
1 Earth Works
Site Clearing to an average depth of 20cm to remove top soil &
1.1 m2 55.26 10.00 552.60
Grubbing 55.26
Excavation for Foundation Trench to a depth of not exceeding 1
1.2 m below stripped ground level including for drainage line of m3 13.7 65.00 890.50
wastes. 13.70
Back filling under the foundation with selected granular material
1.3 m3 1.4 30.00 41.10
to a final depth of 100 mm with compaction 1.37
Provide and fill hard-core with hard basaltic or equivalent stone,
well compacted and blinded with crushed stone to a finishing
1.4 m³ 11.0 130.00 1,427.40
thickness of 250 mm under floor, pavement around building
50cm wide , at entrance and access ramp 10.98
Cart away and disposal of surplus excavated material to not
1.5 m³ 24.8 30.00 742.56
less than 1 km as directed by the Engineer 24.75
2 Masonry Work -
Provide and erect 50cmx50cm thick basaltic or equivalent
masonry foundation wall to a final depth not exceeding 100 cm
m3 13.7 1,500.00 20,550.00
blow ground level blended & joined in cement mortar of 1:3 mix
2.1 ratio 13.70
3 Concrete Works -
Casting 50 mm thick Lean Concrete Grade C-10 for floor slab m2 23.3 100.00 2,325.50
3.1 23.26
Casting 10 cm thick reinforced concrete of grade C-20 for
m3 2.3 2,300.00 5,348.65
3.2 floor slab as per the drawing 1.03
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work Payment sheet no. 2
Construction of flush school toilet for girls /Carl School/
Contract Previous Current
Item
Item Description Unit Unit rate Amt
No Qty Amount (Birr) Qty Qty
(Birr) (Birr)
page total carried forward = 31,878.31
- - -
- - -
SUPERVISOR
Current Todate
Amount
Qty Amount (Birr)
(Birr)
- - -
- - -
3,431.23 98.04 3,431.23
629.91 18.00 629.91
- - -
1,628.59 46.53 1,628.59
1,191.63 34.05 1,191.63
808.50 23.10 808.50
- - -
2,340.90 66.88 2,340.90
764.72 21.85 764.72
- - -
2,964.77 84.71 2,964.77
- - -
- - -
Current Todate
Amount
Qty Amount (Birr)
(Birr)
- - -
22,037.76
SUPERVISOR
Current Todate
Amount
Qty Amount (Birr)
(Birr)
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Current Todate
Amount
Qty Amount (Birr)
(Birr)
- - -
- - -
-
SUPERVISOR
Current Todate
Amount
Qty Amount (Birr)
(Birr)
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Current Todate
Amount
Qty Amount (Birr)
(Birr)
- - -
SUPERVISOR
Current Todate
Amount
Qty Amount (Birr)
(Birr)
- - -
- - -
- - -
- - -
- - -
- - -
- - -
50,939.29
SUPERVISOR
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work Payment sheet no. 2
Septic tank @ Carl
Contract Previous Current
Item
Item Description Unit Unit rate Amt Amount
No Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
BILL4: Construction Septic Tank and Soak away pits for School Toilets
1 Septic tank(6m*3m*4m)
1.1 Earth Work
1.1.1 Bulk excavation in ordinary soil m3 62.0 65.00 4,031.04 62.02 4,031.04
1.1.2 Bulk excavation in soft rock m3 31.0 10.00 310.08 - -
1.1.3 Bulk excavation in hard rock m3 10.3 10.00 103.36 - -
1.1.4 Cart away excavated material m3 103.4 30.00 3,100.80 -
1.1.5 Back filling with approved selected material m3 280.00 - -
Back filling with approved native material 30.00 - -
1.1.6 Supply and place 250 mm hard core (septic tank) m 2
25.8 130.00 3,359.20 25.84 3,359.20
Supply and place 1m thick coarse gravel (soak pit - -
1.1.7 m3 1.6 500.00 800.00
2m*2m*2.5m internally with 40cm thick masonry wall)
Supply and place 50cm thick fine gravel on top of the coarse - -
1.1.8 m3 0.8 500.00 400.00
gravel
1.1.9 Supply and place 50cm thick fine sand on top of the fine gravel m3 0.8 500.00 400.00 - -
1.2 Masonry and Concrete Work - -
Provide and erect 1.5m height dry masonry wall (40cm in width)
1.2.1 m3 11.5 1,500.00 17,280.00 5.89 8,831.25
for two soak away pits
Provide and erect 1m height masonry wall(40cm in width) in
1.2.2 m3 3.8 1,500.00 5,760.00 3.84 5,760.00
cement mortar (1:3) for two soak away pits
Provide and erect masonry wall (50cm width at the bottom and
1.2.3 40cm width at the top) in cement mortar (1:3) for the septic tank m3 35.3 1,500.00 52,920.00 52,920.00
35.28
Provide and erect 150 mm HCB baffle wall in cement mortar -
1.2.4 m2 9.5 250.00 2,362.50
(1:3)
1.2.5 20 mm thick cement plaster (1:3) (on septic tank inside walls) m2 72.0 150.00 10,800.00 72.00 10,800.00
page total carried forward = 101,626.98
FOR THE CONTRACTOR SUPERVISOR
Name:- Bereket Woldesenbet Name:- Arebu A.
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work Payment sheet no. 2
Septic tank @ Carl
Contract Previous Current
Item
Item Description Unit Unit rate Amt Amount
No Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
Sig.& Date:- Sig.& Date:-
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work Payment sheet no. 2
Septic tank @ Carl
Contract Previous Current
Item
Item Description Unit Unit rate Amt Amount
No Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
1.3 Reinforced Concrete Work -
Reinforced concrete C20 into form work and vibrated around
1.3.1 -
reinforced bars, mix ratio should be 1:2:3 .
Septic tank floor slab, provide slope as shown on the drawing 12,880.00
1.3.2 m3 5.6 2,300.00 12,880.00
in the two compartment of the septic tank 5.60
1.3.3 Septic tank roof slab m3 4.2 2,300.00 9,660.00 4.20 9,660.00
Two 10cm thick C20 reinforced concrete cover slab (2.8m*2.8m -
1.3.4 m3 1.6 2,300.00 3,606.40
in size)
1.4 Form Work - -
Provide and fix formwork with planks, battens, runners etc in:
1.4.1 - -
1.4.1.1 Septic tank roof slab m2 18.0 150.00 2,700.00 18.00 2,700.00
1.5 Reinforcement - -
Provide, cut, bend and fix in position reinforced steel bar. All -
1.5.1 -
according to structural drawing. Price shall include tying wires
62.02 4,031.04
- -
- -
- -
- -
- -
25.84 3,359.20
- -
- -
- -
- -
5.89 8,831.25
3.84 5,760.00
35.28 52,920.00
- -
72.00 10,800.00
85,701.49
SUPERVISOR
Todate
5.60 12,880.00
4.20 9,660.00
- -
- -
- -
18.00 2,700.00
- -
- -
170.38 6,815.17
171.30 6,852.14
- -
- -
- -
- -
- -
Todate
- -
38,907.32
124,608.81
SUPERVISOR
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work Payment sheet no. 2
Construction of flush school toilet for girls /High School/
Contract Previous Current
Item
Item Description Unit Unit rate Amt
No Qty Amount (Birr) Qty Qty
(Birr) (Birr)
BILL3: Construction of flush school toilet for girls
A. Sub structure
1 Earth Works
Site Clearing to an average depth of 20cm to remove top soil &
1.1 m2 55.26 10.00 552.60
Grubbing 55.26
Excavation for Foundation Trench to a depth of not exceeding 1
1.2 m below stripped ground level including for drainage line of m3 13.7 65.00 890.50
wastes. 13.70
Back filling under the foundation with selected granular material
1.3 m3 1.4 30.00 41.10
to a final depth of 100 mm with compaction 1.37
Provide and fill hard-core with hard basaltic or equivalent stone,
well compacted and blinded with crushed stone to a finishing
1.4 m³ 11.0 130.00 1,427.40
thickness of 250 mm under floor, pavement around building
50cm wide , at entrance and access ramp 10.98
Cart away and disposal of surplus excavated material to not
1.5 m³ 24.8 30.00 742.56
less than 1 km as directed by the Engineer
2 Masonry Work -
Provide and erect 50cmx50cm thick basaltic or equivalent
masonry foundation wall to a final depth not exceeding 100 cm
m3 13.7 1,500.00 20,550.00
blow ground level blended & joined in cement mortar of 1:3 mix
2.1 ratio 8.14
3 Concrete Works -
Casting 50 mm thick Lean Concrete Grade C-10 for floor slab m2 23.3 100.00 2,325.50
3.1 23.26
Casting 10 cm thick reinforced concrete of grade C-20 for floor
m3 2.3 2,300.00 5,348.65
3.2 slab as per the drawing 1.03
page total carried forward = 31,878.31
Contract
Item Excuted
Item Description Unit Unit rate
No Qty Amount (Birr) Work
(Birr)
B. Superstructure -
4 Concrete Works -
Casting reinforced concrete of grade C-20 for grade and top tie
beams including formwork and scaffoldings as per the m3 2.4 2,500.00 6,037.50
4.1 drawing 2.42
Casting reinforced concrete of grade C-20 for elevation columns
including formwork and scaffoldings and lintels as per the m3 0.9 2,500.00 2,160.00
4.2 drawing 0.86
Supply, cut, bend & fixing in position reinforcement bar for all
-
4.3 diameters in sub and super structure as per the drawing
4.3.1 Columns -
Φ12 kg 105.2 35.00 3,680.58 98.04
Φ8 kg 18.0 35.00 629.91 18.00
4.3.2 Grade Beams -
Φ12 kg 49.0 35.00 1,715.95 46.53
Φ10 kg 34.0 35.00 1,191.63 34.05
Φ6 kg 23.1 35.00 810.18 23.15
4.3.3 To tie beams -
Φ10 kg 68.1 35.00 2,383.26 66.88
Φ6 kg 23.1 35.00 810.18 21.85
4.3.4 Slab -
Φ8 kg 133.8 35.00 4,683.85 84.71
5 Block work -
5.1 Supply and build HCB 150mm external wall(Class B) m2 55.9 300.00 16,758.00 55.50
5.2 Supply and build HCB 100mm partition wall, (Class C) m2 43.1 280.00 12,058.20 36.90
page total carried forward = 52,919.24
11 Openings -
Openings(20cm *10cm) including plastering and rendering as
No 7 800.00 5,600.00
11.1 per the drawing 7.00
12 Painting -
Three coats of plastic paint to internal walls, columns, lintels
and beams including metal doors and windows with plastic m2 148.3 60.00 8,898.00
12.1 emulsion paint.
13 Hydraulics and sanitary fixtures -
- - -
- - -
- - -
19,815.23
SUPERVISOR
Excuted Amount
(Birr)
- - -
- - -
3,431.23 98.04 3,431.23
629.91 18.00 629.91
- - -
1,628.59 46.53 1,628.59
1,191.63 34.05 1,191.63
810.18 23.15 810.18
- - -
2,340.90 66.88 2,340.90
764.72 21.85 764.72
- - -
2,964.77 84.71 2,964.77
- - -
16,650.00 55.50 16,650.00
10,332.00 36.90 10,332.00
48,941.44
SUPERVISOR
Excuted Amount
(Birr)
- - -
- - -
- - -
SUPERVISOR
Excuted Amount
(Birr)
- - -
- - -
- - -
49,747.00
SUPERVISOR
Excuted Amount
(Birr)
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
5,600.00
SUPERVISOR
Excuted Amount
(Birr)
- - -
- - -
- - -
- - -
- - -
- - -
- - -
142,088.66
SUPERVISOR
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work Payment sheet no. 2
Septic tank @ High School
Contract Previous Current
Item
Item Description Unit Unit rate Amt Amount
No Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
BILL4: Construction Septic Tank and Soak away pits for School Toilets
1 Septic tank(6m*3m*4m)
1.1 Earth Work
1.1.1 Bulk excavation in ordinary soil m3 62.0 65.00 4,031.04 62.02 4,031.04
1.1.2 Bulk excavation in soft rock m3 31.0 10.00 310.08 -
1.1.3 Bulk excavation in hard rock m3 10.3 10.00 103.36 -
1.1.4 Cart away excavated material m3 103.4 30.00 3,100.80 -
1.1.5 Back filling with approved selected material m3 280.00 - -
Back filling with approved native material m3 30.00 -
1.1.6 Supply and place 250 mm hard core (septic tank) m2 25.8 130.00 3,359.20 25.84 3,359.20
Supply and place 1m thick coarse gravel (soak pit -
1.1.7 m3 1.6 500.00 800.00
2m*2m*2.5m internally with 40cm thick masonry wall)
Supply and place 50cm thick fine gravel on top of the -
1.1.8 m3 0.8 500.00 400.00
coarse gravel
Supply and place 50cm thick fine sand on top of the fine -
1.1.9 m3 0.8 500.00 400.00
gravel
1.2 Masonry and Concrete Work - -
Provide and erect 1.5m height dry masonry wall (40cm in
1.2.1 width) for two soak away pits m3 11.5 1,500.00 17,280.00 8,835.00
5.89
Provide and erect 1m height masonry wall(40cm in width)
1.2.2 in cement mortar (1:3) for two soak away pits m3 3.8 1,500.00 5,760.00 5,760.00
3.84
Provide and erect masonry wall (50cm width at the bottom
1.2.3 and 40cm width at the top) in cement mortar (1:3) for the m3 35.3 1,500.00 52,920.00 52,920.00
septic tank 35.28
Provide and erect 150 mm HCB baffle wall in cement -
1.2.4 m2 9.5 250.00 2,362.50
mortar (1:3)
1.2.5 20 mm thick cement plaster (1:3) (on septic tank inside wall m2 72.0 150.00 10,800.00 41.16 6,174.00
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work Payment sheet no. 2
Septic tank @ High School
Contract Previous Current
Item
Item Description Unit Unit rate Amt Amount
No Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
page total carried forward = 101,626.98
FOR THE CONTRACTOR SUPERVISOR
Name:- Bereket Woldesenbet Name:- Arebu A.
62.02 4,031.04
- -
- -
- -
- -
- -
25.84 3,359.20
- -
- -
- -
- -
5.89 8,835.00
3.84 5,760.00
35.28 52,920.00
- -
41.16 6,174.00
Todate
81,079.24
SUPERVISOR
Todate
5.60 12,880.00
- -
- -
18.00 2,700.00
170.38 6,815.17
- -
- -
- -
- -
- -
Todate
- -
- -
22,395.17
103,474.41
SUPERVISOR
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sanitation Work /BOQ for Sanitary Land fill site and Leachet Pond/
Contract Previous Current
Item
Item Description Unit Unit rate Amt Amount
No Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
1.10 Removal of trees No 10.00 100.00 1,000.00
1.20 Clearing and Grubbing m² 7,832.00 10.00 78,320.00
1.30 Common excavation m³ 7,157.00 100.00 715,700.00
1.40 Excavation soft rock m³ 1,534.00 1.00 1,534.00
1.50 Excavation of hard rock m³ 1,534.00 1.00 1,534.00
1.60 Hauling excavated surplus material, hauling distance m³ 5,851.00 30.00 175,530.00
1.70 Disposal of material to stockpile for reuse m³ 4,374.00 30.00 131,220.00
1.80 Compaction and fill in successive layers to form emb m³ 2,843.00 100.00 284,300.00
1.90 Supply, fill & compact in successive layers to form e m³ 656.00 180.00 118,080.00
1.10 hauling excavated surplus material, hauling distance m² 1,458.00 30.00 43,740.00
1.11 Provide, fill & compact 350 mm thick imported clay lin m² 5,179.00 180.00 932,220.00
1.12 Supply and place 300mm thick stone pitching on outs m² 1,451.00 150.00 217,650.00
2.00 Leachet Pond -
2.10 Removal of trees No 2.00 100.00 200.00
2.20 Clearing and Grubbing m² 81.00 1,000.00 81,000.00
2.30 Common excavation m³ 67.20 65.00 4,368.00
2.40 Excavation soft rock m³ 15.12 500.00 7,560.00
2.50 Excavation of hard rock m³ 1.68 500.00 840.00
2.60 Hauling excavated surplus material, hauling distance m³ 84.00 30.00 2,520.00
page total carried forward = 2,797,316.00
3.10 Supply and install barbed wire fence m 371.00 500.00 185,500.00
3.20 Supply and erect steel gate post No. 1.00 10,000.00 10,000.00
3.30 Provide and install entrance gate No. 1.00 10,000.00 10,000.00
Provide and install entrance gate with of synthetic paint
3.30 as given in the specification No. 1.00 10,000.00 10,000.00
page total carried forward = 241,502.00
Total Bill No 5 of Sanitary Land Fill in ETB 3,038,818.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SUPERVISOR
Todate
-
-
-
-
-
-
-
-
-
SUPERVISOR
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sludge drying bed
Contract Previous Current
Item
Item Description Unit Unit rate Amt Amount
No Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
1 Excavation and Earth Work
site clearing to remove top soil to an average depth -
1.1 of 20cm m2 1,578.57 5.00 7,892.85
1.2 Bulk excavation for drying bed and ponds m3 1,971.00 65.00 128,115.00 -
2 Drying bed - -
Compaction of clay liner which is found on the
natural ground and 6km from the site with thickness -
2.1 of 20cm. m3 473.04 180.00 85,147.20
Gravel layerof 75-150mm of 15 cm above clay liner -
2.2 and perforated pipe m3 236.52 250.00 59,130.00
2.3 Gravel layer of 75mm size of 15 cm thick above gram3 236.52 300.00 70,956.00 -
2.4 Sand layer of 25 cm above gravel layer m3 394.20 300.00 118,260.00 -
2.5 150 mm perforated PVC pipe including gascets m 190.00 150.00 28,500.00 -
2.6 200 mm PVC collector pipe including gaskets m 112.00 322.00 36,064.00 -
3 Storage Pond - -
Compaction of clay liner which is found on the
natural ground and 6km from the site with thickness -
3.1 of 30cm. m3 112.50 180.00 20,250.00
3.2 Granular backfill(20cm) m3 75.00 250.00 18,750.00 -
3.3 Stone masonry wall of hard basalt or equivalent imp m3 67.27 1000.00 67,267.20 -
3.4 Stone masonry canal of hard basalt or equivalent i m3 36.78 1500.00 55,176.00 -
page total carried forward = 695,508.25
Sig.& Date:-
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sludge drying bed
Contract Previous Current
Item
Item Description Unit Unit rate Amt Amount
No Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
Sig.& Date:-
Sig.& Date:-
Project: - Sheno Town Water Supply and Sanitation
Client: - Oromia Water mineral and Energy Bureau
Consultant: - Amen Consulting Plc
Contractor :- GTB Engineering
Sludge drying bed
Contract Previous Current
Item
Item Description Unit Unit rate Amt Amount
No Qty Amount (Birr) Qty Qty
(Birr) (Birr) (Birr)
4 Maturation Pond and Aeration Pond - -
25cm Granular Bedding under the perfab -
4.1 polyethlene tanks m3 4.37 180.00 786.76
4.2 150 mm PVC pipe including gascets m 6.00 170.00 1,020.00 -
4.3 15m3 Prefab Polyethelene Tank pcs 1.00 33,000.00 33,000.00 -
4.4 3m3 Prefab Polyethelene Tank pcs 1.00 65,000.00 65,000.00 -
5 Fence and gate work - -
5.1 Supply and install barbed wire fence incuding concretm 318 500.00 159,000.00 -
5.2 Supply and erect steel gate post for the main entra No. 1 10,000.00 10,000.00 -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
Todate
Amount
Qty
(Birr)
Todate
Amount
Qty
(Birr)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
-
SUPERVISOR
Name:- Arebu A.