Você está na página 1de 2
Adam Ganucheau i From: Garry Miller Sent: Thursday, October 29, 2015 9:45 AM To: mmegrath@mdotims.gov; Mood, Amy Ce: Gary Rhoads Subject: FW: Dogwood Access Road. Attachments: Preliminary Roadway Layout.pdf Melinda, Mayor Rhoads asked us to take a look at a potential access for Dogwood and Oakridge coming across Josh Harkins track of land. Enclosed for your review and comments is a draft for this connection. Ths is only for discussion purposes. Once you have had a chance to review please contact the Mayor and lets arrange a meeting to discuss this design and any concept the MDOT might have. We have not shared this with any of the homeowners and will not for the time being. Should you or Amy need any additional information don't hesitate contacting me. Thanks Garry Miller, 601-624-8988 From: Greg Bonds [mailto:gbonds@benchmarkms.net] Sent: Monday, October 19, 2015 11:14 AM To: Garry Miller Cc: Paul Forster Subject: Dogwood Access Road... | have not had a chance to ride out there to look around but attached is a couple of options based on the information that | had available, | like Connector Road “A” because I believe that we would be far enough away from the Dogwood entrance and we would not be crossing the ditch shown which is shown on the Quad as a blue line stream. Not much required as far as permitting a crossing but still would be best not to cross it from a cost standpoint. AA couple of other things to mention: + lassume that a new gate would be required and showed it in a location that would work if Harkins ever develops the remainder of his property. We would need to work out in the agreement that no connections to adjacent property is allowed on the Dogwood side of the gate. Could leave a 1’ strip there that is owned by Dogwood or the City to accomplish this as well. * show making the bend in Dogwood a “T” intersection (3 way stop) as | think this would be the safest way due to the sharpness of that curve and Oakridge traffic having to cut across to use the new exit. {can revise as needed. This drawing is to get the conversation going and comments from you. Let me know the changes you would like to make or we can meet and discuss. Greg Bonds, nchmark Engineering & Surveying, LLC 101 Highpointe Court, Suite B Brandon, MS 39042 Office: 601-591-1077 Fax: 601-591-0714 Gell: 601-720-9986 ‘abonds@benchmarkms.net ‘CONFIDENTIALITY NOTICE *** ‘The information andr attachments contained in tis electronic message are legaly privileged and confidential information intended only forthe use of the individual or entity named above. ifthe reader of tis message isnot the intonded recipient, you ae hereby noted that any dlesemination, istrbuion or copy ofthis communication is strictly prohibited. if you have received this communication In eror, please immediately notty Benchmark Engineering & Surveying, LLC at (601) 691-1077 or by return e-mall and destroy any copies, electronic paper or otherwise, which you may have ofthe above orginal message. ‘Thank you.

Você também pode gostar