As per your request, we are planning out our most cost effective route for the Pipeline Project
near Vernal, Utah. I am going to show you step by step of the options we come up with. First, I
analyze the cost of running the pipeline strictly through the BLM land.
1. Determine the cost of running the pipeline strictly on BLM ground with two different cases:
BLM Ground:320,000/ mi
West: 6 mi
South: 15 mi
East: 28mi
The cost of building a pipeline from West, South and East would be $15,680,000 on BLM ground,
which will cover 49 miles.
Pipeline Project
Mara Giovanna VanDyke
One heading east through the mountain and then south to the refinery:
Study: 200,000
8 months: 680,000
Straight south across the private ground, then straight east to the refinery:
3. Determine the cost function for the pipeline for the configuration involving running from the
well across the private ground at some angle and intersecting the BLM ground to the south
and then running east to the refinery. Use this function to find the optimal way to run the
pipeline to minimize cost. Determine the length of pipe that runs across private land and how
far from the refinery it starts running on BLM land. Determine the angle at which your optimal
path leaves the well. Clearly show all work including drawing the pipeline on the figure below.
Make it very clear how you use your knowledge of calculus to determine the optimal
placement of the pipeline.
Pipeline Project
Mara Giovanna VanDyke
d1= √x 2 + 225
d2=22-x
√
320,0002 (225)
x= 410,0002 −320,0002
= √350.7 = 18.72 miles
d1= √(18.72) 2
+ 225 =23.99~24 miles
d2=22-18.72 = 3.28
f(c) 410,000d1+320,000d2
410,000(24) + 320,000(3.23) = 10,889,600
In Conclusion by running the pipeline at an angle across the private land then across the BLM land is
the most cost effective option.
Pipeline Project
Mara Giovanna VanDyke
4. Include a computer generated graph of the optimal cost function, “C(x)”, for this pipeline for
any configuration involving crossing some private ground as well as some BLM ground.
Reflection:
By taking Calculus 1 I have been able to learn a lot more about how all the math courses that I have
taken are part of the real life world. As I am learning calculus I find that it is very useful tool. I am
going into Architecture and not only do I need to know how to draw and design buildings, I need to
also know how to make functional and structural buildings for the clients and residents. With calculus
I can learn how to estimate the cost of the project, also find out how to build it, and find out different
ways to building using the skills I learned in Calculus. I can start to figure out how long the building
process would take, if the cost of materials affect the building process, and how much it would cost in
general. I plan on going into blueprint construction in commercial buildings so I have to make sure
that I give the decent price and have it all well drawn out so that before the construction process
begins. The client will know that there building will stay standing. Right know my husband and I have
bought a condo and we had to find out how much paint, carpet, light fixtures and other stuff cost,
because we have a budget and we haven’t been wanting to spend more than the budget.