I Modifikasi Gantri

NO ITEM OF WORK MAN POWER DURASI PRICE


Unit Total
1 Modifikasi 1 Welder 1 hari 570,500 570,500
1 Helper 528,500 528,500
2 Consumable 1 Lot 300,000 300,000

SUB TOTAL 1,399,000

II Gantry Iso Tank

NO ITEM OF WORK QTY DURASI PRICE

1 Man Power 1 Welder 3 Hari 1,711,500 1,711,500


1 Helper 1,585,500 1,585,500
3,297,000
2 Material
Pipa CS 3" Sch 40 1 btg 872,200 872,200
Pipa CS 2" Sch 40 1 btg 396,200 396,200
Ball Valve 3" 2 ea 1,820,000 3,640,000
Ball Valve 2" 3 ea 1,540,000 4,620,000
Ball Valve 1" 1 ea 300,000 300,000
Gate Valve 3" 1 ea 2,520,000 2,520,000
Red Tee BW Sch 40 3" x 2" 3 ea 350,000 1,050,000
Swivel Joint 2" 1 ea 9,100,000 9,100,000
Elbow 3" 7 ea 126,000 882,000
Elbow 2" 2 ea 70,000 140,000
Flange 3" 6 ea 150,000 900,000
Flange 2" 1 91,000 91,000
Blind Flange 3" 1 105,000 105,000
Support
Siku 75 1 btg 250,000 250,000
Baseplate 1 lot 300,000 300,000
Turnbuckle 2 ea 200,000 400,000
Wire Sling 6 Mtr 100,000 600,000

SUB TOTAL 26,166,400


3 Modifikasi Pompa
Penambahan roda pada pompa 1 lot 1,000,000 1,000,000
Struktur 1 lot 750,000 750,000

SUB TOTAL 1,750,000

TOTAL 31,213,400
Enginering 10% 3,121,340
PMS + PROFIT 25% 7,803,350

TOTAL PENAWARAN 42,138,090


PT RITAN GLOBAL SOLUSI
Jl. H. Abdul Gani No. 79 Cempaka Putih, Ciputat
Tangerang Selatan - BANTEN ( 15412 )
Telp : 021-2759 9383

QUOTATION
To : Subject : Modifikasi gantry & Loading Isotank
Our Ref : 018/RGS-QT/X/2017
PT. BUNTARA MEGAH INTI Date : 20 Oktober 2017
Ruko Victoria Park Residence Block A2 No. 58 Contact Person
Jl. Imam Bonjol - Karawaci - Tangerang - Commercial matter : Priyo Subroto
Phone : 0813 8332 2881
Attn : Bapak Titis Email : priyosubroto@gmail.com
Telp : 0811 170 780 - Technical Matter : Wahyu Rindarmanto PL
E-Mail : titis@buntara.com Phone : 0812 8609 3569
Email : wahyu.rind@yahoo.co.id
Here with we submit quotation for the equipments below

UNIT PRICE TOTAL PRICE


NO DESCRIPTION QTY REMARKS
Rp Rp

1 Modifikasi Gantri 1 lot 1,399,000 1,399,000

2 Gantry Iso Tank /Bituteiner 1 lot 29,463,400 29,463,400

3 Modifikasi Pompa 1 lot 1,750,000 1,750,000

TOTAL BIAYA PEKERJAAN 32,612,400

4 Engineering 15% 4,891,860

5 Profit 15% 4,891,860


AMOUNT 42,396,120

ROUNDED 42,400,000 Excluded VAT ( PPN 10% )

GOVERNMENT TAX (PPN) 10% 4,240,000

TOTAL 46,640,000 Include VAT ( PPN 10% )

Said Empat puluh enam juta enam ratus empat puluh ribu rupiah

Term & Condition :


- Price Include VAT ( PPN - 10% )
- Delivery time : 1 weeks after Down Payment ( DP ) paid
- Delivery point : Balaraja plant
Validation :
- Qoutation valid for 1 month as per quotation date
Term of payment :
- DP 50% Bank Account : Mandiri KCP Tangerang Ciputat Center
- Final payment 50% : A/N PT. RITAN GLOBAL SOLUSI
: 164 - 00 - 0218480 - 4

Thank you for your trust and good cooperation

Best Regard

Iwan Agus Setiawan


Direktur Utama
PT RITAN GLOBAL SOLUSI
Jl. H. Abdul Gani No. 79 Cempaka Putih, Ciputat
Tangerang Selatan - BANTEN ( 15412 )
Telp : 021-2759 9383

QUOTATION
To : Subject
Our Ref
PT. BUNTARA MEGAH INTI Date
Ruko Victoria Park Residence Block A2 No. 58 Contact Person
Jl. Imam Bonjol - Karawaci - Tangerang - Commercial matter
Phon
Attn : Bapak Nino Email
Telp : 0812 1017 6850 - Technical Matter
E-Mail : nino@buntara.com Phon
Email
Here with we submit quotation for the equipments below

UNIT PRICE TOTAL PRICE


NO DESCRIPTION QTY
Rp Rp
1 Modifikasi Gantri PMB 1 lot 1,818,700 1,818,700
Modifikasi platform folding bridge
dan loading arm

2 Gantry Iso Tank /Bituteiner 1 lot 38,302,420 38,302,420


pembuatan instalasi pipa loading-
unloading dan drumming.

3 Modifikasi Pompa Loading Bituteiner 1 lot 2,275,000 2,275,000


Pembuatan platform pompa.

AMOUNT 42,396,120

ROUNDED 42,400,000

GOVERNMENT TAX (PPN) 10% 4,240,000

TOTAL 46,640,000

Said Empat puluh enam juta enam ratus empat puluh ribu rupiah
Term & Condition :
- Price Include VAT ( PPN - 10% )
- Delivery time : 1 weeks after Down Payment ( DP ) paid
- Delivery point : Balaraja plant
Validation :
- Qoutation valid for 1 month as per quotation date
Term of payment :
- DP 50% Bank Account : Mandiri KCP Tangerang Ciputat Ce
- Final payment 50% : A/N PT. RITAN GLOBAL SOLUSI
: 164 - 00 - 0218480 - 4
PT RITAN GLOBAL SOLUSI
Jl. H. Abdul Gani No. 79 Cempaka Putih, Ciputat
Tangerang Selatan - BANTEN ( 15412 )
Telp : 021-2759 9383

QUOTATION
Thank you for your trust and good cooperation

Best Regard

Iwan Agus Setiawan


Direktur Utama
QUOTATION
: Modifikasi gantry & Loading Isotank
: 018R1/RGS-QT/X/2017
: 21 Oktober 2017

: Priyo Subroto
: 0813 8332 2881
: priyosubroto@gmail.com
: Wahyu Rindarmanto PL
: 0812 8609 3569
: wahyu.rind@yahoo.co.id

REMARKS

Excluded VAT ( PPN 10% )

Include VAT ( PPN 10% )

: Mandiri KCP Tangerang Ciputat Center


: A/N PT. RITAN GLOBAL SOLUSI
QUOTATION
I Modifikasi Gantri

NO ITEM OF WORK MAN POWER DURASI

1 Modifikasi 1 Welder 1 hari


1 Helper
2 Consumable 1 Lot

II Gantry Iso Tank

NO ITEM OF WORK QTY DURASI

1 Man Power 1 Welder 3 Hari


1 Helper

NO MATERIAL QTY
2 Material
Pipa CS 3" Sch 40 1 btg
Pipa CS 2" Sch 40 1 btg
Ball Valve 3" 2 ea
Ball Valve 2" 3 ea
Ball Valve 1" 1 ea
Gate Valve 3" 1 ea
Red Tee BW Sch 40 3" x 2" 3 ea
Swivel Joint 2" 1 ea
Elbow 3" 7 ea
Elbow 2" 2 ea
Flange 3" 6 ea
Flange 2" 1
Blind Flange 3" 1
Support
Siku 75 1 btg
Baseplate 1 lot
Turnbuckle 2 ea
Wire Sling 6 Mtr

SUB TOTAL
3 Modifikasi Pompa
Penambahan roda pada pompa
Struktur