Você está na página 1de 14

Requisition / Order No.

1 Applicable to: ● Proposal  Purchase  As-Built


2

3 For Installation of Vapor Recovery Unit at SMT No. of Pumps Required 3 (2W + 1S)

4 Site Bapco Sitra Marketing Terminal No. of Motors Required 3 (2W + 1S)

5 Unit 027 Item No. P2714 A/B/C

6 Service Lean Absorbent Supply Pump Manufacturer


7 Remarks To be used for Rich absorbent Transfer to tanks Size & Type
8 Serial No.
9 Notes:  Indicates Information completed by Purchaser  by Manufacturer by Manufacturer or Purchaser

10 General
11 Pumps to Operate in (Parallel) 0 No. Motor Driven 3 (2W + 1S) No Turbine Driven

12 (Series) with Pump Item No. P2714 A/B/C Pump Item No.

13 Gear Item No. 1 Motor Item No. M2714 A/B/C Turbine Item no.

14 Gear Provided by Motor Provided by VENDOR Turbine Provided by

15 Gear Mounted by Motor Mounted by VENDOR Turbine Mounted by

16 Gear Data Sht Nos Driver Data Sht Nos Turbine Data Sht Nos

17  Operating Conditions  Site & Utility Data (continued)

18  Capacity Normal 80 gpm Rated 96 gpm Cooling Water:


19  Other Min Return N.A. psig Max allow P  psi

20  Suction Pressure Max/Rated 3.5 / 0 psig Water Source

21  Discharge pressure 86.86 (psia) psig Instrument Air: Max/Min Pressure / psig

22  Differential Pressure 72.2 psi  Liquid


23  Differential Head 222 ft NPSH Available 5.3 ft  Type or Name of Liquid Gasoline

24  Hydraulic Power 4.04 hp  Pumping Temperature


25 Service: ● Continuous  Intermittent(starts/Day) Normal
o
87 F Max 115
o
F Min
o
52 F

26  Site & Utility Data  Specific Gravity 0.7519 @52°F, 0.7196 @Max Temp F o

27 Location:  Specific Heat 0.556 Cp. Btu/lb F


o

28  Indoor  Heated  Under Roof  Viscosity 0.4076 cP @ 100 F o

29 ● Outdoor ● Unheated  Partial Sides  Max Viscosity @ Min. Temp 0.5502 cP

30 O Grade  Mezzanine   Corrosive/Erosive Agent NA

31 ● Hazardous Area(GPS-A12) Zone 2 Temp Class T3  Chloride Concentration (ppm) NA

32 Gas Group D  H S Concentration (ppm)


2 NA

33  Winterization Req'd O Tropicalization Reqd. Liquids(3.5.2.11)  Toxic ● Flammable  Other


34 Site Data:  Performance
35  Elevation ft Barometer psia  rpm
 Range of Ambient Temps: Min/Max 57.3 / 125.7
o
36 F Proposal Curve No.

37  Relative Humidity% Min/Max 35 / 87  Impeller Dia Rated Max Min in

38 Unusual Conditions:  Dust  Fumes  Rated Power hp Efficiency %

39  Other Tropical, marine, salt, high ambient and sand  Minimum Continuous Flow
40  Utility Conditions: Thermal gpm Stable gpm

41 Steam: Drivers Heating  Max Head rated Impeller in

42 Min psig
o
F psig
o
F  Max Power Rated Impeller hp

43 Max psig
o
F psig
o
F  NPSH Required at Rated Cap ftH20

44 Electricity: Drivers Heating Control Shutdown  Suction Specific Speed


45 Voltage 460  Max Sound Pressure Level dBA

46 Hertz 60 Remarks
47 Phase 3

48 Cooling Water:
o o
49 Temp Inlet F Max return F

50 Press. Norm psig Design psig

Project/ Centrifugal Pump data Sheet (non-


SMT
Location
Metric units) for Lean
P2119/P2204
Absorbent
General Notes P2714 Pump P2714 A/B/C
SupplyA/B/C
and References RS 5/7/05 Drawing No. Sheet No. Rev.
NYS-A1.15
Issued for quotation
TS064436 1 of 4 0
Sources NYS-G1.10
No Date Revision By CK Eng STANDARD FORM NO BSF-G-96
Requisition / Order No.
1

2  Construction Couplings: (continued)

3  Main Connections: Flanged to ANSI B16.5  Lubrication

4 Size ANSI Facing Position O Limited End Float Required

5 Rating Spacer Length 7 in

6 Suction ANSI 300 # RF END Service Factor 1.3 (min.)

7 Discharge ANSI 300 # RF TOP  Dynamic Balanced AGMA Balance Class 9

8 Bal.Drum Driver Half Coupling Mounted by

9 ● Pump Mfr. Driver Mfr  Purchaser


10  Other Connections: ● Coupling per API 671

11 Service No. Size Type Remarks: NON SPARK GUARD

12 Drain

13 Vent

14 Press Gauge Material


15 Temp. gauge  Table H-1 Class S-6

16 Warm Up  Barrel/Case A216 GRWCB Impeller A487GRCA6NM

17 Casing Mounting:  Case/Impeller Wear Rings A473-TP410H

18  Centerline  Near Centerline  Shaft A434-4140 Sleeve

19  Foot  Separate Mounting Plate  Diffusers CS/SS

20  Vertical  Sump  Coupling Hubs CS

21  In-Line  Coupling Spacer CS

22 Casing Split:  Coupling Diaphragms


23  Axial  Radial  API Baseplate Number/Material / A36/ A283 C

24 Casing Type:  Vertical Leveling Screws(3.3.1.15) SS316

25  Single Volute  Double Volute  Horizontal Positioning Screws (3.3.1.14) SS316

26  Barrel  Diffuser Remarks:

27  Staggered Volutes  Vertical Double Casing


28 Impeller Mounted:
29  Between Bearings  Overhung
30  Impellers Individually Secured (2.5.4)
31 Case Pressure Rating: Bearings & Lubrication
32  Suction Pressure Regions of Multistage or Double Bearing: (Type/Number) SKF

33 Casing Pump designed for Max Allowable work pressure  Radial /


34 Rotation: (Viewed from Coupling End)  Thrust /
35  CW  CCW  Review & Approve Thrust Bearing Size
36 Remarks: Lubrication: *
37  Grease  Flood  Ring Oil
38 Shaft:  Flinger  Purge Oil Mist  Pure Oil Mist
39 Shaft Diameter at Sleeve in ● Constant level Oiler
40 Shaft Diameter at Coupling in  Pressure  API 610  API 614
41 Shaft Diameter between Bearings in  Oil Visc. ISO Grade
42 Span between Bearings (CL) in  Oil Heater Required  Electric  Steam
43 Span between Bearing and Impeller in  Oil Pressure to be Greater Than Coolant Pressure
44 Remarks: Remarks:

45 * Vendor to provide facility in bearing housing for future purge

46 oil mist lubrication system for pump.

47 Couplings: Driver-Pump

48  Make JOHNCRANE METASTREAM

49  Model
50  Coupling Rating (hp/100rpm)
51 Centrifugal Pump data Sheet (non-
52 Metric units) for Lean Absorbent
53 Supply Pump P2714 A/B/C
RS 5/7/05 Drawing No. Sheet No. Rev.
54
TS064436 2 of 4 0
55
STANDARD FORM NO BSF-G-96
Requisition / Order No.
1

2 Mechanical Seal or Packing Vertical Pumps (Continued)

3 NOTE: For Mechanical Seal Data or Packing Data refer  Separate Mounting Plate
to BSF-G-97 (SI Units) or BSF-G-98 (non-Metric Units).
4  Drive Component Alignment Screws
5 Cooling Water Piping  Pit or Sump Depth ft

6  Sight Flow Indicators  Pump Length ft

7  Manifold Outlet Valve  Minimum submergence required ft

8  Galvanised Piping Required Column Pipe:  Flanged  Threaded


9  Copper Tubing Required Line Shaft:  Open  Enclosed
10  Stainless Steel Tubing Required Guide Bushings:

11  Cooling Water Requirements  Bowl  Line Shaft


12 Seal Jacket/Pedestal/Brg Hsg gpm @ psig Guide Bushings Lube:

13 Seal Heat Exchanger gpm @ psig  Water  Oil


14 Quench gpm @ psig  Grease  Pumpage
15 Total Cooling Water gpm @ Remarks:

16 Remarks:

17

18 Instrumentation (N.A.) Applicable Specifications


19 Vibration: API 610, NYS-G1.10

20  Noncontacting (API670)  Accelerometer


21  Provision for Mounting Only ● Vendor having Unit responsibility
22  See Attached API 670 Data sheet  Governing Specification (if different)
23 Remarks: Remarks: API 610 Latest Edition to be followed.

24

25 Temperature and Pressure:


26  Radial Brg. Metal Temp  Thrust Brg Metal Temp Surface Preparation & Paint
27  Provision for Instrumentation Only  Manufacturer's Standard
28  See Attached API 670 Data sheet ● Other Project SpecificationTS 036261 & TS 036262

29  Temperature Gauges  Thermowells Pump:


30 Other  Pump Surface Preparation SSPC-SP-6
31  Pressure Gauge Type ● Primer EPOXY

32 Location ● Finish Coat EPOXY


33  Pressure Switch Type Baseplate:
34 Location ● Baseplate Surface Preparation SSPC-SP-6
35 Remarks:  Primer
36  Finish Coat
37 Spare Parts (Table 12) Grouting Required: (3.3.1.17) Yes No

38 ● Start Up / Comm. (INCLUDING SEAL MANUFACTURER PARTS ) ● Grout Surface Preparation SSPC-SP-6
39  Reconditioning ● Epoxy Primer
40  Critical Service  Remarks
41 ● Specify Vendor to provide price of recommended spares for 2 Shipment: (4.4.1)
42 years of continous operation along with bids.  Domestic ● Export ● Export Boxing required

43 Motor Drive ● Outdoor Storage more than 6 months


44  Manufacturer Spare Rotor Assembly Packaged for:
45  hp  rpm ● Horizontal Storage  Vertical Storage
46  Horizontal  Vertical  Type of Shipping Preparation
47 Remarks: Remarks:

48

49

50 Vertical Pumps (N.A.)


51  Pump Thrust Up Down Centrifugal Pump data Sheet (non-
52 @ Min Flow lbf lbf Metric units) for Lean Absorbent
53 @ Design Flow lbf lbf Supply Pump P2714 A/B/C
RS 5/7/05 Drawing No. Sheet No. Rev.
54 @ Runout lbf lbf
TS064436 3 of 4 0
55 Max Thrust lbf @ gpm
STANDARD FORM NO BSF-G-96
Requisition / Order No.
1

2  Weights QA Inspection & Test (Continued)

3 Motor Driven:  Material Certification Required


4 Weight of Pump lbs ● Casing ● Impeller ● Shaft
5 Weight of Baseplate lbs ● Other Wear Rings & bushings

6 Weight of Motor lbs ● Casting repair Procedure Approval Required


7 Weight of Gear lbs  Inspection Required for Nozzle Welds
8 Total Weight lbs  Mag. Particle ● Liquid Penetrant
9 Turbine Driven: ● Radiographic ● Ultrasonic
10 Weight of Baseplate lbs ● Inspection Required for Castings
11 Weight of Turbine lbs  Magnetic Particle ● Liquid Penetrant
12 Weight of Gear lbs  Radiographic ● Ultrasonic
13 Total Weight lbs  Charpy Impact Test Required for
14 Remarks:

15  Inspection Req'd for


16  Magnetic Particle O Liquid Penetrant
17  Other Purchaser Requirements  Radiographic  Ultrasonic
18  Coordination Meeting Required ● Hardness Test req'd for WEAR RINGS

19 ● Review Foundation Drawings  Surfactant Hydrotest (4.3.2.5)


20  Review Piping Drawings ● Vendor Submit Test Procedures
21  Observe Piping Checks ● Record Final Assembly Running Clearances
22  Observe Initial Alignment Check ● Vendor Maintenance Records for 5 Years
23 ● Check Alignment at Operating Temperature
24 ● Rotor Balanced During Assembly of Each Element Remarks:

25 ● Vendor Demonstration of Maximum Allowable 1 Vendor shall furnish complete datasheet and installation drawings with bid.

26 Vibration at Minimum Flow 2 Vendor shall furnish the pump characteristic curve along with the bid,

27  Lateral Response Analysis Required duty point duly marked, showing H, Q, NPSHr, BKW

28  Pump Only  All Equipment 3 Vendor is responsible for the selection of the Mechanical seal &

29  Critical Speed Analysis flushing plan. Seal manufacturer shall guarantee the suitability of the seal

30  Stiffness Map of Undamped Rotor system for the specified service. Refer to attached seal datasheet.

31  Torsional Analysis 4 Vendor shall include the necessary instrumentation with the equipment

32 ● Progress Reports Required required for safe operation.

33 Remarks: Vendor to provide GA dwgs of pump, coupling & seal 5 Pump is provided with local Start/Stop push button (by Others). Pump

34 , foundation drawings, CS dwgs with part and MOC, stresses on start/ stop controls shall be from VRU PLC.

35 nozzles. 3 sets of Operation and Maintenance manual and elctronic 6 Margin between NPSHA and NPSHR shall be more than 3 ft (minimum)
36 back up. for entire range of operation.

37 QA Inspection & Test 7 Vendor shall furnish the viscosity correction factors Kq, Kh & Ke

38 ● Review Vendors QA Program 8 Reference P&ID FSA-030769.

39 ● Performance Curve Approval 9 Vendor to advise the need of external bearing flushing or if the use

40 ● Shop Inspection of process fluids is considered.

41 Test Non-Wit Wit Observe 10 Hydro Testing is required.

42 Hydrostatic Test for 1 Hour O ●  11 During normal operation one pump will be used for supply of lean

43 Performance  ●  absorbent to VRU, while one pump will be used for transfer of rich

44 NPSH  ●  absorbent to tanks. One pump will serve as common stand-by.

45 Complete Unit Test With Job Motor  ●  12 Performance Test shall be conducted in accordance with centrifugal pump test

46 Sound Level Test  ●  code of Hydraulic Institute.

47  Dismantle & Insp  ●  13 Final documentation shall include hard copy ( 3 sets) and DVD, back up

48 after Test of all documents mentioned in other purchase requirements.

49  Cleanliness Prior to O  ●
50 Final Assembly

51  Pipeload Test    Centrifugal Pump data Sheet (non-


52  2 Hour Endurance test  •  Metric units) forLean Absorbent
53     Supply Pump P2714 A/B/C
54     RS 5/7/05 Drawing No. Sheet No. Rev.

TS064436 4 of 4 0
55
STANDARD FORM NO BSF-G-96
THE BAHRAIN PETROLEUM COMPANY B.S.C. (CLOSED) Installation of Vapor Recovery Unit at SMT

THE BAHRAIN PETROLEUM COMPANY B.S.C. (CLOSED)


P.O.BOX 25555, AWALI, KINGDOM OF BAHRAIN

PROJECT NO. : EN 1065

PROJECT NAME : INSTALLATION OF VAPOR RECOVERY UNIT AT SITRA MARKETING


TERMINAL

DOCUMENT TITLE : TECHNICAL SPECIFICATION FOR PUMP P2714 A/B/C

DOCUMENT NO : TS064437

AKM/
0 28/03/17 Issued for EPC Enquiry RN VVB GM GAM ARH
ART
Rev.
Date Revision Description PED PED P&U RED PMD APPR.
No.

Doc No. TS-064437 25/03/2017


Revision 0 Page 1 of 8
THE BAHRAIN PETROLEUM COMPANY B.S.C. (CLOSED) Installation of Vapor Recovery Unit at SMT

Table of Contents

1.0 Introduction 3

2.0 Scope of Supply- Materials/ Equipment’s 4

3.0 Scope of Supply- Services 5

4.0 Submission of Datasheets as part of Bids 7

5.0 Deviation and Alternatives 7

6.0 Guarantee/Warranty 7

7.0 Additional Requirement 7

8.0 Payment Schedule 8

9.0 Attachments 8

10.0 Approved Electrical Motor Makes 8

Doc. No. TS-064437 25/03/2017


Revision 0 Page 2 of 8
THE BAHRAIN PETROLEUM COMPANY B.S.C. (CLOSED) Installation of Vapor Recovery Unit at SMT

1.0 Introduction

1.1 This technical specification, together with the applicable standards and data
sheets, cover the minimum and mandatory requirements for pumps (P 2714 A/B/C,
electric motors (M2714 A/B/C), and accessories required for Enhancement of
Mumtaz Distribution Project at Sitra Marketing Terminal, Bahrain Petroleum
Company (Owner), Bahrain.

1.2 The Vendor shall be responsible for the design, engineering, scheduling, supply of
materials, fabrication, co-ordination, assembly, inspection & testing, export
packaging, and for the proper functioning of the unit.

1.3 The Vendor shall guarantee the performance of the equipment as per this job
specification. This specification shall in no way release the Vendor from final
guarantee as to materials, workmanship, safe operation, and performance of the
equipment.

1.4 Where conflicts occur between this technical specification and any other document,
the Vendor shall without undue delay refer all conflicting requirements to the
Purchaser in writing for clarification and resolution, and shall clearly state cost and
delay implications, if any, otherwise this technical specification shall govern. Until
conflict resolution becomes available, most stringent requirements shall govern.
The Vendor is not at liberty to assume which requirements govern.

1.5 The Vendor shall satisfy all the requirements of the attached Caltex Material and
Equipment specification NYS-A1.50 "Basic Requirements for Submission of Bids
and Execution of Contracts for Major Equipment", except para 2.2. The conflict
resolution shall be done in the following order:

• This technical specification


• Data sheets
• Purchase order
• Bapco/Caltex Standards
• API standards
• Other standards and specifications

1.6 Applicable Standards

The design and construction of this equipment shall be in accordance with the
latest edition or revision of the following standards including all referenced
international codes.

Caltex/BAPCO STANDARDS (Attached):

GPS-B4 Caltex General Engineering Specification – Shop Inspection


Requirements

GPS-G1 Caltex General Engineering Specification – Pumps and Drivers

Doc. No. TS-064437 25/03/2017


Revision 0 Page 3 of 8
THE BAHRAIN PETROLEUM COMPANY B.S.C. (CLOSED) Installation of Vapor Recovery Unit at SMT
NYS-A1.50 Caltex Material and Equipment Specification - Basic Requirements
for Submission of Bids and Execution of Contracts for Major Equipment

NYS-G1.10 Caltex Material and Equipment Specification – Centrifugal Pumps


for General Refinery Service

NYS-P1.10 Caltex Material and Equipment Specification – Squirrel Cage


Induction Motors

SF-G-665 Inspection Checklist for Centrifugal Pumps

SF-G-649 Vendor Drawings and Data Requirements for Centrifugal Pumps

SF-P-670 Inspection Checklist for Squirrel Cage and Slip Ring Motors

SF-A-701/703 Equipment Noise Entry Data Sheet

SF-P-631 Vendor Drawings and Data Requirements Electrical Motors

Additional applicable standards:

API 610 Centrifugal Pumps for Petroleum, Heavy Duty Chemical 11th Ed.
and Gas Industry Services
API 682 Shaft Sealing systems for centrifugal and rotary pumps 4th Ed.

2.0 Scope of Supply- Materials/ Equipment’s

2.1 The Vendor shall be responsible for all equipment and accessories within the
scope of supply.

2.2 The equipment shall be able to perform all the duties specified in the data sheets,
under the specified conditions.

2.3 Vendor shall furnish the following equipment/materials including accessories, spare
parts, tools, etc., mentioned below:

2.3.1 Lean Absorbent Supply Gasoline pump P2714 A/B/C, with accessories, as
per this specification and datasheet TS064436 & TS064429.

2.3.2 Motor as per this specification and datasheets TS064442.

2.4 Commissioning / Start-up Spares

2.4.1 Vendor shall supply separate priced list of recommended spare parts for
commissioning and start-up of the equipment along with the bid.

2.5 Operational Spare parts

2.5.1 Vendor shall supply a separate priced part list of recommended spare parts
suitable for two years operation, for the complete scope of supply along with

Doc. No. TS-064437 25/03/2017


Revision 0 Page 4 of 8
THE BAHRAIN PETROLEUM COMPANY B.S.C. (CLOSED) Installation of Vapor Recovery Unit at SMT
the bid as per API 610.

2.6 Special tools

2.6.1 One set of special tools as necessary for lifting, erection, testing and
maintenance of the equipment and accessories shall be provided. These
shall be easily identifiable as to the equipment, and supplied in lockable
steel box except large devices.

2.7 Operation consumables

2.7.1 Vendor shall inform purchaser of the specifications and quantities, and
maintenance frequency of operational consumables, such as lubricants,
fillings, recording charts, etc. if any, for initial charge and six month
operation.

2.7.2 If the consumables are vendor’s exclusive products. Vendor shall provide
their price list for initial charge and six months operation separately.

2.8 Painting & Rust Prevention

2.8.1 Surface painting

2.8.1.1 Painting up to finish coat is required.

2.8.1.2 Vendor shall submit recommended painting system to be


approved by purchaser. Painting system shall be shown in the
proposal separately. In general this shall consist of one coat of
primer, two coats of enamel, total dry film thickness min 100
microns and the painting system shall be compatible with the
operating temperature of equipment.

2.8.2 Rust Prevention

2.8.2.1 The equipment and materials shall be rust proofed adequately for
ocean freight and storage at site with suitable material and/or
methods which vendor selects.

2.8.2.2 Machine surfaces shall be rust proofed adequately also for ocean
freight and storage at site with grease, plastic silica gel or other
suitable materials and/or methods which vendor selects.

2.8.2.3 Vendor shall submit his rust prevention to purchaser’s review and
approval for 2.8.2.1 & 2.8.2.2 above.

Note: Rust prevention effective up to and including three (3)


months ocean transportation and three (3) months unsheltered
outdoor storage at site.

3.0 Scope of Supply- Services


Doc. No. TS-064437 25/03/2017
Revision 0 Page 5 of 8
THE BAHRAIN PETROLEUM COMPANY B.S.C. (CLOSED) Installation of Vapor Recovery Unit at SMT

Vendor shall furnish all the necessary services for design, procurement, fabrication,
testing, and inspection in accordance with this specification and the attached/referenced
documents.

3.1 Documentation

3.1.1 Vendor shall submit to purchaser, as a minimum, the drawing/documents


listed in datasheets and SF-G-649.

3.1.2 Supplier shall satisfy the requirements of section 3.0 of Caltex specification,
NYS-A1.50, in addition to the requirements of this specification.

3.1.3 All drawings and other data shall be based on non-metric (US Customary)
units of measurement, see section 3.1.4 units of measurement. SI units
may be quoted additionally in brackets but US customary units shall take
precedence.

3.1.4 Indication of weights and measurements shall be in:

Temperature °F
Pressure psig or in. Hg. Vacuum
Flow Gas scfh or scfd
Flow: Liquids US gallons per minute
Level for vessel level gauge Inches vs. US gallons

Linear length foot (ft)


inch (in)
Liquid volume US gallon (gal)
US barrel (bbl)

Note: Exceptions to 2.2 of Caltex Specification NYS-A1.50

3.1.5 All Vendor and sub-vendor drawings and other documentation shall be in
the English language.

3.1.6 All Vendors’ engineering drawings shall be preferably provided in PDF


format. Data sheets shall be WORD/EXCEL compatible with Microsoft
Windows XP.

3.1.7 The vendor shall supply Three (3) bound dossiers containing all drawings,
datasheets, spare parts list, performance curves, inspection reports,
material test certificates and operation and maintenance manuals along
with the delivery of pump.

3.1.8 Electronic Data handover


In addition to the hard copies of documents/drawings supplied, Vendor shall
supply As-Built documents/drawings (ACAD) on DVD.

3.2 Test and Inspection


Doc. No. TS-064437 25/03/2017
Revision 0 Page 6 of 8
THE BAHRAIN PETROLEUM COMPANY B.S.C. (CLOSED) Installation of Vapor Recovery Unit at SMT

3.2.1 Vendor shall conduct tests and/or inspection in accordance with this
specification, the datasheets, the reference documents, GPS-B4 and SF-G-
665.

3.2.2 Vendor shall prepare a Quality Plan, which includes all test and inspection
to be completed on the equipment for Owner approval. .

3.2.3 Third Party Inspector and/or Owner will attend witnessed tests/inspections
required as per documents attached. All the factory cost associated with the
inspection and testing of pumps at the factory is in the scope of vendor. The
cost of third party inspection agency will be borne by Bapco.

3.2.4 Vendor shall notify Owner or third party inspector, the scheduled dates of
such inspection at least 30 (thirty) days in advance.

3.2.5 Owner shall approve inspection reports and checklists before shipment of
materials.

3.3 Field Services

Assistance of a qualified engineer and supervisor during pre-commissioning checks


and commissioning and to troubleshoot any problems till successful commissioning
and handing over is required.

4.0 Submission of Datasheets as part of Bids

Along with the bids the vendor shall submit the Bapco datasheets duly filled. Bapco will
consider and review the offer of only such vendors who submits the duly filled Bapco
datasheets for pump, motor, seal, inspection and documentation.

5.0 Deviation and Alternatives


Vendor agrees that only deviations to be considered by Owner shall be limited to those
clearly specified in a deviations list included in Vendor’s proposal.

6.0 Guarantee/Warranty

6.1 The supplier shall guarantee the equipment against defective material and
workmanship for a period of 18 months from the date of supply or 12 months from
the date of commissioning, whichever is earlier.

6.2 The supplier shall guarantee that all the materials used in the system are free from
all discernible injurious defects, and are in accordance with the conditions called for
in this Specification.

7.0 Additional Requirement


Doc. No. TS-064437 25/03/2017
Revision 0 Page 7 of 8
THE BAHRAIN PETROLEUM COMPANY B.S.C. (CLOSED) Installation of Vapor Recovery Unit at SMT

7.1 As an additional feature, the bearing housing to be supplied with a facility to accept
purge oil mist.

8.0 Payment Schedule


• 15 % on approval of drawings.
• 75 % on receipt of equipment at Bapco stores.
• 10 % on receipt of complete documentation.

9.0 Attachments
9.1 Attachment I – Process data sheet of Centrifugal Pump Data Sheet TS064429

9.2 Attachment II - Mechanical Data Sheet of Pump TS064436

9.3 Attachment III- Inspection Check list for Centrifugal pumps TS064443

9.4 Attachment IV Vendor drawings and Data Requirements - Centrifugal Pumps

9.5 Attachment V - Standard Duty LV Induction Motor Data Sheet TS064442,

9.6 Attachment VI - Equipment Noise Enquiry Data Sheet TS064444.

9.7 Attachment VII- Vendor drawings and Data Requirements - Electrical Motor
TS064445.

10.0 Approved Electrical Motor Makes

Approved Country
Manufacturer
General Electric USA
Hawker Siddely UK
Brook Hansen UK
Reliance USA
ABB Sweden
Baldor USA
Siemens Germany
Toshiba Japan
Fuji Japan

Doc. No. TS-064437 25/03/2017


Revision 0 Page 8 of 8
Requisition / Order No.
1 Applicable to: Proposal ● Purchase  As-Built 
2 For Installation of Vapor Recovery Unit at SMT Unit: 027
3 Site Bapco Sitra Marketing Terminal No. Required Three ( One for each pump P2714 A/B/C)

4 Service Lean Absorbent Supply/ Rich absorbent transfer Pump Size & Type
5 Manufacturer : JOHN CRANE No. of Stages
6 Remarks: AS PER API 682 Model
7 Item No. Serial No.
8 Notes  Indicates Information completed by Purchaser  by Manufacturer by Manufacturer or Purchaser

9 O Pump Data( By Pump Vendor )  Liquid


10  Speed rpm  Type or Name of Liquid Gasoline

11  Shaft/ Sleeve Diameter at Seal / in  Concentration


12  Stepped Sleeve Minimum Diameter in  Pumping Temperature
13  Stuffing Box I.D. in Normal 87 F Max 115
o o
F Min 52
o
F

14  Stuffing Box Depth in  Specific Gravity


15 Casing Mount @Normal Temp 0.7352 @ Max Temp 0.7196

16 ● Centerline  Near Centerline  Foot  Specific Heat 0.556 Btu/lb oF

17  Vertical  Separate Mounting Plate Vapor Pressure:

18  In-Line  Sump  @Normal Temp 7.27 psia

19 Casing Split:  @Max Temp 11.98 psia

20  Axial ● Radial Viscosity

21 Impeller  @Normal Temp 0.4455 cP

22  Between Bearings ● Overhung  @Max Temp 0.3741 cP

23 Pump Materials:  Flash Point o


F

24  Table H-1 Class S-6  Auto Ignition Point o


F

25  Shaft  Melting Point (or Pour Point) o


F

26  Sleeve  Corrosive/Erosive Agent NA

27  Gland  Concentration (% or ppm)


28  Site & Utility Data  Chloride Concentration (ppm) NA

29 Unusual Conditions:  Dust  Fumes  H S Concentration (ppm)


2 NA

30  Other Solids Content:

31  Utility Conditions:  Name of Solids Present NA

32 Steam: Drivers Heating  Concentration (ppm or % Wt)


33 Min. psig
o
F psig
o
F  Particle Size
34 Max. psig
o
F psig
o
F  Toxic ● Flammable  Other
35 Electricity: Drivers Heating Control Shutdown  Operating Conditions
36 Voltage  Pump Capacity 80 gpm

37 Hertz  Suction Pressure Minimum 0 psig

38 Phase Rated 0 psig

39 Cooling Water: Maximum 3.5 psig

40 Temp. Inlet
o
F Max Return
o
F  Discharge Pressure 86.86 psia

41 Press. Norm psig Design psig Differential Pressure 72.2 psi

42 Min Return psig Max Allow  P psig NPSH 5.3 ft

43 Water Source  Sealing Press psig Pressure @ Throat

44 Instrument Air: Max/Min Press / psi Service:  Cont.  Intermittent (Starts/Day )


45 Remarks: Cycling:  Temp.  Pressure  Frequency
46 Remarks:

47

48

49

50
Project/ Centrifugal Pump Seal Data Sheet
Location SMT
(non-Metric units) for P2714 A/B/C
General Notes
and References Drawing No. Sheet No. Rev.
0 Issued for Quotation
TS064443 1 of 2 0
Sources
No Date Revision By Ck Eng STANDARD FORM No. BSF-G-98

TS064443 P2714A_B Mechanical Seal.xls


Requisition / Order No.
1 Mechanical Seal or Packing
2 Seal Data:  Flow Rate Max/Min / gpm

3  API 610 Class Code (Appendix H)  Pressure Req'd Max/Min / psia

4  Seal Type  Temperature Req'd Max/Min /


o
F

5  Seal Size
6  Manufacturer Code Barrier Fluid:
7  Seal Drawing Number  API 610 Barrier Piping Plan (Fig. D-3)
8 Seal Construction:  Name of Fluid
9 Mounting  Temp Max/Min /
o
F

10 ● Cartridge  Specific Gravity @


o
F

11  Hooked Sleeve or Non-Cartridge  Vapor Pressure psia @


o
F

12  No Sleeve  Toxic  Flammable  Other


13  Pumping Ring Required  Jacket Required  Flow Rate Max/Min / gpm

14  Aux. Seal Device  Pressure Required Max/Min / psia

15 Seal Materials:  Temperature Req'd Max/Min /


o
F

16 Rotary Seal Ring CARBON Quench Fluid:


17 Gasket/Packing EPR  API 610 Quench Piping (Fig D-3)
18 Stationary Seal Ring SiC or Ni bond TC  Name of Liquid
19 Gasket/Packing EPR  Flow Rate gpm

20 Spring(s) HASTE ALLOY-C Mechanical Seal Piping


21 Bellows HASTE ALLOY-C  Primary Seal Flush Piping:
22 Seal Plate SS316  Tubing  Carbon Steel
23 Shaft Sleeves SS316 ● Pipe ● Stainless Steel
24 Throttle Bushing  Barrier Fluid, Quench, Drain, Vent Piping:
25 Shaft/Sleeve Gasket EPR  Tubing  Carbon Steel
26 Seal Plate Gasket EPR  Pipe ● Stainless Steel
27 Secondary Seal  Piping Assembly
28 Gland Taps:  Threaded  Unions ● Socket Welded

29 Flush (F) Drain (D) Barrier (B)  Seal Welds ● Flanged


30 Vent (V) Cooling (C) Heating (H)  Type Tube Fittings
31 Quench (Q) Required Accessories:
32 Seal Design Data: Reservoir  Material
33 Seal Mounting  Rotating  Stationary  Mount Reservoir on:
34 Single Seal Double or Tandem Seal  Pump Baseplate  Other
35 Inboard Outboard Pressure Gauge

36  Balance % % %  Temperature Gauge (Plans 21,22,23,32,41)


37  Face Width in in in Pressure Switch

38 Max Pressure Rating  Flow Indicator


39  Dynamic psi psi psi Heat Exchanger

40  Static psi psi psi Type

41 Min Pressure Rating Cyclone Separator

42  Dynamic psi psi psi Level Gauge

43  Static psi psi psi Other

44 Temperature Rating Remarks:

45  Minimum o
F o
F o
F Packing Data:
46  Maximum o
F o
F o
F Manufacturer

47 Seal Fluids Requirement Type

48 Flush Liquid: Size & No. Rings

49  API 610 Flush Piping Plan (Fig. D-2) Vendor to advise  Packing Injection Required
50  Name of Fluid Gasoline  Flow gpm @ psia

51  Temp. Min/Max 52 / 115


o
F  Lantern Ring
52  Specific Gravity 0.7519 @ 52
o
F

53  Specific Heat 0.556 Btu/lboF


Centrifugal Pump Seal Data Sheet
54  Vapor Pressure 11.98 psia @ 115 o
F (non-Metric units) for Pump
55  Toxic ● Flammable  Other P2714A/B/C
 Seal Heat Generated Btu/hr
Drawing No. Sheet No. Rev.

TS064443 2 of 2 0
STANDARD FORM No. BSF-G-98