Crop cycle
Stage Duration
Nursery 30 Days
3
Nursery and Selection of Verities
- Select the variety suitable to the season, good yielding and better shape,
suitable to the Green house production.
4
Land preparation and Planting
- MB ploughing fallowed by cultivation.
5
Pinching and Pruning
- Pinching operation was carried out at one month after transplanting
according to different methods like two shoot or three shoot system.
Irrigation
6
Production Expenses for capsicum grown under Greenhouse
6 Misalanius ₹ 5,639
Percentage of the total 0.93
7
Income
8
Total Investment for one Acre of Greenhouse
Return of
Investment Area Cost /sq.m Total Cost Dep. Year Interest Capital
9
With Subsidy With out subsidy
10