Escolar Documentos
Profissional Documentos
Cultura Documentos
Client: . Schlumberger
Clarification:
3. MATERIAL PRICE IS CONSIDERED AS PER MARKET PRICE AS ON TODAY. VALID FOR 1 WEEK
ONLY
7. DESIGN AND SUPPLY OF FOUNDATION BOLT/ANCHOR BOLTS IS NOT A PERT OF SSIS SCOPE.
8. ALL INSTRUMENTATION DESIGN AND SUPPLY ARE EXCLUDED FROM SSIS SCOPE.
3 DRAWING OF STRUCTURE NA
4 STRUCTURE CALCULATION NA
7 PWHT INCLUDED
9 PACKING EXCLUDED
10 INSTRUMENTS EXCLUDED
11 TPIA INCLUDED
12 SUPERVISION EXCLUDED
13 GALVANISING EXCLUDED
16 INSULATION EXCLUDED
17 TRANSPORTATION EXCLUDED
2. Material of Construction