Report No. 9: Centroid Calculation Group No.

2: 9B1G

Date:13 August Page 1 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

I. Propeller and Spinner Group

a. Centroid of PROPELLER
Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 17.0899 11.1322 80.7265 190.2481848 1379.607812
B 28.6118 9.9827 71.1581 285.6230159 2035.961326
C 20.7758 10.8094 61.7381 224.5739325 1282.658418
D 20.2597 10.7804 38.6509 218.4076699 783.0556387
E 28.031 9.9793 29.5155 279.7297583 827.3489805
F 17.0899 11.1322 20.0688 190.2481848 342.9737851
Total 131.858 63.8162 301.858 1388.83075 6651.60596

Centroid of PROPELLER
∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

1388.83075 6651.60596
ẋ = ẏ =
131.858 131.858

𝒙̇ = 𝟏𝟎. 𝟓𝟑𝟐𝟖 𝐲̇ = 𝟓𝟎. 𝟓𝟒𝟗𝟖𝟖


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 2 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 3 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

b. Centroid of SPINNER
Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 24.9052 3.7826 49.8086 94.20640952 1240.493145
B 11.7914 5.8532 52.6855 69.01742248 621.2358047
C 21.3418 10.4226 53.5428 222.4370447 1142.699729
D 21.5318 8.4585 46.932 182.1267303 1010.530438
E 24.5064 11.3328 48.8112 277.7261299 1196.186792
Total 104.077 39.85 251.78 845.513737 5211.14591

Centroid of SPINNER
∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

845.513737 5211.14591
ẋ = ẏ =
104.077 104.077

𝒙̇ = 𝟖. 𝟏𝟐𝟑𝟗 𝐲̇ = 𝟓𝟎. 𝟎𝟕𝟎𝟏


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 4 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 5 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

Centroid of the PROPELLER AND SPINNER GROUP


Component A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
Propeller 131.8581 63.8162 301.8579 1388.830746 6651.60596
Spinner 104.0766 39.8497 251.7801 845.5137369 5211.145908
Total 235.935 103.666 553.638 2234.34448 11862.7519

Centroid of PROPELLER AND SPINNER GROUP


∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

2234.34448 11862.7519
ẋ = ẏ =
235.935 235.935

𝒙̇ = 𝟗. 𝟒𝟕𝟎𝟏𝟕 𝐲̇ = 𝟓𝟎. 𝟐𝟕𝟗𝟕𝟒𝟔


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 6 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 7 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

II. Engine Group

a. Centroid of ENGINE
Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 2.3901 13.7262 48.2084 32.80699062 115.2228968
B 0.6949 16.9688 53.0141 11.79161912 36.83949809
C 32.1144 16.4517 47.6887 528.3364745 1531.493987
D 4.3006 16.9688 41.5885 72.97602128 178.8555031
E 464.7244 35.1227 46.5264 16322.37568 21621.95332
F 28.0977 44.7334 54.2555 1256.905653 1524.454762
Total 532.3221 143.9716 291.2816 18225.19244 25008.81997

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴
𝑥̇ = 𝟑𝟒. 𝟐𝟒 𝐢𝐧. 𝑦̇ = 𝟒𝟔. 𝟗𝟖𝟎𝟔 𝐢𝐧.
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 8 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 9 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

b. Centroid of COWLING
Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 14.8289 19.6855 57.2322 291.914311 848.6905706
B 130.6955 18.2198 49.9161 2381.245871 6523.809648
C 52.9442 19.757 40.2043 1046.018559 2128.5845
D 483.9981 40.367 51.7343 19537.5513 25039.3029
E 360.478 40.3642 39.3526 14550.40609 14185.74654
F 207.959 43.7875 30.5613 9106.004713 6355.497387
Total 1250.9037 182.181 269.0008 46913.14084 55081.63155

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟑𝟕. 𝟓𝟎𝟑𝟒 𝐢𝐧. 𝑦̇ = 𝟒𝟒. 𝟎𝟑𝟑𝟓 𝐢𝐧.


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 10 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 11 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

c. Centroid of OIL AND TANK SYSTEM


Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 21.148 23.2488 37.9484 491.6656224 802.5327632
B 29.9597 28.6587 37.0525 858.6060544 1110.081784
C 29.9597 34.2325 37.0525 1025.59543 1110.081784
D 56.3718 40.2335 35.3554 2268.034815 1993.047538
E 56.3718 46.6618 35.3554 2630.409657 1993.047538
Total 193.811 173.0353 182.7642 7274.31158 7008.791407

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟑𝟕. 𝟓𝟑𝟑𝟎 𝐢𝐧. 𝑦̇ = 𝟑𝟔. 𝟏𝟔𝟑𝟎 𝐢𝐧.


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 12 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 13 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

Centroid of the ENGINE GROUP


Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
Engine 532.3221 143.9716 291.2816 18225.19244 7112.736698
Cowling 1250.9037 182.181 269.0008 46913.14084 55081.63155
Oil and Tank System 193.811 173.0353 182.7642 7274.31158 7008.791407
Total 1977.0368 499.1879 743.0466 72412.64487 69203.15966

Centroid of the ENGINE GROUP

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟑𝟔. 𝟔𝟐𝟔𝟗 𝐢𝐧. 𝑦̇ = 𝟑𝟓. 𝟎𝟎𝟑𝟒 𝐢𝐧.


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 14 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 15 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

III. Fuselage Group

a. Centroid of CANOPY
Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 328.3132 109.4579 70.2419 35936.47341 23061.34296
B 139.4568 143.9751 69.3373 20078.30673 9669.557979
C 143.501 78.4125 58.6035 11252.27216 8409.660854
D 794.5211 107.7717 58.5286 85626.88963 46502.20765
E 553.9135 148.8725 58.5705 82462.48753 32442.99065
Total 1959.7056 588.4897 315.2818 235356.4295 120085.7601

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟏𝟐𝟎. 𝟎𝟗𝟕𝟖𝟓 𝐢𝐧. 𝑦̇ = 𝟔𝟏. 𝟐𝟕𝟕𝟒 𝐢𝐧.


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 16 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 17 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

b. Centroid of FUSELAGE
Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 248.3278 61.8116 44.8184 15349.53864 11129.65467
B 1940.4038 114.1236 41.4121 221445.8671 80356.19621
C 459.5971 105.5109 29.1578 48492.50366 13400.84032
D 220.1075 184.8795 60.4133 40693.36455 13297.42043
E 1277.5275 194.8983 47.503 248987.938 60686.38883
F 848.064 261.0123 50.3629 221355.1352 42710.96243
Total 4994.0277 922.2362 273.6675 796324.3471 221581.4629

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟏𝟓𝟗. 𝟒𝟓𝟓𝟑 𝐢𝐧. 𝑦̇ = 𝟒𝟒. 𝟑𝟔𝟗𝟑 𝐢𝐧.


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 18 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 19 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

c. Centroid of INSTRUMENT AND RADIO


Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 69.4961 70.5687 54.8477 4904.249432 3811.701244
B 26.2529 69.1748 48.8226 1816.039107 1281.734836
Total 95.749 139.7435 103.6703 6720.288539 5093.43608

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟕𝟎. 𝟏𝟖𝟔𝟓 𝐢𝐧. 𝑦̇ = 𝟓𝟑. 𝟏𝟗𝟓𝟕 𝐢𝐧.


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 20 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 21 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

d. Centroid of BATTERY, LIGHTS AND ELECTRICAL SYSTEM


Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 79.9994 61.6775 53.1977 4934.162994 4255.784081
Total 79.9994 61.6775 53.1977 4934.162994 4255.784081

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟔𝟏. 𝟔𝟕𝟕𝟓 𝐢𝐧. 𝑦̇ = 𝟓𝟑. 𝟏𝟗𝟕𝟕 𝐢𝐧.


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 22 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 23 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

e. Centroid of SEATS AND HARNESS


Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 6.5688 101.4765 68.1096 666.5788332 447.3983405
B 146.0665 99.0406 49.5439 14466.5138 7236.704069
C 8.9276 93.9611 37.9889 838.8471164 339.1497036
D 2.8756 81.6584 39.4694 234.816895 113.4982066
E 37.0281 88.6336 36.9808 3281.933804 1369.32876
F 30.5974 86.1139 34.8894 2634.861444 1067.524928
G 6.8215 83.5358 32.3825 569.8394597 220.8972238
H 12.616 89.8063 32.1185 1132.996281 405.206996
I 5.8486 91.6232 32.9235 535.8674475 192.5563821
J 6.5688 138.0069 68.4436 906.5397247 449.5923197
K 146.0665 135.5711 49.8778 19802.39608 7285.475674
L 8.9276 130.4915 38.3229 1164.975915 342.131522
M 2.8756 118.1888 39.8034 339.8637133 114.458657
N 37.0281 125.164 37.3147 4634.585108 1381.692443
O 30.5974 122.6443 35.2233 3752.596705 1077.741399
P 6.8215 120.0663 32.7165 819.0322655 223.1756048
Q 12.616 126.3367 32.4525 1593.863807 409.42074
R 5.8486 128.1536 33.2575 749.519145 194.5098145
Total 514.7002 1960.4726 731.8187 58125.62754 22870.46278

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟏𝟏𝟐. 𝟗𝟑𝟏 𝐢𝐧. 𝑦̇ = 𝟒𝟒. 𝟒𝟑𝟒𝟓 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 24 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 25 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

f. Centroid of PILOT AND PASSENGER


Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 67.8237 93.0739 65.8575 6312.616271 4466.699323
B 26.0207 93.6058 58.787 2435.68844 1529.678891
C 23.9523 89.1389 56.0704 2135.081674 1343.015042
D 2.3262 85.3672 53.4577 198.5811806 124.3533017
E 23.4063 80.8953 53.9269 1893.45966 1262.229199
F 3.4207 76.3041 53.998 261.0134349 184.7109586
G 105.4913 92.2334 50.0106 9729.821269 5275.683208
H 8.9971 92.6584 43.4173 833.6568906 390.6297898
I 18.1402 92.1129 40.8188 1670.946429 740.4611958
J 52.0077 84.835 43.0182 4412.07323 2237.27764
K 12.9734 78.2783 45.6016 1015.535697 591.6077974
L 45.4433 73.6311 40.0703 3346.040167 1820.926664
M 22.1527 67.6488 36.268 1498.603572 803.4341236
N 67.8237 129.6043 65.8575 8790.243162 4466.699323
O 26.0207 130.1362 58.787 3386.235019 1529.678891
P 23.9523 125.6693 56.0704 3010.068774 1343.015042
Q 2.3262 121.8976 53.4577 283.5581971 124.3533017
R 23.4063 117.4258 53.9269 2748.503503 1262.229199
S 3.4207 112.8345 53.998 385.9729742 184.7109586
T 105.4913 128.7638 50.0106 13583.46065 5275.683208
U 8.9971 129.1888 43.4173 1162.324552 390.6297898
V 18.1402 128.6433 40.8188 2333.615191 740.4611958
W 52.0077 121.3654 43.0182 6311.935314 2237.27764
X 12.9734 114.8087 45.6016 1489.459189 591.6077974
Y 45.4433 110.1615 40.0703 5006.102093 1820.926664
Z 22.1527 104.1792 36.268 2307.850564 803.4341236
Total 824.3112 2674.4615 1282.6046 86542.4471 41541.41427
∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟏𝟎𝟒. 𝟗𝟖𝟕𝟔 𝐢𝐧. 𝑦̇ = 𝟓𝟎. 𝟑𝟗𝟓𝟑 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 26 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 27 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

g. Centroid of BAGGAGE
Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 530.2922 152.0343 46.8539 80622.60342 24846.25771
Total 530.2922 152.0343 46.8539 80622.60342 24846.25771

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟏𝟓𝟐. 𝟎𝟑𝟒𝟑 𝐢𝐧. 𝑦̇ = 𝟒𝟔. 𝟖𝟓𝟑𝟗 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 28 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 29 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

Centroid of the FUSELAGE GROUP


Component A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
Canopy 1959.7056 588.4897 315.2818 235356.4295 120085.7601
Fuselage 4994.0277 922.2362 273.6675 796324.3471 221581.4629
Instrument and radio 95.749 139.7435 103.6703 6720.288539 5093.43608
Battery, lights and
electrical system 79.9994 61.6775 53.1977 4934.162994 4255.784081
Seats and harness 514.7002 1960.4726 731.8187 58125.62754 22870.46278
Pilot and passenger 824.3112 2674.4615 1282.6046 86542.4471 41541.41427
Baggage 530.2922 152.0343 46.8539 80622.60342 24846.25771
Total 8998.7853 6499.1153 2807.0945 1268625.906 440274.5779

Centroid of the FUSELAGE GROUP


∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟏𝟒𝟎. 𝟗𝟕𝟕𝟓 𝐢𝐧. 𝑦̇ = 𝟒𝟖. 𝟗𝟐𝟔 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 30 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 31 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

IV. Wing Group

a. Centroid of WINGS (including flaps, ailerons, trim tabs, and struts)


Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 349.3914 118.8875 77.9115 41538.27007 27221.60806
B 189.3335 113.202 72.4626 21432.93087 13719.59768
C 43.6417 141.9663 73.2389 6195.650675 3196.270102
D 28.2338 142.0027 70.8792 4009.275831 2001.189157
E 211.4748 107.3935 53.8144 22711.01893 11380.38948
F 19.257 107.8913 32.9253 2077.662764 7341.382698
Total 841.3322 731.3433 381.2319 97964.80914 64860.43717

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟏𝟏𝟔. 𝟒𝟑𝟒𝟗 𝐢𝐧. 𝑦̇ = 𝟔𝟗. 𝟏𝟐𝟒𝟑 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 32 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 33 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

b. Centroid of FUEL AND TANK SYSTEM


Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 192.0251 126.829 74.2415 24354.35141 14256.23146
Total 192.0251 126.829 74.2415 24354.35141 14256.23146

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟏𝟐𝟗. 𝟖𝟐𝟗𝟎𝐢𝐧. 𝑦̇ = 𝟕𝟒. 𝟐𝟒𝟏𝟓 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 34 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 35 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

Centroid of the WING GROUP


Component A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
Wings 841.3322 116.4349 69.1243 97960.43057 58156.49939
Fuel and
tank system 192.0251 126.829 74.2415 24354.35141 14256.23146
Total 1033.3573 243.2639 143.3658 122314.782 72412.73085

Centroid of the WING GROUP

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟏𝟏𝟖. 𝟑𝟔𝟔𝟑 𝐢𝐧. 𝑦̇ = 𝟕𝟎. 𝟎𝟕𝟓𝟏𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 36 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 37 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

V. Horizontal Tail Group

a. Centroid of Horizontal STABILIZER


Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 13.0769 281.3774 52.2703 3679.544122 683.5334861
B 14.0213 288.6955 52.4281 4047.886214 735.1101185
C 10.9658 295.5612 52.2894 3241.065007 573.3951025
D 13.0769 281.3774 51.0534 3679.544122 667.6202065
E 14.0213 288.6955 50.5003 4047.886214 708.0798564
F 10.9658 295.5612 50.6391 3241.065007 555.2982428
Total 76.128 1731.2682 309.1806 21936.99069 3923.037013

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟐𝟖𝟖. 𝟏𝟓𝟗𝟐𝟗𝐢𝐧. 𝑦̇ = 𝟓𝟏. 𝟓𝟑𝟐𝟏𝟐 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 38 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 39 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

b. Centroid of ELEVATOR
Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 5.8356 301.3211 52.0735 1758.389411 303.8801166
B 3.4691 305.9316 51.8549 1061.307314 179.8898336
C 5.8356 301.3211 50.8549 1758.389411 296.7688544
D 3.4691 305.9316 51.0736 1061.307314 177.1794258
E 2.2829 309.9218 51.4641 707.5204772 117.4873939
Total 20.8923 1524.4272 257.321 6346.913927 1075.205624

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟑𝟎𝟑. 𝟕𝟗𝟐𝟎𝐢𝐧. 𝑦̇ = 𝟓𝟏. 𝟒𝟔𝟒𝟐 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 40 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 41 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

Centroid of the HORIZONTAL TAIL GROUP


Component A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
Horizontal
Stabilizer 76.128 288.1592934 51.53211713 21936.99069 3923.037013
Elevator 20.8923 303.7920156 51.46420568 6346.913927 1075.205624
Total 97.0203 591.9513089 102.9963228 28283.90461 4998.242637

Centroid of the HORIZONTAL TAIL GROUP


∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟐𝟗𝟏. 𝟓𝟐𝟓𝟔𝐢𝐧. 𝑦̇ = 𝟓𝟏. 𝟓𝟏𝟕𝟒𝟗 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 42 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 43 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

VI. Vertical Tail Group

a. Centroid of VERTICAL TAIL AND FINS


Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 85.586 301.3388 96.2397 25790.38254 8236.770964
B 136.3354 291.8743 89.5252 39792.79944 12205.45395
C 163.0462 285.8085 80.0493 46599.98985 13051.73418
D 183.691 279.8891 70.6299 51413.10867 12974.07696
E 210.52 273.89 61.2521 57659.3228 12894.79209
F 138.7405 276.7402 42.8849 38395.07372 5949.872468
Total 917.9191 1709.5409 440.5811 259650.677 65312.70062

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟐𝟖𝟐. 𝟖𝟔𝟖𝟖𝐢𝐧. 𝑦̇ = 𝟕𝟏. 𝟏𝟓𝟑 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 44 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 45 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

b. Centroid of RUDDER
Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 72.9178 305.0926 90.953 22246.68119 6632.092663
B 64.2762 301.9039 84.4763 19405.23546 5429.815554
C 65.0852 298.9334 78.425 19456.14013 5104.30681
D 103.0466 295.1114 70.6386 30410.22639 7279.067559
E 104.3944 290.4494 61.1416 30321.29084 6382.840647
Total 409.7202 1491.4907 385.6345 121839.574 30828.12323

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟐𝟗𝟕. 𝟑𝟕𝟐𝟔𝟑 𝐢𝐧. 𝑦̇ = 𝟕𝟓. 𝟐𝟒𝟏𝟗 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 46 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 47 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

Centroid of the VERTICAL TAIL GROUP


Component A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
Vertical tail
and fins 917.9191 1709.5409 440.5811 259650.677 65312.70062
Rudder 409.7202 1491.4907 385.6345 121839.574 30828.12323
Total 1327.6393 3201.0316 826.2156 381490.251 96140.82385

Centroid of the VERTICAL TAIL GROUP


∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟐𝟖𝟕. 𝟑𝟒𝟒𝟖 𝐢𝐧. 𝑦̇ = 𝟕𝟐. 𝟒𝟏𝟒𝟖𝟔𝟕 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 48 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 49 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

VII. Landing Gear Group

a. Centroid of NOSE LANDING GEAR


Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 28.306 54.7901 22.3622 1550.889 632.9844
B 12.0121 51.8913 15.6719 623.3235 188.2524
C 11.1204 53.9087 15.3483 599.4863 170.6792
D 81.9943 54.4931 10.0225 4468.124 821.7879
E 76.9845 55.1094 6.1201 4242.57 471.1528
F 19.766 53.1215 1.9987 1050 39.5063
Total 230.1833 323.3141 71.5237 12534.3928 2324.363

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟓𝟒. 𝟒𝟓𝟒 𝐢𝐧. 𝑦̇ = 𝟏𝟎. 𝟎𝟗𝟕𝟗 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 50 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 51 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

b. Centroid of MAIN LANDING GEAR


Section A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
A 39.2731 131.9681 21.0088 5182.796 825.0807
B 49.9961 135.0512 20.239 6752.033 1011.871
C 67.1122 135.853 9.7628 9117.394 655.203
D 91.1014 135.9959 5.8539 12389.42 533.2985
E 16.04 133.2422 1.6772 2137.205 26.90229
Total 263.5228 672.1104 58.5417 35578.848 3052.35549

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟏𝟑𝟓. 𝟎𝟏𝟐𝟒 𝐢𝐧. 𝑦̇ = 𝟏𝟏. 𝟓𝟖𝟐𝟖𝟗 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 52 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 53 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

Centroid of LANDING GEAR GROUP


Component A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
Nose landing
gear 230.1833 54.45396256 10.09787852 12534.3928 2324.363
Main landing
gear 263.5228 135.0124088 11.58288956 35578.848 3052.35549
Total 493.7061 189.4663714 21.68076808 48113.2408 5376.71849

Centroid of LANDING GEAR GROUP


∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟗𝟕. 𝟒𝟓𝟑𝟐 𝐢𝐧. 𝑦̇ = 𝟏𝟎. 𝟖𝟗𝟎𝟓 𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 54 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:
Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 55 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating:

CENTROID OF THE AIRCRAFT

CENTROID OF THE AIRCRAFT


Group A (in²) x' (in) y' (in) Ax' (in²) Ay' (in²)
I 235.9347 103.6659 553.638 2234.344483 11862.75187
II 1977.0368 499.1879 743.0466 72412.64487 69203.15966
III 8998.7853 6499.1153 2807.0945 1268625.906 440274.5779
IV 1033.3573 243.2639 143.3658 122314.782 72412.73085
V 97.0203 591.9513089 102.9963228 28283.90461 4998.242637
VI 1327.6393 580.2414343 146.3948956 381490.251 96140.82385
VII 493.7061 189.4663714 21.68076808 48113.2408 5376.71849
Total 14163.4798 8706.892115 4518.216887 1923475.074 700269.0053

∑ 𝐴𝑥 ′ ∑ 𝐴𝑦 ′
𝑥̇ = ∑𝐴
𝑦̇ = ∑𝐴

𝑥̇ = 𝟏𝟑𝟓. 𝟖𝟎𝟓𝟐𝟔𝟏𝟐 𝐢𝐧. 𝑦̇ = 𝟒𝟗. 𝟒𝟒𝟏𝟖𝟕𝟓𝟓𝟐𝐢𝐧


Report No. 9: Centroid Calculation Group No. 2: 9B1G

Date:13 August Page 56 of 56


Instructor: Engr. Jeq Zyrius A. Sudweste
2018
Issue No.: 1 Rating: