Você está na página 1de 5

MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD.

From, To,
Office of the Superintending Engineer, The Chief Engineer (D&P),
Testing & Communication Circle, M. S. E. T. Co. Ltd.,
4th Floor, MSEB Adm. Bldg., CO, Mumbai.
Sector-17, Vashi, Navi Mumbai-400703.
Tel: ( 022) 27656040 / 27656039 Fax: 27653463
E-Mail: se7500@mahatransco.in
CIN No.U40109MH2005SGC153646
Website: www.mahatransco.in
Ref: SE/TCC/VSH/Tech/No. 129 Date: 27.04.2018

Sub: - Occurrence Report of220KV Taloja Substation on 17.04.2018 @ 18:17 Hrs

Ref: EE (T) Panvel Mail dtd.25.04.2018

OCCURRENCE ANALYSIS REPORT FORMAT

1. Date & Time of Occurrence :17.04.2018(18:17 Hrs)


2. Name of Sub-station :220KV Taloja Substation
3. SAP Notification No. : 1. 220 kV Taloja-Apta Line (20057402)
2. 220kV Taloja-OCIL-II Line
(Line was already on outage-20057263)
3. 220/100kV 200MVA ADITYA ICT
(10299451)
4. 220/22kV 50MVA ALSTOM T/F
(10299452)
5. 220kV Bus-Coupler (10299449)
4. Name of Feeder (bays) / Equipment’s involved: 1. 220 kV Taloja-Apta Line

2. 220kV Taloja-OCIL-II Line


3. 220/100kV 200MVA ADITYA ICT
4. 220/22kV 50MVA ALSTOM T/F
5. 220kV Bus-Coupler

5. Date & Time of Restoration :Main Bus section-II restored at 18:54 hrs
on 17.04.2018.
6. Detailed of SLD & sub-station interconnection: Attached separately
7. Brief Summary of occurrence: On 17.04.2018 @ 18:17 hrs, 100 kV Taloja-Pal Line at 100 kV
Taloja Sub-Station tripped from both end in Zone 1 from Pal end & in Zone 2 from Taloja end for R
Phase to Earth fault. At the same time, Line Differential & LBB Protection of 220 kV Taloja-OCIL
Line II (which was under outage) operated, causing isolation of 220 kV Bus-Section-II at 220 kV
Taloja Sub-Station.
8. Conditions prior to Occurrence : Cloudy & Dust Storm
9. Conditions after Occurrence : Cloudy & Dust Storm

10. Bus Configuration & load Prior to occurrence :

Sr. No. 220 KV Main Bus Section– I 220 KV Main Bus Section – II
Name of bays (Feeder/ Loads (MW) Name of bays (Feeder/ Loads (MW)
ICTs/TFs) ICTs/TFs)
1 220kV Taloja – Kalwa Line 48.48 220kV Taloja – Apta Line 132.5
2 220kV Taloja – OCIL I Line 7.57 220kV Taloja – OCIL II Line -

3 220/100kV 100MVA CGL ICT 17.15 200/100kV 200MVA 32.87


ADITYA ICT
4 220/22kV 50MVA CGL T/F 12.23 220/22kV 50MVA ALSTOM 12
T/F

11. Load/Power loss and / or generation (In MW): The total 22 KV feeder load loss of about 12 MW
is observed for 05 min as 220/22 KV 50 MVA ALSTOM make T/F tripped due to LBB operation of
220 KV Taloja-OCIL Ckt-II. (220 KV Main Bus Section-2)
12. Interrupted and duration of interruption:

Sr. Name of the Feeder / Occurrence Occurrence Restoration Restoration Time


No. Equipment Date Time Date
1 220kV Bus Coupler 17.04.2018 18:17Hrs 17.04.2018 18:54 Hrs.

2 220kV Taloja – Apta Line 17.04.2018 18:17Hrs 17.04.2018 18:54 Hrs.


3 220/100kV 200MVADITYA 17.04.2018 18:17Hrs 17.04.2018 18:55 Hrs.
ICT
4 220/22kV 50MVA 17.04.2018 18:17Hrs 17.04.2018 18:57 Hrs.
ALSTOM T/F
5 220kV Taloja – OCIL II Line 17.04.2018 10:15Hrs 20.04.2018 20:00 Hrs.
(Under Outage)

13. Load/Power loss due to operation of Load Trimming Scheme (LTS)/Special Protection
Scheme (SPS)/Under Voltage Load Trimming Scheme (UVLS).
a) Please specify whether existing Load trimming /SPS/ UVLS schemes if any, are serving
intended purpose.
b) Please specify whether load trimming scheme or special protection scheme operated as
desired or Non-operation/maloperation, any modifications in LTS/SPS required.
c) Please specify Settings adopted for LTS/SPS/UVLS & revision required, if any.

Sr. Name of Feeder/bays Load Relief obtained


No. FROM TO Duration MW
NIL NIL NIL NIL NIL
14. Relay/Flag Indications :

Sr. Name of Local End Indication Remote End Indication


No. Feeder/bays WI RI WI RI
1 220kV Taloja – Nil B.B. Trip Relay Nil Nil
Apta Line 87M2X
2 220kV Taloja – Line Line Differential Line Line Differential Relay
OCIL II Line Differential Relay (ER Differential (ER CSC103)
Prot. Optd. CSC103) Prot. Optd. Trip Relay
LBB Prot. Line Back-Up
Optd. Relay (ER
CSC211)
CBF Optd.
Trip Relay 86
3 220/100kV Nil B.B. Trip Relay - -
200MVA 87M2X
ADITYA ICT Trip Relay 86
4 220/22kV Nil B.B. Trip Relay - -
50MVA 87M2X
ALSTOM T/F Trip Relay 86
5 220kV Bus- Nil B.B. Trip Relay - -
coupler 87M2X

15. Performance & Indication of PLCC : NA

Sr. Name of Local End Remote End


No Feeder/b Permissive Permissive Direct Direct Permissive Permissive Direct Direct
. ays trip - I trip - II trip-I trip-II trip - I trip - II trip-I trip-II
Tx Rx Tx Rx Tx Rx Tx Rx Tx Rx Tx Rx Tx Rx Tx Rx

(Please specify whether advancement of counter after operation during occurrence observed)

16. Restoration :
Sr. No. Name of Feeder/bays Date & Time Duration Remark
From To (hrs)

1 220kV Bus Coupler 17.04.2018 17.04.2018


18:17 Hrs 18:54 Hrs
0:37
2 220kV Taloja – Apta 17.04.2018 17.04.2018
Line 18:17 Hrs 18:54 Hrs
0:37
3 220/100kV 200MVA 17.04.2018 17.04.2018
ADITYA ICT 18:17 Hrs 18:55 Hrs
0:38
4 220/22kV 50MVA 17.04.2018 17.04.2018
ALSTOM T/F 18:17 Hrs 18:57 Hrs
0:40
5 220kV Taloja – OCIL II 17.04.2018 20.04.2018 Under outage
Line 10:15 Hrs 20:00 Hrs
(Outage availed)
17. System data including soft copies of DRs (in Comtrade format _ cfg & dat file, of both end in
case of line), Event Logger (EL) log and relevant data related to occurrence of SMS, SAS &
SCADA. : DR attached separately

18. Observations & Analysis of occurrence


1. On 17.04.2018 @ 18:17 hrs, 100 kV Taloja-Pal Line at 100 kV Taloja Sub-Station tripped from
both end i.e. in Zone 1 from Pal end & in Zone 2 from Taloja end for R Phase to Earth fault.
PLCC protection coupler was not in service at 100 KV Pal Sub-Station due to incomplete PLCC
wiring, hence no carrier aided tripping observed.
2. At the same time, Line Differential & LBB Protection of 220 kV Taloja-OCIL Ckt- II operated
(which was under outage), causing isolation of 220 kV Bus-Section-II at 220 kV Taloja Sub-
Station. It was observed that earthing was provided on bus side at 220kV Taloja end and on-
line side at 220 KV OCIL end for the purpose of maintenance work.
3. As, at the same instant, there was a fault on 100 kV Taloja-Pal Line due to snapping of earth
conductor on M/C tower between L.No. 7 & 8 (L. No. starts from 220 KV Pal Sub-Station end),
differential protection (Differential pick up setting: 0.2, CTR:800/1) of 220 KV Taloja-OCIL
Ckt-II operated due to circulation of zero sequence current through earth and 220 KV CTs at
Taloja end.
4. Further, it is seen from DRs that fault current of 100 KV Taloja-Pal line and the Circulating
current on 220 KV Taloja-OCIL line-2 (which was under outage) continues up to Zone-II time
(i.e. 400 ms approx). The LBB is operated due to CBF I EF & PH setting in BU relay CSC 211
(Backup relay internal LBB function) where the E/F setting was kept same as O/C setting i.e.
0.8 Amp with 200 msec time delay. Now the setting of CBF I EF in BU relay of 220kV Taloja –
OCIL Ckt-II is revised and set on higher possible value i.e.100A.
5. Due to operation of LBB protection, all elements connected to 220 KV Main Bus Section-2
tripped. The total 22 KV feeder load loss of about 12 MW is observed for 05 min as 220/22 KV
50 MVA ALSTOM make T/F tripped due to LBB operation of 220 KV Taloja-OCIL Ckt-II.

19. Sequence of Events : As above at Sr. No. 14 and 16


a) Line tripping& Restoration
b) ICT/TF tripping& Restoration
c) Relay Operations observed
20. Diagnostic test records of Equipment’s/lines including recent ones in soft. Past trends of
diagnostic testing results if results are alarming along with action taken or proposed.
21. Protection related issue if any : Nil
a) Non-operation of protection system & reason for the same
b) Maloperation of protection system & reason for the same
c) Protection system Non-operation/Maloperation due to human error
22. Operational issues leading to Nonoperation/Maloperation of protection system, if any: NIL
23. Remedial Measures suggested & action taken in order to avoid recurrence.

 It is recommended to provide earthing at line LA side instead of providing permanent earthing


on Line Isolator during line outages.
 The PLCC protection coupler taken in service at 100 KV Pal end and trials have been taken. It is
instructed to check the healthiness of protection coupler wherever provided for all other lines.
 The setting of CBF I EF in BU relay of 220kV Taloja – OCIL II line is revised and set on higher
possible value i.e.100A.

Encl: SLD and DR.

(Moreshwar S. Jangde)
Superintending Engineer,
Testing & Communication Circle, Vashi.

Copy s.w. rs.to:


1) The Chief Engineer, PAC, MSETCL, Airoli
2) The Chief Engineer, Trans.(O&M), C.O. MSETCL, Mumbai
3) The Chief Engineer, EHV PC(O&M) Zone MSETCL, Vashi
4) The SE, EHV (O&M) Circle, MSETCL Panvel
Copy to:
1) The Executive Engineer, EHV(O&M) Division, MSETCL, Panvel
2) The Executive Engineer, EHV Testing Division, MSETCL, Panvel