Start Of The
Project
ARCHITECTURAL DRAWINGS
APPROVAL FROM ZONESCORP
‐ Online submission
NOCs ‐ NOC approval requires minimum 1 month
‐ Can proceed with further submission after receiving payment receipt
Requirements
prior to TPD
prior to TPD
submission
‐ Manual submission
‐ 3‐4 weeks required
Approval from third party
Water tank location
(Water tank capacity
Water tank capacity required)
Supply arrangement
TRM Civil design
‐ Email submission ‐ Online submission
‐ 1 week required ‐ 3‐4 days required
Requirements for
TPD submission
Architectural Structural
Submission Submission
‐ Online submission
Online submission ‐ Online submission
Online submission
‐ 4‐5 weeks required ‐ 4‐5 weeks required
Drainage
submission
Documents
E.H.C
Site Handover Letter
Get The Building Undertaking Letter
Permit
SHANKLAND COX LTD
TOWN PLANNING DEPARTMENT
DOCUMENTS AND DRAWINGS REQUIRMENTS
ONLINE SITE (AL‐AIN)
https://am.abudhabi.ae/ESMetro/Default.aspx
DOCUMENTS:
1. REQUEST FOR BUILDING PERMIT 01 (STAMP & SIGN ON LETTER HEAD)
2. REQUEST FOR BUILDING PERMIT 02 (STAMP & SIGN+CLIENT SIGNATURE)
3. CONSULTANT UNDERTAKINGS (STAMP & SIGN+CLIENT SIGN )
4. ESTIMATED COST (STAMP AND SIGN+CLIENT SIGNATURE ON LETTER HEAD)
5. LOCATION PICTURES (STAMP AND SIGN)
6. FURNITURE PICTURES (CAN BE MERGED WITH LOCATION PICTURES OR
MADE SEPRATE)
7. MANDATED CONSULTANT (APPOINTMENT LETTER)
8. AFFECTION PLAN (SITE PLAN)
9. APPROVED SIGNATURE
10. SIGNATURE AUTHORISATION LETTER
11. CHECK LIST (STAMP AND SIGN)
12. UPDATED CLIENT PASSPORT
13. DED‐CLASSIFICATION CERTIFICATE
14. PROFESSIONAL LICENSE ALAIN‐ 2017
15. AADC ELECTICAL APPROVAL (WITH OFFICE STAMP)
16. AADC WATER TANK APPROVAL (WITH OFFICE STAMP)
17. CIVIL DEFENCE APPROVAL (WITH OFFICE STAMP)
18. DOT APPROVAL
19. UPC APPROVAL/ ESTIDAMA
20. ADEC APPROVAL (IF SCHOOL PROJECT)
21. FOOD AUTHORITY APPROVAL (IF REQUIRED)
22. PREVIOUSLY APPROVED DRAWINGS ( IF ANY)
ARCHITECTURE DRAWINGS: (ONLY BLACK AND WHITE – COLOUR 7) ON
MODEL SPACE ONLY‐ DELETE ALL LINE IN LAYOUT
1. PERSPECTIVE LAYOUT
2. MASTER PLAN (IF ANY)
3. SITE PLAN
4. FLOOR PLANS
5. ELEVATIONS AND SECTIONS
6. DETAILS (STAIRS, PARAPET..ETC)
7. BUILDING OUTLINE‐ A15
DOCUMENTS :
1. REQUEST FOR DRAWING APPROVAL (FILLED STAMPED AND SIGN)
2. INFORMATION ABOUT THE BUILDING (FILLED AND STAMPED)
3. CONSULTANT LETTER FOR APPROVAL (COVER LETTER STAMPED AND SIGNED)
4. MANDATED CONSULTANT (APPOINMENT LETTER)
5. PREVENTION AND SAFETY CERTIFICATE
6. EMIRATES CODE PURCHASE BILL
7. SIGNATURE AUTHORISATION LETTER
8. APPROVED SIGNATURE
9. AFFECTION PLAN (SITE PLAN)
10. PREVIOUS APPROVAL LETTER (IF ANY)
11. PREVIOUSLY APPROVED DRAWINGS (IF ANY)
DRAWINGS : (All drawings in PDF with sign and stamp)
1. PERSPECTIVE LAYOUT
2. FIRE CODE STUDY
3. SITE PLAN
4. FLOOR PLANS
5. SECTIONS & ELEVATIONS
6. SERVICE BLOCK PLANS AND DETAILS (IF ANY)
7. STAIR CASE AND RAILING DETAILS (IF ANY)
INFORMATION REQUIRED
1. ASSMEMBLY POINT
2. FIRE EXITS
3. FIRE HYDRANTS/ LANDING VALVES/ BREECHING INLETS
4. FIRE HOSE REELS (FHC)
5. EXTINGUISHERS
6. EXIT SIGNS
DOCUMENTS online submission (PDF FORMAT‐ Max 7 MB) :
1. AFFECTION PLAN (SITE PLAN)
2. MANDATED CONSULTANT (APPOINMENT LETTER)
3. MINISTRY OF SOCIAL AFFAIRS APPROVAL LETTER ( IF REQ)
4. PAYMENT RECIEPT (AFTER PRELIMINARY APPROVAL)
5. PREVIOUS APPROVAL LETTER / DWGS (IF ANY)
DRAWINGS online submission (PDF AND CAD FORMAT‐ Max 7MB) :
FOR GENERAL PROJECTS:
1. PARKING AND CIRCULATION PLAN
2. CAD STANDARDS DRAWINGS‐
‐ PLOT
‐ ROAD
‐ SERVICE (IF REQ)
FOR SCHOOL PROJECTS (TIS):
1. SITE LOCATION
2. PARKING AND CIRCULATION PLANS
3. SCHOOL SAFETY ZONE
4. CAD STANDARDS DRAWINGS‐
‐ PLOT
‐ ROAD
‐ SERVICE (IF REQ)
PAYMENT DOCUMENTS :
1. SITE PLAN
2. PROFESSIONAL LICENSE ALAIN‐ 2014
3. APPLICATION NUMBER (PRINT SCREEN OF SUBMISSION PAGE)
DOCUMENTS:
1. APPLICATION FOR APPROVAL
2. MANDATED CONSULTANT (APPOINTMENT LETTER)
3. AFFECTION PLAN (SITE PLAN)
4. PERPECTIVE
5. PROFESSIONAL LICENSE ALAIN‐ 2017
6. PREVIOUSLY APPROVED LETTER AND DRAWINGS (IF ANY)
DRAWINGS: A3 SIZE‐ 2 COPIES (ALL DRAWINGS TO BE STAMPED)
1. MASTER PLAN (IF ANY)
2. SITE PLAN
3. FLOOR PLANS
4. ELECTRIC ROOM ENTRANCE MAIN ELEVATION
5. SECTIONS
6. DETAILED FLOOR PLAN SHOWING TRANSFORMER ROOM/GENERATOR/LV ROOM
7. DETAILED ELEVATION PART OF THE AADC SIDE SHOWING THE LABLED SIGNAGES
8. DETAILS OF TRENCH.. ETC
9. STRCTURE DRAWINGS SHOWING THE POWER SCHEMATIC DIAGRAM
DRAINAGE DEPT
DOCUMENTS AND DRAWINGS REQUIRMENTS
DOCUMENTS (A4 SIZE):
1. NOC FROM ADSSC‐ 2SETS
2. (MAKE SURE THE STAMP DATE IS WITHIN 6 MONTHS OF SUBMISSION) [IN
CASE DATE IS 6MONTHS BEFORE.. ISSUE OBC LETTER AGAIN]
3. SITE PLAN ‐2 SETS (SAME AS ABOVE)
4. TPD LETTER
5. COVER LETTER
DRAWINGS (A3 SIZE):
6. APPROVED TPD ARCH DRAWINGS‐ 2SETS
7. DRAINAGE DRAWINGS‐ 2 SETS
Make CD of two folders‐ documents and drawings. Submit hardcopy A3 and CD in the tourism office.
DOCUMENTS :
1. AFFECTION PLAN (SITE PLAN)
2. MANDATED CONSULTANT (APPOINMENT LETTER)
3. PHOTOES ( AFOLDER WITH ALL THE SITE PHOTOES)
4. LOCATION PICTURES
5. COVER LETTER
6. PCR REQUEST FORM
7. PROFESSIONAL LICENSE ALAIN‐ 2017
DRAWINGS (PDF FORMAT) :
1. FULL SET DRAWINGS
( PERSPECTIVE, SITE, FLOOR PLANS, ELEVATIONS AND SECTIONS)
FOOD AUTHORITY
DOCUMENTS AND DRAWINGS REQUIRMENTS
To be discussed with the engineer in food control authority department
DOCUMENTS (A4 SIZE):
1. COVER LETTER
2. SITE PLAN
3. TPD COMMENTS SHEET ( FOOD AUTHORITY COMMENT HIGHLIGHITED )
DRAWINGS (A1 SIZE/ STAMPED SHEETS):
4. EQUIPMENT LAYOUTS
اﻟﻤﮭﻨﺪس
اﻹﺳﺘﺸﺎري اﻟﺒﻨﺪ اﻟﺘﻔﺼﯿﻠﻲ اﻟﺒﻨﺪ اﻟﺮﺋﯿﺴﻲ م
اﻟﻤﺮاﺟﻊ
اﻹﺷﺘﺮاطﺎت
.١
اﻟﻌﺎﻣﺔ
ﻧﺴﺒﺔ اﻟﺒﻨﺎء
ﺗﻮﺟﯿﮫ
اﻟﻤﺒﺎﻧﻲ
اﻟﻤﺪاﺧﻞ
اﻻرﺗﺪادات
AACM-CP-CF-29
V 1.0 October 11, 2012
اﻷﺳﻮار
ﻏﺮﻓﺔ
اﻟﻜﮭﺮﺑﺎء
2 0
ﻣﺒﻨﻰ
اﻟﻤﺤﻼت و
اﻟﻤﻜﺎﺗﺐ .٨
اﻟﺸﺒﺮات /
.٩
اﻟﻤﺨﺎزن
AACM-CP-CF-29
V 1.0 October 11, 2012
طﺎﺑﻖ
.١٠
اﻟﺴﺮداب
.١١
.١٢اﻟﻮاﺟﮭﺎت
.١٣
1 20
اﻟﺪرج .١٤
:
اﻟﻤﺼﺎدر:
AACM-CP-CF-29
V 1.0 October 11, 2012