No.

REKERIMENTU ATU REALIZA


PROJETO IDA
1 OSAN
2 RAI & DOCUMENTU
3 DESENHO/ PLANTA
4 REKURSU HUMANU
5 MATERIAL / EQUIPAMENTU
6 BEE

IDENTIFIKA ESCOPO DO PROJETO

No. DESCRISAUN DO SERVISU


1. SERVISU DAHULUK
2. SERVISU BA FUNDASAUN
3. SERVISU BA BETAUN ARMADU
4. SERVISU DINDING/PAREDI
5. SERVISU MONTA ARUS ODAMATAN NO JANELA
6. SERVISU KAKULUK
7. SERVISU REBOKU/PLESTERAN
8. SERVISU ATERU IHA PARTE LANTAI OKOS
9. SERVISU COR LANTAI
10. SERVISU NAHE KERAMIK (pasangan lantai)
11. SERVISU PLAFOND
12. SERVISU MONTA ODAMATAN NO JANELA
13. SERVISU PINTURAS
14. SERVISU KOMPLETARES
No. DESCRISAUN DO SERVISO

I. SERVISU BA FUNDASAUN NIA


1. Servisu Dahuluk
a. Limpeza Terrenu
b. Monta Estaka
c. Harii Armazen & Ofisina
2. Servisu Ke'e Rai Nian
a. Ke'e Rai Ba Fundasaun
3. Servisu Hada Fundasaun Nian
a. Aterrru Rai-henek Iha Fundasaun Nia Okos
b. Hada Fatuk La uza Argamassa
c. Hada Fundasaun
d. Aterru Fila Fali Rai Ne'ebe Ke'e

II. SERVISU BETAUN & PAREDI


1. Servisu Betaun Armadu
a. Sloof
b. Koluna
c. Sinta Jeral
d. Baki Iha Varanda Nian
2. Betaun La Armadu
a. Laje (1:2:3)
b. Betaun Cor ( 1:2:3 ) Ba WC & Neut
3. Paredi
a. Deskrisaun Paredi Eixo Horizontal
b. Deskrisaun Paredi Eixo Vertikal
c. Montazen Paredi Kuda-Kuda
4. Arus
a. Arus Odamatan & Janela
b. Ankru

III. SERVISU BA KAKULUK NIAN


1. Armadura Kakuluk Nian
a. Servisu Kuda-Kuda
b. Baut & Plat Besi
c. Servisu Lisplank
2. Servisu Taka Kakuluk
a. Taka Kalen Ho Material Kalen
b. Monta Perabung

IV. SERVISU BA PLAFOND NIAN


1. Ai Plafond Nian
a. Armadura Ba Plafond Laran
b. Armadura Ba Plafond Laran
c. Balok Gantung
2. Montazen Plafond Nian
a. Montazen Plafond Laran
b. Montazen Plafond Liur
c. Les Pinggir Plafond Laran

No. DESCRISAUN DO SERVISO

V. SERVISU BA REBOKA NIAN


1. Reboka Paredi
2. Reboka Paredi Iha Sinta Jeral nia Leten
3. Kose Sementi Been

VI. SERVISU BA LAJE NIAN


1. Aterru Rai Iha Laje Nia Okos
2. Aterru Agregadu Iha Laje Nia Okos
3. Aterru Rai-henek Iha Laje Nia Okos
4. Nahe Azuleiju
a. Nahe Azuleiju (20x20)
b. Nahe Azuleiju (30x30)

VII. SERVISU BA ODAMATAN & JANELA


1. Odamatan
2. Janela
3. Ventilasi
4. Save & Dobralisa
a. Save
b. Dobralisa

VIII. SERVISU BA PINTURA NIAN


1. Pinta Paredi
2. Pinta Paredi Iha Sinta Jeral Nia Leten
3. Pinta Koluna & Sinta
4. Pinta Arus Odamatan & Janela
5. Pinta Plafond Laran & Liur

IX. SERVISU KOMPLETARIA LARAN & LIUR


1. Servisu instalasaun Fiu
2. Servisu Monta Lampu
3. Servisu Monta Stop Kontak
4. Servisu Monta Sakelar Tunggal
5. Servisu Monta Sakelar Ganda
6. Servisu Monta Panel
7. Servisu Eskavasaun Rai ba Septicktank
8. Servisu Aterru Rai henek ba septicktank
9. Servisu Cor Laje Ba Septicktank
10. Servisu Hada Batako Ba septicktank
11. Servisu Instalasaun Bee Foer Ho Pipa PVC 4"
12. Servisu Instalasaun Bee Foer Ho Pipa PVC 2"
13. Servisu Instalasaun Be'e Mos Ho Pipa PVC 3/4"
2.5 Volume Servisu
Volume servisu katak servisu ida ne’ebe hanesan halo kalkulasaun total volume servisu nian
ne’ebe iha unidade ida, volume mos bele dehan hanesan Kubiku servisu nian. Kubiku ne’ebe dehan ne’e
iha siknifika laos hanesan volume ne’ebe tebes, maibe parte total volume servisu ne’ebe iha unidade ida.
Volume servisu ne’e kalkula tuir iha dezeño tekniku husi konstrusaun ida ne’ebe sei kontrui ba.parte hotu
husi element konstrusaun ne’ebe iha ba dezeño tekniku tenki kalkula kompletu no teliti para kalkulasaun
volume servisu akurat no kompletu.

KALKULASAUN VOLUME
I. SERVISU BA FUNDASAUN NIAN
1. Servisu Dahuluk
a. Limpeza Terrenu

Medida Unidade
Komprimentu 18 m
Largura 16 m
Area KxL
288 m²
Volume 288 m²

b. Monta Estaka

Komprimentu 15 m
Largura 13 m
Perimetru 2x(P+L)
2 x ( 15+13)
56 m
Volume 56 m

Panjang Tiang 1 m
Jarak Ting ke tiang 1;5 m
Banyak Tiang 56/1,5
37.3333333 Bh
38 Bh

Microsoft Confidential 08/15/2018 5


Ai kabelak (3x20x400) cm
Ai Ring (5x7x100) cm
V. Ai kabelak 56x0,03x0.20
0.336 m³
V. Ai Ring 38x1x0,05x0,07
0.133 m³
Total 0.469 m³
Ai restu 10% 0.0469 m³
Volume Total 0.5159 m³
c. Harii Armazen & Ofisina

Medida Unidade
Komprimentu 6 m
Largura 5 m
Area 30 m²
Volume 30 m²

2. Servisu ke'e Rai Nian


a. ke'e Rai ba Fundasaun
EIXO VERTIKAL
No. Eixo Naruk Unidade
1.1 A-K 12 m
1.2 B-K 12 m
1.3 C-I 4 m
1.4 D-H 2 m
1.5 E-K 12 m
ƩV 42 m

EIXO HORIZONTAL
No. Eixo Naruk Unidade
1.1 F-A 10 m
1.2 G-B 6 m
1.3 H-A 10 m
1.4 I-A 10 m
1.5 J-B 6 m
K-A 10 m
ƩH 52 m

Komprimentu ba rai ne'ebe ke'e mak = 42+52


= 94 m
Medida Unidade
komprimentu 94 m
Largura 0.77 m
Altura 0.8 m
Area 0.616 m²
Volume 57.904 m³

# Seksaun Rai ne'ebe ke'e

3. Servisu Hada Fundasaun nian


a. Aterru rai-henek iha fundasaun nia okos

Medisa Unidade
Komprimentu 94 m
Largura 0.77 m
Espessura 0.1 m
Area 0.077 m²
Volume 7.238 m³

b. hada fatuk la uza Argamassa

Medisa Unidade
Komprimentu 94 m
Largura 0.77 m
Espessura 0.1 m
Area 0.077 m²
Volume 7.238 m³

c. Hada fundasaun

Medisa Unidade
Komprimentu 94 m
Largura leten 0.45 m
Largurakraik 0.67 m
Altura 1 m
Area 0.56 m²
Volume 52.64 m³

d. Aterru fila fali rai ne'ebe ke'e

Medida Unidade
Komprimentu 94 m

Microsoft Confidential 08/15/2018 7


Largura leten 0.16 m
Larggura kraik 0.055 m
Altura 1 m
Area 0.1075 m²
Volume 10.105 m³

II. SERVISU BETAUN & PAREDI


1. Betaun armadu
a. sloof

EIXO VERTIKAL
No. Eixo Naruk Unidade
1.1 A-K 12 m
1.2 B-K 12 m
1.3 C-I 4 m
1.4 D-H 2 m
1.5 E-K 12 m
ƩV 42 m

EIXO HORIZONTAL
No. Eixo Naruk Unidade
1.1 F-A 10 m
1.2 G-B 6 m
1.3 H-A 10 m
1.4 I-A 10 m
1.5 J-B 6 m
K-A 10 m
ƩH 52 m

Koprimentu total Sloof = 94 m

Medida Unidade
Komprimentu 94 m
Largura 0.2 m
Altura 0.25 m
Area 0.05 m²
volume 4.7 m³
# Seksaun sloof

b. Koluna

Medida Unidade
Komprimentu 2.4 m
Largura 0.25 m
Altura 0.25 m
Area 0.0625 m²
Total koluna 20 bh
Volume 3 m³

# Seksaun koluna

c. Sinta jeral

Medida Unidade
Komprimentu 94 m
Largura 0.2 m
Altura 0.25 m
Area 0.05 m²
Volume 4.7 m³

# Seksaun Sinta jeral

d. Baki Iha Varanda nian

Medida Unidade
Komprimentu 6.5 m
Largura 0.25 m
Espessura 0.08 m
Area 0.02 m²
Volume 0.13 m³

2. Betaun la Armadu
a. Laje (1:2:3 )

Naran Medida Unidade


L1 K x Lx E 10.69 m³
L2 K x Lx E 14.594 m³
L3 K x Lx E 10.44 m³
L4 K x Lx E 14.594 m³
L5 K x Lx E 14.594 m³
L6 K x Lx E 3.24 m³
L7 K x Lx E 14.79 m³
L8 K x Lx E 10.69 m³
L9 K x Lx E 7.56 m³
L10 K x Lx E 6.974 m³
Area 108.166 m³
Volume 2.16332 m³

Microsoft Confidential 08/15/2018 9


b. Betaun Cor (1:2::3 )
1. Tanki haris fatin
Medida Unidade
largura 0.85 m
0.55 m
Espesura 0.15 m
Altura 0.7 m
Area 0.3375 m²
Volume 0.23625 m³

2.Neut Arus
Medida Unidade
Largura 0.12 m
Espesura 0.06 m
Altura 0.05 m
Kuantidade 12 bh
Area 0.0072 m²
Volume 0.00432 m³
Desenho Neut Arus

3. Paredi
a. Deskrisaun Paredi Eixo Horizontal

1.1 Parede K-A


Area Parede K-A Medida Unidade
Komprimentu 9.5 m
Altura 2.15 m
Area 20 m²

Area Arus nian Area 6.51 m²

1.1 Desenho Parede K-A

1.2 Parede F-A


Area Parede F-A Medida Unidade
Komprimentu 9.25 m
Altura 2.15 m
Area 20 m²
Area Arus nian Area 6.48 m²

1.2 Desenho Parede F-A


1.3 Parede H-A
Area Parede H-A Medida Unidade
Komprimentu 7.25 m
Altura 2.15 m
Area 16 m²

1.3 Desenho Parede H-A

1.4 Parede I-A


Area Parede I-A Medida Unidade
Komprimentu 7.5 m
Altura 2.15 m
Area 16 m²

1.4 Desenho Parede I-A

b. Deskrisaun paredi Eixo Vertikal

2.1 Parede A-K


Area Parede A-K Medida Unidade
Komprimentu 11 m

Microsoft Confidential 08/15/2018 11


Altura 2.15 m
Area 24 m²

Area Arus nian Area 1.8 m²

2.1 Desenho Parede A-K


2.2 Parede B-K
Area Parede B-K Medida Unidade
Komprimentu 11 m
Altura 2.15 m
Area 24 m²

Area Arus nian Area 4.57 m²

2.2 Desenho Parede B-K

2.3 Parede C-I


Area Parede C-I Medida Unidade
Komprimentu 3.75 m
Altura 2.15 m
Area 8.06 m²

Area Arus nian Area 1.68 m²

2.3 Desenho Parede C-I


2.4 Parede E-K
Area Parede E-K Medida Unidade
Komprimentu 9 m
Altura 2.15 m
Area 19 m²

Area Arus nian Area 2.76 m²

2.4 Desenho Parede E-K

Area montazen parede Tuir eixo Horizontal no vertikal


b. Eixo horizontal
No. Eixo Area total Area Arus nian Area Netto
1.1 K-A 20.425 6.51 13.92
1.2 F-A 19.8875 6.48 13.403
1.3 H-A 15.5875 0 15.5875
1.4 I-A 16.125 0 16.125
Ʃ 72.025 13 59.0355

a. Eixo Vertikal
No. Eixo Area total Area Arus nian Area Netto
1.1 A-K 24.1875 1.8 22.392
1.2 B-K 24.1875 4.57 19.6195
1.3 C-I 8.0625 1.68 6.3815
1.4 E-K 19.35 2.76 16.59
Ʃ 75.7875 11 64.983

Medida Unidade
Area Eixo Horizontal 59.0355 m²
Area Eixo Vertikal 64.983 m²
Espessura Batako nian 0.14 m
Volume 17.36259 m³

c. Montazen paredi Kuda-Kuda

Medida Unidade
Komprimentu 10.25 m
Altura 1.31 m
Area 6.71375 m²
Volume 0.939925 m³

Tamba Parede ne'e iha 2, entaun Volume Tenki vezes Dois

Microsoft Confidential 08/15/2018 13


Volume Total = 1.87985 m³

Volume Total ba Parede Tomak = 19 m³

4. Arus
a. Arus Odamatan no janela

TIPE ARUS
A1 A2
Volume
A1 A2
0.115488 0.114192

Total 1 buah 1 buah

A3 A4 Volume
A3 A4
0.120096 0.229824

Total 3 buah 4 buah


b. Ankru
TIPE Kuantidade Unidade
A1 10 bh
A2 10 bh
A3 8 bh
A4 6 bh
Ʃ 34 bh

III. SERVISU BA KAKULUK NIAN


1. Armadura Kakuluk Nian
a. Servisu Kuda- kuda

Desenho Armadura Kuda-kuda Nian

Kuda-Kuda
Naran Komprimentu Medida Kuantidade Volume Unidade
Balok Tarik 10.25 6/12 2 0.1476 m³
makelar 4.19 6/12 2 0.060336 m³
Asna 11.86 6/12 2 0.170784 m³
Scora 5.14 6/12 2 0.074016 m³
Balok Dinding 11.86 6/12 2 0.170784 m³
Gording 13.65 5/7 16 0.7644 m³
Ʃ 1.38792 m³
su % Ai Lakon nian 0.138792 m³

Microsoft Confidential 08/15/2018 15


Volume Total 1.526712 m³

b. Baut & Plat Besi

c. Servisu Lisplank

Medida Volume Unidade


Komprimentu 39.32 0.07864 m³
Largura 0.2
Espessura 0.01

Volume ba Liaplank Triangulu nian


Altura 0.66 0.001122 m³
Baze 0.17
Volume Total 0.079762 m³
10% Ai Lakon 0.0079762 m³
Volume Total Ba Lisplank 0.0866162 m³

2. Servisu Taka kakuluk


a. Taka Kakuluk ho Material Kalen

Medida Area Volume Unidade


Komprimentu 13.85 169.247 169 m²
Largura 6.11

b. Monta Perabung
Monta kalen Junta Nian
Medida Volume Unidade
Komprimentu 13.85 2.77 m²
Largura 0.2

IV. SERVISU BA PLAFOND NIAN


1. Ai Plafond Nian
a. Armadura Ba Plafond Laran

Solusaun A
Medida Kuantidade Volume Unidade
Komprimentu (X) 5.8 5/7 4 0.0812 m³
Komprimentu (Y) 1.8 5/7 11 0.0693 m³
Ʃ 0.1505 m³

Solusaun B
Medida Kuantidade Volume Unidade
Komprimentu (X) 3.8 5/7 8 0.0532 m³
Komprimentu (Y) 3.8 5/7 8 0.1064 m³
Ʃ 0.1596 m³

Solusaun C
Medida Kuantidade Volume Unidade
Komprimentu (X) 5.8 5/7 4 0.0812 m³
Komprimentu (Y) 1.8 5/7 11 0.0693 m³
Ʃ 0.1505 m³

Solusaun D
Medida Kuantidade Volume Unidade

Microsoft Confidential 08/15/2018 17


Komprimentu (X) 3.8 5/7 8 0.0532 m³
Komprimentu (Y) 3.8 5/7 8 0.1064 m³
Ʃ 0.1596 m³

Solusaun E
Medida Kuantidade Volume Unidade
Komprimentu (X) 4.2 5/7 6 0.0588 m³
Komprimentu (Y) 1.8 5/7 4 0.0252 m³
Ʃ 0.084 m³

Solusaun F
Medida Kuantidade Volume Unidade
Komprimentu (X) 3.8 5/7 8 0.0532 m³
Komprimentu (Y) 3.8 5/7 8 0.1064 m³
Ʃ 0.1596 m³

Solusaun G
Medida Kuantidade Volume Unidade
Komprimentu (X) 3.8 5/7 8 0.0532 m³
Komprimentu (Y) 3.8 5/7 8 0.1064 m³
Ʃ 0.1596 m³

Solusaun H
Medida Kuantidade Volume Unidade
Komprimentu (X) 3.8 5/7 4 0.0532 m³
Komprimentu (Y) 1.8 5/7 8 0.0504 m³
Ʃ 0.1036 m³

Solusaun I
Medida Kuantidade Volume Unidade
Komprimentu (X) 1.8 5/7 4 0.0252 m³
Komprimentu (Y) 1.8 5/7 4 0.0252 m³
Ʃ 0.0504 m³

Solusaun J
Medida Kuantidade Volume Unidade
Komprimentu (X) 5.8 5/7 5 0.0812 m³
Komprimentu (Y) 1.8 5/7 11 0.0693 m³
Ʃ 0.1505 m³
Somatori Volume 1.3279 m³

b. Armadura Ba Plafond Liur

Solusaun 1
Medida Kuantidade Volume Unidade
Komprimentu (X) 11.45 5/7 4 0.1603 m³
komprimentu (Y) 0.5 5/7 36 0.063 m³
Ʃ 0.2233 m³

Solusaun 2
Medida Kuantidade Volume Unidade
Komprimentu (X) 0.5 5/7 44 0.077 m³
komprimentu (Y) 13.45 5/7 4 0.1883 m³
Ʃ 0.2653 m³
Somatori Volume 0.4886 m³

c. Balok Gantung

Solusaun
Naran Medida Kuantidade Volume Unidade
Balok gantung Komprimentu 0.35 5/7 36 0.0441 m³
Balok komprimentu 4 5/7 10 0.14 m³
Ʃ 0.1841 m³

matoriu Husi Volume Ba Plafond Tomak 2 m³


10% Ai Lakon 0.2 m³
Volume Total ba Armadura Plafond 2.2 m³

Microsoft Confidential 08/15/2018 19


Desenho Armadura Plafond nian

2. Monta Plafond
a. Monta Plafond laran

No. Naran Area Unidade


1 Varanda 10.44 m²
2 Kuartu 14.44 m²
3 Sala Visita 10.44 m²
4 Kuartu 14.44 m²
5 Sala 6.84 m²
6 Kuartu 14.44 m²
7 Cosinha 14.44 m²
8 Sala 6.48 m²
9 WC 3.24 m²
10 Varanda Kotuk 10.44 m²
Volume 105.64 m²

b. Monta Plafond Liur

Naran Area Unidade


Uma oin 6.87 m²
Uma Kotuk 6.87 m²
Sorin Los 8.07 m²
Sorin Karuk 8.07 m²
Volume 29.88 m²

c. Les Pinggir Plafond Laran

No. Komprimentu Unidade


1 15.2 m
2 15.2 m
3 13.2 m
4 15.2 m
5 8.5 m
6 15.2 m
7 15.2 m
8 9.43 m
9 7.2 m
10 15.2 m
Volume 129.53 m

V. SERVISU BA REBOKA NIAN


1. Reboka Paredi

No. Naran Area Unidade


1 Eixo Horizontal 59.0355 m²
2 Eixo Vertikal 64.983 m²
Area Total ba Reboka 248.037 m²

2. Reboka Paredi iha Sinta Jeral nia Leten

Area Area Total Unidade


1 2
6.42 6.03 12.45 m²

3. Servisu kose Sementi Been

Microsoft Confidential 08/15/2018 21


No. Naran Area Unidade
1 Eixo Horizontal 59.0355 m²
2 Eixo Vertikal 64.983 m²
Area Total 248.037 m²

VI. SERVISU LAJE NIAN


1. Aterru Rai iha Laje nia okos

Naran Medida Unidade


L1 K x Lx E 10.69 m³
L2 K x Lx E 14.594 m³
L3 K x Lx E 10.44 m³
L4 K x Lx E 14.594 m³
L5 K x Lx E 14.594 m³
L6 K x Lx E 3.24 m³
L7 K x Lx E 14.79 m³
L8 K x Lx E 10.69 m³
L9 K x Lx E 7.56 m³
L10 K x Lx E 6.974 m³
Area 108.166 m³
Volume 43.2664 m³

2. Aterru Agregadu Iha Laje nia okos

Naran Medida Unidade


L1 K x Lx E 10.69 m³
L2 K x Lx E 14.594 m³
L3 K x Lx E 10.44 m³
L4 K x Lx E 14.594 m³
L5 K x Lx E 14.594 m³
L6 K x Lx E 3.24 m³
L7 K x Lx E 14.79 m³
L8 K x Lx E 10.69 m³
L9 K x Lx E 7.56 m³
L10 K x Lx E 6.974 m³
Area 108.166 m³
Volume 16.2249 m³

3. Aterru Rai-henek iha Laje nia okos

Naran Medida Unidade


L1 K x Lx E 10.69 m³
L2 K x Lx E 14.594 m³
L3 K x Lx E 10.44 m³
L4 K x Lx E 14.594 m³
L5 K x Lx E 14.594 m³
L6 K x Lx E 3.24 m³
L7 K x Lx E 14.79 m³
L8 K x Lx E 10.69 m³
L9 K x Lx E 7.56 m³
L10 K x Lx E 6.974 m³
Area 108.166 m³
Volume 16.2249 m³

4. Nahe Azuleiju
a. Nahe Azuleiju (20x20) & (30x30)

Area Laje Total


Area Nahe Azuleiju (20x20) Unidade
108.166 3.24 m²

b. Nahe Azuleiju (30x30)

Area Unidade
104.926 m²

VII. SERVISU BA ODAMATAN & JANELA


1. Odamatan & Janela

Odamatan & Janela


Tipu Kuaantidade Unidade Medida Area Unidade
Altura Largura
A1 1 Tahan 1.73 1 1.73 m²
A2 1 Tahan 1.73 0.92 1.5916 m²
A3 3 Tahan 1.7 0.7 1.19 m²
A4 14 Tahan 1 0.62 0.62 m²
A5 1 Tahan 1.73 0.6 1.038 m²

Microsoft Confidential 08/15/2018 23


2. Ventilasi

Ventilasi
Tipu Kuaantidade Unidade

A1 1 bh

4. Save , Dobralisa & Kait Angin


a. Save

Tipe Kuantidade Total Unidade


A1 1 5 bh
A2 1
A3 3

b. Dobralisa & Kait Angin


Dobralisa Kait Angin
Tipe Kuantidade Total Unidade Kuantidade Total Unidade
A1 6 43 bh 14 14 bh
A2 6
A3 3
A4 28

VIII. SERVISU BA PINTURA NIAN


1. Pinta Paredi

No. Naran Area Unidade


1 Eixo Horizontal 59.0355 m²
2 Eixo Vertikal 64.983 m²
Area Pinta nian 248.037 m²

2. Pinta Paredi iha Sinta Jeral nia Leten

Area Area Total Unidade


1 2 12.45 m²
6.42 6.03

3. Pinta Koluna & Sinta

No. Naran Area Unidade


1 Koluna 96 m
2 Sinta 282 m
Area Pinta nian 94.5 m²

4. Pinta Arus Odamatan & Janela

Tipe Area Unidade


A1 3.6852 m²
A2 3.5556 m²
A3 1.3488 m²
A4 26.712 m²
Area total 35.3016 m²

5. Pinta Plafon Laran & liur


Volume 135.52 m³
IX. SERVISU KOMPLETARIA LARAN & LIUR
1. Eletrisidade

Volume
Lampu TL (V 75) Fiu Stop Kontak Sakelar Tunggal Sakelar Ganda Panel
9 50 7 4 2 1

2. Saneamentu & Instalasaun Bee

Microsoft Confidential 08/15/2018 25


a. Septicktank

Servisu Septicktank
Eskavasaun
Medida Unidade
Komprimentu 2.4 m
Largura 1.2 m
Altura 3.15 m
Volume 9.072 m³

Aterru Rai-henek
Medida Unidade
Komprimentu 2.4 m
Largura 1.2 m
Espessura 0.1 m
Volume 0.288 m³

Cor Laje
Medida Unidade
Komprimentu 1.95 m
Largura 1.2 m
Espessura 0.5 m
Volume 1.17 m³

Hada Batako
Medida Unidade
Komprimentu 7.5 m
Altura 3 m
Area 22.5 m²

Cor iha Leten


Medida Unidade
Komprimentu 2.4 m
Largura 1.2 m
Espessura 0.1 m
Volume 0.288 m³

b. Instalasaun Bee Foer

Medida Unidade
Komprimentu (d 4') 8.65 m
Komprimentu (d 2') 20.33 m
Volume 28.98 m
Material Haris Fatin & Dapur
Kloset dudut Kitchen Zink Floor Drain Unidade
1 1 1 bh

Material Junta Kanu nian


Elbow ( L ) Soket Tee ( T ) Fita Unidade
5 3 1 2 bh

c. Instalasaun Bee mos

Medida Unidade
Diametru Knau (d ) 3/4' Ins
Komprimentu 34.49 m
Volume 34.49 m

Material Junta Kanu nian


Elbow ( L ) Soket Tee ( T ) Tornera Fita Unidade
3 6 2 2 2 bh

Microsoft Confidential 08/15/2018 27


2.6 Rekapitulasaun Volume Servisu
katak halo resumo fila fali volume servisu kada servisu ida-idak ne’ebe sura tiha ona.

REKAPITULASAUN VOLUME

No. DESCRISAUN DO SERVISO VOLUME UNIDAEDE


I. SERVISU BA FUNDASAUN NIA
1. Servisu Dahuluk
a. Limpeza Terrenu 288 m²
b. Monta Estaka 56 m
c. Harii Armazen & Ofisina 30 m²
2. Servisu Ke'e Rai Nian
a. Ke'e Rai Ba Fundasaun 57.904 m³
3. Servisu Hada Fundasaun Nian
a. Aterrru Rai-henek Iha Fundasaun Nia Okos 7.238 m³
b. Hada Fatuk La uza Argamassa 7.238 m³
c. Hada Fundasaun 52.64 m³
d. Aterru Fila Fali Rai Ne'ebe Ke'e 10.105 m³

II. SERVISU BETAUN & PAREDI


1. Servisu Betaun Armadu
a. Sloof 4.7 m³
b. Koluna 3 m³
c. Sinta Jeral 4.7 m³
d. Baki Iha Varanda Nian 0.13 m³
2. Betaun La Armadu
a. Laje (1:2:3) 2.16332 m³
b. Betaun Cor ( 1:2:3 ) Ba WC & Neut 0.24057 m³
3. Paredi
a. Deskrisaun Paredi Eixo Horizontal 17.36259 m³
b. Deskrisaun Paredi Eixo Vertikal
c. Montazen Paredi Kuda-Kuda 1.87985 m³
4. Arus
a. Arus Odamatan & Janela 9 bh
b. Ankru 34 bh

III. SERVISU BA KAKULUK NIAN


1. Armadura Kakuluk Nian
a. Servisu Kuda-Kuda 1.526712 m³
b. Baut & Plat Besi
c. Servisu Lisplank 0.0866162 m³
2. Servisu Taka Kakuluk
a. Taka Kalen Ho Material Kalen 169.247 m²
b. Monta Perabung 2.77 m²

IV. SERVISU BA PLAFOND NIAN


1. Ai Plafond Nian
a. Armadura Ba Plafond Laran 1.3279 m³
b. Armadura Ba Plafond Laran 0.4886 m³
c. Balok Gantung 0.1841 m³
2. Montazen Plafond Nian
a. Montazen Plafond Laran 105.64 m²
b. Montazen Plafond Liur 29.88 m²
c. Les Pinggir Plafond Laran 129.53 m
No. DESCRISAUN DO SERVISO VOLUME UNIDAEDE

V. SERVISU BA REBOKA NIAN


1. Reboka Paredi 248.037 m²
2. Reboka Paredi Iha Sinta Jeral nia Leten 12.45 m²
3. Kose Sementi Been 248.037 m²

VI. SERVISU BA LAJE NIAN


1. Aterru Rai Iha Laje Nia Okos 43.2664 m³
2. Aterru Agregadu Iha Laje Nia Okos 16.2249 m³
3. Aterru Rai-henek Iha Laje Nia Okos 16.2249 m³
4. Nahe Azuleiju
a. Nahe Azuleiju (20x20) 3.24 m²
b. Nahe Azuleiju (30x30) 104.926 m²

VII. SERVISU BA ODAMATAN & JANELA


1. Odamatan 5.5496 m²
2. Janela 0.62 m²
3. Ventilasi 1 bh
4. Save & Dobralisa
a. Save 5 bh
b. Dobralisa 43 bh

VIII. SERVISU BA PINTURA NIAN


1. Pinta Paredi 248.037 m²
2. Pinta Paredi Iha Sinta Jeral Nia Leten 12.45 m²
3. Pinta Koluna & Sinta 94.5 m²
4. Pinta Arus Odamatan & Janela 35.3016 m²
5. Pinta Plafond Laran & Liur 135.52 m³

IX. SERVISU KOMPLETARIA LARAN & LIUR


1. Eletrisidade
a. Lampu TL (V 75) 9 bh
b. Stop Kontak 7 bh
c. Sakelar Tuggal 4 bh
d. Sakelar Ganda 2 bh
e. Panel 1 bh
2. Septicktank
a. Eskavasaun Rai Ba Septicktank
b. Aterru Rai-henek Ba Septicktank
c. Cor Laje Ba Septicktank
d. Hada Batako Ba Septicktank
3 Instalasaun Be'e Foer
a. Instalasaun Be'e Foer Ho Pipa PVC 4"
b. Instalasaun Be'e Foer Ho Pipa PVC 2"
c. Instalasaun Be'e Mos Ho Pipa PVC 3/4"
2.7 Presu Material no Mão de obra
folin osan ba material no mão de obra, ba material folin osan ne’e determina tiha ona husi Ministeriu
Comersiu E Industria, no salariu ba trabalhador sira iha loron ida. folin material no mão de obra
mak tuir mai ne'e:

REJISTU UNIDADE DE PRESU BA MATERIAL

No Naran Material Unidade Presu


1 Semen Tonasa Sak $ 4.10
2 Besi beton Ø 6 mm Btg $ 1.90
3 Besi beton Ø 8 mm Btg $ 3.35
4 Besi beton Ø 10 mm Btg $ 5.20
5 Besi beton Ø 12 mm Btg $ 7.50
6 Besi beton Ø 14 mm Btg $ 10.00
7 Besi beton Ø 16 mm Btg $ 13.35
8 Besi beton Ø 19 mm Btg $ 18.75
9 Besi beton Ø 22 mm Btg $ 25.10
10 Besi beton Ø 25 mm Btg $ 32.40
11 Paku 3 cm Kg $ 2.50
12 Paku 5 cm Kg $ 1.00
13 Paku 7 cm Kg $ 1.00
14 Paku 10 cm Kg $ 1.00
15 Paku 12 cm Kg $ 1.00
16 Paku seng Kg $ 1.50
17 Bj C 80 x 40 x 6 Btg $ 38.50
18 Bj L 30 x 30 x 6 Btg $ 7.00
19 Besi Kotak 30 x 30 Btg $ 9.00
20 Besi Kotak 40 x 40 Btg $ 13.00
21 Besi Kotak 50 x 50 Btg $ 16.50
22 Pipa I 1/4" ( Medium A ) Btg $ 22.00
23 Pipa GI 1/2" ( Medium A ) Btg $ 9.00
24 Pipa GI 3/4" ( Medium A 0 Btg $ 11.00
25 Pipa GI 1" ( Medium A ) Btg $ 16.00
26 Pipa GI 1 1/2" ( Medium A ) Btg $ 24.00
27 Pipa GI 2" ( Medium A ) Btg $ 31.00
28 Pipa GI 2 1/2" ( Medium super ) Btg $ 39.00
29 Pipa GI 3" ( Medium A ) Btg $ 45.00
30 Pipa GI 4" ( Medium A ) Btg $ 60.00
31 Pipa GI 5" ( Medium Super ) Btg $ 97.00
32 Pipa GI 6" ( Medium Super ) Btg $ 108.00
33 Pipa PVC 1/4" Btg $ 3.00
34 Pipa PVC 1/2" Aw Btg $ 2.00
35 Pipa PVC 3/4" Aw Btg $ 2.50
36 Pipa PVC 1" Aw Btg $ 3.00
37 Pipa PVC 1 1/2" D Btg $ 5.50
38 Pipa PVC 2" D Btg $ 2.00
39 Pipa PVC 2 1/2" D Btg $ 9.50
40 Pipa PVC 3" D Btg $ 13.00
41 Pipa PVC 4" D Btg $ 21.00
42 Pipa PVC 5" Aw Btg $ 32.00
43 Pipa PVC 6" Aw Btg $ 450.00
44 Tegel 20 x 20 Dos $ 5.25
45 Tegel 30 x 30 ( Putih ) Dos $ 5.57
46 Tegel 40 x 40 ( Putih ) Dos $ 6.25
47 Tegel 60 x 60 ( Motif ) Dos $ 12.50
48 Semen Putih Sak $ 1.25
49 Cat I Aries 20 Kg Lata $ 170.00
50 Kloset duduk Toto bh $ 2.10
51 Kloset jongkok bh $ 9.00
52 Wastafel Toto bh $ 125.00
53 Sen bjls 20 Lbr $ 2.00
54 Sen bjls 25 Lbr $ 2.75
55 Seng Bjls 28 Lbr $ 2.50
56 Seng Bjls 30 Lbr $ 3.00
57 Seng Bjls 40 Lbr $ 4.50
58 Triplex 3 mm Lbr $ 4.25
59 Triplex 4 mm Lbr $ 5.50
60 Triplex 6 mm Lbr $ 6.75
61 Triplex 9 mm Lbr $ 10.00
62 Triplex 12 mm Lbr $ 14.50
63 Triplex 15 mm Lbr $ 18.00
64 Triplex 18 mm Lbr $ 21.00
65 Besi Strip 5 mm Kg $ 9.00
66 Engsel 1 set bh $ 2.50
67 Balok 4/6-4m m3 $ 3.75
68 Balok 5/7-4m m3 $ 4.00
69 Balok 5/10-4m m 3
$ 7.50
70 Balok 6/12-4m m3 $ 12.50
71 Papan 2/20-4m m 3
$ 2.25
72 Papan 3/20-4m m3 $ 12.75
73 Papan 3/20-4m m 3
$ 9.50
74 KUSEN PINTO POLOS BUAH $ 45.00
75 KUSEN ZENDELA POLOS BUAH $ 40.00
76 KUSEN PINTO VENTILASI BUAH $ 60.00
77 KUSEN ZENDELA VENTILASI BUAH $ 55.00
78 KUSEN ZENDELA GANDEN POLOS BUAH $ 80.00
79 KUSEN ZENDELA GANDEN VENTILASI BUAH $ 110.00
80 KUSEN PINTU GANDEN ZENDELA POLOS BUAH $ 85.00
81 KUSEN PINTU GANDEN ZENDELA VENTILASI BUAH $ 115.00
82 DAUN PINTU HO SAVE BUAH $ 110.00
83 DAUN PINTO BUAH $ 100.00
84 DAUN ZENDELA BUAH $ 55.00
85 VENTILASI BUAH $ 35.00
86 MONTA DAUN PINTU BUAH $ 10.00
87 MONTA DAUN ZENDELA BUAH $ 5.00
88 Concrete Block 40 x 20 x 10 A1 BH $ 0.55
89 Concrete Block 40 x 20 x 10 A2 bh $ 0.50
90 Loster X 20 x 20 bh $ 0.90
91 Loster ruby 20 x 20 bh $ 0.90
92 Loster diamond new 20 x 20 bh $ 0.90
93 Loster Segi 2 20 x 20 bh $ 0.90
94 Loster Rose 20 x 20 bh $ 0.90
95 Loster coco Lama 20 x 20 bh $ 0.90
96 Loster Coco New 20 x 20 bh $ 0.90
97 Loster Benz 20 x 20 bh $ 0.90
98 Loster Tulip 20 x 20 bh $ 0.90
99 Loster Segi 1 20 x 20 bh $ 0.90
100 Loster Ring 20 x 20 bh $ 0.90
101 Kancil 37 cm bh $ 1.95
102 Lady 52 cm bh $ 2.35
103 Lotus 56 cm bh $ 2.45
104 Putri 60 cm bh $ 2.65
105 Orkid 61 cm bh $ 3.10
106 Crown 62 cm bh $ 2.65
107 Luis 63 cm bh $ 2.65
108 Oscar 64 cm bh $ 2.75
109 Suki 70 cm bh $ 2.75
110 Raja 90 cm bh $ 2.95
111 Vinyl 2 64 cm bh $ 2.75
112 Sony 61 cm bh $ 2.85
113 Vinly 1 54 cm bh $ 2.45
114 Kabel NIM 2.5 mm 2 urat Rol $ 55.00
115 Kabel NIM 2.5 mm 3 urat Rol $ 70.00
116 Kabel engser m'
117 Meteran bh
118 MCB 2A bh $ 7.80
119 MCB 4A bh $ 7.80
120 MCB 6A bh $ 7.80
121 MCB 8A bh $ 7.80
122 MCB 10A 1 Phase bh $ 7.80
123 MCB 12A bh $ 7.80
124 MCB 16A 1 Phase bh $ 7.80
125 MCB 32A 1 Phase bh $ 7.80
126 MCB 50A 1 Phase bh $ 7.80
127 Sekring tunggal bh $ 5.00
128 Sekring Ganda bh
129 Kotak Sambung T ( 3 Way ) bh $ 0.50
130 Kotak Sambung Krus ( 4 way ) bh $ 0.75
131 Isolasi Listrik bh $ 1.00
132 Saklar Tunggal bh $ 1.50
133 Saklar Ganda bh $ 1.50
134 Stop kontak 1 lubang Set $ 1.00
135 Stop kontak 2 lubang Set $ 2.00
136 Stop kontak 3 lubang bh $ 3.00
137 Stop Kontak 4 lubang bh $ 4.00
138 Konector Pasang $ 2.50
139 Istikador Pasang
140 Klem 10 mm Pak $ 1.00
141 Klem 12 mm Pak $ 1.50
142 Lampu Philips Tornado 5w Bh $ 4.50
143 Lampu Philips Tornado 8w Bh $ 5.00
144 Lampu Philips Tornado 12w Bh $ 5.25
145 Lampu Philips Tornado 15w Bh $ 5.50
146 Lampu Philips Tornado 20w Bh $ 5.75
147 Lampu Philips Genic 5w Bh
148 Lampu Philips Genic 8w Bh
149 Lampu Philips Genic 11w Bh $ 3.75
150 Lampu Philips Genic 14w Bh $ 4.25
151 Lampu Philips Genic 18w Bh $ 4.50
152 Lampu Philips Esensial 23w Bh $ 5.00
153 Philips Sumbat 1x18 w Bh $ 1.75
154 Philips Sumbat 1x36 w Bh $ 2.25
155 Philips Sumbat 2x36 w Bh
156 Sekop Unit $ 4.00
157 Paku tembok 4" Kg $ 2.50
158 Plamir kg $ 5.00
159 Gerobak Unit $ 19.00
160 Cat Plafon 20 tlr ltr $ 10.50
161 Bucket (ember cor) Bh
162 lem apoxy Bh $ 7.00
163 Seng gelombang Lbr $ 3.00
164 Penjepit Gordyng m
165 Plamir kayu 0,7 kg Lata
166 Kran 1/2" Bh $ 1.50
167 Lis plafon 4x4 cm m $ 6.50
168 Seal tape Bh
169 Kuas Rol Unit $ 3.00
170 Kuas 2" Unit $ 1.50
171 Paku tenbok 10 cm Kg $ 2.00
172 Grindel 14" Nippon Batang
173 grandel jendela Bh
174 kait angin bh $ 1.00
175 Kunci Slot 1set
176 Kaca Hitam 3 mm m2
177 Vernis lata $ 6.00
178 Dempul Plamir Lata
179 Amplas Unit $ 0.50
180 Bout 6" Kg
181 Lem seng Lata
182 Bout Seng Kg
183 Bout Tanam 4" Kg
184 Soket Bh $ 1.50
185 Sekrup Kg
186 Tangga Unit $ 40.00
187 Besi Pentanahang m
188 Eskrup Kontainer Kg
189 Cok Projektor Bh
190 Terpal 8 x 10 m Batang $ 48.00
194 Isi gurinda 14" Bh $ 3.50
195 Isi gurinda tebal Bh $ 2.00
196 Isi gurinda potong Bh $ 2.00
197 PASIR CUCI NO.1 m3 $ 25.00
198 PASIR KALI NO.2 m3 $ 16.00
199 BATU PECAH 10-20 m 3
$ 20.00
200 BATU PECAH 20-40 m3 $ 15.00
201 Kerikil Ukuran 1-2 m 3
$ 45.00
202 Kerikil Ukuran 2-4 m3 $ 45.00
203 Keramik 20 x 20 Dos $ 7.00
204 Keramik 30 x 30 Dos $ 7.50
205 Keramik 40 x 40 Dos $ 8.50
206 Keramik 60 x 60 Dos $ 25.00
207 Keramik 10 x 25 Dos $ 6.55
208 Keramik 20 x 25 Dos $ 6.50
209 Keramik 20 x 40 Dos $ 8.50
210 Keramik 30 x 60 Dos $ 29.00
211 Keramik 10 x 10 Dos $ 7.00
212 Keramik 10 x 20 Dos $ 7.00
213 Keramik 10 x 29 Dos $ 7.00
214 Cat I Aries 20 Kg Lata $ 10.75
215 Cat II Vinilex 25 Kg Lata $ 37.50

REJISTU PRESU BA TRABALHADOR

No. Trabalhador Unidade Presu


1 Pekerja Org/hari $ 6.00
2 Tukang Kayu Org/hari $ 7.00
3 Tukang Batu Org/hari $ 7.00
4 Tukang Besi Org/hari $ 7.00
5 Tukan Cat Org/hari $ 6.00
6 Tukang Las Org/hari $ 6.00
7 Tukang Listrik Org/hari $ 6.00
8 Tukang Sanitasi Org/hari $ 6.00
9 Kepala Tukang Org/hari $ 10.00
10 Mandor Org/hari $ 15.00
Ministeriu
STANDAR KOEFISIEN ANALISA HARGA SATUAN PEKERJAAN
( AHSP )
No Kebutuhan Unit Koefisien
I PEKERJAAN PERSIAPAN
1 1 m' Pagar sementara dari seng gelombang, tinggi 2m
Semen Portland Kg 2.5000
Seng Gelombang 0.2 Lbr 1.2158
Pasir Beton m3 0.0050
Bahan
Koral beton m3 0.0090
Kayu Usuk 5/7 m 3
0.0410
Paku Biasa 2" - 5" Kg 0.0829

Pekerja Oh 0.2495
Tukang Kayu Oh 0.2858
Tenaga Kerja
Kepala tukang Oh 0.0200
Mandor Oh 0.0200
2 1 m' Pengukuran dan pemasangan bowplank
Kayu Usuk 5/7 m3 0.0177
Bahan Paku Biasa 2"-5" Kg 0.0200
Kayu Papan 3/20 m3 0.0070

Pekerja Oh 0.1000
Tukan kayu Oh 0.1000
Tenaga Kerja
Kepala Tukang Oh 0.0100
Mandor Oh 0.0050
3 1 m2 Pembuatan Gudang semen dan alat
Dolken kayu Ø 8-10/4m Btg 1.7000
Kayu m3 0.2074
Paku biasa 2" - 5" Kg 0.3000
Bahan Semen Portland Kg 10.5000
Pasir beton m3 0.0300
Koral beton m 3
0.0500
seng Gelombang BJLS 28 Lbr 1.5306

Pekerja Oh 1.0000
Tukang kayu Oh 2.0000
Tenaga Kerja
Kepala Tukang Oh 0.2000
Mandor Oh 0.0500
4 1 m2 Pembuatan rumah jaga / konstruksi kayu
Dolken kayu Ø 8-10/4m Btg 3.0500
Kayu m 3
0.2807
Bahan
Paku biasa 2" - 5" Kg 0.7117
Seng gelombang BJLS 28 Lbr 1.7090

Pekerja Oh 1.0167
Tukang kayu Oh 1.5250
Tenaga Kerja
Tenaga Kerja
Kepala Tukang Oh 0.1527
Mandor Oh 0.0510
5 1 m2 Membersikan Lapangan dan perataan
Pekerja Oh 0.1000
Tenaga Kerja
Mandor Oh 0.0500

II PEKERJAAN TANAH
1 1 m3 Galian tanah biasa sedalam 1 m
Pekerja Oh 0.6700
Tenaga Kerja
Mandor Oh 0.0320
2 1 m3 Galian tanah biasa sedalam 2 m
Pekerja Oh 0.7500
Tenaga Kerja
Mandor Oh 0.0470
3 1 m3 Galian tanah sedalam 3 m
Pekerja Oh 0.8900
Tenaga Kerja
Mandor Oh 0.0685
4 1 m3 Galian tanah keras sedalam 1 meter
Pekerja Oh 0.9500
Tenaga Kerja
Mandor Oh 0.0530
5 1 m3 Galian tanah cadas sedalam 1 meter
Pekerja Oh 1.5000
Tenaga Kerja
Mandor Oh 0.0600
6 1 m3 Galian Tanah Lumpur sedalam 1 meter
Pekerja Oh 0.9163
Tenaga Kerja
Mandor Oh 0.0700
7 1 m2 Pekerjaan Stripping tebing setinggi 1 meter
Pekerja Oh 0.4230
Tenaga Kerja
Mandor Oh 0.0260
8 1 m3 Membuang tanah sejauh 30 meter
Pekerja Oh 0.3300
Tenaga Kerja
Mandor Oh 0.0125
9 Menimbung kembali 1 m3 galian
Pekerja Oh 0.2142
Tenaga Kerja
Mandor Oh 0.0143
10 1 m3 Pemadatan tanah ( Per 20 cm )
Pekerja Oh 0.5000
Tenaga Kerja
Mandor Oh 0.0500
11 1 m3 Timbunan Pasir
Bahan Pasir Urug m3 1.2000

Pekerja Hr 0.3023
Tenaga Kerja
Mandor Hr 0.0127
12 1 m3 Pemasangan Lapisan Ijuk tebal 10 cm
Bahan Ijuk m3 2.7577

Pekerja Oh 0.1500
Tenaga Kerja
Tenaga Kerja
Mandor Oh 0.0150
13 1 m3 Penimbunan Sirtu Padat untuk peninggian lantai bangunan
Bahan Sirtu m3 1.2000

Pekerja Oh 0.3046
Tenaga Kerja
Mandor Oh 0.0379

III PEKERJAAN PONDASI


1 1 m3 Pasang Pondasi batu belah 1 Pc : 3 Ps
Batu belah 15/20 cm m3 1.1490
Bahan Semen Portland Kg 202.0000
Pasir Pasangan m3 0.4850

Pekerja Oh 1.5000
Tukang batu Oh 0.6000
Tenaga Kerja
Kepala Tukang Oh 0.0905
Mandor Oh 0.0973
2 1 m3 Pasang Pondasi Batu belah 1 Pc : 4 Ps
Batu belah 15/20 cm m3 1.2000
Bahan Semen Portland Kg 163.0000
Pasir Pasangan m3 0.5348

Pekerja Oh 1.8313
Tenaga kerja Tukang batu Oh 0.8404
Kepala Tukang Oh 0.0991
Mandor Oh 0.0750
3 1 m3 Pasang Pondasi batu belah 1 Pc : 5 Ps
Batu belah 15/20 cm m3 1.2000
Bahan Semen Portland Kg 136.0000
Pasir Pasangan m3 0.5440

Pekerja Oh 1.7141
Tukang batu Oh 0.7130
Tenaga Kerja
Kepala Tukang Oh 0.1095
Mandor Oh 0.1919
4 1 m3 Pasangan Pondasi batu kosong
Batu belah 15/20 cm m3 1.2000
Bahan
Pasir Urug m 3
0.3033

Pekerja Oh 0.7800
Tukang batu Oh 0.3900
Tenaga kerja
Kepala Tukang Oh 0.0579
Mandor Oh 0.0579
5 1 m3 Pasangan Pondasi Sumuran Ф 1 meter
Batu belah 15/20 cm m3 0.4500

Bahan
Semen Portland Kg 213.4000
Bahan
Pasir beton m3 0.3837
Kerikil/koral m3 0.5670

Tenaga Kerja Pekerja Oh 2.2353


Tukang batu Oh 0.4580
Kepala Tukang Oh 0.0457
Mandor Oh 0.0900

IV PEKERJAAN BETON
1 Pembesian 10 Kg dengan besi polos / Ulir
Besi beton ( Polos / Ulir ) Kg 10.5000
Bahan
Kawat beton Kg 0.1500

Pekerja Oh 0.0949
Tukang Besi Oh 0.0757
Tenaga Kerja
Kepala Tukang Oh 0.0109
Mandor Oh 0.0223
2 1 m2 Pasang bekisting untuk Pondasi
Kayu kelas III m3 0.0326
Bahan Paku biasa 5" - 10" Kg 0.1586
Minyak Bekisting Ltr 0.0168

Pekerja Oh 0.5200
Tukang Kayu Oh 0.2600
Tenaga Kerja
Kepala Tukang Oh 0.0260
Mandor Oh 0.0260
3 1 m2 Pasangan Bekisting untuk Sloof
Plywood tebal 9mm Lbr 0.3500
Kayu kelas III m 3
0.0450
Bahan
paku biasa 5" - 10" Kg 0.3000
Minyak Bekisting Ltr 0.0256

Pekerja Oh 0.5200
Tukang Kayu Oh 0.2600
Tenaga Kerja
Kepala Tukang Oh 0.0260
Mandor Oh 0.0260
4 1 m2 Pasangan Bekisting Untuk Kolom
Kayu kelas III m3 0.0400
Paku biasa 5" - 12" Kg 0.4000
Minyak Bekisting Ltr 0.0555
Bahan
Balok kayu kelas II m3 0.0150
Plywood tebal 9 mm Lbr 0.3500
Dolken Kayu 8" - 10"/4m Btg 2.0000

Pekerja Oh 0.6600
Tukang Kayu Oh 0.3300
Tenaga Kerja
Tenaga Kerja
Kepala Tukang Oh 0.0330
Mandor Oh 0.0330
5 1 m2 Pasangan Bekisting untuk balok
Kayu kelas III m3 0.0400
Bahan Paku biasa 5" - 12" Kg 0.4000
Minyak Bekisting Ltr 0.3500
Balok kayu Kelas II m3 0.0360
Plywwod tebal 9 mm Lbr 0.3500
Dolken kayu 8" - 10"/4m Btg 2.0000

Pekerja Oh 0.6600
Tukang kayu Oh 0.3300
Tenaga Kerja
Kepala Tukang Oh 0.0330
Mandor Oh 0.0330
6 1 m2 Pasangan bekisting untuk lantai
Kayu Kelas III m3 0.0400
Paku biasa 5" - 12" Kg 0.4000
Minyak bekisting Ltr 0.0536
Bahan
Balok kayu kelas II m3 0.0360
Plywood tebal 9 mm Lbr 0.3500
Dolken kayu 8" - 10"/4m Btg 2.0000

Pekerja Oh 0.6600
Tukang Kayu Oh 0.3330
Tenaga Kerja
Kepala Tukang Oh 0.0330
Mandor Oh 0.0330
7 1 m2 Pasangan Bekisting untuk Tangga
Kayu Kelas III m3 0.0300
Paku biasa 5" - 12" Kg 0.4000
Minyak bekisting Ltr 0.1500
Bahan
Balok kayu klas II m3 0.0183
Plywood tebal 9 mm Lbr 0.3455
Dolken kayu 8" - 10"/4m Btg 2.0000

Pekerja Oh 0.6600
Tukan Kayu Oh 0.3300
Tenaga Kerja
Kepala Tukang Oh 0.0330
Mandor Oh 0.0161
8 1 m2 Pasangan Jembatan Untuk Pengecoran beton
Kayu klas III ( Papan ) m3 0.0260
Bahan Paku biasa 5" - 12" Kg 0.6000
Dolken Kayu 8" - 10"/4m Btg 0.5000

Pekerja Oh 0.1500
Tukang Kayu Oh 0.0500
Tenaga Kerja
Kepala Tukang Oh 0.0051
Tenaga Kerja

Mandor Oh 0.0080
9 1 m3 Membuat Pondasi beton bertulang K 175, f'c = 14.5 Mpa ( 150 Kg besi + Bekisting )
Kayu klas III m3 0.2000
Paku biasa 5" - 12" Kg 1.5000
Minyak bekisting Ltr 0.0667
Bahan
besi beton polos Kg 150.0000
Kawat Beton Kg 2.2500
Semen Portland Kg 323.0000
Pasir beton m3 0.5200
Koral beton m3 0.7800

Pekerja Oh 4.2108
Tukang Batu Oh 0.3093
Tukang kayu Oh 1.0842
Tenaga Kerja
Tukang Besi Oh 1.0500
Kepala Tukang Oh 0.2450
Mandor Oh 0.1922
10 1 m3 membuat sloof beton bertulang K 175, f'c = 14.5 Mpa ( 200 Kg besi + Bekisting )
Kayu Klass III m3 0.2700
Paku biasa 5" - 12" Kg 2.0000
Minyak bekisting Ltr 0.1000
Besi beton Polos Kg 200.0000
Bahan
Kawat beton Kg 3.0000
Semen Portland Kg 323.0000
Pasir Beton m3 0.5200
Koral beton m3 0.7800

Pekerja Oh 4.9152
Tukang Batu Oh 0.3093
Tukang Kayu Oh 1.5600
Tenaga Kerja
Tukang besi Oh 1.4000
Kepala Tukang Oh 0.3270
Mandor Oh 0.2013
11 1 m3 membuat kolom beton bertulang K 175, f'c = 14.5 Mpa ( 300 Kg besi + bekisting )
Kayu klas III m3 0.4000
paku biasa 5" - 12" Kg 4.0000
Minyak bekisting Ltr 2.0000
Besi beton Polos Kg 300.0000
Bahan Kawat beton Kg 4.5000
Semen Portland Kg 323.0000
Pasir beton m3 0.5200
Koral beton m3 0.7800
Kayu klas II balok m 3
0.1500
Plywood tebal 9 mmm Lbr 3.5000
Dolken kayu 8"/4 m Btg 16.0000
Pekerja Oh 7.1750
Tukang Batu Oh 0.3093
Tukang Kayu Oh 2.7920
Tenaga Kerja
Tukan Besi Oh 2.1000
Kepala Tukang Oh 0.4883
Mandor Oh 0.2747
12 1 m3 membuat balok beton bertulang K 175, f'c = 14.5 Mpa ( 200 kg besi + bekisting )
Kayu klas III m3 0.3200
Bahan
Paku biasa 5" - 12" Kg 3.2000
Minyak bekisting Ltr 2.0000
Besi beton Polos Kg 200.0000
Kawat beton Kg 3.0000
Semen Portland Kg 323.0000
Pasir beton m3 0.5200
Koral beton m 3
0.7800
Kayu Klas II balok m3 0.1500
Plywwod tebal 9 mm Lbr 3.5000
Dolken kayu 8"/4 m Btg 16.0000

Pekerja Oh 7.1750
Tukang batu Oh 0.3093
Tukang Kayu Oh 1.6500
Tenaga Kerja
Tukang Besi Oh 1.4000
Kepala Tukang Oh 0.4883
Mandor Oh 0.2747
13 1 m3 membuat Plat beton bertulang K 175, f'c = 14.5 Mpa (150 kg besi + Bekisting )
Kayu klas III m3 0.1350
Paku Biasa 5" - 12" Kg 1.3497
Minyak bekisting Ltr 0.6750
Besi beton Polos Kg 157.5000
Kawat beton Kg 2.2500
Bahan Semen Portland Kg 323.0000
Pasir beton m3 0.5200
Koral beton m 3
0.7800
Kayu klas II balok m3 0.0505
Plywood tebal 9 mm Lbr 2.1810
Dolken kayu 8"/4 m Btg 16.0000

Pekerja Oh 6.7690
Tukang batu Oh 0.3093
Tenaga Kerja Tukang Kayu Oh 1.3000
Tukang Besi Oh 1.0500
Kepala Tukang Oh 0.2650
Mandor Oh 0.2650
14 1 m' membuat Kolom Praktis beton bertulang ( 11 x 11 ) cm
kayu klas III m3 0.0025

Bahan
Paku 5" - 12" Kg 0.0452
Besi beton Polos Kg 3.0000
Bahan Kawat beton Kg 0.4500
Semen Portland Kg 4.1750
Pasir Beton m3 0.0063
Koral Beton m 3
0.0093

Pekerja Oh 0.1588
Tukang Batu Oh 0.0473
Tenaga Kerja
Tukang Kayu Oh 0.0113
Tukang Kayu Oh 0.0118
Kepala Tukang Oh 0.0108
Mandor Oh 0.0100
15 1 m3 membuat beton mutu f'c = 7.4 Mpa ( K 100 )
Semen Portland Kg 254.0000
Bahan Batu koral beton m 3
0.8197
Pasir Beton m3 0.6200

Pekerja Oh 1.6500
Tukang Batu Oh 0.2890
Tenaga kerja
Kepala Tukang Oh 0.0290
Mandor Oh 0.0200
16 1 m3 membuat beton mutu f'c = 9.8 Mpa ( K 125 )
Semen Portland Kg 284.5500
Bahan Batu Koral beton m 3
0.8273
Pasir beton m3 0.6175

Pekerja Oh 1.6820
Tukang Batu Oh 0.2805
Tenaga Kerja
Kepala Tukang Oh 0.0280
Mandor Oh 0.0200
17 1 m3 membuat beton mutu f'c = 12.2 Mpa ( K 150 )
Semen Portland Kg 315.7000
Bahan Batu koral beton m 3
0.8180
Pasir beton m3 0.5845

Pekerja Oh 1.6915
Tukang Batu Oh 0.2820
Tenaga Kerja
Kepala Tukang Oh 0.0285
Mandor Oh 0.0200
18 1 m3 membuat beton mutu f'c = 14.5 Mpa ( K 175 )
Bahan Semen Portland Kg 323.0000
Batu koral beton m 3
0.7800
Pasir beton m3 0.5200

Pekerja Oh 1.6500

Tenaga Kerja
Tukang Kayu Oh 0.2675
Tenaga Kerja
Kepala Tukang Oh 0.0267
Mandor Oh 0.0200
19 1 m3 membuat beton mutu f'c = 16.9 Mpa ( K 200 )
Semen Portland Kg 325.0000
Bahan Batu koral beton m 3
0.8100
Pasir beton m3 0.5400

Pekerja Oh 1.6500
Tukang Kayu Oh 0.2750
Tenaga Kerja
Kepala Tukang Oh 0.0380
Mandor Oh 0.0300
20 1 m3 membuat beton mutu f'c = 19.3 Mpa ( K 225 )
Semen Portland Kg 377.0200
Bahan Batu koral beton m 3
0.8200
Pasir beton m3 0.5000

Pekerja Oh 1.6694
Tukang Kayu Oh 0.3050
Tenaga Kerja
Kepala Tukang Oh 0.0456
Mandor Oh 0.0400
21 1 m3 membuat beton mutu f'c = 21.7 Mpa ( K 250 )
Semen Portland Kg 384.0000
Bahan Batu koral beton m 3
0.7368
Pasir beton m3 0.4697

Pekerja Oh 1.6500
Tukang Kayu Oh 0.2750
Tenaga Kerja
Kepala Tukang Oh 0.0458
Mandor Oh 0.0400
22 1 m3 membuat beton mutu f'c = 24 Mpa ( K 275 )
Semen Portland Kg 412.0000
Bahan Batu koral beton m3 0.7800
Pasir beton m 3
0.5560

Pekerja Oh 1.6820
Tukang Kayu Oh 0.3125
Tenaga Kerja
Kepala Tukang Oh 0.0500
Mandor Oh 0.0500
23 1 m3 membuat beton mutu f'c = 26.4 Mpa ( K 300 )
Bahan Semen Portland Kg 413.0000
Batu koral beton m3 0.7206
Pasir beton m 3
0.4769

Pekerja Oh 1.6500
Tukang Kayu Oh 0.2750
Tenaga Kerja
Tenaga Kerja
Kepala Tukang Oh 0.0459
Mandor Oh 0.0400
24 1 m3 membuat beton mutu f'c = 31.2 Mpa ( K 350 )
Semen Portland Kg 464.3500
Bahan Batu koral beton m3 0.7800
Pasir beton m 3
0.4867

Pekerja Oh 2.1000
Tukang Kayu Oh 0.3500
Tenaga Kerja
Kepala Tukang Oh 0.0717
Mandor Oh 0.0700
25 1 m3 membuat Sloof beton bertulang K 350, f'c = 31.2 Mpa ( 150 kg besi + Bekisting )
Kayu klas III m3 0.2770
Bahan
Paku biasa 5" - 12" Kg 2.0500
Minyak bekisting Ltr 0.6150
Besi beton Polos Kg 150.0000
Kawat beton Kg 2.2500
Semen Portland Kg 464.3500
Pasir beton m3 0.4867
Koral beton m3 0.7800
Plywood tebal 9 mm Lbr 2.9160

Pekerja Oh 4.3460
Tukang batu Oh 0.2820
Tukang Kayu Oh 1.3325
Tenaga Kerja
Tukang Besi Oh 1.0765
Kepala Tukang Oh 0.2700
Mandor Oh 0.2000
26 1 m3 membuat balok beton bertulang mutu 350, f'c = 31.2 Mpa ( 175 kg besi + bekisting )
Kayu klas III m3 0.3280
Paku biasa 5" - 12" Kg 3.2800
Minyak bekisting Ltr 1.6400
Besi beton Polos Kg 175.0000
Kawat beton Kg 2.6250
Bahan Semen Portland Kg 464.3500
Pasir beton m3 0.4867
Koral beton m3 0.7800
Kayu klas II m 3
0.1500
Plywood tebal 9 mm Lbr 4.0000
Dolken kayu 8"/4 m Btg 16.0000

Pekerja Oh 5.4325
Tukang batu Oh 0.3415
Tukang Kayu Oh 1.6500
Tenaga Kerja
Tukang Besi Oh 1.4000
Kepala Tukang Oh 0.3330
Mandor Oh 0.3000
27 1 m3 membuat balok beton bertulang mutu K 275, f'c = 24 Mpa ( 175 kg besi + bekisting )
Kayu klas III m3 0.3280
Paku biasa 5" - 12" Kg 3.2800
Minyak bekisting Ltr 1.6400
Besi beton Polos Kg 175.0000
Kawat beton Kg 2.6250
Bahan Semen Portland Kg 412.0000
Pasir beton m3 0.5560
Koral beton m 3
0.7800
Kayu klas II m3 0.1400
Plywood tebal 9 mm Lbr 4.0000
Dolken kayu 8"/4 m Btg 16.0000

Pekerja Oh 5.4325
Tenaga Kerja
Tukang batu Oh 0.3415
Tukang Kayu Oh 1.6500
Tukang Besi Oh 1.4000
Kepala Tukang Oh 0.3330
Mandor Oh 0.3000

V PEKERJAAN ATAP
1 1 kg Pekerjaan kuda-kuda baja ( Truss Steel works )
Steel truss box (60x10x1.5 mmx20mm) Kg 1.0250
Bahan
Self Drilling Screws 12 - 14 x 20 mm bh 1.0250

Pekerja Oh 0.0410
Tukang Oh 0.0200
Tenaga Kerja
Kepala Tukan Oh 0.0100
Mandor Oh 0.0100
2 1 kg Purlin Steel works
Steel Purlin 50x20x10x1.5x600 mm Kg 1.0250
Bahan
Self Drilling Screws 12 - 14 x 20 mm bh 1.0250

Pekerja Oh 0.0205
Tukang Oh 0.0105
Tenaga Kerja
Kepala Tukang Oh 0.0011
Mandor Oh 0.0005
3 1 m Pekerjaan rangka atap
RHS 100.50.5 Btg 0.2050
Bahan
Kawat las Kg 0.0105

Pekerja Oh 0.0615
Tukang Oh 0.0615
Tenaga Kerja
Kepala Tukang Oh 0.0060
Mandor Oh 0.0030
4 1 m Pasang Gording Canal C 75.45.15.1.6
Canal C 75.35.15.1.5 Btg 0.2050
Bahan
Kawat Las Kg 0.0105
Pekerja Oh 0.0585
Tukang Las Oh 0.0300
Tenaga Kerja
Kepala Tukang Oh 0.0060
Mandor Oh 0.0030
5 1 m2 Baja Ringan
Light Steel Profile m 4.5600
Bahan Screw Ls 1.0000
Dynabolt Ls 1.0000

Pekerja Oh 0.0770
Tukang Oh 0.1540
Tenaga Kerja
Kepala Tukang Oh 0.0155
Mandor Oh 0.0040
6 1 m2 Pasang atap seng gelombang
Seng Gelombang Lbr 0.7000
Bahan
Paku seng Kg 0.0200

Pekerja Oh 0.1409
Tukang Kayu Oh 0.1256
Tenaga Kerja
Kepala Tukang Oh 0.0510
Mandor Oh 0.0067
7 1 m' Pasang nok atap sirap
Seng Plat 3" x 6" Bjls 28 Lbr 0.4000
Paku 1/2" - 1" Kg 0.0600
Bahan
Paku 2" - 5" Kg 0.0500
Kayu Papan 3 cm m3 0.0060

Pekerja Oh 0.1250
Tukang Kayu Oh 0.2500
Tenaga kerja
Kepala Tukang Oh 0.0420
Mandor Oh 0.0067
8 1 m2 Pasangan atap genteng Plentong besar
Bahan Genteng Plentong bh 23.0770

Pekerja Oh 0.1500
Tukang kayu Oh 0.0656
Tenaga Kerja
Kepala Tukang Oh 0.0070
Mandor Oh 0.0070
9 1 m' Pasang Bubungan Plentong besar
Bahan Bubungan Plentong bh 4.4351
Semen Portland Kg 8.0000
Pasir Pasang m3 0.0320

Pekerja Oh 0.4000
Tukang Kayu Oh 0.2000
Tenaga Kerja
Kepala Tukang Oh 0.0200
Tenaga Kerja

Mandor Oh 0.0020
10 1 m2 Pasang atap Asbes gelombang 1.80 x 0.92 m x 5mm
Asbes Gelombang Lbr 0.7577
Bahan
Paku Pancing Kg 0.1200

Pekerja Oh 0.1400
Tukang kayu Oh 0.0670
Tenaga Kerja
Kepala Tukang Oh 0.0070
Mandor Oh 0.0070
11 1 m2 Pasang Atap Sirap
Genteng Sirap bh 61.0000
Bahan
Paku biasa 1/2" - 1" Kg 0.2033

Pekerja Oh 0.1687
Tukang Kayu Oh 0.2543
Tenaga Kerja
Kepala Tukang Oh 0.0253
Mandor Oh 0.0080
12 1 m2 Pasang Atap Alang - alang
Bahan Alang - Alang Lbr 6.6625
Tali Bengikat Kg 0.5125

Pekerja Oh 0.2050
Tenaga Kerja
Mandor Oh 0.0105

VI PEKERJAAN DINDING
1 1 m2 Pasangan Batako 40 x 20 x 10 cm, Campuran Spesi 1Pc : 4Ps
Batako bh 12.5000
Bahan Semen Portland Kg 12.0000
Pasir Pasang m3 0.0380

Pekerja Oh 0.3518
Tukang Batu Oh 0.1131
Tenaga Kerja
Kepala Tukang Oh 0.0193
Mandor Oh 0.0288
2 1 m2 Pasangan Paving Block 25 x 20 x 6cm
Paving Block bh 20.6000
Bahan Semen Portland Kg 8.3200
Pasir Pasang m3 0.0620

Pekerja Oh 0.3210
Tukang Batu Oh 0.4370
Tenaga Kerja
Kepala Tukang Oh 0.0220
Mandor Oh 0.0175
3 1 m2 Pasang Paving Block 20 x 10 x 6cm
Paving Block bh 51.5000
Bahan Semen Portland Kg 8.3200
Pasir Pasang m3 0.0620
Pekerja Oh 0.3210
Tukang Batu Oh 0.4370
Tenaga Kerja
Kepala Tukang Oh 0.0220
Mandor Oh 0.0175
4 1 m3 Pasangan Bronjong ( 2 x 1 x 1m )
Batu kali m3 1.1000
Bahan
Bronjong Unit 0.5000

Pekerja Oh 0.6667
Tenaga Kerja
Mandor Oh 0.0240

VII PEKERJAAN PLESTERAN


1 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm
Semen Portland Kg 7.0521
Bahan
Pasir Pasang m 3
0.0200

Pekerja Oh 0.2559
Tukang Batu Oh 0.1500
Tenaga Kerja
Kepala Tukang Oh 0.0167
Mandor Oh 0.0167
2 1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm
Semen Portland Kg 6.2400
Bahan
Pasir Pasang m3 0.0214

Pekerja Oh 0.2559
Tukang Batu Oh 0.1500
Tenaga Kerja
Kepala Tukang Oh 0.0167
Mandor Oh 0.0167
3 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm
Semen Portland Kg 12.7500
Bahan
Pasir Pasang m3 0.0270

Pekerja Oh 0.3500
Tukang Batu Oh 0.1500
Tenaga Kerja
Kepala Tukang Oh 0.0202
Mandor Oh 0.0273
4 1 m2 Plesteran 1 Pc : 3 Ps, tebal 20 mm
Semen Portland Kg 10.3500
Bahan
Pasir Pasang m 3
0.0310

Pekerja Oh 0.3500
Tukang Batu Oh 0.1500
Tenaga Kerja
Kepala Tukang Oh 0.0202
Mandor Oh 0.0273
5 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20 mm
Semen Portland Kg 8.3200
Bahan
Pasir Pasang m 3
0.0320
Pekerja Oh 0.3500
Tukang Batu Oh 0.1500
Tenaga Kerja
Kepala Tukang Oh 0.0202
Mandor Oh 0.0273
6 1 m2 Plesteran ciprat, 1 Pc : 2 Ps
Semen Portland Kg 5.6080
Bahan
Pasir Pasang m3 0.0110

Pekerja Oh 0.2559
Tukang Batu Oh 0.1270
Tenaga Kerja
Kepala Tukang Oh 0.0130
Mandor Oh 0.0150
7 1 m2 Plesteran 1 Pc : 5 Ps, tebal 15 mm
Semen Portland Kg 4.7751
Bahan
Pasir Pasang m3 0.0220

Pekerja Oh 0.2559
Tukang Batu Oh 0.1500
Tenaga Kerja
Kepala Tukang Oh 0.0167
Mandor Oh 0.0167
8 1 m2 Plesteran 1 Pc : 5 Ps, tebal 20 mm
Bahan Semen Portland Kg 6.4490
Pasir Pasang m 3
0.0230

Pekerja Oh 0.3500
Tukang Batu Oh 0.1500
Tenaga Kerja
Kepala Tukang Oh 0.0202
Mandor Oh 0.0273

VII PEKERJAAN FINISHING SIAR PASANGAN


1 Memasang 1 m2 finishing siar Pasangan dinding bata merah
Bahan Semen Portland Kg 3.8220

Pekerja Oh 0.1500
Tukan Batu Oh 0.0731
Tenaga Kerja
Kepala Tukang Oh 0.0074
Mandor Oh 0.0069
2 Memasang 1 m2 finishing siar Pasangan dinding Conblock ekspose
Bahan Semen Portland Kg 1.6400

Pekerja Oh 0.0720
Tukan Batu Oh 0.0360
Tenaga Kerja
Kepala Tukang Oh 0.0040
Mandor Oh 0.0040
3 Memasang 1 m2 finishing siar Pasangan batu kali adukan 1Pc : 2Ps
Semen Portland Kg 6.3400
Bahan
Pasir Pasang m3 0.0120
Pekerja Oh 0.3000
Tukan Batu Oh 0.1500
Tenaga Kerja
Kepala Tukang Oh 0.0150
Mandor Oh 0.0270
4 1 m2 Acian
Bahan Semen Portland Kg 3.4988

Pekerja Oh 0.1753
Tukan Batu Oh 0.1057
Tenaga Kerja
Kepala Tukang Oh 0.0146
Mandor Oh 0.0146

IX PEKERJAAN KAYU
1 Membuat dan memasang 1 m3 kuse Pintu dan jendela kayu klas I
Balok Kayu m3 1.1080
Bahan Paku 10 cm Kg 1.0031
Lem Kayu Kg 1.0000

Pekerja Oh 6.9380
Tukang kayu Oh 20.8140
Tenaga Kerja
Kepala tukang Oh 2.1521
Mandor Oh 0.4283
2 Membuat dan memasang 1 m3 Kusen Pintu dan jendela Kayu klas II/III
Bahan Balok Kayu m3 1.1080
Paku 10 cm Kg 1.0031
Lem Kayu Kg 1.0000

Pekerja Oh 6.0000
Tukang kayu Oh 18.0000
Tenaga Kerja
Kepala tukang Oh 2.0000
Mandor Oh 0.3890
3 Membuat dan memasang 1 m2 Pintu Klamb Standar, Kayu klas II
Papan Kayu m3 0.0400
Bahan
Paku 5 - 7 cm Kg 0.4750

Pekerja Oh 0.5725
Tukang Kayu Oh 1.5508
Tenaga Kerja
Kepala Tukang Oh 0.1551
Mandor Oh 0.0956
4 Membuat dan memasang 1 m2 Pintu klamb sederhana, kayu klas III
Papan Kayu m3 0.0400
Bahan
Paku 5 - 7 cm Kg 0.4750

Pekerja Oh 0.5725
Tenaga Kerja
Tukang Kayu Oh 1.5508
Kepala Tukang Oh 0.1551
Mandor Oh 0.0956
5 Membuat dan memasang 1 m2 daun Pintu Panel, akyu klas I/II
papan Kayu m3 0.0400
Bahan
Lem Kayu Kg 0.5000

Pekerja Oh 1.0000
Tukang Kayu Oh 2.5543
Tenaga Kerja
Kepala Tukang Oh 0.2556
Mandor Oh 0.0500
6 Membuat dan memasang 1 m2 Pintu dan Jendela kaca, Kayu klas I/II
papan Kayu m3 0.0240
Bahan
Lem Kayu Kg 0.1593

Pekerja Oh 0.8000
Tukang Kayu Oh 2.1006
Tenaga Kerja
Kepala Tukang Oh 0.2043
Mandor Oh 0.0400
7 Membuat dan memasang 1 m2 Pintu dan jendela jalusi, Kayu klas I/II
papan Kayu m3 0.0385
Bahan
Lem Kayu Kg 0.5000

Pekerja Oh 1.0000
Tukang Kayu Oh 3.0000
Tenaga Kerja
Kepala Tukang Oh 0.3000
Mandor Oh 0.0500
8 Memasang 1 m3 Konstruksi kuda-kuda konvensional, Kayu Klas I. II dan III bentang 6 m'
Balok Kayu m3 1.1000
Bahan
Besi strip tebal 5 mm Kg 15.0000
paku 12 cm Kg 3.4460

Pekerja Oh 4.4054
Tukang Kayu Oh 10.1540
Tenaga Kerja
Kepala Tukang Oh 1.0154
Mandor Oh 0.2000
9 Memasang 1 m3 konstruksi kuda-kuda expose, kayu klas I
Balok Kayu m3 1.1150
Bahan Besi strip tebal 5 mm Kg 15.0000
Paku 12 cm Kg 2.4260

Pekerja Oh 4.7508
Tukang Kayu Oh 20.1000
Tenaga Kerja
Kepala Tukang Oh 2.0100
Mandor Oh 0.2375
10 Memasang 1 m3 Konstruksi gording, kayu klas II
Balok Kayu m3 1.1000
Bahan Besi Strip tebal 5 mm Kg 15.0000
Paku 12 cm Kg 3.0000

Tenaga kerja Pekerja Oh 2.4000


Tukang Kayu Oh 7.2000
Kepala Tukang Oh 0.7200
Mandor Oh 0.1200
11 Memasang 1 m2 rangka langit - langit, ( 60 x 60 ) cm kayu klas II/III
Kaso - kaso ( 5 x 7 ) cm m3 0.0163
Bahan
Paku 7 dan 10 cm Kg 0.2543

Pekerja Oh 0.2033
Tukang Kayu Oh 0.3050
Tenaga Kerja
Kepala Tukang Oh 0.0305
Mandor Oh 0.0750
12 Memasang 1 m' Lisplank uk. 3 x 20 cm, Kayu klas I/II
Papan Payu m3 0.0100
Bahan
Paku 5 sampai 7 cm Kg 0.0759

Pekerja Oh 0.1194
Tukang Kayu Oh 0.2390
Tenaga Kerja
Kepala Tukang Oh 0.0239
Mandor Oh 0.0050
13 Memasang 1 m' Lisplank uk. 3 x 30 cm, Kayu klas I/II
Papan Payu m3 0.0110
Bahan
Paku 5 sampai 7 cm Kg 0.0759

Pekerja Oh 0.1194
Tukang Kayu Oh 0.2390
Tenaga Kerja
Kepala Tukang Oh 0.0239
Mandor Oh 0.0050

X PEKERJAAN PENUTUP LANTAI & DINDING


1 1 m2 Pasang batu koral sikat campuran 1 : 2
Batu koral sikat Kg 10.0000
Bahan Semen Portland Kg 3.8950
Pasir pasang m3 0.0665

Pekerja Oh 0.5125
Tukang Batu Oh 0.2050
Tenaga Kerja
Kepala Tukang Oh 0.0205
Mandor Oh 0.0205
2 Memasang 1 m2 lantai keramik ukuran 30 x 30 cm
Keramik bh 11.8700
Semen Portland Kg 8.0000
Bahan
Pasir pasang m3 0.0450
Semen warna Kg 1.5000

Pekerja Oh 0.7000
Tukang batu Oh 0.3500
Tenaga Kerja
Tenaga Kerja
Kepala Tukang Oh 0.0350
Mandor Oh 0.0350
3 Memasang 1 m2 lantai keramik ukuran 40x 40 cm
Bahan Keramik bh 6.6250
Semen Portland Kg 8.0000
Pasir Pasang m3 0.0450
Semen warna Kg 0.9400

Pekerja Oh 0.7000
Tukang Batu Oh 0.3500
Tenaga Kerja
Kepala Tukang Oh 0.0350
Mandor Oh 0.0350
4 Memasang 1 m2 lantai keramik ukuran 60 x 60 cm
Keramik bh 3.0000
Semen Portland Kg 8.0000
Bahan
Pasir Pasang m3 0.0450
Semen warna Kg 0.9321

Pekerja Oh 0.7000
Tulang Batu Oh 0.3500
Tenaga Kerja
Kepala Tukang Oh 0.0350
Mandor Oh 0.0350

XI PEKERJAAN LANGIT - LANGIT


1 Memasang 1 m2 langit - langit tripleks
Tripleks Lbr 0.3750
Bahan
Paku biasa 1/2" - 1" Kg 0.0300

Pekerja Oh 0.1000
Tenaga Kerja Tukang Kayu Oh 0.1000
Kepala Tukang Oh 0.0100
Mandor Oh 0.0050

XIII PEKERJAAN KUNCI DAN KACA


1 1 Bh. Pasang kunci tanam biasa
Bahan Kunci tanam biasa bh 1.0000

Pekerja Oh 0.0100
Tukang Besi Oh 0.5000
Tenaga Kerja
Kepala Tukang Oh 0.0100
Mandor Oh 0.0050
2 1 bh. Pasang engsel Pintu
Bahan Engsen Pintu bh 1.0000

Pekerja Oh 0.0150
Tukang Besi Oh 0.1500
Tenaga Kerja
Kepala Tukang Oh 0.0150
Mandor Oh 0.0010
3 1 bh. Pasang engsel jendela kupu-kupu
Bahan Engsel jendela bh 1.0000

Pekerja Oh 0.0100
Tenaga Kerja Tukang Besi Oh 0.1000
Kepala Tukang Oh 0.0100
Mandor Oh 0.0010
4 1 bh. Pasang kait angin
Bahan Kait angin bh 1.0000

Pekerja Oh 0.0150
Tukang Besi Oh 0.1500
Tenaga Kerja
Kepala Tukang Oh 0.0150
Mandor Oh 0.0010
5 1 bh. Pasang kunci slot
Bahan Kunci slot bh 1.0000

Pekerja Oh 0.0098
Tukang Besi Oh 0.0683
Tenaga Kerja
Kepala Tukang Oh 0.0068
Mandor Oh 0.0010
6 1 m2 Pasang kaca, tebal 3 - 5 mm
Bahan Kaca bh 1.1000

Pekerja Oh 0.0150
Tukang Besi Oh 0.1500
Tenaga Kerja
Kepala Tukang Oh 0.0150
Mandor Oh 0.0010

XIV PEKERJAAN SANITASI


1 Memasang 1 bh kloset duduk / monoblok lengkap
Bahan Kloset duduk lengkap bh 1.0000

Pekerja Oh 1.4501
Tukang Batu Oh 1.2366
Tenaga Kerja
Kepala Tukang Oh 0.1236
Mandor Oh 0.1600
2 Memasang 1 bh kloset jongkok Porselen
Kloset Jongkok Porselen bh 1.0000
Bahan Semen Portland Kg 6.1000
Pasir Pasang m3 0.0103

Pekerja Oh 1.0000

Tenaga Kerja
Tukang Batu Oh 1.5250
Tenaga Kerja
Kepala Tukang Oh 1.5000
Mandor Oh 0.1627
3 Memasang 1 m' Pipa Galvanis Ø 1/2" - 1"
Pipa Galvanis m' 1.2000
Bahan
Asesories ( % dari harga Pipa ) % 35.0000

Pekerja Oh 0.0540
Tukang Batu Oh 0.0900
Tenaga Kerja
Kepala Tukang Oh 0.0090
Mandor Oh 0.0270
4 Memasang 1 m' Pipa Galvanis Ø 1 1/2" - 3"
Bahan Pipa Galvanis m' 1.2000
Asesories ( % dari harga Pipa ) % 35.0000

Pekerja Oh 0.1080
Tukang Batu Oh 0.1800
Tenaga Kerja
Kepala Tukang Oh 0.0180
Mandor Oh 0.0054
5 Memasang 1 m' Pipa PVC tipe AW Ø 1/2" - 1 1/2"
Pipa PVC m' 1.2000
Bahan
Asesories ( % dari harga Pipa ) % 35.0000

Pekerja Oh 0.0360
Tukang Batu Oh 0.0706
Tenaga Kerja
Kepala Tukang Oh 0.0075
Mandor Oh 0.0043
6 Memasang 1 m' Pipa PVC tipe AW Ø 2"
Pipa PVC m' 1.2000
Bahan
Asesories ( % dari harga Pipa ) % 35.0000

Pekerja Oh 0.0450
Tukang Batu Oh 0.0750
Tenaga Kerja
Kepala Tukang Oh 0.0090
Mandor Oh 0.0025
7 Memasang 1 m' Pipa PVC tipe AW Ø 3" - 4"
Bahan Pipa PVC m' 1.2000

Pekerja Oh 0.0810
Tukang Batu Oh 0.1879
Tenaga Kerja
Kepala Tukang Oh 0.0189
Mandor Oh 0.0070
8 Memasang 1 buah kran 1/2" atau 3/4"
Kran air bh 1.0000
Bahan
Seal tape bh 0.0245

Pekerja Oh 0.0100
Tukang Batu Oh 0.1000
Tenaga Kerja
Tenaga Kerja
Kepala Tukang Oh 0.0100
Mandor Oh 0.0050

XV PEKERJAAN PENGECATAN
1 1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Cat meni Kg 0.1850
Dempul / Plamir Kg 0.1380
Bahan Cat dasar Kg 0.1700
Cat Penutup 2x Kg 0.2730
Kuas bh 0.0294

Pekerja Oh 0.0847
Tukang Cat Oh 0.0890
Tenaga Kerja
Kepala Tukang Oh 0.0139
Mandor Oh 0.0051
2 1 m2 Pengecatan bidang kayu dengan Vernis
Vernis Kg 0.2930
Dempul / Plamir Kg 0.0934
Bahan
Amplas Lbr 0.8924
Kuas bh 0.0294

Pekerja Oh 0.0539
Tukang Cat Oh 0.0806
Tenaga Kerja
Kepala Tukang Oh 0.0129
Mandor Oh 0.0046
3 1 m2 Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Plamir Kg 0.1154
Cat dasar Kg 0.0920
Bahan
Cat penutup 2x Kg 0.2600
Kuas bh 0.0294

Pekerja Oh 0.0362
Tukang Cat Oh 0.0630
Tenaga Kerja
Kepala Tukang Oh 0.0064
Mandor Oh 0.0064
2.8 Unidade de Presu
Unidade do Presu katak folin osan ba material no mão de obra ba servisu 1m³ nian.
tan ne’e iha unidade presu ida ne’e involve folin material no mão de obra ne’ebe vezes ba koefisiente
material no mão de obra nian para hodi bele hetan folin osan ba servisu refere, ba material nia folin halo
peskija folin material sira iha merkadu no loja sira. No folin osan ba trabalhadores sira selu tuir salariu
ne’ebe SEFOPE determina tiha ona.
Tan ne’e unidade presu ba projetu uma simples mak tuir mai ne’e:

DESCRICAO UNIDADE DE PRESU

Presu Presu
No. Deskrisaun do Servisu Unidade Coeficiente Total ($)
Material ($) Unitario ($)

I. SERVISU BA FUNDASAUN NIAN


1 Limpeza Terrenu
a. Mao De Obra
Mandor Pd 0.05 $ 15.00 $ 0.75 $ 1.35
Ajudante Pd 0.1 $ 6.00 $ 0.60
2 Monta Estaka
a. Mao De Obra
Mandor Pd 0.005 $ 15.00 $ 0.08
Badaen Ai Pd 0.1 $ 7.00 $ 0.70
Ajudante Pd 0.1 $ 6.00 $ 0.60
b. Material $ 1.53
Ai (5/7) m³ 0.0177 $ 4.00 $ 0.07
Ai-kabelak m³ 0.007 $ 9.50 $ 0.07
Pregu kg 0.02 $ 1.00 $ 0.02
4 Servisu Ke'e Rai Ba Fundasaun
a. Mao De Obra
Mandor Pd 0.07 $ 15.00 $ 1.05 $ 6.55
Ajudante Pd 0.9163 $ 6.00 $ 5.50
5 Servisu Aterru Rai-henek Iha
Fundasaun Nia Okos
a. Mao De Obra
Mandor Pd 0.0127 $ 15.00 $ 0.19
Ajudante Pd 0.3023 $ 6.00 $ 1.81
b. Material $ 21.20
Rai-henek Kg 1.2 $ 16.00 $ 19.20
6. Servisu Hada Fatuk La Uza
Argamassa
a. Mao De Obra
Mandor Pd 0.0579 $ 15.00 $ 0.87
Badaen Fatuk Pd 0.39 $ 7.00 $ 2.73
Ajudante Pd 0.78 $ 6.00 $ 4.68 $ 26.28
b. Material
Batu belah 15/20 cm m³ 1.2 $ 15.00 $ 18.00
7 Hada Fundasaun ( 1:4 )
a. Mao De Obra
Mandor Pd 0.075 $ 15.00 $ 1.13
Badaen Fatuk Pd 0.8404 $ 7.00 $ 5.88
Ajudante Pd 1.8313 $ 6.00 $ 10.99
b. Material $ 66.07
Batu belah 15/20 cm m³ 1.2 $ 15.00 $ 18.00
Simentu Portland Kg 163 $ 0.10 $ 16.71
Rai-henek m³ 0.5348 $ 25.00 $ 13.37
Servisu Aterru Fila Fali Rai
8
Ne'ebe Ke'e
a. Mao De Obra
Mandor Pd 0.0143 $ 15.00 $ 0.21 $ 1.50
Ajudante Pd 0.2142 $ 6.00 $ 1.29
II. SERVISU BA BETAUN & PAREDI
Servisu Sloof Betaun 1:2:3 +
1
Bekisting
a. Mao De Obra
Mandor Pd 0.2013 $ 15.00 $ 3.02
Badaen Fatuk Pd 0.3093 $ 7.00 $ 2.17
Badaen Ai Pd 1.56 $ 7.00 $ 10.92
Badaen Besi Pd 1.4 $ 7.00 $ 9.80
Ajudante Pd 4.9152 $ 6.00 $ 29.49
b. Material
Ai Klass III m3 0.2700 $ 390.63 $ 105.47
Triplesk (6mm) Flh 0.3750 $ 6.75 $ 2.53
Pregu biasa 5" - 12" Kg 2.0000 $ 1.00 $ 2.00 $ 390.40
Besi beton Polos Ø12 Kg 200.0000 $ 0.70 $ 140.80
Arame beton Kg 3.0000 $ 1.00 $ 3.00
Agregadu Groso m3 0.7800 $ 45.00 $ 35.10
Sementi Portland Kg 323.0000 $ 0.10 $ 33.11
Rai-henek m3 0.5200 $ 25.00 $ 13.00
Servisu Koluna Betaun
2
Armadu 1:2:3 + Bekisting
a. Mao De Obra
Mandor Pd 0.2747 $ 15.00 $ 4.12
Badaen Ai Pd 2.792 $ 7.00 $ 19.54
Badaen Besi Pd 2.1 $ 7.00 $ 14.70
Badaen Fatuk Pd 0.3093 $ 7.00 $ 2.17
Ajudante Pd 7.175 $ 6.00 $ 43.05
b. Material
Ai kelas III m3 0.4000 $ 285.71 $ 114.29 $ 466.20
Pregu biasa 5" - 12" Kg 4.0000 $ 1.00 $ 4.00
Besi beton Polos Kg 300.0000 $ 0.70 $ 211.20
Arame beton Kg 4.5000 $ 1.00 $ 4.50
Sementi Portland Kg 323.0000 $ 0.10 $ 33.11
Rai-henek m3 0.5200 $ 25.00 $ 13.00
Triplesk (6mm) Flh 0.3750 $ 6.75 $ 2.53
Servisu Sintal Jeral Betaun
3
1:2:3 + Bekisting
a. Mao De Obra
Mandor Pd 0.2747 $ 15.00 $ 4.12
Badaen Ai Pd 1.65 $ 7.00 $ 11.55
Badaen Besi Pd 1.4 $ 7.00 $ 9.80
Badaen Fatuk Pd 0.3093 $ 7.00 $ 2.17
Ajudante Pd 7.175 $ 6.00 $ 43.05
b. Material
Ai kelas III m3 0.32 $ 285.71 $ 91.43 $ 392.85
Pregu biasa 5" - 12" Kg 3.2 $ 1.00 $ 3.20
Besi beton Polos Kg 200 $ 0.70 $ 140.80
Arame beton Kg 3 $ 1.00 $ 3.00
Sementi Portland Kg 323 $ 0.10 $ 33.11
Rai-henek m3 0.52 $ 25.00 $ 13.00
Triplesk (6mm) Kg 0.3750 $ 6.75 $ 2.53
Agregadu m3 0.78 $ 45.00 $ 35.10
4 Cor Baki Iha Varanda Nian
a. Mao De Obra
Mandor Pd 0.2013 $ 15.00 $ 3.02
Badaen Besi Pd 1.4 $ 7.00 $ 9.80
Badaen Fatuk Pd 0.3093 $ 7.00 $ 2.17
Ajudante Pd 4.9152 $ 6.00 $ 29.49
b. Material $ 270.53
Pregu biasa 5" - 12" Kg 2 $ 1.00 $ 2.00
Besi beton Polos Kg 200 $ 0.71 $ 142.00
Arame beton Kg 3 $ 1.00 $ 3.00
Sementi Portland Kg 323 $ 0.10 $ 33.11
Rai-henek m3 0.52 $ 16.00 $ 8.32
Triplesk (6mm) Kg 0.3750 $ 6.75 $ 2.53
Agregadu m3 0.78 $ 45.00 $ 35.10
5 Laje (1:2:3)
a. Mao De Obra
Mandor Pd 0.03 $ 15.00 $ 0.45
Badaen Fatuk Pd 0.275 $ 7.00 $ 1.93
Ajudante Pd 1.65 $ 6.00 $ 9.90
b. Material $ 90.68
Sementi Portland Kg 325 $ 0.10 $ 33.31
Agregadu m3 0.81 $ 45.00 $ 36.45
Rai-henek m3 0.54 $ 16.00 $ 8.64
6 Beton Cor Ba Tanki & Neut Nian
a. Mao De Obra
Mandor Pd 0.02 $ 15.00 $ 0.30
Badaen Fatuk Pd 0.282 $ 7.00 $ 1.97
Ajudante Pd 1.6915 $ 6.00 $ 10.15
b. Material $ 90.94
Sementi Portland Kg 315.7 $ 0.10 $ 32.36
Agregadu m3 0.818 $ 45.00 $ 36.81
Rai-henek m3 0.5845 $ 16.00 $ 9.35
7 Servisu Paredi Nian
a. Mao De Obra
Mandor Pd 0.0288 $ 15.00 $ 0.43
Badaen Fatuk Pd 0.1131 $ 7.00 $ 0.79
Ajudante Pd 0.3518 $ 6.00 $ 2.11
b. Material $ 11.76
Batako bh 12.5 $ 0.50 $ 6.25
Sementi Portland Kg 12 $ 0.10 $ 1.23
Rai-henek m3 0.038 $ 25.00 $ 0.95
8 Servisu Arus Nian
a. Mao De Obra
Mandor Pd 0.4283 $ 15.00 $ 6.42
Badaen Ai Pd 20.814 $ 7.00 $ 145.70
Ajudante Pd 6.938 $ 6.00 $ 41.63
b. Material $ 681.66
Ai kela I/II (6/12) m3 1.108 $ 434.03 $ 480.90
Pregu biasa (10cm) Kg 1.0031 $ 1.00 $ 1.00
Lem Ai Kg 1 $ 6.00 $ 6.00
9 Servisu Kuda-kuda Nian
a. Mao De Obra
Mandor pd 0.2375 $ 15.00 $ 3.56
Badaen Ai pd 20.1 $ 7.00 $ 140.70
Ajudante pd 4.7508 $ 6.00 $ 28.50
b. Material $ 719.13
Ai kela I/II (6/12) m3 1.115 $ 434.03 $ 483.94
Pregu (12cm) Kg 2.426 $ 1.00 $ 2.43
Besi strip tebal 5 mm Kg 15 $ 4.00 $ 60.00
III. SERVISU BA KAKULUK NIAN
1 Servisu Gording
a. Mao De Obra
Mandor Pd 0.12 $ 15.00 $ 1.80
Badaen Ai Pd 7.2 $ 7.00 $ 50.40
Ajudante Pd 2.4 $ 6.00 $ 14.40
b. Material $ 383.89
Ai kela I/II (5/7) m3 1.1 $ 285.71 $ 314.29
Pregu (12cm) Kg 3 $ 1.00 $ 3.00
2 Servisu Lisplank
a. Mao De Obra
Mandor Pd 0.005 $ 15.00 $ 0.08
Badaen Ai Pd 0.239 $ 7.00 $ 1.67
Ajudante Pd 0.1194 $ 6.00 $ 0.72
b. Material $ 2.50
Ai-Kabelak ( 0,01x0,2x4) m3 0.01 $ 2.25 $ 0.02
Pregu Kg 0.01 $ 1.00 $ 0.01
3 Servisu Taka Kakuluk Ho Material Kalen
a. Mao De Obra
Mandor Pd 0.0067 $ 15.00 $ 0.10 $ 5.00
Badaeen Ai Pd 0.1256 $ 7.00 $ 0.88
Ajudante Pd 0.1409 $ 6.00 $ 0.85
b. Material
Kalen Bjls 40 Flh 0.7 $ 4.50 $ 3.15
Pregu (5cm ) Kg 0.02 $ 1.00 $ 0.02
IV. SERVISU BA PLAFOND NIAN
1 Servisu Monta Perabung
a. Mao De Obra
Mandor Pd 0.0067 $ 15.00 $ 0.10
Badaen Ai Pd 0.1256 $ 7.00 $ 0.88
Ajudante Pd 0.1409 $ 6.00 $ 0.85 $ 5.00
b. Material
Kalen Bjls 40 Flh 0.7 $ 4.50 $ 3.15
Pregu (5cm ) kg 0.02 $ 1.00 $ 0.02
2 Servisu Armadura Plafond Nian
a. Mao De Obra
Mandor Pd 0.075 $ 15.00 $ 1.13
Badaen Ai Pd 0.305 $ 7.00 $ 2.14
Ajudante Pd 0.2033 $ 6.00 $ 1.22
b. Material $ 9.39
Ai 5(5/7) m³ 0.0163 $ 285.71 $ 4.66
Pregu Kg 0.2543 $ 1.00 $ 0.25
3 Servisu Monta Plafond
a. Mao De Obra
Mandor Pd 0.005 $ 15.00 $ 0.08
Badaen Ai Pd 0.1 $ 7.00 $ 0.70
Ajudante Pd 0.1 $ 6.00 $ 0.60 $ 3.98
b. Material
Triplesk (6mm) Flh 0.375 $ 6.75 $ 2.53
Pregu (3cm) Kg 0.03 $ 2.50 $ 0.08
V. SERVISU BA REBOKA NIAN
1 Servisu Reboka Nian
a. Mao De Obra
Mandor Pd 0.0273 $ 15.00 $ 0.41
Badaen Fatuk Pd 0.15 $ 7.00 $ 1.05
Ajudante Pd 0.35 $ 6.00 $ 2.10 $ 5.54
b. Material
Sementu Portland Kg 12.75 $ 0.10 $ 1.31
Rai-henek m³ 0.027 $ 25.00 $ 0.68
2 Servisu Kose Sementu Been
a. Mao De Obra
Mandor Pd 0.0146 $ 15.00 $ 0.22
Badaen Fattuk Pd 0.1057 $ 7.00 $ 0.74
Ajudante Pd 0.1753 $ 6.00 $ 1.05 $ 2.37
b. Material
Sementu Portland Kg 3.4988 $ 0.10 $ 0.36
VI. SERVISU BA LAJE NIAN
1 Servisu Aterru Rai Iha Laje Nia Okos
a. Mao De Obra
Mandor Pd 0.0379 $ 15.00 $ 0.57 $ 2.40
Ajudante Pd 0.3046 $ 6.00 $ 1.83
b. Material
Sirtu m³ 1.2 $ -
2 Servisu Aterru Agregadu Iha Laje Nia Okos
a. Mao De Obra
Mandor Pd 0.0379 $ 15.00 $ 0.57
Ajudante Pd 0.3046 $ 6.00 $ 1.83 $ 56.40
b. Material
Agregadu m³ 1.2 $ 45.00 $ 54.00
3 Servisu Aterru Rai-henek Iha Laje Nian Okos
a. Mao De Obra
Mandor Pd 0.0127 $ 15.00 $ 0.19
Ajudante Pd 0.3023 $ 6.00 $ 1.81 $ 21.20
b. Material
Rai-henek m³ 1.2 $ 16.00 $ 19.20
4 Servisu Nahe Azuleiju (20x20)
a. Mao De Obra
Mandor Pd $ 15.00 $ -
Badaen Fatuk Pd $ 7.00 $ -
Ajudante Pd $ 6.00 $ -
b. Material Err:509
Azuleiju Flh Err:509 Err:509
Sementu Portland Kg $ 0.10 $ -
Rai-henek m³ $ 25.00 $ -
Sementu Mutin Kg Err:509 Err:509
5 Servisu Nahe Azuleiju (30x30)
a.Mao De Obra
Mandor Pd 0.035 $ 15.00 $ 0.53
Badaen Fatuk Pd 0.35 $ 7.00 $ 2.45
Ajudante Pd 0.7 $ 6.00 $ 4.20
b. Material Err:509
Azuleiju Flh 11.87 Err:509 Err:509
Sementu Portland Kg 8 $ 0.10 $ 0.82
Rai-henek m³ 0.045 $ 25.00 $ 1.13
Sementu Mutin Kg 1.5 Err:509 Err:509
VII. SERVISU BA ODAMATAN & JANELA
1 Servisu Monta Odamatan & Janela Tahan
a.Mao De Obra
Mandor Pd 0.05 $ 15.00 $ 0.75
Badaen Ai Pd 3 $ 7.00 $ 21.00
Ajudante Pd 1 $ 6.00 $ 6.00
b. Material Err:509
Ai-Kabelak m³ 0.0385 Err:509 Err:509
Lem Ai Kg 0.5 $ 1.00 $ 0.50
2 Servisu Monta Chave
a.Mao De Obra
Mandor Pd 0.005 $ 15.00 $ 0.08
Badaen Ai Pd 0.5 $ 7.00 $ 3.50
Ajudante Pd 0.01 $ 6.00 $ 0.06 $ 13.64
b. Material
Chave Odamatan bh 1 $ 10.00 $ 10.00
3 Servisu Monta Dobralisa Odamatan
a.Mao De Obra
Mandor Pd 0.001 $ 15.00 $ 0.02
Badaen Ai Pd 0.15 $ 7.00 $ 1.05
Ajudante Pd 0.015 $ 6.00 $ 0.09 $ 6.16
b. Material
Dobralisa bh 1 $ 5.00 $ 5.00
4 Servisu Monta Dobralisa Janela
a.Mao De Obra
Mandor Pd 0.001 $ 15.00 $ 0.02
Badaen Ai Pd 0.1 $ 7.00 $ 0.70
Ajudante Pd 0.01 $ 6.00 $ 0.06 $ 5.78
b. Material
Dobralisa bh 1 $ 5.00 $ 5.00
5 Servisu Monta Kait Angin
a.Mao De Obra
Mandor Pd 0.001 $ 15.00 $ 0.02
Badaen Ai Pd 0.15 $ 7.00 $ 1.05
Ajudante Pd 0.015 $ 6.00 $ 0.09 $ 3.16
b. Material
Kait Angin bh 1 $ 2.00 $ 2.00
VIII. SERVISU BA PINTURA NIAN
1 Servisu Pinta Paredi
a.Mao De Obra
Mandor Pd 0.0064 $ 15.00 $ 0.10
Badaen Ai Pd 0.063 $ 7.00 $ 0.44
Ajudante Pd 0.0362 $ 6.00 $ 0.22
b. Material $ 1.28
Cat Dasar Kg 0.092 $ 0.54 $ 0.05
Cat 2 x Penutup Kg 0.26 $ 1.50 $ 0.39
Kuas Roll bh 0.0294 $ 3.00 $ 0.09
2 Servisu Pinta Arus
a.Mao De Obra
Mandor Pd 0.0046 $ 15.00 $ 0.07
Tukang Cat Pd 0.0806 $ 6.00 $ 0.48
Ajudante Pd 0.0539 $ 6.00 $ 0.32
b. Material $ 3.59
Vernis Kg 0.293 $ 6.00 $ 1.76
Dempul / Plamir Kg 0.0934 $ 5.00 $ 0.47
Amplas Lbr 0.8924 $ 0.50 $ 0.45
Kuas bh 0.0294 $ 1.50 $ 0.04
3 Servisu Pinta Plafond
a.Mao De Obra
Mandor Pd $ 15.00 $ -
Badaen Ai Pd $ 7.00 $ -
Ajudante Pd $ 6.00 $ - $ -
b. Material
Tinta Kg $ 10.50 $ -
Kuas Roll bh $ 3.00 $ -
IX. SERVISU BA KOMPLETARIA LARAN & LIUR
1 Servisu instalasaun Fiu
a. Mao De Obra
Eletrisista Ls 1 $ 1.00 $ 1.00
b. Material $ 2.10
Kabel NIM 2.5 mm 2 urat m 1 $ 1.10 $ 1.10
2 Servisu Monta Lampu
a. Mao De Obra
Eletrisista Ls 1 $ 3.00 $ 3.00
b. Material $ 8.50
Lampu TL bh 1 $ 5.50 $ 5.50
3 Servisu Monta Stop Kontak
a. Mao De Obra
Eletrisista Ls 1 $ 3.00 $ 3.00
b. Material $ 5.00
Stop Kontak ( kuak 2) bh 1 $ 2.00 $ 2.00
4 Servisu Monta Sakelar Tunggal
a. Mao De Obra
Eletrisista Ls 1 $ 3.00 $ 3.00
b. Material $ 4.50
Sakelar Tunggal bh 1 $ 1.50 $ 1.50
5 Servisu Monta Sakelar Ganda
a. Mao De Obra
Eletrisista Ls 1 $ 3.00 $ 3.00
b. Material $ 4.50
Sakelar Ganda bh 1 $ 1.50 $ 1.50
6 Servisu Monta Panel
a. Mao De Obra
Eletrisista Ls 1 $ 5.00 $ 5.00
b. Material $ 10.00
Panel bh 1 $ 5.00 $ 5.00
7 Servisu Eskavasaun Rai ba Septicktank
a. Mao De Obra
Mandor Pd 0.0685 $ 15.00 $ 1.03 $ 6.37
Ajudante Pd 0.89 $ 6.00 $ 5.34
8 Servisu Aterru Rai henek ba septicktank
a. Mao De Obra
Mandor Pd 0.0127 $ 15.00 $ 0.19
Ajudante Pd 0.3023 $ 6.00 $ 1.81
b. Material $ 21.20
Rai-henek m³ 1.2 $ 16.00 $ 19.20
9 Servisu Cor Laje Ba Septicktank
a. Mao De Obra
Mandor Pd 0.02 $ 15.00 $ 0.30
Badaen Fatuk Pd 0.2805 $ 7.00 $ 1.96 $ 88.63
Ajudante Pd 1.682 $ 6.00 $ 10.09
b. Material
Rai-henek m³ 0.6175 $ 16.00 $ 9.88
Sementi Portland kg 284.55 $ 0.10 $ 29.17
Agregadu m³ 0.8273 $ 45.00 $ 37.23
10 Servisu Hada Batako Ba septicktank
a. Mao De Obra
Mandor Pd 0.0288 $ 15.00 $ 0.43
Badaen Fatuk Pd 0.1131 $ 7.00 $ 0.79
Ajudante Pd 0.3518 $ 6.00 $ 2.11
b. Material $ 11.76
Rai-henek m³ 0.038 $ 25.00 $ 0.95
Sementi Portland kg 12 $ 0.10 $ 1.23
Batako bh 12.5 $ 0.50 $ 6.25
11 Servisu Instalasaun Bee Foer Ho Pipa PVC 4"
a. Mao De Obra
Mandor Pd 0.007 $ 15.00 $ 0.11
Canalizador Pd 0.1879 $ 7.00 $ 1.32
Ajudante Pd 0.081 $ 6.00 $ 0.49
b. Material $ 14.33
Pipa PVC 4" m' 1.2 $ 3.50 $ 4.20
Asesories ( % dari harga Pipa ) % 35% $ 3.50 $ 1.23
Kolset Ls 1 $ 5.00 $ 5.00
Floor Drain Ls 1 $ 2.00 $ 2.00
12 Servisu Instalasaun Bee Foer Ho Pipa PVC 2"
a. Mao De Obra
Mandor Pd 0.0025 $ 15.00 $ 0.04
Canalizador Pd 0.075 $ 7.00 $ 0.53
Ajudante Pd 0.045 $ 6.00 $ 0.27
b. Material $ 8.16
Pipa PVC 2" m' 1.2 $ 1.50 $ 1.80
Asesories ( % dari harga Pipa ) % 35% $ 1.50 $ 0.53
Ktchen zink Ls 1 $ 5.00 $ 5.00
13 Servisu Instalasaun Be'e Mos Ho Pipa PVC 3/4"
a. Mao De Obra
Mandor Pd 0.0043 $ 15.00 $ 0.06
Canalizador Pd 0.0706 $ 7.00 $ 0.49
Ajudante Pd 0.036 $ 6.00 $ 0.22
b. Material $ 4.65
Pipa PVC 2" m' 1.2 $ 2.50 $ 3.00
Asesories ( % dari harga Pipa ) % 35% $ 2.50 $ 0.88
2.9 Plano Jerensiamentu Kustu ( Bill Of Quantity )
Plano jerensiamentu Kustu katak folin osan ba servisu hotu-hotu ne’ebe involve iha projetu idea nia laran. tan ne’e folin osan ba projetu uma
simples ne’e mak tuir mai ne’e :

DESKRISAUN

Volume de Unidade de Unidade de Presu


No. Deskrisaun do Servisu Unidade Total ($)
Servisu Presu ($) do Servisu ($)
1. SERVISU HAHU NIAN
1. Limpeza Terrenu m² 288 $ 1.35 $ 388.80
2. Monta estaka m 56 $ 1.53 $ 85.81 $ 684.6
3. Armazen & Ofisina m² 30 $ 6.00 $ 180.00
4. Preparasaun bee Ls 1 $ 30.00 $ 30.00
2. SERVISU BA RAI NIAN
1. K'e rai ba fundasaun m³ 57.904 $ 6.55 $ 379.14
2. Aterru Rai-henek Iha Fundasaun Nia Okos m³ 7.238 $ 21.20 $ 153.48
3. Aterru Fila Fali Rai Iha Fundasaun Nia Okos m³ 7.238 $ 1.50 $ 10.85
4. AterruAgregadu iha Laje Nia Okos m³ 16.2249 $ 56.40 $ 915.02
5. Aterru Rai Iha Laje Nia Okos m³ 43.2664 $ 2.40 $ 103.67 $ 1,715.6
6. Aterru Rai-henek Iha Laje Nia Okos m³ 7.238 $ 21.20 $ 153.48
3. SERVISU HADA & REBOKA NIAN
1. Hada Fatuk La Uza Argamassa m³ 7.238 $ 26.28 $ 190.20
2. Hada Fundasaun Ho Mortar 1:4 m³ 52.64 $ 66.07 $ 3,478.09
3. Hada Batako 1:4 m² 19.24244 $ 11.76 $ 226.38 $ 5,925.8
4. Reboka Parede m² 260.487 $ 5.54 $ 1,443.46
5. Halo Kaber Parede/Acian m² 248.037 $ 2.37 $ 587.68
4. SERVISU BETAUN NIAN
1. Sloof Betaun Armadu m³ 4.7 $ 390.40 $ 1,834.90
2. Viga betaun Armadu m³ 4.7 $ 392.85 $ 1,846.41
3. Koluna m³ 3 $ 466.20 $ 1,398.61
4. Baki Iha Varanda Nia Oin m³ 0.13 $ 270.53 $ 35.17 $ 5,333.1
5. Laje m³ 2.16332 $ 90.68 $ 196.16
6. Cor Betaun Ba Tanki WC & Neut m³ 0.24057 $ 90.94 $ 21.88
5. SERVISU KAKULUK NIAN
1. Servisu Trelisas 6/12 m³ 0.62352 $ 719.13 $ 448.39
2. Servisu Madre 5/7 m³ 0.170784 $ 383.89 $ 65.56
3. Servisu Zinco Kakuluk BJLS 0.40 m² 169.247 $ 5.00 $ 845.41
4. Lis Pinggir m 129.53 $ - $ 1,373.4
5. Servisu Lisplank 1/20 m³ 0.0866162 $ 2.50 $ 0.22
6. Seng Bubungan m 2.77 $ 5.00 $ 13.84
6. SERVISU PLAFOND NIAN
5. Rangka Plafond 5/7 m³ 2.20066 $ 9.39 $ 20.67
6. Taka Plafond Tripleks 3mm m² 135.52 $ 3.98 $ 539.54 $ 560.2
7. SERVISU BA LAJE NIAN
1. Nahe Azuleiju (20x20) m² 3.24 $ -
2. Nahe Azuleiju (30x30) m² 104.926 $ 7.50 $ 786.95 $ 786.9
8. SERVISU ODAMATAN & JANELA
1. Monta Arus Odamatan Nian unit 4 $ 60.00 $ 240.00
2. Monta Arus Janela Nian unit 4 $ 110.00 $ 440.00
3 Monta Arus Odamatan & Janela Gandeng unit 2 $ 115.00 $ 230.00
3. Monta Janela Nia Tahan unit 14 $ 60.00 $ 840.00 $ 2,836.4
4. Monta Odamatan nia tahan unit 6 $ 120.00 $ 720.00
5. Monta Chave Odamatan Nian bh 5 $ 13.64 $ 68.18
6. Monta Dobralisa Odamatan Nian bh 15 $ 6.16 $ 92.33
7. Monta Kait Angin bh 14 $ 3.16 $ 44.17
8. Monta Dobralisa Janela Nian bh 28 $ 5.78 $ 161.70
9. SERVISU PINTURA NIAN
1. Pinta Paredi m² 248.037 $ 1.28 $ 317.95
2. Pinta Paredi iha Sinta Jeral nia Leten m² 12.45 $ 1.28 $ 15.96
3. Pinta Koluna & Sinta m² 94.5 $ 1.28 $ 121.13 $ 581.8
4. Pinta Arus Odamatan & Janela m² 35.3016 $ 3.59 $ 126.78
5. Pinta Plafon Laran & liur m² 135.52 $ -
10. SERVISU KOMPLETARIA
1. Servisu instalasaun Fiu m' 50 $ 2.10 $ 105.00
2. Servisu Monta Lampu bh 9 $ 8.50 $ 76.50
3. Servisu Monta Stop Kontak bh 7 $ 5.00 $ 35.00
4. Servisu Monta Sakelar Tunggal bh 4 $ 4.50 $ 18.00
5. Servisu Monta Sakelar Ganda bh 2 $ 4.50 $ 9.00
6. Servisu Monta Panel bh 1 $ 10.00 $ 10.00
7. Servisu Eskavasaun Rai ba Septicktank m³ 9.07 $ 6.37 $ 57.77 $ 1,135.9
8. Servisu Aterru Rai henek ba septicktank m³ 0.29 $ 21.20 $ 6.11
9. Servisu Cor Laje Ba Septicktank m³ 1.17 $ 88.63 $ 103.70
10. Servisu Hada Batako Ba septicktank m² 22.5 $ 11.76 $ 264.70
11. Servisu Instalasaun Bee Foer Ho Pipa PVC 4" m' 8.65 $ 14.33 $ 123.97
12. Servisu Instalasaun Bee Foer Ho Pipa PVC 2" m' 20.33 $ 8.16 $ 165.84
13. Servisu Instalasaun Be'e Mos Ho Pipa PVC 3/4 m' 34.49 $ 4.65 $ 160.37

TOTAL DE ORCAMENTO $ 20,934


folin osan ba projetu uma
NO DESCRICAO DO SERVISU ORCAMENTO

I SERVISU HAHU NIAN 684.61


II SERVISU BA RAI NIAN 1715.64
III SERVISU HADA & REBOKA NIAN 5925.81
IV SERVISU BETAUN NIAN 5333.13
V SERVISU KAKULUK NIAN 1373.41
VI SERVISU PLAFON NIAN 560.21
VII SERVISU BA LAJE NIAN 786.95
VIII SERVISU ODAMATAN & JANELA 2836.37
IX SERVISU PINTURA NIAN 581.82
X SERVISU KOMPLETARIA NIAN 1135.95
SUB TOTAL 20933.89
2% TAXA 418.677788577
10% LUCRO 2093.3889428848
GRAND TOTAL 23445.96
DESCRICAO UNIDADE DE PRESU

Volume Loron Material


No. Deskrisaun Do Servisu Unidade Coeficiente Do Ne'ebePr Ne'ebe
Servis0 esija Presija
I. SERVISU BA FUNDASAUN NIAN
1 Limpeza Terrenu
a. Mao De Obra
Mandor Pd 0.05 288.000 14.400
Ajudante Pd 0.1 28.800
2 Monta Estaka
a. Mao De Obra
Mandor Pd 0.005 0.280
Badaen Ai Pd 0.1 5.600
Ajudante Pd 0.1 5.600
56.000
b. Material
Ai (5/7) m³ 0.0177 0.991
Ai-kabelak m³ 0.007 0.392
Pregu kg 0.02 1.120
4 Servisu Ke'e Rai Ba Fundasaun
a. Mao De Obra
Mandor Pd 0.07 57.904 4.053
Ajudante Pd 0.9163 53.057
5 Servisu Aterru Rai-henek Iha
Fundasaun Nia Okos
a. Mao De Obra
Mandor Pd 0.0127 0.092
Ajudante Pd 0.3023 7.238 2.188
b. Material
Rai-henek Kg 1.2 8.686
6. Servisu Hada Fatuk La Uza
Argamassa
a. Mao De Obra
Mandor Pd 0.0579 0.419
Badaen Fatuk Pd 0.39 2.823
7.238
Ajudante Pd 0.78 5.646
b. Material
Batu belah 15/20 cm m³ 1.2 8.686
7 Hada Fundasaun ( 1:4 )
a. Mao De Obra
Mandor Pd 0.075 3.948
Badaen Fatuk Pd 0.8404 44.239
Ajudante Pd 1.8313 96.400
52.640
b. Material
Batu belah 15/20 cm m³ 1.2 63.168
Simentu Portland Kg 163 8580.320
Rai-henek m³ 0.5348 28.152
Servisu Aterru Fila Fali Rai
8
8
Ne'ebe Ke'e
a. Mao De Obra
Mandor Pd 0.0143 7.238 0.104
Ajudante Pd 0.2142 1.550
II. SERVISU BA BETAUN & PAREDI
Servisu Sloof Betaun 1:2:3 +
1
Bekisting
a. Mao De Obra
Mandor Pd 0.2013 0.946
Badaen Fatuk Pd 0.3093 1.454
Badaen Ai Pd 1.56 7.332
Badaen Besi Pd 1.4 6.580
Ajudante Pd 4.9152 23.101
b. Material
Ai Klass III m3 0.2700 4.700 1.269
Triplesk (6mm) Flh 0.3750 1.763
Pregu biasa 5" - 12" Kg 2.0000 9.400
Besi beton Polos Ø12 Kg 200.0000 940.000
Arame beton Kg 3.0000 14.100
Agregadu Groso m3 0.7800 3.666
Sementi Portland Kg 323.0000 1518.100
Rai-henek m3 0.5200 2.444
Servisu Koluna Betaun
2
Armadu 1:2:3 + Bekisting
a. Mao De Obra
Mandor Pd 0.2747 0.824
Badaen Ai Pd 2.792 8.376
Badaen Besi Pd 2.1 6.300
Badaen Fatuk Pd 0.3093 0.928
Ajudante Pd 7.175 21.525
b. Material
3.000
Ai kelas III m3 0.4000 1.200
Pregu biasa 5" - 12" Kg 4.0000 12.000
Besi beton Polos Kg 300.0000 900.000
Arame beton Kg 4.5000 13.500
Sementi Portland Kg 323.0000 969.000
Rai-henek m3 0.5200 1.560
Triplesk (6mm) Flh 0.3750 1.125
Servisu Sintal Jeral Betaun
3
1:2:3 + Bekisting
a. Mao De Obra
Mandor Pd 0.2747 1.291
Badaen Ai Pd 1.65 7.755
Badaen Besi Pd 1.4 6.580
Badaen Fatuk Pd 0.3093 1.454
Ajudante Pd 7.175 33.723
b. Material
Ai kelas III m3 0.32 4.700 1.504
4.700
Pregu biasa 5" - 12" Kg 3.2 15.040
Besi beton Polos Kg 200 940.000
Arame beton Kg 3 14.100
Sementi Portland Kg 323 1518.100
Rai-henek m3 0.52 2.444
Triplesk (6mm) Kg 0.3750 1.763
Agregadu m3 0.78 3.666
4 Cor Baki Iha Varanda Nian
a. Mao De Obra
Mandor Pd 0.2013 0.026
Badaen Besi Pd 1.4 0.182
Badaen Fatuk Pd 0.3093 0.040
Ajudante Pd 4.9152 0.639
b. Material
Pregu biasa 5" - 12" Kg 2 0.130 0.260
Besi beton Polos Kg 200 26.000
Arame beton Kg 3 0.390
Sementi Portland Kg 323 41.990
Rai-henek m3 0.52 0.068
Triplesk (6mm) Kg 0.3750 0.049
Agregadu m3 0.78 0.101
5 Laje (1:2:3)
a. Mao De Obra
Mandor Pd 0.03 0.065
Badaen Fatuk Pd 0.275 0.595
Ajudante Pd 1.65 3.569
2.163
b. Material
Sementi Portland Kg 325 703.079
Agregadu m3 0.81 1.752
Rai-henek m3 0.54 1.168
6 Beton Cor Ba Tanki & Neut Nian
a. Mao De Obra
Mandor Pd 0.02 0.005
Badaen Fatuk Pd 0.282 0.068
Ajudante Pd 1.6915 0.407
0.241
b. Material
Sementi Portland Kg 315.7 75.948
Agregadu m3 0.818 0.197
Rai-henek m3 0.5845 0.141
7 Servisu Paredi Nian
a. Mao De Obra
Mandor Pd 0.0288 0.554
Badaen Fatuk Pd 0.1131 2.176
Ajudante Pd 0.3518 6.769
19.242
b. Material
Batako bh 12.5 240.531
Sementi Portland Kg 12 230.909
Rai-henek m3 0.038 0.731
8 Servisu Arus Nian
a. Mao De Obra
Mandor Pd 0.4283 0.248
Badaen Ai Pd 20.814 12.064
Ajudante Pd 6.938 4.021
0.580
b. Material
Ai kela I/II (6/12) m3 1.108 0.642
Pregu biasa (10cm) Kg 1.0031 0.581
Lem Ai Kg 1 0.580
III. SERVISU BA KAKULUK NIAN
9 Servisu Kuda-kuda Nian
a. Mao De Obra
Mandor pd 0.2375 0.148
Badaen Ai pd 20.1 12.533
Ajudante pd 4.7508 2.962
0.624
b. Material
Ai kela I/II (6/12) m3 1.115 0.695
Pregu (12cm) Kg 2.426 1.513
Besi strip tebal 5 mm Kg 15 9.353
1 Servisu Gording
a. Mao De Obra
Mandor Pd 0.12 0.020
Badaen Ai Pd 7.2 1.230
Ajudante Pd 2.4 0.171 0.410
b. Material
Ai kela I/II (5/7) m3 1.1 0.188
Pregu (12cm) Kg 3 0.512
2 Servisu Lisplank
a. Mao De Obra
Mandor Pd 0.005 0.000
Badaen Ai Pd 0.239 0.021
Ajudante Pd 0.1194 0.087 0.010
b. Material
Ai-Kabelak ( 0,01x0,2x4) m3 0.01 0.001
Pregu Kg 0.01 0.001
3 Servisu Taka Kakuluk Ho Material Kalen
a. Mao De Obra
Mandor Pd 0.0067 1.134
Badaeen Ai Pd 0.1256 21.257
Ajudante Pd 0.1409 169.247 23.847
b. Material
Kalen Bjls 40 Flh 0.7 118.473
Pregu (5cm ) Kg 0.02 3.385
1 Servisu Monta Perabung
a. Mao De Obra
Mandor Pd 0.0067 0.019
Badaen Ai Pd 0.1256 0.348
Ajudante Pd 0.1409 2.770 0.390
2.770
b. Material
Kalen Bjls 40 Flh 0.7 1.939
Pregu (5cm ) kg 0.02 0.055
IV. SERVISU BA PLAFOND NIAN
2 Servisu Armadura Plafond Nian
a. Mao De Obra
Mandor Pd 0.075 0.165
Badaen Ai Pd 0.305 0.671
Ajudante Pd 0.2033 2.201 0.447
b. Material
Ai 5(5/7) m³ 0.0163 0.036
Pregu Kg 0.2543 0.560
3 Servisu Monta Plafond
a. Mao De Obra
Mandor Pd 0.005 0.678
Badaen Ai Pd 0.1 13.552
Ajudante Pd 0.1 135.520 13.552
b. Material
Triplesk (6mm) Flh 0.375 50.820
Pregu (3cm) Kg 0.03 4.066
V. SERVISU BA REBOKA NIAN
1 Servisu Reboka Nian
a. Mao De Obra
Mandor Pd 0.0273 7.111
Badaen Fatuk Pd 0.15 39.073
Ajudante Pd 0.35 260.487 91.170
b. Material
Sementu Portland Kg 12.75 3321.209
Rai-henek m³ 0.027 7.033
2 Servisu Kose Sementu Been
a. Mao De Obra
Mandor Pd 0.0146 3.621
Badaen Fattuk Pd 0.1057 26.218
248.037
Ajudante Pd 0.1753 43.481
b. Material 867.832
Sementu Portland Kg 3.4988
VI. SERVISU BA LAJE NIAN
1 Servisu Aterru Rai Iha Laje Nia Okos
a. Mao De Obra
Mandor Pd 0.0379 1.640
Ajudante Pd 0.3046 43.266 13.179
b. Material
Sirtu m³ 1.2 51.920
2 Servisu Aterru Agregadu Iha Laje Nia Okos
a. Mao De Obra
Mandor Pd 0.0379 0.615
Ajudante Pd 0.3046 16.225 4.942
b. Material
16.225

Agregadu m³ 1.2 19.470


3 Servisu Aterru Rai-henek Iha Laje Nian Okos
a. Mao De Obra
Mandor Pd 0.0127 0.092
Ajudante Pd 0.3023 7.238 2.188
b. Material
Rai-henek m³ 1.2 8.686
4 Servisu Nahe Azuleiju (20x20)
a. Mao De Obra
Mandor Pd 0.000
Badaen Fatuk Pd 0.000
Ajudante Pd 0.000
b. Material 3.240
Azuleiju Flh 0.000
Sementu Portland Kg 0.000
Rai-henek m³ 0.000
Sementu Mutin Kg 0.000
5 Servisu Nahe Azuleiju (30x30)
a.Mao De Obra
Mandor Pd 0.035 3.672
Badaen Fatuk Pd 0.35 36.724
Ajudante Pd 0.7 73.448
b. Material 104.926
Azuleiju Flh 11.87 1245.472
Sementu Portland Kg 8 839.408
Rai-henek m³ 0.045 4.722
Sementu Mutin Kg 1.5 157.389
VII. SERVISU BA ODAMATAN & JANELA
1 Servisu Monta Odamatan & Janela Tahan
a.Mao De Obra
Mandor Pd 0.05 1.000
Badaen Ai Pd 3 60.000
Ajudante Pd 1 20.000 20.000
b. Material
Ai-Kabelak m³ 0.0385 0.770
Lem Ai Kg 0.5 10.000
2 Servisu Monta Chave
a.Mao De Obra
Mandor Pd 0.005 0.025
Badaen Ai Pd 0.5 2.500
5.000
Ajudante Pd 0.01 0.050
b. Material
Chave Odamatan bh 1 5.000
3 Servisu Monta Dobralisa Odamatan
a.Mao De Obra
Mandor Pd 0.001 0.015
Badaen Ai Pd 0.15 2.250
15.000
Ajudante Pd 0.015 0.225
15.000

b. Material
Dobralisa bh 1 15.000
4 Servisu Monta Dobralisa Janela
a.Mao De Obra
Mandor Pd 0.001 0.028
Badaen Ai Pd 0.1 2.800
28.000
Ajudante Pd 0.01 0.280
b. Material
Dobralisa bh 1 28.000
5 Servisu Monta Kait Angin
a.Mao De Obra
Mandor Pd 0.001 0.014
Badaen Ai Pd 0.15 2.100
14.000
Ajudante Pd 0.015 0.210
b. Material
Kait Angin bh 1 14.000
VIII. SERVISU BA PINTURA NIAN
1 Servisu Pinta Paredi
a.Mao De Obra
Mandor Pd 0.0064 2.272
Badaen Ai Pd 0.063 22.364
Ajudante Pd 0.0362 12.851
354.987
b. Material
Cat Dasar Kg 0.092 32.659
Cat 2 x Penutup Kg 0.26 92.297
Kuas Roll bh 0.0294 10.437
2 Servisu Pinta Arus
a.Mao De Obra
Mandor Pd 0.0046 0.162
Tukang Cat Pd 0.0806 2.845
Ajudante Pd 0.0539 1.903
b. Material 35.302
Vernis Kg 0.293 10.343
Dempul / Plamir Kg 0.0934 3.297
Amplas Lbr 0.8924 31.503
Kuas bh 0.0294 1.038
3 Servisu Pinta Plafond
a.Mao De Obra
Mandor Pd 0.000
Badaen Ai Pd 0.000
Ajudante Pd 135.520 0.000
b. Material
Tinta Kg 0.000
Kuas Roll bh 0.000
IX. SERVISU BA KOMPLETARIA LARAN & LIUR
1 Servisu instalasaun Fiu
a. Mao De Obra
Eletrisista Ls 1 50.000
50.000
50.000
b. Material
Kabel NIM 2.5 mm 2 urat m 1 50.000
2 Servisu Monta Lampu
a. Mao De Obra
Eletrisista Ls 1 9.000
9.000
b. Material
Lampu TL bh 1 9.000
3 Servisu Monta Stop Kontak
a. Mao De Obra
Eletrisista Ls 1 7.000
7.000
b. Material
Stop Kontak ( kuak 2) bh 1 7.000
4 Servisu Monta Sakelar Tunggal
a. Mao De Obra
Eletrisista Ls 1 4.000
4.000
b. Material
Sakelar Tunggal bh 1 4.000
5 Servisu Monta Sakelar Ganda
a. Mao De Obra
Eletrisista Ls 1 2.000
2.000
b. Material
Sakelar Ganda bh 1 2.000
6 Servisu Monta Panel
a. Mao De Obra
Eletrisista Ls 1 1.000
1.000
b. Material
Panel bh 1 1.000
7 Servisu Eskavasaun Rai ba Septicktank
a. Mao De Obra
Mandor Pd 0.0685 9.072 0.621
Ajudante Pd 0.89 8.074
8 Servisu Aterru Rai henek ba septicktank
a. Mao De Obra
Mandor Pd 0.0127 0.004
Ajudante Pd 0.3023 0.288 0.087
b. Material
Rai-henek m³ 1.2 0.346
9 Servisu Cor Laje Ba Septicktank
a. Mao De Obra
Mandor Pd 0.02 0.023
Badaen Fatuk Pd 0.2805 0.328
Ajudante Pd 1.682 1.968
1.170
b. Material
Rai-henek m³ 0.6175 0.722
Sementi Portland kg 284.55 332.924
Agregadu m³ 0.8273 0.968
10 Servisu Hada Batako Ba septicktank
a. Mao De Obra

22.500
Mandor Pd 0.0288 0.648
Badaen Fatuk Pd 0.1131 2.545
Ajudante Pd 0.3518 7.916
22.500
b. Material
Rai-henek m³ 0.038 0.855
Sementi Portland kg 12 270.000
Batako bh 12.5 281.250
11 Servisu Instalasaun Bee Foer Ho Pipa PVC 4"
a. Mao De Obra
Mandor Pd 0.007 0.061
Canalizador Pd 0.1879 1.625
Ajudante Pd 0.081 0.701
b. Material 8.650
Pipa PVC 4" m' 1.2 10.380
Asesories ( % dari harga Pipa ) % 35% 3.028
Kolset Ls 1 8.650
Floor Drain Ls 1 8.650
12 Servisu Instalasaun Bee Foer Ho Pipa PVC 2"
a. Mao De Obra
Mandor Pd 0.0025 0.051
Canalizador Pd 0.075 1.525
Ajudante Pd 0.045 0.915
20.330
b. Material
Pipa PVC 2" m' 1.2 24.396
Asesories ( % dari harga Pipa ) % 35% 7.116
Ktchen zink Ls 1 20.330
13 Servisu Instalasaun Be'e Mos Ho Pipa PVC 3/4"
a. Mao De Obra
Mandor Pd 0.0043 0.148
Canalizador Pd 0.0706 2.435
Ajudante Pd 0.036 34.490 1.242
b. Material
Pipa PVC 2" m' 1.2 41.388
Asesories ( % dari harga Pipa ) % 35% 12.072
Loron Ne'ebe Trabalhador
Mak Ne'ebe Mak
Determina Presija

3 4.800
9.600

0.140
2.800
2.800
2

6 0.676
8.843 10

0.046
2 1.094

0.210
1.411
2
2.823

0.790
8.848
19.280
5
1 0.104
1.550

0.473
0.727
3.666
3.290
11.551

0.275
2.792
2.100
0.309
7.175

0.430
2.585
2.193
0.485
11.241

3
3

0.026
0.182
0.040
0.639

0.032
0.297
1.785
2

0.010
0.136
0.814
1

0.092
0.363
1.128
6
0.124
6.032
2.011
2

0.074
6.266
1.481
2

0.010
0.615
2 0.205

0.000
0.021
1 0.010

0.567
10.629
2 11.923

0.037
0.696
1 0.781
1

0.041
0.168
4 0.112

0.169
3.388
4 3.388

1.422
7.815
5 18.234

1.811
13.109
2
21.740

0.410
4 3.295

0.205
3 1.647
3

0.031
3 0.729

0.000
0.000
0.000
1

0.816
8.161
16.322
5

0.500
30.000
2 10.000 4

0.050
5.000
1
0.100

0.030
4.500
1
0.450
1

0.056
5.600
1
0.560

0.028
4.200
1
0.420

0.568
5.591
3.213
4

0.162
2.845
1.903
1

0.000
0.000
4 0.000

25.000
2
2

18.000
1

14.000
1

8.000
1

4.000
1

2.000
1

2 0.311
4.037

0.007
1 0.174

0.047
0.656
3.936
1

1
0.648
2.545
7.916
1

0.121
3.251
1.401
1

0.102
3.050
1.830
1

0.297
4.870
1 2.483

101.0 Dias
14.4 Semana
3.6 mes

449.601
DESCRICAO
NO DO SERVISU ORCAMENTO PERCENTAGEM MES
SEMANAS
1 2 3
I SERVISU HAHU NIAN 684.61 3.27% 3.3%
II SERVISU BA RAI NIAN 1715.64 8.20% 2.0% 2.0%
III SERVISU HADA & REBOKA NIAN 5925.81 28.31%
IV SERVISU BETAUN NIAN 5333.13 25.48%
V SERVISU KAKULUK NIAN 1373.41 6.56%
VI SERVISU PLAFON NIAN 560.21 2.68%
VII SERVISU BA LAJE NIAN 786.95 3.76%
VIII SERVISU ODAMATAN & JANELA 2836.37 13.55%
IX SERVISU PINTURA NIAN 581.82 2.78%
X SERVISU KOMPLETARIA NIAN 1135.95 5.43%
TOTAL 20933.89 100.00%
3% 2% 2%
PRECENTAGEM COMULATIVO DO PLANO 3% 5% 7%
MES MES MES %
SEMANAS SEMANAS SEMANAS
4 5 6 7 8 9 10 11 12 13 14 15 16
100%
2.0% 2.0% 90%
14% 14% 80%
13% 13% 70%
3.3% 3.3% 60%
1.3% 1.3% 50%
1.9% 1.9% 40%
14% 30%
1.4% 1.4% 20%
2.7% 2.7% 10%
0%
16% 16% 14% 13% 16% 5% 3% 2% 1% 1% 3% 3%
23% 39% 53% 66% 82% 87% 90% 92% 93% 95% 97% 100%
2.13 Orariu ba Atividade Projeto Nian.

PENDAHULUAN
ATIVIDADE ESPLIKASAUN
LANGSUNG
A SERVISU HAHU NIAN -
B SERVISU BA RAI NIAN A
C SERVISU BETAUN NIAN B
D SERVISU HADA & REBOKA NIAN C
E SERVISU ODAMATAN & JANELA D
F SERVISU KAKULUK NIAN D&E
G SERVISU PLAFOND NIAN F
H SERVISU BA LAJE NIAN G
I SERVISU PINTURA NIAN F,G&H
J SERVISU KOMPLETARIA I

. Diagrama Activity On Node

A E F

HAHU D G I J

B C H

TEMPU
ATIVIDADE ESPLIKASAUN
(SEMANAS)
A SERVISU HAHU NIAN 1
B SERVISU BA RAI NIAN 3
C SERVISU BETAUN NIAN 1
D SERVISU HADA & REBOKA NIAN 3
E SERVISU ODAMATAN & JANELA 1
F SERVISU KAKULUK NIAN 1
G SERVISU PLAFOND NIAN 1
H SERVISU BA LAJE NIAN 1
I SERVISU PINTURA NIAN 1
J SERVISU KOMPLETARIA 2
Diagrama On Node Ba Eearly Star & Early Finish

Diagrama ba Late Star & Late Finish

. Resultado kalkulasaun ES,EF,LF &LF

ATIVIDADE TEMPU ES EF LS LF
A 1 0 1 0 1
B 3 1 4 1 4
C 1 4 5 4 5
D 3 5 8 5 8
E 1 8 9 8 9
F 1 9 10 9 10
G 1 10 11 10 11
H 1 11 12 11 12
I 1 12 13 12 13
J 2 13 15 13 15
Kalkulasaun ba Tempu Folga no Kritiku

SLACK CRITICAL
ATIVIDADE
TEMPU ES EF LS LF LS-ES Path
A 1 0 1 0 1 0 ya
B 3 1 4 1 4 0 ya
C 1 4 5 4 5 0 ya
D 3 5 8 5 8 0 ya
E 1 8 9 8 9 0 ya
F 1 9 10 9 10 0 ya
G 1 10 11 10 11 0 ya
H 1 11 12 11 12 0 ya
I 1 12 13 12 13 0 ya
J 2 13 15 13 15 0 ya

Husi Resultadu Kalkulasaun Iha tabela leten ne'e hatudu Katak Tempu Ne'ebe presija atu realiza atu
hala'o projetu ne'e laiha tempu ne'ebe folga.
`