CS/B.Tech/ME/PE/BT/TT/APM (NEW)/SEM-6/HU-611/2013
p:/
2013
PRODUCTION & OPERATIONS MANAGEMENT
Time Allotted : 3 Hours Full Marks : 70
/q
The figures in the margin indicate full marks.
Candidates are required to give their answers in their own words
pap
as far as practicable.
GROUP – A
( Multiple Choice Type Questions )
1. Choose the correct alternatives for any ten of the following :
er.
10 × 1 = 10
a) Maintenance b) Growth
c) Maturity d) Decline.
forecasting ?
a) Regression analysis
a c.
c) Simplex method
in
b) production planning
pap
c) project execution
d) quality control.
purchasing ?
6009 2
CS/B.Tech/ME/PE/BT/TT/APM (NEW)/SEM-6/HU-611/2013
d) none of these.
a) job sequencing
a c.
b) machine scheduling
c) quality control
d) none of these.
in
b) Batch production
p:/
c) Continuous production
d) None of these.
/q
xii) Productivity can be mathematically expressed as
a) cost/input b) input/output
pap
GROUP – B
( Short Answer Type Questions )
er.
6009 4
CS/B.Tech/ME/PE/BT/TT/APM (NEW)/SEM-6/HU-611/2013
Job M1 M2
A 9 2
ut .
B 5 4
C 8 10
D 3 5
a c.
E 4 6
F 1 11
G 7 6
in
GROUP – C
( Long Answer Type Questions )
p:/
Answer any three of the following. 3 × 15 = 45
volume. 6
8. a) What is an Operating Characteristics (OC) curve ? 3
b) Determine the control limits for X bar and R charts
wb
9. a) What is productivity ? 2
6009 6
CS/B.Tech/ME/PE/BT/TT/APM (NEW)/SEM-6/HU-611/2013
Rs.
p:/
Output 20,000
Human input 10,000
/q
Material input 2,000
A 8 12 7 10 11 9
B 10 7 11 6 12 8
in
e) ABC Analysis.
/q pap
er.
wb
ut .
a c.
in
6009 8