2 Pre-insulated refrigerant pipe and drain pipe c/w pipe insulation, hot-dipped galvanised iron 1 lot 40,000.00
trunking etc.
3 Supply ductwork c/w PE foam external insulation (closed cell type) & internal insulation (open 1 lot 240,000.00
cell type), plenium box, splitter damper, hanger rods, inspection door, fittings, connection,
noise attenuation, insulation, etc as per drawings and specification.
4 Return ductwork c/w PE foam external insulation (closed cell type) & internal insulation (open 1 lot 90,000.00
cell type), plenium box, splitter damper, hanger rods, inspection door, fittings, connection,
noise attenuation, insulation, etc as per drawings and specification.
5 Fresh ductwork c/w Variable Control damper etc. as per drawings and specification. 1 lot 10,000.00
6 Supply air grilles c/w adjustable air volume damper and hanger system type adjustable 3mm 1 lot 27,000.00
dia. Suspension rod c/w clip
7 Return air grilles c/w adjustable air volume damper and hanger system type adjustable 3mm 1 lot 18,000.00
dia. Suspension rod c/w clip
8 Fresh Air Grille c/w netting, Variable control damper and motorised fresh air damper. 1 lot 5,000.00
10 I' beam and 'C' channel steel support hanger ('C' channel mild steel to fixed at beam) for the 1 lot 10,000.00
purpose to hang equipment at Roof Flooror area no provide slab
I) Ducting, difuser and other necessary accessories
11 Automatic control c/w sensor, sequential thermostat, timers, control motor and sensor wiring 1 lot 5,000.00
etc.
12 Electrical Work
I) Switchboard for all AHUs c/w test certificate, PF devises, starter, relay, LED, wiring, surge 1 lot 28,000.00
arrestor, timers, under voltages protection, MCCB, MCB wiring & cabling and all associated for
complete operation of AHUs.
ii) Power cable from isolator to switchboard c/w mild steel trunking or relay and control 1 lot 8,000.00
wiring.
iii) Electrical work and control wiring from switchboard to equipment c/w mild steel trunking 1 lot 12,000.00
or relay.
3 Pre-insulated refrigerant pipe and drain pipe c/w pipe insulation, hot-dipped galvanised iron 1 lot 4,000.00
trunking etc.
4 Supply ductwork c/w PE foam external insulation (closed cell type) & internal insulation (open 1 lot 13,500.00
cell type), plenium box, splitter damper, hanger rods, inspection door, fittings, connection,
noise attenuation, insulation, etc as per drawings and specification.
5 Return ductwork c/w PE foam external insulation (closed cell type) & internal insulation (open 1 lot 13,500.00
cell type), plenium box, splitter damper, hanger rods, inspection door, fittings, connection,
noise attenuation, insulation, etc as per drawings and specification.
6 Fresh ductwork c/w Variable Control damper etc. as per drawings and specification. 1 lot 2,000.00
7 Supply air grilles c/w adjustable air volume damper and hanger system type adjustable 3mm 1 lot 1,800.00
dia. Suspension rod c/w clip
8 Return air grilles c/w adjustable air volume damper and hanger system type adjustable 3mm 1 lot 1,000.00
dia. Suspension rod c/w clip
9 Fresh Air Grille c/w netting and motorised fresh air damper. 1 lot 3,000.00
10 I' beam and 'C' channel steel support hanger ('C' channel mild steel to fixed at beam) for the 1 lot 8,000.00
purpose to hang equipment at Roof Flooror area no provide slab
i) Fan Coil Unit (FCU)
Ii) Ducting, difuser and other necessary accessories
11 Automatic control c/w sensor, sequential thermostat, timers, control motor and sensor wiring 1 lot 3,000.00
etc.
12 Electrical Work
I) Switchboard for all FCUs c/w test certificate, PF devises, starter, relay, LED, wiring, surge 1 lot 3,000.00
arrestor, timers, under voltages protection, MCCB, MCB wiring & cabling and all associated for
complete operation of FCU.
ii) Power cable from isolator to switchboard c/w mild steel trunking or relay and control 1 lot 2,000.00
wiring.
iii) Electrical work and control wiring from switchboard to equipment c/w mild steel trunking 1 lot 2,000.00
or relay.
iv) Interlocking device c/w accessories for operation 24 hrs 1 lot 1,500.00
3 Pre-insulated refrigerant pipe and drain pipe c/w pipe insulation, hot-dipped galvanised iron 1 lot 4,000.00
trunking etc.
4 Supply ductwork c/w PE foam external insulation (closed cell type) & internal insulation (open 1 lot 19,650.00
cell type), plenium box, splitter damper, hanger rods, inspection door, fittings, connection,
noise attenuation, insulation, etc as per drawings and specification.
5 Return ductwork c/w PE foam external insulation (closed cell type) & internal insulation (open 1 lot 19,650.00
cell type), plenium box, splitter damper, hanger rods, inspection door, fittings, connection,
noise attenuation, insulation, etc as per drawings and specification.
6 Fresh ductwork c/w Variable Control damper etc. as per drawings and specification. 1 lot 3,000.00
7 Supply air grilles c/w adjustable air volume damper and hanger system type adjustable 3mm 1 lot 2,700.00
dia. Suspension rod c/w clip
8 Return air grilles c/w adjustable air volume damper and hanger system type adjustable 3mm 1 lot 3,600.00
dia. Suspension rod c/w clip
9 Fresh Air Grille c/w netting and motorised fresh air damper. 1 lot 2,000.00
10 I' beam and 'C' channel steel support hanger ('C' channel mild steel to fixed at beam) for the 1 lot 10,000.00
purpose to hang equipment at Roof Floor or area no provide slab
i) Fan Coil Unit (FCU)
Ii) Ducting, difuser and other necessary accessories
11 Automatic control c/w sensor, sequential thermostat, timers, control motor and sensor wiring 1 lot 3,000.00
etc.
12 Electrical Work
I) Switchboard for all FCUs c/w test certificate, PF devises, starter, relay, LED, wiring, surge 1 lot 3,000.00
arrestor, timers, under voltages protection, MCCB, MCB wiring & cabling and all associated for
complete operation of FCU.
ii) Power cable from isolator to switchboard c/w mild steel trunking or relay and control 1 lot 1,500.00
wiring.
iii) Electrical work and control wiring from switchboard to equipment c/w mild steel trunking 1 lot 1,500.00
or relay.
iv) Interlocking device c/w accessories for operation 24 hrs 1 lot 1,500.00
2 Pre-insulated refrigerant pipe and drain pipe c/w pipe insulation, hot-dipped galvanised iron 1 lot 28,000.00
trunking etc.
3 Electrical work such as conduit, cabling and control wiring between various equipment. 1 lot 2,500.00
4 Switchboard (24 hrs operation) c/w starter, power factor device, single phasing device, switch, 1 lot 15,000.00
timer, interloking device etc.
2 Pre-insulated refrigerant pipe and drain pipe c/w pipe insulation, hot-dipped galvanised iron 1 lot 4,000.00
trunking etc.
3 Electrical work such as conduit, cabling and control wiring between various equipment. 1 lot 1,500.00
4 Switchboard (24 hrs operation) c/w starter, power factor device, single phasing device, switch, 1 lot 2,600.00
timer, interloking device etc.
Electrical work such as conduit, cabling and control wiring between various equipment, 1 lot 5,000.00
3
interloking devices etc.
Electrical work such as conduit, cabling and control wiring between various equipment, 1 lot 6,500.00
3
interloking devices etc.
2 Preparation of 12 copies of contract document c/w hard cover binding 1 lot 2,000.00
3 1 lot By other
12 set of Handling Over Document for the installation works which includes As-Buil Drawing,
one set As-Built Drawing in digital CD with Autocad latest edition and operation manual
5 Other submission fees, testing and commissioning fees required by authorised agency 1 lot 2,000.00
6 Management cost for attending site meeting, supervision and coordination of work duration 1 lot 2,000.00
of contract.
8 Hacking, coring, punching of hole in wall, floor, ceilling repalcement etc and making good to 1 lot 20,000.00
the satisfaction of the S.O
13 All necessary concrete plinth (AHU,CU, Switchboard, etc), Signage and clearing. 1 lot 5,000.00
18 Any other work or item not specifically mentioned above but implied and/or necessary for
complete installation ( give details)
i)
ii)
iii)
PROJECT : SISTEM PENYAMAN DAN PENGALIAN UDARA UNTUK CADANAGAN KLINIK KESIHATAN JENIS 3 (TEJA) - CR DENGAN KUATERS
SECTION 9 : SCHEDULE OF TENDER PRICES
The prices entered in this schedule shall be the Supply, Installation, testing and commissioning of the complete Air Conditioning System and other
ancillary equipment in accordance with the requirement of the specification and drawing.
ITEM DESCRIPTION OTY PRICES (RM)
Mr MICHEAL YU
_________________________________
Name and address (with stamp)
_______________________________
Signature of witness 6 JUNE 2018
Date :
NURUL AIN
________________________________
Name and address (with stamp)