2. CONTINGENCY RESERVES
Define if development estimates will include contingency reserve to account for risks related to
uncertainty.
6. REVISION HISTORY
[Provide information on how the development and distribution of the Activity Cost Estimate was
controlled and tracked. Use the table below to provide the version number, the author
implementing the version, the date of the version, the name of the person approving the version, the
date that particular version was approved, and a brief description of the reason for creating the
revised version.]
UN Triangular Partnership Project Version
for African Rapid Deployment of Engineering Capabilities Number:
Project Title Date: Sep. 9, 17
Page: 2 of 5
Parametric Estimates
Analogous Estimates
Duration Estimate = Previous Duration x Multiplier
Multiplier = Current Activity / Previous Duration
WBS ID Previous Previous Cost Current Multiplier Cost Estimate
3.2 road 6 kmActivity 120.000,00 20 Activity
km 3,33 =120.000 x 3,33
paving =400.000,00