Escolar Documentos
Profissional Documentos
Cultura Documentos
CKT-A1
CKT-A3
CKT-A4
CKT-A2
US
US A DI
DI R IN
RA IN NG M
G
IN 0 M N DI 200
E 2
ND 220 B
US BE
DI
RA IN
US G
DI IN 0 M
RA IN ND 220
NG M BE
DI 200
BEN 2
=E13 RBAA E04
=E10 YAS1 E04
R B
PROPOSED 132 kv 1200 sqmm xlpe power cable in trefoil formation
R Y B R Y B R Y B R Y B
BE
ND 220
IN 0 M
3200
3200
3200
3200
3200
RA IN
DI
US
T202
SECTION A - A SECTION B - B
REVISIONS
41 41 41 41 B HG 23-11-17 REVISED AS PER COMMENTS ON DTS-220
A HG 19-04-17 ISSUED FOR APPROVAL
41
41
41
41
REV. NAME DATE DESCRIPTION
SECTION (TYPE-A) A2 A4 A3 A1
SECTION (TYPE-B) SECTION (TYPE-C) SECTION (TYPE-D) WS Atkins & Partners Overseas
CONTRACTOR:
R
P.O. Box No: - 129170 ISO 9001
BURE
I TA
88 218 100 218 100 218 100 218 100 218 100 218 100 218 100 218 100 218 100 218 100 218 100 218 53 ISO 14001
S
OHSAS 18001
Abu Dhabi, U.A.E. BUREAU VERITAS
Certification
Ghantoot Group 1 8 2 8
218 23
R Y B R Y B
PROJECT NAME:
NAME DATE
100
DRAWN HG 19-04-2017
CHECKED TITLE:
MH 19-04-2017
A1 A2
300
R B
PROPOSED 132 kv 1200 sqmm xlpe power cable in trefoil formation
EXHAUST EXHAUST
AIR DUCT AIR DUCT PROPOSED 132 kv 1200 sqmm xlpe power cable phase red
FD 2
PROPOSED 132 kv 1200 sqmm xlpe power cable phase yellow
PROPOSED 132 kv 1200 sqmm xlpe power cable phase blue
PROPOSED 32 FIBER OPTIC CABLE
TO BASEMENT FLOOR D
(REFER SHEET 1)
CABLE SHAFT
F
FD 3 FD 3
FD 3
CABLE SHAFT
FD 1
FRESH AIR
DBDC-3
FLR. OPEN.
DBP-2
DBL-2
FD 3
FD 2
FD 1 FD 2
FD 1 FRESH AIR FRESH AIR FRESH AIR
FLR. OPEN. FLR. OPEN. DUCT
REVISIONS
FD 1 FD 1 B HG 23-11-17 REVISED AS PER COMMENTS ON DTS-220
FD 1 FD 1 FD 1 FD 2
A HG 19-04-17 ISSUED FOR APPROVAL
CONSULTANT:
F
WS Atkins & Partners Overseas
F
D CONTRACTOR:
F
(Electrical Projects Division)
VE
AU
R
F P.O. Box No: - 129170 ISO 9001
BURE
I TA
ISO 14001
S
OHSAS 18001
Abu Dhabi, U.A.E. BUREAU VERITAS
LADDER ACCESS
Certification
Ghantoot Group 1 8 2 8
TO ROOF
PROJECT NAME:
NAME DATE
KEY PLAN
NOTES :
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE SPECIFIED
2. CABLE SUPPORTS SHALL BE FIXED AT INTERVAL OF 1 m MAXIMUM.
3. ONLY NON-MAGNETIC CABLE CLEATS SHALL BE USED.
4. CABLES ARE IN TREFOIL FORMATION.
5. ALL CABLE DUCTS SHOULD BE FIRE SEALED AFTER INSTALLATION OF CABLES.
6. ALL CABLE SUPPORTS AND STRUCTURES SHOULD BE EARTHED.
7. ADDITIONAL FOC LOOP SHALL BE 20M AT THE TERMINATIONS AND AT THE SPLICING BOX.
8. SNAKING LENGTH OF 1525MM SHALL BE KEPT IN SIDE CABLE TRENCH OUT SIDE
4465
SUBSTATION BOUNDARY WALL.
9. ALL REQUIRED SUPPORTING STRUCTURAL & HARDWARE SHALL PROVIDED BY GHANTOOT
10. LADDER STRUCTURAL DESIGN & DIMENSION SHALL BE AS PER STRUCTURAL CALCULATION
NEW
800
FOTP-2
SPACE FOR FUTURE PANELS
4000
REVISIONS
B HG 23-11-17 REVISED AS PER COMMENTS ON DTS-220
A HG 23-04-17 ISSUED FOR APPROVAL
REV. NAME DATE DESCRIPTION
CLIENT:
CONTRACTOR:
R
P.O. Box No: - 129170 ISO 9001
BURE
I TA
ISO 14001
S
OHSAS 18001
Abu Dhabi, U.A.E. BUREAU VERITAS
Certification
Ghantoot Group 1 8 2 8
PROJECT NAME:
NAME DATE
CHECKED TITLE:
MH 23-04-17