132kV Cable & FO Cable Layout in CUP S/S


B
D FLCT-1
YR YR
FLCT-2 YAS1
YR YR
RBAA
C

CKT-A1

CKT-A3

CKT-A4

CKT-A2
US
US A DI
DI R IN
RA IN NG M
G
IN 0 M N DI 200
E 2
ND 220 B
US BE
DI
RA IN
US G
DI IN 0 M
RA IN ND 220
NG M BE
DI 200
BEN 2
=E13 RBAA E04
=E10 YAS1 E04

=E07 FLCT-2 E09


KEY PLAN
=E03 FLCT-1 E11
NOTES :
D C 1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE SPECIFIED
2. CABLE SUPPORTS SHALL BE FIXED AT INTERVAL OF 1 m MAXIMUM.
3. ONLY NON-MAGNETIC CABLE CLEATS SHALL BE USED.
T202
A A 4. CABLES ARE IN TREFOIL FORMATION.
5. ALL CABLE DUCTS SHOULD BE FIRE SEALED AFTER INSTALLATION OF CABLES.
6. ALL CABLE SUPPORTS AND STRUCTURES SHOULD BE EARTHED.
7. ADDITIONAL FOC LOOP SHALL BE 20M AT THE TERMINATIONS AND AT THE SPLICING BOX.
8. SNAKING LENGTH OF 1525MM SHALL BE KEPT IN SIDE CABLE TRENCH OUT SIDE
T203 SUBSTATION BOUNDARY WALL.

B 9. ALL REQUIRED SUPPORTING STRUCTURAL & HARDWARE SHALL PROVIDED BY GHANTOOT


10. LADDER STRUCTURAL DESIGN & DIMENSION SHALL BE AS PER STRUCTURAL CALCULATION

PLAN REFERENCE DRAWINGS & DOCUMENTS


T204 1.GENERAL ROUTE LAYOUT (132kV CABLE ROUTE N-14516.1 AM 5100 U 610
TO TELECOM ROOM
IN FIRST FLOOR
T202 FROM LILO CONNECTION POINT TO CUP2 (Rev D)
SUBSTATION )
(REFER SHEET 2)
BASEMENT FLOOR PLAN 2.TYPICAL TRENCH CROSS SECTION N-14516.1 AG 7500 Q 631
(Rev C)
3.SCHEMATIC DIAGRAM FOR CKT-A1 N14516.1 AG 7500 R 650
(Rev D)
4.SCHEMATIC DIAGRAM FOR CKT-A2 N14516.1 AG 7500 R 651
(Rev D)
5.SCHEMATIC DIAGRAM FOR CKT-A3 N14516.1 AG 7500 R 652
(Rev D)
6.SCHEMATIC DIAGRAM FOR CKT-A4 N14516.1 AG 7500 R 653
(Rev D)
7.132/22kV CUP2 AIRPORT SUBSTATION N14512 SA 7610 Q 3230
132KV POWER CABLE LAYOUT (Rev C)
LEGEND

R B
PROPOSED 132 kv 1200 sqmm xlpe power cable in trefoil formation

PROPOSED 132 kv 1200 sqmm xlpe power cable phase red


PROPOSED 132 kv 1200 sqmm xlpe power cable phase yellow
PROPOSED 132 kv 1200 sqmm xlpe power cable phase blue
PROPOSED 32 FIBER OPTIC CABLE

R Y B R Y B R Y B R Y B

BE
ND 220
IN 0 M
3200

3200

3200

3200

3200
RA IN
DI
US
T202

T204 T204 T204


T204

SECTION A - A SECTION B - B

REVISIONS
41 41 41 41 B HG 23-11-17 REVISED AS PER COMMENTS ON DTS-220
A HG 19-04-17 ISSUED FOR APPROVAL
41

41

41

41
REV. NAME DATE DESCRIPTION

500 860 1280 1700 CLIENT:

860 1280 1700


500
220 420 220 220 420 420 220 220 420 420 420 220
Y
200 200 200 200 200 200
CONSULTANT:
R B

SECTION (TYPE-A) A2 A4 A3 A1

SECTION (TYPE-B) SECTION (TYPE-C) SECTION (TYPE-D) WS Atkins & Partners Overseas

CONTRACTOR:

A3 A4 (Electrical Projects Division)


VE
AU

R
P.O. Box No: - 129170 ISO 9001

BURE

I TA
88 218 100 218 100 218 100 218 100 218 100 218 100 218 100 218 100 218 100 218 100 218 100 218 53 ISO 14001

S
OHSAS 18001
Abu Dhabi, U.A.E. BUREAU VERITAS
Certification
Ghantoot Group 1 8 2 8
218 23

R Y B R Y B
PROJECT NAME:
NAME DATE
100

PREPARED HG 19-04-2017 TENDER No 14516.1


NEW ADAC, CUP2 132kV CABLE WORKS
R Y B R Y B
218

DRAWN HG 19-04-2017

CHECKED TITLE:
MH 19-04-2017

A1 A2
300

APPROVED SD 19-04-2017 132kV CABLE & FO CABLE LAYOUT IN CUP2 S/S


SHEET SIZE SCALE
A1 NTS (132kV CABLE ROUTE FROM LILO CONNECTION
CONTRACT NO. POINT TO CUP2 SUBSTATION )
SECTION C - C N14516.1
INTERNAL REF. DRWG. NO. REV. SHEET LAST QTY.
NO. SHEET SHEETS
N14516.1 AG 7500 U 657 B 1 2 2
KEY PLAN
NOTES :
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE SPECIFIED
2. CABLE SUPPORTS SHALL BE FIXED AT INTERVAL OF 1 m MAXIMUM.
CABLE SHAFT 3. ONLY NON-MAGNETIC CABLE CLEATS SHALL BE USED.
4. CABLES ARE IN TREFOIL FORMATION.
5. ALL CABLE DUCTS SHOULD BE FIRE SEALED AFTER INSTALLATION OF CABLES.
6. ALL CABLE SUPPORTS AND STRUCTURES SHOULD BE EARTHED.
7. ADDITIONAL FOC LOOP SHALL BE 20M AT THE TERMINATIONS AND AT THE SPLICING BOX.
8. SNAKING LENGTH OF 1525MM SHALL BE KEPT IN SIDE CABLE TRENCH OUT SIDE
SUBSTATION BOUNDARY WALL.
9. ALL REQUIRED SUPPORTING STRUCTURAL & HARDWARE SHALL PROVIDED BY GHANTOOT
10. LADDER STRUCTURAL DESIGN & DIMENSION SHALL BE AS PER STRUCTURAL CALCULATION

REFERENCE DRAWINGS & DOCUMENTS


1.GENERAL ROUTE LAYOUT (132kV CABLE ROUTE N-14516.1 AM 5100 U 610
FROM LILO CONNECTION POINT TO CUP2 (Rev D)
SUBSTATION )
2.TYPICAL TRENCH CROSS SECTION N-14516.1 AG 7500 Q 631
(Rev C)
3.SCHEMATIC DIAGRAM FOR CKT-A1 N14516.1 AG 7500 R 650
(Rev D)
4.SCHEMATIC DIAGRAM FOR CKT-A2 N14516.1 AG 7500 R 651
(Rev D)
5.SCHEMATIC DIAGRAM FOR CKT-A3 N14516.1 AG 7500 R 652
(Rev D)
6.SCHEMATIC DIAGRAM FOR CKT-A4 N14516.1 AG 7500 R 653
SECTION D - D (Rev D)
7.132/22kV CUP2 AIRPORT SUBSTATION N14512 SA 7610 Q 3230
132KV POWER CABLE LAYOUT (Rev C)
LEGEND

R B
PROPOSED 132 kv 1200 sqmm xlpe power cable in trefoil formation
EXHAUST EXHAUST
AIR DUCT AIR DUCT PROPOSED 132 kv 1200 sqmm xlpe power cable phase red
FD 2
PROPOSED 132 kv 1200 sqmm xlpe power cable phase yellow
PROPOSED 132 kv 1200 sqmm xlpe power cable phase blue
PROPOSED 32 FIBER OPTIC CABLE

TO BASEMENT FLOOR D
(REFER SHEET 1)

CABLE SHAFT
F
FD 3 FD 3

FD 3

CABLE SHAFT
FD 1

FRESH AIR

DBDC-3
FLR. OPEN.

DBP-2
DBL-2
FD 3
FD 2
FD 1 FD 2
FD 1 FRESH AIR FRESH AIR FRESH AIR
FLR. OPEN. FLR. OPEN. DUCT

REVISIONS
FD 1 FD 1 B HG 23-11-17 REVISED AS PER COMMENTS ON DTS-220
FD 1 FD 1 FD 1 FD 2
A HG 19-04-17 ISSUED FOR APPROVAL

EXHAUST EXHAUST EXHAUST EXHAUST REV. NAME DATE DESCRIPTION


AIR DUCT AIR DUCT AIR DUCT AIR DUCT
CLIENT:

CONSULTANT:

F
WS Atkins & Partners Overseas
F

D CONTRACTOR:

F
(Electrical Projects Division)
VE
AU

R
F P.O. Box No: - 129170 ISO 9001

BURE

I TA
ISO 14001

S
OHSAS 18001
Abu Dhabi, U.A.E. BUREAU VERITAS
LADDER ACCESS

Certification
Ghantoot Group 1 8 2 8
TO ROOF

PROJECT NAME:
NAME DATE

PREPARED HG 19-04-2017 TENDER No 14516.1


NEW ADAC, CUP2 132kV CABLE WORKS
FRESH AIR FRESH AIR FRESH AIR
DRAWN HG 19-04-2017
DUCT DUCT DUCT
CHECKED TITLE:
MH 19-04-2017
FIRST FLOOR PLAN
APPROVED SD 19-04-2017 132kV CABLE & FO CABLE LAYOUT IN CUP2 S/S
SHEET SIZE SCALE
A1 NTS (132kV CABLE ROUTE FROM LILO CONNECTION
CONTRACT NO. POINT TO CUP2 SUBSTATION )
N14516.1
INTERNAL REF. DRWG. NO. REV. SHEET LAST QTY.
NO. SHEET SHEETS
N14516.1 AG 7500 U 657 B 2 2 2
Proposed Location for FOTP in CUP S/S
660
EXHAUST
AIR DUCT

KEY PLAN
NOTES :
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE SPECIFIED
2. CABLE SUPPORTS SHALL BE FIXED AT INTERVAL OF 1 m MAXIMUM.
3. ONLY NON-MAGNETIC CABLE CLEATS SHALL BE USED.
4. CABLES ARE IN TREFOIL FORMATION.
5. ALL CABLE DUCTS SHOULD BE FIRE SEALED AFTER INSTALLATION OF CABLES.
6. ALL CABLE SUPPORTS AND STRUCTURES SHOULD BE EARTHED.
7. ADDITIONAL FOC LOOP SHALL BE 20M AT THE TERMINATIONS AND AT THE SPLICING BOX.
8. SNAKING LENGTH OF 1525MM SHALL BE KEPT IN SIDE CABLE TRENCH OUT SIDE

4465
SUBSTATION BOUNDARY WALL.
9. ALL REQUIRED SUPPORTING STRUCTURAL & HARDWARE SHALL PROVIDED BY GHANTOOT
10. LADDER STRUCTURAL DESIGN & DIMENSION SHALL BE AS PER STRUCTURAL CALCULATION

REFERENCE DRAWINGS & DOCUMENTS


1.GENERAL ROUTE LAYOUT (132kV CABLE ROUTE N-14516.1 AM 5100 U 610
FROM LILO CONNECTION POINT TO CUP2 (Rev D)
SUBSTATION )
2.TYPICAL TRENCH CROSS SECTION N-14516.1 AG 7500 Q 631
(Rev C)
3.SCHEMATIC DIAGRAM FOR CKT-A1 N14516.1 AG 7500 R 650
(Rev D)
4.SCHEMATIC DIAGRAM FOR CKT-A2 N14516.1 AG 7500 R 651
(Rev D)
5.SCHEMATIC DIAGRAM FOR CKT-A3 N14516.1 AG 7500 R 652
(Rev D)
6.SCHEMATIC DIAGRAM FOR CKT-A4 N14516.1 AG 7500 R 653
(Rev D)
7.132/22kV CUP2 AIRPORT SUBSTATION N14512 SA 7610 Q 3230
132KV POWER CABLE LAYOUT (Rev C)
LEGEND
NEW
800

FOTP-1 PROPOSED 32 FIBER OPTIC CABLE

NEW
800

FOTP-2
SPACE FOR FUTURE PANELS
4000

REVISIONS
B HG 23-11-17 REVISED AS PER COMMENTS ON DTS-220
A HG 23-04-17 ISSUED FOR APPROVAL
REV. NAME DATE DESCRIPTION
CLIENT:

1525 800 2400 800 1525


CONSULTANT:
1525

WS Atkins & Partners Overseas

CONTRACTOR:

(Electrical Projects Division)


VE
AU

R
P.O. Box No: - 129170 ISO 9001

BURE

I TA
ISO 14001

S
OHSAS 18001
Abu Dhabi, U.A.E. BUREAU VERITAS
Certification
Ghantoot Group 1 8 2 8

PROJECT NAME:
NAME DATE

PREPARED HG 23-04-17 TENDER No 14516.1


NEW ADAC, CUP2 132kV CABLE WORKS
DRAWN HG 23-04-17

CHECKED TITLE:
MH 23-04-17

APPROVED SD 23-04-17 PROPOSED LOCATION FOR FOTP IN CUP2 S/S


SHEET SIZE SCALE
A1 NTS (132kV CABLE ROUTE FROM LILO CONNECTION
CONTRACT NO. POINT TO CUP2 SUBSTATION )
N14516.1
INTERNAL REF. DRWG. NO. REV. SHEET LAST QTY.
NO. SHEET SHEETS
N14516.1 AG 7800 P 628 B 2 2 2