Você está na página 1de 4

100 DAYS ACTION PLAN LIST - BUS BAYS IN GHMC

Name of the Name of the


Sl. Ward Amount of Present Status of work in Target Date of
Div Name of the Work Agency / Contact Responsible Officer
No. No. estimate detail Completion
No.
AE / AEE
1 2 3 4 5 6 7 8 9

Construction of Bus bays @ various


locations in Ward No.1,2,3,4, & 134
( Type-I, Package) of Kapra Circle, Sri B.V.Subhakar
GHMC. (1. Sainikpuri near Jyothi Rao Rao,
police statue, 2. Sharadha Bus Stop, 3. JYOTHI VLCCS Ph : 8374924052
1,2,3,4,5
1 to 9 1-Kapra G Block Colony Bus stop, 4. Sai 31.50 9391044194 Sri B.Ramesh Babu, Completed
&6
Sudheer College Bus stop, 5. North 233019103 Ph : 9000994035Sri
Kamala Nagar, 6. Chinna Cherla Pally P.K.Bala Kishan,
Bus stop, 7. Pedda Cherla Palli Bus Ph : 9866506752
stop, 8. IG Mint Colony, 9. EC Nagar
Bus Stop Cherla Pally)

Bharat Petrol Bunk, Nagole (Nagole Sri S.Prasad


10 11 3A VELTECHCONST Completed
Sujatha Hotel) 9704333827
15.60 RUCTIONS
9959899988 Sri S.Prasad
11 11 3A Bandlaguda Road, Arunodaya Nagar Completed
9704333827
VELTECHCONST Sri K.Venugopala
12 12 3A Sitara Hotel L.B.Nagar X Roads 3.50 RUCTIONS Rao Completed
9959899988 9849908091
VELTECHCONST
Sri G.Sainath Goud
13 13 3A High Court Colony Bus Stop 3.50 RUCTIONS Completed
9000631586
9959899988
VELTECHCONST Sri K.Venugopala
14 12 3A Pallavi Garden Chintalkunta 3.50 RUCTIONS Rao Completed
9959899988 9849908091
Mohd
15 59 6 Durganagar Junction 4.10 Completed
Shahbazullah
Mohd
16 60 6 IB Function hall, PDP Junction 4.10 Completed
Shahbazullah

1
Name of the Name of the
Sl. Ward Amount of Present Status of work in Target Date of
Div Name of the Work Agency / Contact Responsible Officer
No. No. estimate detail Completion
No.
AE / AEE
1 2 3 4 5 6 7 8 9
Mohd
17 58 6 NPA, Shivarampally 4.10 Completed
Shahbazullah
Mohd
18 59 6 Mailardevpally Junction 4.10 Completed
Shahbazullah
Mohd
19 59 6 Gaganpahad Bus stop 4.10 Completed
Shahbazullah
Durgah Nagar 'X' Road (HMWS 7 SB Mohd
20 59 6 4.10 Completed
Reservoior) Shahbazullah
Mohd
21 60 6 Anand Bhavan Hotel, Hyderguda 4.10 Completed
Shahbazullah

Construction of Bus Bays (10 Nos) at 1)


Opp: to VIGG Electronics, Masab tank
(RHS), 2) Near Sarojini Devi Eye
Hospital, 3) Near PTI building, Near
Masjid, 4) Salarjung Colony near SBI
Bank, 5) Opp: to Hockey play ground,
Masab tank Jn, 6) Back side of Ahmed
22 to M/s. P.N
74 7A Nagar Community hall, 7) Opp: To 40.00 Ravi Completed
31 Constructions
Electrical sub station near military
compound wall (RHS) near Nanal
Nagar Jn, 8) Salar Bridge Hakeempet,
9) Mothi Darwaza Opp: Syndrilla
School, 10) Near Zeeshan hotel, Banjari
Darwaza, Golconda, in Division No.7A,
CZ, GHMC

Construction of Bus Bays (4 Nos) at 1)


SD hospital, 2) NMDC, 3) PTI building M/s. P.N.
32 75 7A 16.00 Ravi Completed
& 4) Public Health office Division Constructions
No.7A, CZ, GHMC
Opp; to Zooni Show Room, Tolichowki
33 69 7B 4.00 M.A.Nayeem Completed
main road
Opp: to Deccan park, 7 Tombs main
34 68 7B 4.00 M.A.Nayeem Completed
road

2
Name of the Name of the
Sl. Ward Amount of Present Status of work in Target Date of
Div Name of the Work Agency / Contact Responsible Officer
No. No. estimate detail Completion
No.
AE / AEE
1 2 3 4 5 6 7 8 9

Opp: to Azaan School, 7 Tombs main


35 68 7B 4.00 M.A.Nayeem Completed
road
36 96 10A Near Yousufguda X road 4.00 MD shafi Ravinder Reddy Completed
37 97 10A 2) Saradhi studio turning, 4.00 MD shafi ashok Rao Completed
Srinagar colony main road near
38 97 10A 4.00 MD shafi ashok Rao Completed
Graveyard
39 98 10A 2) SE R & B office, DK Road, 4.00 MD shafi Mohan Completed
40 98 10A 4) Chest Hospital, Erragadda Opp 4.00 MD shafi Mohan Completed
41 100 10A FCI godown 4.00 MD shafi ashok Rao Completed
Construction of Bus Bays (10 Nos) at 1)
42 100 10A 4.00 MD shafi Ravinder Reddy Completed
Sanath nagar Opp Gokul theater
43 101 10A 3) HUDA Nursary opp. ESI, 4.00 MD shafi Ravinder Reddy Completed
Construction of bus bay (5 nos) package
44 114 14A no. III on kukatpally circle - 14 5.00 Jyothi WLCCS A.Rupadevi, AEE Completed
Gate No. 2 JNTUH - 1 NO- Completed
45 114 14A Gate No. 1 JNTUH - 1 NO- Completed 5.00 Jyothi WLCCS A.Rupadevi, AEE Completed

46 114 14A NH-65 Adjacent to Shivalayam 5.00 Jyothi WLCCS A.Rupadevi, AEE Completed

47 114 14A NH-65 Adjacent to Shivalayam 5.00 Jyothi WLCCS A.Rupadevi, AEE Completed
PJR Constructions Sri. V. Kondal Rao,
48 133 16 Retreat Colony Opp side 5.00 Completed
9866312665 AE
PJR Constructions Sri. B. Bhanu
49 134 16 Opp Retreat Colony main gate 5.00 Completed
9866312665 Chander, AEE
Old Dairy Farm Main Road, PJR Constructions Sri. B. Maheshwar,
50 135 16 5.00 Completed
Khanajiguda beside Poja Hotel 9866312665 AE

3
Name of the Name of the
Sl. Ward Amount of Present Status of work in Target Date of
Div Name of the Work Agency / Contact Responsible Officer
No. No. estimate detail Completion
No.
AE / AEE
1 2 3 4 5 6 7 8 9

Abstract for the Bus Bays

Sl. No Status Nos.

1 Completed 50

Total 50

Você também pode gostar