MES SEMANA 34 (AGOSTO) SEMANA 35 (AGOSTO) SEMANA 36 (AGOSTO) SEMANA 37 (AGO

DIAS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Frente / Actividades
L M W J V S D L M W J V S D L M W J V S D L M
CALENDARIO
20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11
OBRAS PORTUARIAS
OBRAS PROVISIONALES
TRAZO Y REPLANTEO DE OBRA X X X X X X X X X X X X X X X X X X X X
AGUA PARA LA OBRA X X X X X X X X X X X X X X X X X X X X
ENERGIA PARA LA OBRA X X X X X X X X X X X X X X X X X X X X
PUENTE DE ACCESO
FABRICACION DE PILOTES DE CONCRETO
CONCRETO EN PILOTES F'C 350 KG/CM2 X X X X X X X X X X X X X X X X X X X X
ENCOFRADO Y DESENCOFRADO EN PILOTES X X X X X X X X X X X X X X X X X X X X
ACERO DE REFUERZO f'y 4200 kglcm2 EN PILOTES X X X X X X X X X X X X X X X X X X X X
FABRICACION DE LOSAS NERVADAS
ACERO DE REFUERZO f'y 4200 kglcm2 EN LOSA NERVADAS X X X X X X X X X X X X X X
CONCRETO EN LOSAS NERVADAS f'c 280 kg/cm2 X X X X X X X X X X X X X X
ENCOFRADO Y DESENCOFRADO EN LOSAS NERVADAS X X X X X X X X X X X X X X
NUCLEOS
CONCRETO EN NUCLEO f'c 280 kg/cm2 X X X X X X X X X X X X X X X X X X X X
ENCOFRADO Y DESENCOFRADO EN NUCLEO X X X X X X X X X X X X X X X X X X X X
ACERO DE REFUERZO fy 4200 kg/cm2 EN NUCLEO X X X X X X X X X X X X X X X X X X X X

DESINFECCION
FALSO PISO
CONCRETO FALSO PISO f'c 210 kg/cm2 X
ARQUITECTURA
REVOQUES
TARRAJEO MUROS DE INTERIORES, CEMENTO : ARENA, 1:5 X X X X X X
TARRAJEO MUROS DE EXTERIORES, CEMENTO : ARENA, 1:6 X X X X X X
TARRAJEO RAYADO C/MORTERO 1:5 X X X X X X
DERRAMES A=0.15 m.MORTERO 1:5 X X X X X X
CIELO RASO
TARRAJEO DE CIELO RASO X X X X
PISOS
CONTRAPISO X X X X
PISO DE CEMENTO PULIDO C/IMPERMEABILIZANTE X X
PISO CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO X X X X X X
ZOCALOS
ZOCALO DE CERAMICA COLOR 45 X 45 cm X X X X X
CONTRAZOCALO CERAMICO H=0.10 m X X X X X
COBERTURAS
CUBIERTA LADRILLO PASTELERO 0.24x0.24 X X X X X
PINTURAS
PINTURA LATEX EN CIELO RASO
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X X X X X X X X X X X X X X X X X X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS X X X X X X X X X X X X X X X X X X X X

REDES Y TALLERES
1° PISO
ARQUITECTURA
REVOQUES
TARRAJEO MUROS DE EXTERIORES, CEMENTO : ARENA, 1:6 X X X
DERRAMES A=0.15 m.MORTERO 1:5 X X
PISOS
PISO DE CEMENTO PULIDO C/IMPERMEABILIZANTE X X X X
PINTURAS
PINTURA EPOXICA EN MUROS X X X X
PINTURA LATEX EN MUROS INTERIORES
PINTURA LATEX EN MUROS EXTERIORES
PINTURA EN CIELORASO CON EPOXlCO X X X X
PINTURA LATEX EN CIELO RASO
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X X X X X X X X X X X X X X X X X X
2° PISO
ARQUITECTURA
REVOQUES
TARRAJEO MUROS DE EXTERIORES, CEMENTO : ARENA, 1:6 X X X
DERRAMES A=0.15 m.MORTERO 1:5 X X
PISOS
PISO DE CEMENTO PULIDO C/IMPERMEABILIZANTE X X X
PISO CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO X X
PISO VINILICO DE ALTO TRANSITO X X
ZOCALOS
CONTRAZOCALO CERAMICO H=0.10 m X X
CONTRAZOCALO DE CEDRO DE E=1", H=0.10 m X X
COBERTURAS
CUBIERTA LADRILLO PASTELERO 0.24x0.24 X X X X X X
PINTURAS
PINTURA EPOXICA EN MUROS
PINTURA LATEX EN MUROS INTERIORES X X X
PINTURA LATEX EN MUROS EXTERIORES
PINTURA EN CIELORASO CON EPOXlCO
PINTURA LATEX EN CIELO RASO X X X
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X X X X X X X X X X X X X X X X X X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS X X X X X X

SS-HH
1° PISO
ESTRUCTURAS
FALSO PISO
CONCRETO FALSO PISO f'c 210 kg/cm2 X X
ARQUITECTURA
REVOQUES
DERRAMES A=0.15 m.MORTERO 1:5 X X X
PISOS
CONTRAPISO X X
PISO CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO X X X X
PISO DE CEMENTO PULIDO C/IMPERMEABILIZANTE X X X X
ZOCALOS
ZOCALO DE CERAMICA COLOR 45 X 45 cm X X X X X
PINTURAS
PINTURA EPOXICA EN MUROS
PINTURA LATEX EN MUROS INTERIORES
PINTURA LATEX EN MUROS EXTERIORES
PINTURA EN CIELORASO CON EPOXlCO
PINTURA LATEX EN CIELO RASO X X
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X X X X X X X X X X X X X X X X X X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS X X X X X X X X X X X X X X X X X X X X

2° PISO
ARQUITECTURA
REVOQUES
DERRAMES A=0.15 m.MORTERO 1:5 X X X
PISOS
PISO CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO X X X X
PISO DE CEMENTO PULIDO C/IMPERMEABILIZANTE X X
ZOCALOS
ZOCALO DE CERAMICA COLOR 45 X 45 cm X X X X
CONTRAZOCALO CERAMICO H=0.10 m X X X
COBERTURAS
CUBIERTA LADRILLO PASTELERO 0.24x0.24 X X X X
PINTURAS
PINTURA EPOXICA EN MUROS
PINTURA LATEX EN MUROS INTERIORES
PINTURA LATEX EN MUROS EXTERIORES
PINTURA EN CIELORASO CON EPOXlCO
PINTURA LATEX EN CIELO RASO X X
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X X X X X X X X X X X X X X X X X X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS X X X X X X X X X X X X X X X X X X X X

FRIO
1° PISO
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMENTACION X X
CONCRETO SIMPLE
CONCRETO FALSOCIMIENTOS 100 kg/cm2 + 30% P.G. X X
CIMIENTOS
CONCRETO EN CIMIENTOS CORRIDOS f´c 175 kg/cm2 X X
ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS
SOBRECIMIENTOS
CONCRETO EN SOBRECIMIENTOS f´c 175 kg/cm2
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS
CONCRETO ARMADO
ZAPATAS
CONCRETO ZAPATAS f'c=210 kg/cm2 X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
VIGA DE CIMENTACION
CONCRETO VIGA DE CIMENTACION f'c=210 kg/cm2 X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
SOBRECIMIENTO REFORZADO
CONCRETO EN SOBRECIMIENTO REFORZADO f'c=210 kg/cm2 X X
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO X X X X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
COLUMNAS
CONCRETO COLUMNAS f'c=210 kg/cm2 X X X
ENCOFRADO Y DESENCOFRADO DE COLUMNAS X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
ARQUITECTURA
ALBAÑILERlA
MURO LADRILLO K.K AMARRE DE SOGA
MURO LADRILLO K.K AMARRE DE CABEZA X X X X

INSTALACIONES MENORES
MOVIMIENTO DE TIERRAS
RELLENO CON MATERIAL DE PRESTAMO X X X X X
ELIMINACION DE MATERIAL EXCEDENTE X X
POZO SEPTICO
LOSA MACIZA X
CONCRETO F´C = 350 KG/CM2 X X
ENCOFRADO Y DESENCOFRADO X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS X X X X
EMISOR SUBMARINO Y CUARTO DE BOMBAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMENTACION X X
LOSA MACIZA
CONCRETO F´C = 350 KG/CM2 X
ENCOFRADO Y DESENCOFRADO X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X
CIMIENTOS
CONCRETO F´C = 210 KG/CM2 EN CIMIENTOS X X
SOBRECIMIENTOS
CONCRETO F´C = 350 KG/CM2 EN SOBRECIMIENTOS X
ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS X X
CONCRETO ARMADO
ZAPATAS
CONCRETO F´C = 350 KG/CM2 EN ZAPATAS X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X
COLUMNAS
CONCRETO COLUMNAS f'c=210 kg/cm2 X
ENCOFRADO Y DESENCOFRADO DE COLUMNAS X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
ARQUITECTURA
ALBAÑILERlA
MURO LADRILLO K.K AMARRE DE SOGA X X X
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X X X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS X
CAMARA DE REJAS Y TRAMPA DE GRASA
CONCRETO SIMPLE
CONCRETO FALSOCIMIENTOS 100 kg/cm2 + 30% P.G. X
MUROS
CONCRETO F´C = 350 KG/CM2 X
ENCOFRADO Y DESENCOFRADO X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
LOSA
CONCRETO F´C = 350 KG/CM2 X
ENCOFRADO Y DESENCOFRADO X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
LOSA MACIZA
CONCRETO F´C = 350 KG/CM2 X
ENCOFRADO Y DESENCOFRADO X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS X
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS
TAREAS PREVIAS
ESTRUCTURAS
FALSO PISO
CONCRETO FALSO PISO 210 kg/cm2 + 30% P.G. X X
COLUMNAS
CONCRETO COLUMNAS f'c=210 kg/cm2 X X X
ENCOFRADO Y DESENCOFRADO DE COLUMNAS X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
VIGAS X
CONCRETO VIGAS f'c=210 kg/cm2 X X X X
ENCOFRADO Y DESENCOFRADO DE VIGAS X X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
LOSA ALIGRADA X
CONCRETO LOSA ALIGERADA f'c=210 kg/cm2 X X X X
ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA X X X X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
ARQUITECTURA
ALBAÑILERlA
MURO LADRILLO K.K AMARRE DE CABEZA X X X

TANQUE ELEVADO
MOVIMIENTO DE TIERRAS
RELLENO CON MATERIAL DE PRESTAMO X X X X
FALSO PISO X
CONCRETO FALSO PISO 210 kg/cm2 + 30% P.G.
CONCRETO ARMADO
ZAPATAS
CONCRETO F´C = 350 KG/CM2 EN ZAPATAS X
ENCOFRADO Y DESENCOFRADO DE ZAPATAS X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
VIGA DE CIMENTACION
CONCRETO F´C = 350 KG/CM2 EN VIGA DE CIMENTACION X
ENCOFRADO Y DESENCOFRADO DE VIGA DE CIMENTACION X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
PLATEA DE CIMENTACION
CONCRETO F´C = 350 KG/CM2 EN PLATEA X
ENCOFRADO Y DESENCOFRADO DE PLATEA X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X
COLUMNAS
CONCRETO COLUMNAS f'c=210 kg/cm2 X X X
ENCOFRADO Y DESENCOFRADO DE COLUMNAS X X X X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X X X X X
VIGAS
CONCRETO VIGAS f'c=210 kg/cm2 X X
ENCOFRADO Y DESENCOFRADO DE VIGAS X X X X
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 X X X X
SEMANA 37 (AGOSTO)
24 25 26 27 28
% REAL
W J V S D
12 13 14 15 16

X X X X 40.00%
X X X X 40.00%
X X X X 40.00%

X X X X 40.00%
X X X X 40.00%
X X X X 40.00%

X X X X 40.00%
X X X X 40.00%
X X X X 40.00%

X X X X 40.00%
X X X X 40.00%
X X X X 40.00%

100.00%

100.00%
100.00%
100.00%
100.00%

100.00%

100.00%
100.00%
100.00%

X X X 100.00%
100.00%
100.00%

X 10.00%

X X X X 60.00%

X X X X 60.00%

100.00%
100.00%

100.00%

X 100.00%
X X X 100.00%

100.00%

X X X X 100.00%

100.00%
100.00%

100.00%
100.00%
100.00%

100.00%
100.00%

100.00%

X 100.00%
X X X 80.00%

100.00%

X X X X
100.00%

100.00%

100.00%

100.00%
100.00%
100.00%

100.00%

X X X 60.00%

X X 100.00%

X X X X 100.00%

X X X X 100.00%

100.00%

100.00%
100.00%

100.00%
100.00%

100.00%

X X X 100.00%

X X 100.00%

X X X X 100.00%
X X X X 100.00%

100.00%

100.00%

X 100.00%

X X 100.00%
X X X 100.00%

100.00%
100.00%

100.00%
100.00%

X X 100.00%
X 100.00%

X X 100.00%
X 100.00%
100.00%

X 60.00%

100.00%
100.00%

100.00%
100.00%
100.00%

100.00%

100.00%
100.00%

X 100.00%
X X 100.00%
X 100.00%

100.00%

100.00%
100.00%

100.00%
100.00%

100.00%
100.00%
100.00%

100.00%

100.00%

X X 100.00%

100.00%

100.00%
100.00%
100.00%

100.00%
100.00%
100.00%

100.00%
100.00%
100.00%

X X 100.00%

X X 70.00%
100.00%

10.00%
10.00%

10.00%
10.00%

20.00%

100.00%
100.00%

100.00%
100.00%

100.00%
100.00%

100.00%
100.00%
100.00%

60.00%
60.00%
X 60.00%

X 60.00%
X X 60.00%
X X 60.00%
FUERZA OBRERA - SEC III

Jefe de Campo:
Maestro de Obra: Luis Nonalaya

Operario Oficial Peon total


Cuadrilla Cap
Real Requerim. Real Requerim. Real Requerim. Real
Albañileria 1 4 6 2 2 3 2 10
Acero 1 2 5 3 3 1 2 7
Carpinteria 1 4 8 3 2 5 3 13
Mov. Tierras 1 3 4
19 7 7 34

Requerimiento Total 33
total
Requerim.
20
17
26
4
67

Você também pode gostar

  • Palomino
    Palomino
    Documento5 páginas
    Palomino
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Libro 2
    Libro 2
    Documento3 páginas
    Libro 2
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Codigo de Colores - NTP 900 058 2005
    Codigo de Colores - NTP 900 058 2005
    Documento3 páginas
    Codigo de Colores - NTP 900 058 2005
    R. S.
    Ainda não há avaliações
  • Mapa Satelital de La Provincias Costeras de Huaura
    Mapa Satelital de La Provincias Costeras de Huaura
    Documento2 páginas
    Mapa Satelital de La Provincias Costeras de Huaura
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Palomino
    Palomino
    Documento5 páginas
    Palomino
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Palomino
    Palomino
    Documento5 páginas
    Palomino
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • 1 Diseno Emisor Submarino
    1 Diseno Emisor Submarino
    Documento40 páginas
    1 Diseno Emisor Submarino
    Ricardo Chura
    Ainda não há avaliações
  • Agregado: Material
    Agregado: Material
    Documento30 páginas
    Agregado: Material
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • TUBOS
    TUBOS
    Documento1 página
    TUBOS
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Calculo de Acero en Vigas y Columnas
    Calculo de Acero en Vigas y Columnas
    Documento6 páginas
    Calculo de Acero en Vigas y Columnas
    Gim Collas
    86% (14)
  • Ssss
    Ssss
    Documento9 páginas
    Ssss
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Lenin
    Lenin
    Documento327 páginas
    Lenin
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • D PDF
    D PDF
    Documento1 página
    D PDF
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Z Pox Gel ....
    Z Pox Gel ....
    Documento3 páginas
    Z Pox Gel ....
    Flavio Gaspar
    Ainda não há avaliações
  • DIAPO
    DIAPO
    Documento18 páginas
    DIAPO
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Estadisticaqqq
    Estadisticaqqq
    Documento2 páginas
    Estadisticaqqq
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Informe de Seguridad - N 13 Rev 1
    Informe de Seguridad - N 13 Rev 1
    Documento10 páginas
    Informe de Seguridad - N 13 Rev 1
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Tanque Elevado
    Tanque Elevado
    Documento115 páginas
    Tanque Elevado
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • La Bomba Es Un Compresor Hidráulico Tradicional Que Envía Líquido A Alta Presión Al Gato para Generar La Fuerza Necesaria para El Tensado
    La Bomba Es Un Compresor Hidráulico Tradicional Que Envía Líquido A Alta Presión Al Gato para Generar La Fuerza Necesaria para El Tensado
    Documento5 páginas
    La Bomba Es Un Compresor Hidráulico Tradicional Que Envía Líquido A Alta Presión Al Gato para Generar La Fuerza Necesaria para El Tensado
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Solucionario Evaluación Final
    Solucionario Evaluación Final
    Documento4 páginas
    Solucionario Evaluación Final
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Informe de Calidad 02-Febrero - 8 Febrero
    Informe de Calidad 02-Febrero - 8 Febrero
    Documento6 páginas
    Informe de Calidad 02-Febrero - 8 Febrero
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Pro Piedad
    Pro Piedad
    Documento2 páginas
    Pro Piedad
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Taraaaaa
    Taraaaaa
    Documento1 página
    Taraaaaa
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Estadistica
    Estadistica
    Documento2 páginas
    Estadistica
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Diapositiva Primer Trabajo de Conreto
    Diapositiva Primer Trabajo de Conreto
    Documento8 páginas
    Diapositiva Primer Trabajo de Conreto
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Analisi
    Analisi
    Documento4 páginas
    Analisi
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • XXX
    XXX
    Documento15 páginas
    XXX
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Diapos Concreto
    Diapos Concreto
    Documento9 páginas
    Diapos Concreto
    Leonel Fernando Mauricio Ramirez
    Ainda não há avaliações
  • Ejercicio Propuestos
    Ejercicio Propuestos
    Documento4 páginas
    Ejercicio Propuestos
    Raúl Alfredo
    Ainda não há avaliações