3 PEKERJAAN PLUMBING
Page 1
BILL NO 3
PROJECT : COCA-COLA BULAN BARU, SURABAYA
SERVICES : PLUMBING
Page 2
BILL NO 3
PROJECT : COCA-COLA BULAN BARU, SURABAYA
SERVICES : PLUMBING
Sub Total
Page 4
BILL NO 3
PROJECT : COCA-COLA BULAN BARU, SURABAYA
SERVICES : PLUMBING
3.2.1.10 Laboratory
Diameter 25 mm m 16
Fittings lot 1
3.2.1.11 Maintenance
Diameter 25 mm m 16
Fittings lot 1
3.2.1.12 Amenity
Diameter 65 mm m 20
Diameter 50 mm m 4
Diameter 40 mm m 9
Diameter 32 mm m 22
Diameter 25 mm m 145
Diameter 20 mm m 14
Diameter 15 mm m 186
Fittings lot 1
3.2.1.13 Utility
Diameter 50 mm m 56
Fittings lot 1
Sub Total
fixed in position complete with all supports, hangers and other necessary
fixing and jointing materials as specified
Page 7
BILL NO 3
PROJECT : COCA-COLA BULAN BARU, SURABAYA
SERVICES : PLUMBING
Fittings lot 1
Sub Total
3.4.1.3 Amenity
Page 8
BILL NO 3
PROJECT : COCA-COLA BULAN BARU, SURABAYA
SERVICES : PLUMBING
Diameter 100 mm m 42
Diameter 80 mm m 18
Diameter 65 mm m 12
Diameter 50 mm m 4
Diameter 40 mm m 10
Fittings lot 1
fixed in position complete with all supports, hangers and other necessary
fixing and jointing materials as specified
3.4.3.2 Amenity
Diameter 65 mm m 30
Diameter 50 mm m 72
Diameter 40 mm m 15
Diameter 32 mm m 142
Fittings lot 1
Page 9
BILL NO 3
PROJECT : COCA-COLA BULAN BARU, SURABAYA
SERVICES : PLUMBING
3.4.4 ANCILLARIES
fixed in position complete with all other necessary fixing and CIVIL WORKS
as specified
3.4.4.1 Control Box no 12
3.4.4.2 Industrial Floor Drain diameter 100 mm no 5
Sub Total
Cable Power NYFGbY 3Cx6 mm2, from Panel Guard House (PP-Guard
House) to Sewage Pit Pump (PP-01) Local Control Panel (LCP-PP-01)
3.5.8 m 70
Cable Power NYFGbY 3Cx6 mm2 + NYA 6 mm2, from Panel Pump Room
(PP-Pump Room) to Sewage Pit Pump (PP-02) Local Control Panel (LCP-PP-
02)
Page 10
BILL NO 3
PROJECT : COCA-COLA BULAN BARU, SURABAYA
SERVICES : PLUMBING
Sub Total
Sub Total
TOTAL BILL No. 3 PLUMBING SERVICES
Page 11
UNIT RATE TOTAL
(Rupiah) (Rupiah)
Rp 168,000,000 Rp 168,000,000
Rp 45,000,000 Rp 45,000,000
Rp 56,000,000 Rp 56,000,000
Rp 159,200,000 Rp 159,200,000
Page 12
UNIT RATE TOTAL
(Rupiah) (Rupiah)
Rp 32,000,000 Rp 32,000,000
Rp 87,000,000 Rp 87,000,000
Rp 103,000,000 Rp 103,000,000
Rp 7,850,000 Rp 15,700,000
Page 13
UNIT RATE TOTAL
(Rupiah) (Rupiah)
Rp 7,850,000 Rp 15,700,000
Rp 8,500,000 Rp 17,000,000
Rp 9,000,000 Rp 18,000,000
Rp 37,500,000 Rp 75,000,000
Page 14
UNIT RATE TOTAL
(Rupiah) (Rupiah)
Rp 13,000,000 Rp 208,000,000
Rp 33,800,000 Rp 135,200,000
Rp 9,200,000 Rp 9,200,000
Rp 15,000,000 Rp 45,000,000
Rp 1,189,000,000
Page 15
UNIT RATE TOTAL
(Rupiah) (Rupiah)
Rp 275,000 Rp 3,300,000
Rp 176,667 Rp 6,360,000
Rp 1,450,000 Rp 1,450,000
Rp 276,000 Rp 151,800,000
Rp 227,143 Rp 3,180,000
Rp 125,314 Rp 17,544,000
Rp 96,918 Rp 14,150,000
Rp 75,094 Rp 24,030,000
Rp 54,167 Rp 55,250,000
Rp 49,525 Rp 1,981,000
Rp 36,953 Rp 2,365,000
Rp 24,500 Rp 980,000
Rp 40,700,000 Rp 40,700,000
Rp 26,438 Rp 423,000
Rp 6,919 Rp 691,900
Rp 168,000 Rp 168,000
Rp 70,750 Rp 566,000
Rp 39,091 Rp 860,000
Rp 23,333 Rp 700,000
Rp 320,000 Rp 320,000
Rp 40,313 Rp 645,000
Rp 97,000 Rp 97,000
Rp 40,313 Rp 1,290,000
Rp 194,000 Rp 194,000
Page 16
UNIT RATE TOTAL
(Rupiah) (Rupiah)
Rp 81,250 Rp 650,000
Rp 53,063 Rp 849,000
Rp 37,625 Rp 1,505,000
Rp 28,200 Rp 423,000
Rp 23,333 Rp 2,660,000
Rp 914,000 Rp 914,000
Rp 41,346 Rp 1,075,000
Rp 162,000 Rp 162,000
Rp 40,313 Rp 1,290,000
Rp 194,000 Rp 194,000
Rp 40,313 Rp 645,000
Rp 97,000 Rp 97,000
Rp 40,313 Rp 645,000
Rp 97,000 Rp 97,000
Rp 113,200 Rp 2,264,000
Rp 111,250 Rp 445,000
Rp 72,222 Rp 650,000
Rp 51,455 Rp 1,132,000
Rp 37,069 Rp 5,375,000
Rp 30,214 Rp 423,000
Rp 23,333 Rp 4,340,000
Rp 2,195,000 Rp 2,195,000
Rp 79,464 Rp 4,450,000
Rp 668,000 Rp 668,000
Page 17
UNIT RATE TOTAL
(Rupiah) (Rupiah)
Rp 8,490,000 Rp 84,900,000
Rp 4,485,000 Rp 67,275,000
Rp 2,340,000 Rp 21,060,000
Rp 2,015,000 Rp 8,060,000
Rp 630,000 Rp 1,890,000
Rp 286,000 Rp 572,000
Rp 224,000 Rp 1,120,000
Rp 221,000 Rp 3,978,000
Rp 7,475,000 Rp 22,425,000
Rp 3,640,000 Rp 3,640,000
Rp 3,400,000 Rp 10,200,000
Rp 1,000,000 Rp 6,000,000
Rp 400,000 Rp 2,400,000
Rp 350,000 Rp 350,000
Rp 700,000 Rp 700,000
Rp 550,000 Rp 1,650,000
Rp 100,000 Rp 2,000,000
Rp 323,513,000
Rp 90,692 Rp 4,716,000
Rp 98,118 Rp 3,336,000
Rp 1,200,000 Rp 1,200,000
Rp 95,273 Rp 2,096,000
Rp 337,500 Rp 1,350,000
Rp 166,667 Rp 15,000,000
Rp 975,000 Rp 975,000
Rp 41,867 Rp 628,000
Page 18
UNIT RATE TOTAL
(Rupiah) (Rupiah)
Rp 105,000 Rp 105,000
Rp 225,000 Rp 2,700,000
Rp 166,667 Rp 12,500,000
Rp 580,000 Rp 580,000
Rp 234,000 Rp 936,000
Rp 140,000 Rp 840,000
Rp 351,000 Rp 3,510,000
Rp 135,000 Rp 270,000
Rp 175,500 Rp 351,000
Rp 200,000 Rp 800,000
Rp 51,893,000
Rp 98,440,000
Rp 2,376,000
Rp 3,479,000
Rp 3,500,000
Rp 115,000 Rp 920,000
Rp 99,000 Rp 594,000
Rp 48,750 Rp 195,000
Rp 50,417 Rp 302,500
Rp 26,625 Rp 213,000
Rp 335,000 Rp 335,000
Page 19
UNIT RATE TOTAL
(Rupiah) (Rupiah)
Rp 120,476 Rp 5,060,000
Rp 82,500 Rp 1,485,000
Rp 48,750 Rp 585,000
Rp 37,813 Rp 151,250
Rp 31,950 Rp 319,500
Rp 1,140,000 Rp 1,140,000
Rp 122,667 Rp 3,680,000
Rp 74,250 Rp 297,000
Rp 48,750 Rp 585,000
Rp 42,014 Rp 756,250
Rp 30,429 Rp 639,000
Rp 894,000 Rp 894,000
Rp 161,361 Rp 149,420,000
Rp 22,420,000 Rp 22,420,000
Rp 19,556 Rp 352,000
Rp 14,000 Rp 56,000
Rp 11,750 Rp 282,000
Rp 104,000 Rp 104,000
Rp 30,533 Rp 916,000
Rp 17,597 Rp 1,267,000
Rp 14,933 Rp 224,000
Rp 11,915 Rp 1,692,000
Rp 465,000 Rp 465,000
Page 20
UNIT RATE TOTAL
(Rupiah) (Rupiah)
Rp 74,250 Rp 1,188,000
Rp 48,750 Rp 390,000
Rp 37,821 Rp 2,950,000
Rp 26,625 Rp 639,000
Rp 11,990 Rp 1,175,000
Rp 952,000 Rp 952,000
Rp 750,000 Rp 9,000,000
Rp 1,500,000 Rp 7,500,000
Rp 326,938,500
Page 21
UNIT RATE TOTAL
(Rupiah) (Rupiah)
Rp 30,000,000 Rp 30,000,000
Rp 30,000,000
Rp 1,921,344,500
Page 22
PUMPs
3.2.2 VALVES
and other(PN-10) & ANCILLARIES
necessary fixing and jointing materials as
specified
3.2.2.1 Gate valve diameter 150 mm no 10
3.2.2.2 Gate valve diameter 100 mm no 15
3.2.2.3 Gate valve diameter 50 mm no 9
3.2.2.4 Gate valve diameter 40 mm no 4
3.2.2.5 Gate valve diameter 32 mm no 3
3.2.2.6 Gate valve diameter 25 mm no 2
3.2.2.7 Gate valve diameter 20 mm no 5
3.2.2.8 Gate valve diameter 15 mm no 18
3.2.2.9 Check valve diameter 100 mm no 3
3.2.2.10 Strainer diameter 150 mm no 1
3.2.2.11 Strainer diameter 100 mm no 3
3.2.2.12 Flexibel diameter 100 mm no 6
3.2.2.13 Floater valve diameter 150 mm no 6
3.2.2.14 Foot valve diameter 100 mm no 1
3.2.2.15 Water Meter diameter 150 mm no 1
3.2.2.16 Water Meter diameter 100 mm no 3
3.2.2.17 Garden Faucet diameter 15 mm no 20
3.4.3.2 Amenity
Diameter 65 mm m 30 38 10
Diameter 50 mm m 72
Diameter 40 mm m 15
Diameter 32 mm m 142
Fittings lot 1
3.4.3.3 Warehouse Office Pre - Form Warehouse w/ Toilet
Diameter 80 mm m 16 16 4
Diameter 65 mm m 8
Diameter 50 mm m 78
Diameter 40 mm m 24
Diameter 32 mm m 98
Fittings lot 1
BILL NO 3
PROJECT :
SERVICES :
3 PEKERJAAN PLUMBING
3.2.1.10 Laboratory
Diameter 25 mm m 16 Rp 57,563 Rp 921,000
Fittings lot 1 Rp 139,000 Rp 139,000
3.2.1.11 Maintenance
Diameter 25 mm m 16 Rp 57,563 Rp 921,000
Fittings lot 1 Rp 139,000 Rp 139,000
3.2.1.12 Amenity
Diameter 65 mm m 20 Rp 161,750 Rp 3,235,000
Diameter 50 mm m 4 Rp 159,000 Rp 636,000
Diameter 40 mm m 9 Rp 103,111 Rp 928,000
Diameter 32 mm m 22 Rp 73,500 Rp 1,617,000
Diameter 25 mm m 145 Rp 52,952 Rp 7,678,000
Diameter 20 mm m 14 Rp 43,143 Rp 604,000
Diameter 15 mm m 186 Rp 33,333 Rp 6,200,000
Fittings lot 1 Rp 3,136,000 Rp 3,136,000
3.2.1.13 Utility
Diameter 50 mm m 56 Rp 113,518 Rp 6,357,000
Fittings lot 1 Rp 954,000 Rp 954,000
3.4.1.3 Amenity
Diameter 100 mm m 42 Rp 172,143 Rp 7,230,000
Diameter 80 mm m 18 Rp 117,889 Rp 2,122,000
Diameter 65 mm m 12 Rp 69,583 Rp 835,000
Diameter 50 mm m 4 Rp 54,000 Rp 216,000
Diameter 40 mm m 10 Rp 45,800 Rp 458,000
Fittings lot 1 Rp 1,630,000 Rp 1,630,000
3.4.3.2 Amenity
Diameter 65 mm m 30 Rp 43,667 Rp 1,310,000
Diameter 50 mm m 72 Rp 25,139 Rp 1,810,000
Diameter 40 mm m 15 Rp 21,333 Rp 320,000
Diameter 32 mm m 142 Rp 17,042 Rp 2,420,000
Fittings lot 1 Rp 670,000 Rp 670,000
3.4.4 ANCILLARIES
fixed in position complete with all other necessary fixing and CIVIL WORKS as
specified
3.4.4.1 Control Box no 12 Rp 1,075,000 Rp 12,900,000
3.4.4.2 Industrial Floor Drain diameter 100 mm no 5 Rp 2,150,000 Rp 10,750,000
Sub Total