End User Training Manual

for

SAP HCM – Human Capital Management

Process Name: Training & Event Management


(T-code: PSV2 – to book a BE)

Process No: TRF/R2R/6.3

Control Copy No: TRF/R2R/6.3/

() * (
Doc Version Description Prepared by Date Reviewed by Approved by
00 Original Palani Dorai 24.12.2009 Amita Batra &
Ankita Paul
Project: MISSION SURE

Introduction

Recruitment to Retirement process in TRF has the following business processes.

# # + #
! " # $ %& &'
$ %& &'
( $ %& & '('
) * + ,- $ %& & '('
- * + ,- $ %& & '('
. * + ( ,- $ %& & '('
/ * + ) ,- $ %& & '('
0 * + - ,- $ %& & '('
1 , 2 3 4 '5 # $ %& & ')
6 7 $ %& &)'
, $ %& &)'
$ 4,, , $ %& &.'(
( $ 4,, , $ %& &.'(
) $ %& &/'6
- $ %& &0'
. $ %& &0'

For each of the above processes, separate End User Training Manuals are available

This document covers sl. No. 12 & 13 of the above list that is Training & Event
Management processes.

This End User Training manual on Training & Event Management process consists of the
Following sequence of sub-processes
1. To book a Business Event - Transaction Code PSV2

TRF/R2R/6.3 % &&$ $ '#&&

Page 2 of 12
Project: MISSION SURE

1. To book a Business Event - Transaction Code PSV2

Procedural Steps

Purpose
To book a Business Event

Menu Path
SAP Easy Access -> SAP menu Human Resources Training and Event
Management > Business Events > PSV2 – Business Event Menu

Transaction Code
PSV2

Procedure
Enter the Transaction code PSV2 in the command field (refer the following
screen)

Or go as per the navigation shown below and click PSV2 – Business Event menu

TRF/R2R/6.3 % &&$ $ '#&&

Page 3 of 12
Project: MISSION SURE

Press <Enter> or key, the following screen will appear

The following screen appears

TRF/R2R/6.3 % &&$ $ '#&&

Page 4 of 12
Project: MISSION SURE

Let us expand the sub-tree for the first node “Technical training for Officers”, the screen will
look as shown below. (Click on the triangular icon)

Click once

Select (click once on this node) the PLC and click once on the Business event on the top
menu bar (refer screen above), the following pull down menu appears

And

Navigate up to the option with Resources (refer screen below)

TRF/R2R/6.3 % &&$ $ '#&&

Page 5 of 12
Project: MISSION SURE

When we Click on the “with resources” option the following screen appears

TRF/R2R/6.3 % &&$ $ '#&&

Page 6 of 12
Project: MISSION SURE

In the above screen

a) Change the start and end dates of the Planning period field

b) From the Drop Down list, select and populate the value in the Location field

c) Click on the Resource Selection push button, the following pop up window
appears.

TRF/R2R/6.3 % &&$ $ '#&&

Page 7 of 12
Project: MISSION SURE

Click on the details button, the following pop up screen appears

The above screen shows that no resource is assigned.

Click on the check mark button to close the above pop up window, the screen will return back
to the earlier Resource Selection Overview pop up window

And

Click again on the check mark button to close the pop up window, the following screen
appears

TRF/R2R/6.3 % &&$ $ '#&&

Page 8 of 12
Project: MISSION SURE

Using the drop down list, select the required value for the Company .

The screen will look as below

TRF/R2R/6.3 % &&$ $ '#&&

Page 9 of 12
Project: MISSION SURE

Click on the save button, the system will return back to the following screen

TRF/R2R/6.3 % &&$ $ '#&&

Page 10 of 12
Project: MISSION SURE

With the following message at the status line

If we expand the PLC node, by clicking the right side arroe button, the following screen shows the
details of what we have created above

Details of what we
have created above

Return back to SAP Easy Access Screen or Home Screen, by clicking

the left arrow button.

End of document on T-code PSV2