CE221- CE TECHNOLOGY 3/MASONRY NC II

“ INSTALLATION OF COLUMN REBARS ”

CASTULO, GLENN LOURENCE C. MARCH 16, 2018

SATURDAY (10:00AM-4:00PM) ENG’R: BENJAMIN RAMOS


MATERIALS:

Swivel Clamps

Steel wires

Frame bars

H-frames

Diagonal bracings

Baseplates

Wire Cutters

Pliers

Twister

Steel rods

PROCEDURE IN THE INSTALLATION OF COLUMN REBARS

STEP BY STEP PROCEDURE:

1. Cut the steel rods, these will be the supports shaped in small squares
2. Fold them into squares, the folding part is very important to get exact
measurements
3. Get 4 more long steel rods and bend one side into a 90 degree, length
depending on the frame
4. Line up the 4 long rods and put the squares around them
5. Position the squares apart and ready the long bas by making them point out
wards
6. Tie all the bars together
7. Next you will need 8 more bars. For the frame, you need half of them slightly
longer
8. Bend the frame bars on both ends about 135 degrees
9. Set up a mesh like pattern with the frame bars, the longer ones being on the
bottom and the shorter ones on top, and tie all the bars together
10. Set up all the H-frames, diagonal bracing, baseplates, pipes, swivel clamps
around the area
11. Place the post structure guide on top of the frame and tie them together
12. Place whole structure in the hole and make sure it is level

PHOTO SET-UP
ANALYSIS:

The use of the scaffolding and the setting up of column and footing in this
activity for the benefit of installing formwork and plumbing has been achieved with
minor areas to improve. The installation process just needs to be improved in order to
reach a faster time of completion for the use of such to reach practicality.

The work which should have been finished in 1 or 2 weeks has reached more
time than anticipated. The resolving of such will bring practical use.

CONCLUSION:

To conclude, the activity workshop was educational in the field of masonry,


wherein we achieved one of the most fundamental requirements of the discipline.
The achievement of completing the activity will be helpful in future tasks related
to Civil Engineering.