Safety Meeting Minutes Date: 12th August 2011
Page 1 of 2

Name of the Job Site: M/s. Tata Metaliks Limited, Kharagpur Sheet : 1 of 2 Ref:

Business unit: O&M Job No: Meeting No.04


Date of meeting: 28.6.2018
Purpose of Meeting: Site Safety Meeting Location of Meeting: CPP#3 Control Room
MEMBERS PRESENT INVITIEES MEMBERS ABSENT
1. Manas Rakshit
2. Indrajit Kumar Dey
3. Sanjeev Kumar
4. Sudhir Walke
5. Janaradan Singh
6. Alok Kumar Roy
7. Prasenjit Mandal
8. Amitava jana
9. Samir samanta
10.Arinban bag
11. Apu bera
12.Tarun kumar Nayak
13.Pranab ghosal
14.Subhasis Shaha
15.Kamal Palmal
16.Narayan Bera
REPORT SENT TO
No. of Name / Dept. No. of Name / Dept. No. of Name / Dept.
Copies Copies Copies

Prepared By: Sanjeev kumar Location: Control room Date:28/06/2018

Site Office:

Prepared by: Approved by: Issued On Page


th
Core Team Management Appointee 12 August 2011 1 of 2
Occupational Health & Safety Management System Doc No.: OHS/D27
Format No: OHS/FT27
Safety Meeting Minutes Date: 12th August 2011
Page 2 of 2

Name of the Job Site: Tata Metaliks LTD. Sheet 2 of 2

Business unit: CPP#3 Job No.: Meeting No:04

Item Description of Discussion Action By Target Remarks


No.
1 Oils and grease to be removed and placed in a store Shift in charge 29/06/2018 Complete
room.
2 Two number of RCCB required in electrical portable Station Manager 30/06/2018
board.
3 LOTO register to be maintained at site. Safety officer 30/06/2018
4 Required proper illumination in ETP area. Electrical 30/06/2018
engineer
5 Single phase welding machine required. Electrical 30/06/2018 Complete
engineer
6 Required proper approach to work on ID suction Maintenance 30/06/2018
damper Boiler #2. Engineer
7 Cooling tower cooling tower backside drain is not in Civil work 30/06/2018
same level everywhere. required
8 Industrial socket required in store room (single Electrical 30/06/2018 Complete
phase socket). engineer
9 Required platform to work on the catch Pit. Maintenance 30/06/2018
Engineer

Next meeting is scheduled on: 24.7.2018