5.2 Process of Manufacture
The flow chart of the process is as follows:
â
Filling, Sealing & Capping M/C
258
6.0 POLLUTION CONTROL
There is no major pollution problem associated with this industry except for disposal of waste water
which should be managed appropriately. The entrepreneurs are advised to take “No Objection
Certificate” from the State Pollution Control Board.
7.0 ENERGY CONSERVATION
Suitable measures shall be taken to conserve electricity.
8.0 PRODUCTION CAPACITY
Quantity : 45 lakh litre/annum (15,000 L/day)
Installed capacity : 20,000 L/day
Optimum capacity utilization : 70%
Working days : 300/annum (3 shifts)
Manpower : 18
Utilities
Motive Power : 40 kW
Water : 25 kL/day
259
Consultancy fee, project report, deposits with : 3.00
electricity department etc.
260
Repairs and maintenance@10% 3.20
Consumables & spares 1.20
Transport & Travel 0.40
Publicity 0.05
Postage & stationery 0.08
Telephone 0.13
Insurance 0.44
————
Total: 5.50
261
10.3 Net Profit per year
= Sales – Cost of production
= 270 – 243
= Rs. 27 lakh
= 27X 100
270
= 10%
= 27X 100
117.13
= 23%
= 26.50 X 100
26.50 +27
= 49.5%
262