Você está na página 1de 9

S. No.

4.
3.
2.
1.

71
71
02
69
UC No.
DG Khan / DG Khan DG Khan / DG Khan DG Khan / DG Khan DG Khan / DG Khan Division/District

Darkhast

District DG Khan
District DG Khan
District DG Khan

Jamal

Baber (Jalbani No. 71)


Baber (Jalbani No. 71)
Chutta District DG Khan
Name of the Scheme

and Drain at Verious Basti of

Basti Haji Mohammad Sharif


and Drain at Chachey Wala,
Basti Haji Mohammad Sharif
Basti Gul Muhammad Isran,
and Drain at Chachey Wala,

Dehmraya, Basti Channer,


Yaqiani Mouza Jalbani, Nari
Dehmraya, Basti Channer,
Yaqiani Mouza Jalbani, Nari
Gharbi No. 02 UC DG Khan
Colony and Akbar Colony,
Bodla Basti Malana, Baloch
House Talib Faqeer to Iqbal
and Drain at Basti Malana,

Basti Bhambhani, Basti


Construction of PCC soling
Basti Bhambhani, Basti
Construction of PCC soling
Janubi No. 81, Tehsil Kot
Khan Janubi No. 01, Mouza
Khan
Mouza Darkhast Jamal
No-69) Tehsil Kot Chutta
Basti Sanjrani, Basti Hafiz
Street Middle School to
Construction of PCC Soling

Basti Qasai (Basti Malana


Abad, Basti Cheena and

Basti Gul Muhammad Isran,


Construction of PCC, Soling
25,00,000 25,00,000 25,00,000 25,00,000 COST (Rs.)
REVISED COST
LETTER No. Administrative Approval
DDD/AA/576-89 DDD/AA/576-89 DDD/AA/576-89 DDD/AA/576-89

30-11-2017 30-11-2017 30-11-2017 30-11-2017 DATED.

25,00,000 25,00,000 25,00,000 2500000 COST (Rs.)

REVISED COST
Technical Sanction
LETTER No.
DATED.
Daily Express (Multan Edition) Daily Express (Multan Edition) Daily Express (Multan Edition) Daily Express (Multan Edition) NEWSPAPER

PUBLISH DATE
09-12-2017 09-12-2017 09-12-2017 09-12-2017

23-12-2017 23-12-2017 23-12-2017 23-12-2017


ISSUANCE DATE
Tender Notice

23-12-2017 23-12-2017 23-12-2017 23-12-2017 BID OPENING DATE

Nos. Bid Participants

03
02
02
02
Qureshi Brothers Rana Ayyaz Ahmed Z Aziz and Co. Rao Engineering Services
Selected Contractor.
25,00,000 25,00,000 25,00,000 2500000 COST (Rs.)
321/LG 388/LG 411/LG 389/LG LETTER No. Letter of Acceptance Cost

30-12-2017 30-12-2017 30-12-2017 30-12-2017 DATED.

11,04,400 23,34,878 23,25,268 2290336 Cost (Rs.) Work done as per paid bills

58 % 100 % 100 % 100 %


Cost (Rs.) Physical Progress

44 % 93 % 93 % 91 % Financial Progress

HANDING OVER CERTIFICATE

COMPLETION CERTI FI CATE

30-12-2017 30-12-2017 30-12-2017 30-12-2017 Planned Start

29-02-2018 29-02-2018 29-02-2018 29-02-2018 Planned Finish

Days Planned Duration


60 60 60 60
Sft

375 Cft
685 Cft

=13721 Cft
=14370 Cft
=12346 Cft

PS Drain = 650 Rft

PCC 1:2:4 = 4870 CFT


DISTRICT COUNCIL

Pacca brick on edge =1900

Pacca brick work in F/P 1:5 =


Pacca brick work in F/P 1:5 =

Pacca brick on edge =435 Sft


P/L dry brick pavement/soling
P/L dry brick pavement/soling
P/L dry brick pavement/soling
Planned Scope of Work

In Progress Yes Yes Yes Work done as per Planned Scope of Work
No
No
No
Work
Deviation from
Planned Scope of

In Progress Yes Yes Yes Work done as per Paid Vouchers


LOCAL GOVERNEMNT DEVELOPMENT PACKAGE

Bills
Deviation from paid

Current Status
Overall Quality of Works

Remedial Measure for improvement


Remarks / Observations
Syed Baqir Hussain Shah
Not Provided by Authority
Construction of Soling, Tuff
DG Khan / MZG
Tile, Drain, Culverts,

09/Do (I&S)
27-12-2017

28-12-2017

03-01-2018

03-01-2018

04-03-2018

In Progress

In Progress
25,00,000

25,00,000

16,98,142
2500000
Boundary Wall of Graveyard P/L dry brick pavement/soling

80 %

69%
5. 09 / Janazahgah, Waiting Shed, 01 60 in proper camber and sand
Sullage Carrier, RCC Slab of cushion = 10220 Cft
UC Shaikh Umer.
Muzaffargarh

Rough Rough Enterprises


Not Provided by Authority
DG Khan / MZG

111/Do(I&S)
27-12-2017

28-12-2017

03-01-2018

03-01-2018

04-03-2018
Construction of Soling, Drain P/L dry brick pavement/soling
25,00,000

25,00,000

25,00,000

21,16,657
Brick Pavement Constructed only 9352 Cft.

84 %
95 %
UC Banday Shah Tehsil in proper camber and sand

Yes

Yes
6. 111 60 Major Variation
Alipur. cushion = 10550 Cft
Muzaffargarh

Rough Rough Enterprises


Not Provided by Authority
DG Khan / MZG

27-12-2017

28-12-2017

03-01-2018

03-01-2018

04-03-2018

In Progress

In Progress
99/Do(I&S)
Construction of Soling,
25,00,000

25,00,000

25,00,000

9,10,600

36 %
48 %
Drain, Sullage Carrier UC Brick Pavement/soling =
7. 99 60
Gabber Arain Tehsil AliPur 10745 Cft
Muzaffargarh
Not Provided by Authority

Muhammad Azhar Hinjra


Construction of Soling / Tuff
DG Khan / MZG

Tile, Drain, Culverts,


27-12-2017

28-12-2017

03-01-2018

03-01-2018

04-03-2018
21,96,957
25,00,000

25,00,000

25,00,000

2/Do(I&S)
Boundary Wall of Graveyard P/L dry brick pavement/soling Bricks Pavement Constructed only 9110 Cft.

87 %
98 %

Yes

Yes
8. 02 / Janazahgah, Waiting Shed, 60 in proper camber and sand Major Variation
Sullage Carrier, RCC Slab of cushion = 9782 Cft
UC Hingrai Tehsil Kot Addo.
Muzaffargarh.
Not Provided by Authority

P/L dry brick pavement/soling


Construction of Soling / Tuff
Expert Engineering

in proper camber and sand


DG Khan / MZG

Tile, Drain, Culverts, cushion = 9928 CFT


27-12-2017

28-12-2017

03-01-2018

03-01-2018

04-03-2018
15/Do(I&S)
25,00,000

25,00,000

21,99,688
2462500

Boundary Wall of Graveyard Brick Pavement Constructed only 9371 Cft.


Fabrication of mild steel =150

89 %
91 %

Yes

Yes
9. 15 / Janazahgah, Waiting Shed, 60 Major Variation
Kg
Sullage Carrier, RCC Slab of
Cement Plaster 1:4, 0.5” thick
UC Thatha Gurmani.
= 146 SFT
Muzaffargarh
RCC Slab 1:2:4 = 49 CFT
Syed Baqir Hussain Shah
Not Provided by Authority

Construction of Soling / Tuff


DG Khan / MZG

Tile, Drain, Culverts, Not


27-12-2017

28-12-2017

03-01-2018

03-01-2018

04-03-2018
03/Do(I&S)

Prov
25,00,000

25,00,000

24,85,000

22,00,596

Boundary Wall of Graveyard


88 %
98 %

ided

Yes

Yes
10. 03 / Janazahgah, Waiting Shed, 60 Brick pavement/ = 12775 Cft Minor variation
by
Sullage Carrier, RCC Slab of
Auth
UC Tibba, Tehsil Kot Addo.
ority
Muzaffargarh

Brick pavement/soling = 9811


Not Provided by Authority

Iqbal Khan Associate

Construction of Soling / Tuff Cft


DG Khan / MZG

Tile, Drain, Culverts, Not Fabrication of mild steel =150


Engineering
27-12-2017

28-12-2017

03-01-2018

03-01-2018

04-03-2018
25/Do(I&S)

Prov
25,00,000

25,00,000

25,00,000

22,95,854

Boundary Wall of Graveyard Kg


100 %

91 %

ided

Yes

Yes
11. 25 / Janazahgah, Waiting Shed, 60 Cement Plaster 1:4, 0.5” thick Minor variation Minor variation in Brick Pavements.
by
Sullage Carrier, RCC Slab of = 146 SFT
Auth
UC Sadiq Abad. RCC Slab 1:2:4 = 49 CFT
ority
Muzaffargarh Pacca Brick work in F/P = 154
CFT
Rajpoot Developers
DG Khan / MZG

Not Provided by

27-12-2017

28-12-2017

03-01-2018

03-01-2018

04-03-2018
45/Do(I&S)
25,00,000

25,00,000

25,00,000

23,23,837
Authority

Construction of Soling,
100 %

92 %

Brick pavement = 10769 Cft


Yes

Yes
12. 45 Drain, UC Hassan pur 60 No
Trund, Tehsil Muzaffargarh.
19.
18.
17.
16.
15.
14.
13.

09
25
05
35
47
90
109
DG Khan / Layyah DG Khan / Layyah DG Khan / Layyah DG Khan / Layyah DG Khan / MZG DG Khan / MZG DG Khan / MZG

Pur

Layyah
Layyah
Layyah
Layyah

Wasawa.

Construction

No. 306/TDA.
Muzaffargarh.
Muzaffargarh.
Muzaffargarh.

etc. in UC Mirhan.
UC Ghalwani Tehsil Alipur,

Construction of a Cluster of
Construction of a Cluster of
Construction of a Cluster of

Soling, PCC Slab, Culverts


UC Jhalareen, Tehsil Jatoi,

waiting Shed, Soling & Drain


Rehabilitation of Streets and
&
Soling etc. in UC Sonhara
Soling etc. in UC 35 Fateh
UC Garay Wahin Tehsil
Construction of Soling, Drain
Construction of Soling, Drain
Construction of Soling, Drain

etc. in Union Council Chak


Drains Including Soling, Re-
Rural.
25,00,000 25,00,000 25,00,000 25,00,000 25,00,000 25,00,000 2500000

Not Provided by
AA/DD(Dev)/LY/DDC/640 AA/DD(Dev)/LY/DDC/759 AA/DD(Dev)/LY/DDC/640 AA/DD(DEV)/LY/DDC/640 Not Provided by Authority Not Provided by Authority
Authority

29-11-2017 12-01-2018 29-11-2017 29-11-2017

25,00,000 25,00,000 25,00,000 25,00,000 25,00,000 25,00,000 2500000

XEN/LG&CD/DGK/1980 XEN/LG&CD/DGK/2001 XEN/LG&CD/DGK/1978 XEN/LG&CD/DGK/2153


02-12-2017 02-12-2017 02-12-2017 02-12-2017

Daily Pakistan (Multan Edition) Daily Express (Multan Edition) Daily Pakistan (Multan Edition) Daily Pakistan (Multan Edition)

09-12-2017 20-01-2018 09-12-2017 06-01-2018

21-12-2017 06-02-2018 22-01-2018 20-01-2018 27-12-2017 27-12-2017 27-12-2017

23-12-2017 07-02-2018 23-01-2018 22-01-2018 28-12-2017 28-12-2017 28-12-2017

02
02
02
02
01
by
by

Not
Not

ided
ided

ority
ority

Auth
Auth

Prov
Prov

Muhammad Ashraf
Sher Gul Khan Sher Gul Khan Khuda Bakhsh Zaffar Contractor & Builders Rough Rough Enterprises Rough Rough Enterprises
Chohan
20,83,627 23,10,624 19,92,326 23,14,746 24,95,000 25,00,000 25,00,000

AE/LG&CD/LY/266 AE/LG&CD/LY/331 AE/LG&CD/LY/264 AE/LG&CD/LY/307 47/Do(I&S) 90/Do(I&S) 109/Do(I&S)

09-01-2018 09-02-2018 09-01-2018 25-01-2018 03-01-2018 03-01-2018 03-01-2018

20,78,762 8,28,626 17,37,807 11,54,790 23,35,923 23,33,318 23,32,940

100 % 48 % 99 % 62 % 100 % 100 % 100 %

99 % 35 % 87 % 49 % 93 % 93 % 93 %

09-01-2018 09-02-2018 09-01-2018 25-01-2018 03-01-2018 03-01-2018 03-01-2018

15-02-2018 28-02-2018 15-02-2018 25-02-2018 04-03-2018 04-03-2018 04-03-2018

38
20
38
30
60
60
60

Cft
Cft

=11676Kg
= 4983 Cft

= 811 CFT
= 11907 Cft
= 12325 Cft

= 1266 CFT
building = 817 Cft
PS Drain = 511 Rft

Chak No. 464/TDA


Chak No. 434/TDA
Chak No. 471/TDA
PCC 1:2:4 = 77 Cft

building = 725 CFT

building = 1452 CFT


Mild steel fabrication

RCC 1:2:4 = 422 CFT


Drain Type-I = 177 Rft

Drain Type-I = 1512 Rft

Pacca brick in other than


Pacca brick in other than

Pacca brick in other than


2ft Span Culvert = 13 Nos.
Brick pavement = 10459 Cft

Pacca brick work = 2457 Cft

P/L dry brick pavement/soling


P/L dry brick pavement/soling
P/L dry brick pavement/soling
P/L dry brick pavement/soling
P/L dry brick pavement/soling
Brick pavement/soling = 9863
Brick pavement/soling = 1203

Mild steel fabrication =1749Kg

Yes In Progress Yes In Progress Yes Yes Yes

No
No
No
No
No

Yes In Progress Yes In Progress Yes Yes Yes


Construction of Soling and
Other Allied work Pukhta

DD(Dev)/2017-18/RP/672
Road to Basti Daim Mohana,

Muhammad Amin Khan


DG Khan / Rajanpur

Kacha Paro Shah, Pukhta


Road to Basti Shah Meer

29-11-2017

08-12-2017

24-12-2017

26-12-2017

02-01-2018

02-01-2018

01-03-2018
Jang News
25,00,000

25,00,000

23,36,393

22,47,717
Machi Kacha, Pukhta Road P/L dry brick pavement/soling

100 %

96 %

Yes

Yes
78
20. 65 Khuda Bakhsh Bangliani 02 60 = 13256 CFT No
Kacha Paro Shah, Pukhta
Road to Basti Hussain
Bakhsh Khan Harwani
Jongo Thari UC Belay Shah
Tehsil Rojhan, District
Rajanpur

Construction of Soling, Drain

Nawa-i-Waqt (Multan Edition)


DD(Dev)/2017-18/RP/671
and Other Allied Work at
DG Khan / Rajanpur

Mansoor Dhol, Fiaz Ahmad,

Ghulam Chandan
Yasin Mastoi, Allah Abad
29-11-2017

10-12-2017

27-12-2017

28-12-2017

05-01-2018

05-01-2018

04-03-2018
25,00,000

25,00,000

25,00,000

19,78,918
City Nai Abad Eid Ghah P/L dry brick pavement/soling

304/DO
Bricks Pavement Constructed only 10999 Cft

79 %
92 %

Yes

Yes
21. 09 Colony Mah 03 60 = 12038 CFT Major Variation
tab Shah, Umer Bara, Basti PS Drain = 483 Rft
Khadim Gazaerrasool Pur
Gadan Wala and Other
Mouzas UC Allahbad
Gharbi, Rajanpur

Daily Express (Multan Edition) Nawa-i-Waqt (Multan Edition) Nawa-i-Waqt (Multan Edition)
Construction of Soling Drain
DD(Dev)/2017-18/RP/671

Malik Muhammad Iqbal


and Allied Works Basti
DG Khan / Rajanpur

Mikan Mouza Jam Pur Rural


29-11-2017

10-12-2017

27-12-2017

28-12-2017

05-01-2018

05-01-2018

04-03-2018
Aria, Basti Khosa Basti Riaz
25,00,000

25,00,000

24,97,500

17,82,355
P/L dry brick pavement/soling

300/DO
Bricks Pavement Constructed only 10234 Cft

71 %
85 %
Ahm ad Khan Khosa Mouza

Yes

Yes
22. 05 03 60 = 13523 CFT Major Variation
Tataar Wala Jam Pur, Basti
Parhar Mouza Pool Wala,
Basti Wado, Mouza Pool
Wala UC Tataar Wala.
Rajanpur
Construction of Soling Drain
DD(Dev)/2017-18/RP/671

and Allied Works B/Wala at


DG Khan / Rajanpur

No Record of Billing
Graveyard Basti Hajo Mud
Khuda Bakhsh
29-11-2017

10-12-2017

27-12-2017

28-12-2017

05-01-2018

05-01-2018

28-02-2018

In Progress
Rana Rahim Bukhsh Diyaat P/L dry brick pavement/soling
25,00,000

25,00,000

25,00,000

7,35,342
315/DO

31.3%
45 %
Mud Peerenditta Ajmal Diyat = 9972 CFT
23. 25 03 52
Mustafa Diyat, Basti Hajo, Pacca brick work other than
Ganman Khan Khalilani building 1:5 = 1395 CFT
Tibbi Solgi, UC 25 Wah
Lashari
Rajanpur
DD(Dev)/2017-18/RP/672

Construction of Soling and


MS Sajjad Engineers
DG Khan / Rajanpur

Drain Other Allied Work


29-11-2017

20-12-2017

25-12-2017

26-12-2017

21-01-2018

21-01-2018

20-03-2018
Basti Kalo Malik, Basti Thara
25,00,000

25,00,000

23,36,393

P/L dry brick pavement/soling


Sunbhlani, Basti Shah Meer
99

24. 68 02 60 = 13328 Cft


Sakhani and Basti Ghulam
Muhammad Subhlani UC
Shah Wali Tehsil Rojhan
Rajanpur. LGDP 2017-18

Construction of Soling, Drain


Zoulaid Construction Company
Nawa-i-Waqt (Multan Edition)

and Other Allied Work at


DD(Dev.)/2017-18/RP/671

Pukhta Road Basti Karachi


DG Khan / Rajanpur

to Bachao Band Basti

In Progress

In Progress
29-11-2017

10-12-2017

27-12-2018

28-12-2018

05-01-2018

05-01-2018

28-02-2018

Rasheed Ahmad, Misbah


23,50,000

15,46,632
25,00,000

25,00,000

336/DO

65 %
78 %

Khalil Masjid Chowk Providing and laying dry brick


25. 49 03 54
Deehgah to Bhagsari pavement/soling = 13018 Cft
Cannal, Qasba Bamka,
Mouza Mad Meeran and
other Mouzas, UC Rakh Kot
Mithan.
Rajanpur
Nawa-i-Waqt (Multan Edition)
DD(Dev.)/2017-18/RP/671
DG Khan / Rajanpur

Construction of Drain, Soling


Urwa Builders

and Other Allied Work


29-11-2017

10-12-2017

27-12-2018

28-12-2018

05-01-2018

05-01-2018

28-02-2018
25,00,000

25,00,000

23,50,000

22,53,196
324/DO(I)

Qasba Sikhani Wala, Basti Providing and laying dry brick


100 %

95 %

Yes

Yes
26. 35 Leshari Zahir Peer, Sikhani 03 54 pavement/soling = 12100 Cft No
Wala Kotla Sher Muhammad Drain Type-I = 343 Rft
UC Sikhani Wala.
Rajanpur
Mr. Muhammad Farooq
DG Khan / Rajanpur

965-70/LG&CD/RP
30-08-2016

31-08-2016

10-09-2016
Construction of Soling Basti

2,93,700

4,73,834
300000

300000
There is some confusion of Billing amount estimate (500000) and agreed

94 %
Abid Hussain Petafi UC

02
27. 13
Muhammad Pur Ward No.2. amount as per work order (293700).
Rajanpur.

LG&CD/TS/XEN/DGK/2050
Construction of PCC, Soling
DG Khan / Tibbi Khark

and Drain in Basties Union

DDD/AA/576-89

Kashif Iftikhar
30-11-2017

02-12-2017

25-12-2017

26-12-2017

30-12-2017

30-12-2017

28-02-2018
Council Tibbi Khark (Basti
25,00,000

25,00,000

24,76,968

20,34,464
P/L Brick Pavement/soling =

349/LG
Abdul Kareem, Basti Tibbi Tender advertisement was done but neither name of newspaper is

82 %
93 %

Yes

Yes
28. 49 02 60 13859 Cft No
Kharak, Basti Elahi Khan) confirmed not tendering date is mentioned.
PS Drain = 340 Rft
Tibbi Kharak No. 49, LGDP
2017-18
Rajanpur.

LG&CD/TS/XEN/DGK/2036

Muhammad Yaqoob Dairvi


Cement concrete brick or
Construction of PCC, Soling,
DG Khan/DG Khan

stone ballast 1.5” to 2” guage


DDD/AA/576-89

Drain at Noor wala, Basti


30-11-2017

02-12-2017

25-12-2017

26-12-2017

30-12-2017

30-12-2017

28-02-2018
=3822 Cft

25,00,000

18,61,715
25,00,000

25,00,000

354/1LG
Sahwani, Manjothay Wala,

74 %
87 %
Pacca brick work in F/P 1:5 =

Yes

Yes
29. 35 Mouza Bahadur Garh, 02 60 Major Variation Major Variation in PCC.
7579 Cft
Mouza Kot Mubarak Shawdi
PCC 1:2:4= 1543 Sft
Bahadur Garh # 35, LGDP’s
2017-18, Dera Ghazi Khan Plaster 0.5” thick 1:4 = 6712
Sft
LG&CD/TS/XEN/DGK/2029
DG Khan/DG Khan

Construction of PCC, Soling P/L dry brick pavement/soling


DDD/AA/576-89

Shahbaz Abbas
30-11-2017

02-12-2017

25-12-2017

26-12-2017

30-12-2017

30-12-2017

28-02-2018
and Drain at streets Qasba in streets or roads = 11952
25,00,000

25,00,000

25,00,000

23,70,196
398/LG

100 %
Cft

94 %
Kala Chah Nawan, Basti

Yes

Yes
30. 28 03 60 No
Qasmani, Chah Mehmooday Pacca brick on edge = 2055
Wala Kala No.28. Cft
DG Khan PS Drain = 815 Rft
LG&CD/T.S/XEN/DGK/1980
AA/DD(Dev)/LY/DDC/640

No Record of Billing
AE/LG&CD/LY/266
Mr. Sher Gul Khan
Layyah / Layyah

Earth Filling = 17013 Cft


Daily Pakistan

Const. of a Cluster of
29-11-2017

02-12-2017

09-12-2017

22-12-2017

23-12-2017

09-01-2018

09-01-2018

10-03-2018

In Progress
25,00,000

25,00,000

20,83,627

7,04,432

Waiting Shed, Soling & Excavation = 1565 Cft

33 %
48 %
31. Drain etc. Chak No. 02 60 RCC Slab 1:2:4 = 919 Cft
471/TDA, 434/TDA, Chak Mild Steel = 3425 Kgs
No. 464/TDA in UC Mirhan Brick Pavement = 3529 Cft
LG&CD/T.S/XEN/DGK/1978
AA/DD(Dev)/LY/DDC/640

No Record of Billing
AE/LG&CD/LY/264
Mr. Khuda Bakhsh
Layyah / Layyah

Daily Pakistan
29-11-2017

02-12-2017

09-12-2017

22-12-2017

23-12-2017

09-01-2018

09-01-2018

10-03-2018
Earth Work = 114827 Cft

In Progress
Const. Soling Dunba Band
25,00,000

25,00,000

19,92,326

17,37,807

87 %

Pacca Brick Work = 131 Cft


97 %

Near Railway Line Mouza


32. 02 60
Souzaof a Chak No. Mild Steel = 109 Kg
464/TDA in UC Mirhan Brick Pavement = 11907 Cft
LG&CD/T.S/XEN/DGK/2001
AA/DD(Dev)/LY/DDC/759

Earth Work = 29162 Cft

No Record of Billing
Const. and Rehabilitation of
Mr. Sher Gul Khan
Layyah / Layyah

AE/LG&CD/LY

Brick Soling = 4983 Cft


Daily Express

Streets and Drains Including


12-01-2018

02-12-2017

20-01-2018

06-02-2018

07-02-2018

09-01-2018

09-01-2018

10-03-2018

In Progress
25,00,000

25,00,000

23,10,624

Soling Re-Soling PCC Slab Drain Type-I = 1512 Rft


33. Culverts etc in UC Chak No. 02 60 Pacca Brick Work = 282 Cft
306/TDA,304/TDA,268/TDA Mild Steel = 109 Kg
,291/TDA,380/TDA, in UC Brick Pavement = 11907 Cft
Mirhan Const. of 2ft Span = 13No.
AA/DD(Dev)/LY/DDC/735

XEN/LG&CD/DGK/2153

Mr. Zaffar Contractor &

No Record of Billing
Const. of a Cluster of Soling
Layyah / Layyah

AE/LG&CD/LY
Daily Pakistan
02-01-2018

03-01-2018

05-01-2018

20-01-2018

22-01-2018

09-01-2018

09-01-2018

10-03-2018

In Progress

etc. Chak 243-A/TDA,


25,00,000

25,00,000

23,49,467
Builders

,231/TDA, 242-A/TDA, 239- Earth Work = 92278 Cft


34. 02 60
B/TDA, M/Road 244/TDA, Brick Soling = 12325 Cft
243/TDA, 231/TDA, in UC
Fateh Pur Rural

MUNICIPAL COMMITTEE
Haji Faiz Bux Proprietior Noman
3-16/1122/DD(Dev)/MZG
DG Khan / Sinawan

13-17/MC Sinawan
Repair / Construction of
P/L dry brick pavement/soling

30-11-2017

23-01-2018

23-01-2018

22-03-2018
Surface Drain P/L Dry Brick

20,00,000

20,00,000

19,97,000

12,80,468
in streets or roads =1578 Cft
Pavement Earth Filling ETC-

77 %

65%

Yes

Yes
Ali

60
35. 7 01 RCC Roof Slab = 162 Cft Major Variation
Ward No.1,2.3,7
PS Drain = 120 Rft
MC Sinawan.
Muzaffargarh

Construction of Drains, PCC


Flooring House of Ilyas
Zargar to House Abdul

Daily Express (Multan Edition)


Ghafar Ward No. 7, Street

CE(HQ)PLGB TS/2017 Lhr

Mian Muhammad Khalique


AA/DD(Dev)/LY/DDC/639
DG Khan / Chowk Azam

Amanullah Taheem Ward


No. 08, House of Manzoor PCC 1:2:4 = 1332 cft

MC/CA/MSF/45
Balouch to House Mushtaq
29-11-2017

30-11-2017

08-12-2017

25-12-2017

26-12-2017

30-12-2017

30-12-2017

28-02-2018
Providing and fixing marble
30,00,000

30,00,000

29,92,500

27,94,313

100 %
Balouch Ward No. 09, Street 1.5” X 0.375” = 6395 Rft

93 %

Yes

Yes
60
36. 7 Master Li aqat Wali Ward 03 No
Pacca Brick work 1:5 = 4299
No. 10, Street Master Sft
Manzoor Wali Ward No.11,
PCC Slab 1:2:4 = 4956 Cft
From Masjid Ali-ul-Murtaza
to House Mazhar Abbas
Wad No 12, Municipal
Committee Chowk Azam.
Layyah.

Ward No. 09
P/L dry brick pavement/soling
DG Khan/ Chowk Sarwar Shaheed

in streets or roads = 2997


3-16/1127/DD (DEV)/MZG

CFT
Construction of Surface Ward No. 10

M/S Javed Iqbal

MC/CSS/400
P/L dry brick pavement/soling
30-11-2017

11-01-2018

12-01-2018

15-01-2018

15-01-2018

16-03-2018
Drain P/L Dry Brick
20,00,000

20,00,000

19,78,000

16,40,692
in streets or roads = 2905CFT

82 %
92 %
Pavement Earth Filling Ward

Yes

Yes
60
37. 11 01 Ward No. 11 Minor variation
No. 9, 10, 11 & 12 MC
Chowk Sarwar Shaheed. P/L dry brick pavement/soling
Muzaffargarh in streets or roads = 2915CFT
Ward No. 12
P/L dry brick pavement/soling
in streets or roads = 2741
CFT
Muhammad Kamran Shah Muhammad Hasnain Raza
DG Khan / Kot Addu

No Record of Billing
Construction of Surface
M.C.K.A 16-18

In Progress
01-01-2018

01-01-2018

01-03-2018
Drain Type-I P/L Dry Brick P/L dry brick pavement/soling
20,00,000

20,00,000

19,90,000

4,86,722

in streets or roads =2327 Cft


24 %
35 %

Pavement Earth Filling ETC

60
38. 25
(LGDP) Halka No. PS Drain Type-I = 321 Rft
(25,30,31,32)
MC Kot Addu
DG Khan / Kot Addu

No Record of Billing
Pacca brick work in F/P 1:5
M.C.K.A 22-24

Construction of Surface
=1153 Cft

In Progress
01-01-2018

01-01-2018

01-03-2018
20,00,000

20,00,000

19,93,000

7,14,489

Drain Type-I P/L Dry Brick


35 %
48 %

60 Pacca brick on edge =3223


39. 5 Pavement Earth Filling ETC
Sft
(LGDP) Halka No. (1,3,4,5)
PS Drain Type-I = 2149 Rft
MC Kot Addu
Brick Pavement = 6874 Cft
DG Khan / Dera Din Pana

No Record Provided by

No Record Provided by

No Record Provided by
Manshaad Hussain

Construction of Surface
01-01-2018

01-01-2018

11-02-2018

Drain Brick Pavement Earth


15,00,000

15,00,000

14,85,300
Authority

Authority

Authority
Filling ETC (LGDP) Halka No Record Provided by
142

40

40. 10
No. (9, 10, 11) MC Daira Authority
Deen Panah.
Muzaffargarh

Construction of Drains,
Daily Express (Multan Edition)

Soling, Re-Soling, PCC


CE(HQ)PLGB TS/2017/LHR
AA/DD(Dev)/LY/DDC/637

Flooring, Baba Nelo, Rana


DG Khan / Fateh Pur

Saeed Ahmad Khan

Mursaleen Wali Ward No. 7, Brick pavement soling edging


29-11-2017

30-11-2017

15-12-2017

29-12-2017

30-12-2017

09-01-2018

09-01-2018

10-03-2018

In Progress

In Progress
Street Ghulam Muhammad
25,00,000

25,00,000

24,97,500

17,25,595

= 5360 CFT
80 %

Wali Ward No.8, 9 Street


69%
143

60

41. 09 03 P/L Dry Brick pavement soling


Girls School Wali, Ward
= 5446 CFT
No.10, Street Chacha Barkat
PCC 1:2:4 = 813 Cft
Wali Eastern Side Girls High
School Ward No.11, MC
Fateh Pur.
Layyah
Daily Jang (Multan Edition)
AA/DD(Dev)/LY/DDC/676
Construction of Boundary

Mr. Rehman Traders

10/M.O(I)/M.C/RJN
DG Khan / Rojhan
Wall Dadan Shah Graveyard

29-11-2017

15-12-2017

27-12-2017

28-12-2017

04-01-2018

04-01-2018

03-04-2018

In Progress

In Progress
Tuff Tile Lakhpall Market to Flooring with tuff tile standard

5,00,000

5,00,000

5,10,000

1,86,195

36 %
50 %
House Sufder Khogani/Tuff size and 7000 PSI crushing

90
42. 02
Tile old Gross Market strength = 3774 Sft
Rojhan City Ward No.10 MC
Rojhan Tehsil Rojhan.
Rajanpur

Syed Mehtab Ahmad Shah


AA/DD(Dev)/LY/DDC/674

Daily Khabrain (Multan


DG Khan / Rajanpur

181/MO(I)/MC/RP
29-11-2017

08-12-2017

26-12-2017

26-12-2017

28-12-2017

28-12-2017

28-02-2018

In Progress

In Progress
Construction of Drain, Soling 5,00,000

5,00,000

4,75,000

2,90,363
Providing and laying dry brick

Edition)

61 %
75 %
and Allied Works at Mistry

60
43. 11 03 pavement/soling in streets /
Sanwal Dr. Bilal Ward No.11
roads = 1332 Cft
MC Rajanpur.

Daily Express (Multan Daily Khabrain (Multan


DG Khan / Fazalpur

Shahid Aqeel Khan


Construction of Drain,

08-12-2017

25-12-2017

26-12-2017

02-01-2018

02-01-2018

01-02-2018
5,00,000

5,00,000

4,67,585

3,84,802
Soling, Street Pavement and Providing and laying dry brick

Edition)

82 %
92 %

Yes

Yes
106

30
44. 01 Other Allied Work at Ward 02 pavement/soling in streets / No
No.1 MC Fazalpur. roads = 2483 Cft
Rajanpur.

Construction of Drain Soling,


DG Khan / Jampur

Ghulam Chanan
Street Pavement and Allied Providing and laying Tuff

116 / MC / JP
07-12-2017

22-12-2017

23-12-2017

27-12-2017

27-12-2017

26-02-2018
5,00,000

5,00,000

4,99,750

4,48,556
Work from House Zafar pavers 60 mm thickness
Edition)

100 %

89 %

Yes

Yes
60
45. 13 Khosa to House Iqbal Dasti 02 having 7000 PSI = 2055 Sft No
to House Shafi Burra Ward PS Drain = 102 Rft
No. 13, MC Jampur. Brick Pavement = 627 Cft
Rajanpur
Daily Express (Multan

Malik Gohar Hussain


Construction of Drain Soling,
DG Khan / Jampur

Street Pavement and Allied

123 / MC / JP
07-12-2017

22-12-2017

23-12-2017

27-12-2018

27-12-2017

26-02-2018
Providing and laying Tuff
5,00,000

5,00,000

4,99,250

3,32,506
Work from Halema Masjid to
Edition)

66 %
80 %
pavers 60 mm thickness

Yes

Yes
Tuff Tile Constructed only 2243 Sft.
02

60
46. 09 House Master Muhammad Major Variation
having 7000 PSI = 3038 Sft
Shoukat Naseer Ward No.9
PS Drain = 271 Rft
MC Jampur.
Rajanpur.
DD(Dev.)/2017-18/RP/ 675

Mr. Muhammad Farooq


DG Khan / Kot Mithan

Construction of Drain, Street


05-2018 / KM
29-11-2017

12-12-2017

25-12-2017

26-12-2017

04-01-2018

04-01-2018

17-02-2018
Jang News
5,00,000

5,00,000

5,00,000

4,73,834

Pavement and Allied Work Providing and laying Tuff


100 %

94 %

Yes

Yes
02

45
47. 02 at Basti Shaikhan Ward No.2 pavers 60 mm thickness No
MC Kot Mithan. having 7000 PSI = 4500 SFT
Rajanpur
Daily Express (Multan
AA/DD(DEV)/LY/DDC

Construction of Boundary
37-39/MO (I) MC/KR
DG Khan / Karor Lal

Mr. Ghulam Safdar

Wall, Drains, Soling, Re-


05-12-2017

13-12-2017

29-12-2017

30-12-2017

05-01-2018

05-01-2018

04-02-2018
Soling, PCC Flooring etc.
5,00,000

5,00,000

4,47,750

3,14,750
Edition)

Sawag
Eason

70 %
81 %

Yes

Yes
654

ward No.8, Ward No. 9, and Wrong work order date was written. 05-01-2017
05

48. 09 30 PCC 1:2:4 = 1525 Cft Minor Variation


Ward No. 10. Ward No. 11,
Ward No. 12, Ward No. 13,
MC Karor Lal Eason.
Layyah
Pervez Iqbal Ranjha Construction
Daily Express (Multan Edition)
AA/DD(DEV)/LY/DDC/654

Construction of Boundary
34-36/MO (I) MC/KR

Wall, Drains, Soling, Re-


DG Khan / Karor

05-12-2017

13-12-2017

29-12-2017

30-12-2017

05-01-2018

05-01-2018

04-02-2018

Soling, PCC Flooring etc. P/L Dry brick pavement/soling


34,77,250

33,14,585
Company
3500000

3500000

100 %

=6483 Cft
95 %

ward No.1, Ward No. 2,

Yes

Yes
04

30

49. 1-7 No
Ward No. 3, Ward No. 4, PCC 1:2:4 = 2444 Cft
Ward No. 5, Ward No. PS Drain = 1724 Rft
6,Ward No. 7,MC Karor.
Layyah
Daily Express (Multan Edition)
CE(HQ)PLGB TS / 2017 LHR
AA/DD(DEV)/LY/DDC/638

Muhammad Saeed Khalid

Construction of Drain, PCC


DG Khan / Layyah

MO (I) MC/LY/137

Flooring in Ward No. 11,


29-11-2017

04-12-2017

09-12-2017

26-12-2017

27-12-2017

29-12-2017

29-12-2017

25-02-2018

Manwar Colony No. 1, Ward


5,00,000

5,00,000

4,88,500

4,50,667

100 %

92 %

No. 12, Ward No. 13, Street PCC 1:2:4 = 1005 Cft
Yes

Yes
58

50. 15 No
3

Kamran Mashdi Mohallah PS Drain = 324 Rft


Faiz Abad Ward No. 14,
Ward No.15, MC Layyah
City.
Daily Express (Multan Edition)
CE(HQ)PLGB TS / 2017 LHR
AA/DD(DEV)/LY/DDC/638

Mojahid Zubair Khan


Construction of Drain, PCC
DG Khan / Layyah

MO (I) MC/LY/135
Flooring Basti Shah Nawaz

29-11-2017

04-12-2017

09-12-2017

26-12-2017

27-12-2017

29-12-2017

29-12-2017

25-02-2018
5,00,000

5,00,000

4,86,900

4,60,567
Ward No. 6, No. 8, Ward No.

100 %

94 %
PCC 1:2:4= 1032 Cft

Yes

Yes
58
51. 09 9, Ward No. 10, Drain PCC No

3
PS Drain = 138 Rft
Flooring and Brick Soling
Ward No. 7, MC Layyah
City.

MC J (IS) No 46
DG Khan / Jatoi

Shehzad Ali
30-11-2017

25-12-2017

26-12-2017

27-12-2017

27-12-2017

10-02-2018
P/L dry brick pavement/soling

15,00,000

12,93,978
15,00000

Construction of Soling/Drain 15,00000


in streets/roads = 5071 Cft

86 %
97 %

Yes

Yes
45
52. 22 Ward No. 16,21,22 MC Jatoi Minor Variation
PS Drain = 782 Rft
LGDP, Muzaffargarh
3-16/1120/DD(DEV)MZG

M/S Rajpoot Developers


Brick pavement = 3046 Cft
DG Khan / Ali Pur

Construction of Drains
Tuff paver having 7000 psi
30-11-2017

26-12-2017

27-12-2017

28-12-2017

28-12-2017

27-02-2018

In Progress

In Progress
Soling (Brick Pavement)
20,00,000

20,00,000

20,00,000

7,71,358
crushing strength = 3839 Sft

104(I)

38 %
50 %
Earth Filling Tuff Pavers and

60
53. 14 Pacca brick work on edge
Sullage Carrier Ward No. 13,
lead in 1:5 = 1299 Cft
14, 15 & 16 MC Alipur.
PS Drain Type-I = 932 Rft
Muzaffargarh
Sullage Carrier = 435 Rft
M/S Rana Muhammad Zafar
3-16/1120/DD(DEV)MZG

P/L Sub-base course


=3500Cft
DG Khan / Alipur

Construction of Drains
30-11-2017

26-12-2017

27-12-2017

28-12-2017

28-12-2017

27-02-2018
Tuff paver having 7000 psi
20,00,000

20,00,000

20,00,000

18,45,865
Soling (Brick Pavement)

100 %
104(I)

crushing strength = 10609 Sft

92 %
Iqbal

Yes

Yes
60
54. 7 Earth Filling Tuff Paver Ward NO
P/L dry brick pavement
No. 5, 6, 7 & 8, MC Alipur.
street/road = 805 Cft
Muzaffargarh.
PS Drain = 336 Rft
Nawa-i- Waqt (Multan Edition) Nawa-i- Waqt (Multan Edition) Nawa-i- Waqt (Multan Edition)

Hafiz Ghulam Akbar Buzdar

Construction of Drain &


Soling at Basti Jhoke Pacca brick work in F/P
DG Khan / Taunsa

DDD/AA/576-89

Ranjha, Basti Jiani, Basti 1:5=658 Cft


30-11-2017

07-12-2017

26-12-2017

27-12-2017

30-12-2017

30-12-2017

28-02-2018
25,00,000

25,00,000

25,00,000

23,00,423

Kalari, Basti Kot Mohi, Basti


339/LG

100 %

92%

PS Drain = 1170 Rft

Yes

Yes
60
55. 15 Yaran Mureedani, Jorakhi, 02 No
Basti Miroani and Mureedani P/L dry brick pavement
Janubi UC Pirdhan Sharqi street/road = 12880 Cft
No. 15 Taunsa Sharif
DG Khan
DG Khan / Taunsa

Construction of Soling Drain


Shahid Manzoor
DDD/AA/601-12

P/L PCC 1:2:4 = 1514 Cft


30-11-2017

07-12-2017

26-12-2017

27-12-2017

30-12-2017

30-12-2017

29-01-2018

& PCC in Gali Zahid Wali,


5,00,000

5,00,000

4,99,950

4,70,000
400/LG

100 %

Pacca brick work in F/P


94 %

Hotani Manjhota Wala Ward

Yes

Yes
30

56. 09 02 No
No. 9, MC Taunsa Shareef 1:5=120 Cft
LGDP 2017-18
DG Khan
Ghulam Abbas Langah
DG Khan / Taunsa

DDD/AA/601-12

Construction of Soling Drain P/L PCC 1:2:4 = 1514 CFT


30-11-2017

07-12-2017

26-12-2017

27-12-2017

30-12-2017

30-12-2017

29-01-2018
5,00,000

5,00,000

5,00,000

4,59,947

& PCC in Gali Imam Bakhsh


325/LG

P/L Pacca brick work in F/P


100 %

91 %

Yes

Yes
30

57. 19 Mohallah Ghaloo Wala Ward 02 No


1:5=120 Cft
No.19 MC Taunsa LGDP
2017-18 Brick Ballast = 2070 Cft
Muhammad Muzaffar Hassain
Nawa-i- Waqt (Multan Edition)
DG Khan / Shehar Sultan

DDD/AA/601-12
Construction of Surface

30-11-2017

07-12-2017

28-12-2017

29-12-2017

04-01-2018

04-01-2018

05-03-2018

In Progress

In Progress
MC/SS/107
PS Drain = 207 Rft

20,00,000

20,00,000

19,96,000

12,59,843
Drain & P/L Dry Brick

63 %
75 %
Tuff Pavers = 14168 Sft

60
58. 05 Pavement, P/L Tuff Paver, 02
P/L P.C.C Ward No. 5 to 8 Brick Ballast = 3352 Cft
MC Shaher Sultan (LGDP)

MUNICIPAL CORPORATION

P/L watering ramming brick or

Mr. Muhammad Nazir Mr. Ghulam Murtaza Pittafi


Nawa-i- Waqt (Multan
DG Khan / DG Khan

DDD/AA/590-600 stone ballast= 6868.14 Cft

30-11-2017

07-12-2017

26-12-2017

27-12-2017

27-12-2017

27-12-2017

26-02-2018
Constructi on of PCC Soling P/L topping of cement
25,00,000

25,00,000

25,00,000

23,58,050
Edition)

100 %

94 %
2273
and Drain Streets Block Nos

Yes

Yes
concrete 1:2:4=26779 Cft 1.

60
59. 09 02 No
35, 36, J.B.A and Block f
UC No. 09 PS Drain Type-I = 615 Rft
Fabrication of mild steel =215
Kg
Construction of PCC, Drain

Nawa-i- Waqt (Multan


DG Khan / DG Khan

DDD/AA/590-600

and Soling Mastoi Colony,


P/L dry brick pavement
30-11-2017

07-12-2017

26-12-2017

27-12-2017

27-12-2017

27-12-2017

26-02-2018
Shakir Town, Tahir Town,
25,00,000

25,00,000

25,00,000

23,59,265
Edition) street/road = 12099 Cft

100 %

94 %
2271
Gulshan Iqbal, Qaim Wala,

Yes

Yes
2.

60
60. 11 03 PCC Toping 1:2:4 = 4632 Sft Miner Variation
Muslim Town and Sikhani
Colony Urban Union Council
No.11 Municipal
Corporation, DG Khan
Nawa-i- Waqt (Multan Edition)
DG Khan / DG Khan

Construction of PCC Soling

M/S Gillani Traders


DDD/AA/590-600

and Drain Streets Mehboob P/L watering ramming brick or


30-11-2017

07-12-2017

26-12-2017

27-12-2017

27-12-2017

27-12-2017

26-02-2018
25,00,000

25,00,000

25,00,000

23,50,331
abad, Block No.42, Block stone ballast= 6180 Cft

100 %

94 %
2276

Yes

Yes
3.

60
61. 06 No. 43, Nouring Abad and 02 No
PCC 1:2:4 Toping = 24810 Sft
Shahzada Sultan Town UC
No. 06 Municipal
Corporation, DG Khan.

Construction of PCC, Drain


and Soling Street Nasir
M/S Fahad Khan Khosa and Co.
Nawa-i- Waqt (Multan Edition)

Khan ASI, Street Khalid


Khan Ward No.1, Street
DG Khan / DG Khan

Akram Elahi Bhambhani


DDD/AA/576-89

PS Drain = 463 Rft


30-11-2017

07-12-2017

26-12-2017

27-12-2017

27-12-2017

27-12-2017

26-02-2018
Nizamabad Ward No.2,
25,00,000

25,00,000

25,00,000

21,00,767

P/L dry brick pavement


95 %
2282

Street Abasia Mosque Ward


84%

Yes

Yes
street/road = 1397 Cft 4.

60
62. 01 02 No
No.3, Street M Bilal Ward
PCC 1:2:4 Toping = 24250 Sft
No. 4, Street Mosque
Brick Ballast = 6063 Cft
Bhambani Qari Shoukat,
Street Sohanara Shatal
Ward No.6 UC No.1
Municipal Corporation, Dera
Ghazi Khan
Nawa-i- Waqt (Multan Edition)

Pacca brick work in 1:5=1076


Asad Ullah Malghani
DG Khan / DG Khan

Construction of PCC, Soling


DDD/AA/576-89

and Drain in Streets of Basti CFT


30-11-2017

07-12-2017

26-12-2017

27-12-2017

30-12-2017

30-12-2017

28-02-2018
25,00,000

25,00,000

25,00,000

23,00,217

Kukri Wala, Basti Naseer


300/LG

100 %

P/L PCC 1:2:4 = 204 CFT


92%

Yes

Yes
5.
60

63. 02 Abad Wala, Basti Qaim Wali, 03 No


Basti Lakhani and Basti P/L dry brick pavement
Jarwar (UC No.2 Lakhani) street/road = 12284 CFT
LGDP 2017-18
Nawa-i- Waqt (Multan Edition)

Pacca brick work in 1:5=1076


DG Khan / DG Khan

DDD/AA/576-89

Al-Khair Buzdar

CFT
30-11-2017

07-12-2017

26-12-2017

27-12-2017

30-12-2017

30-12-2017

28-02-2018

Construction of PCC, Soling


25,00,000

25,00,000

25,00,000

15,64,826
301/LG

62 %
75 %

and Drain in Basti Jalu Wali, P/L PCC 1:2:4 = 204 CFT
Yes

Yes
6.
60

64. 03 02 No
Trimin and Chooni (UC No.3 P/L dry brick pavement
Jalu Wali) LGDP 2017-18 street/road = 12284 CFT

Você também pode gostar