GENERAL NOTES :-

This Drawing is property of M&S. No part of this Drawing may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of the M&S.
1. All dimensions are in mm.
2. All drawing should be read along with the relevant Architectural
Drawings.

3. Grade of R.C.C. items shall be M20 by design mix confirming


F to I.S. 456 - 2000 unless otherwise specified F

4. Tor 40 steel conforming to I.S 1786 - 1985 Grade - Fe 500

5. Clear cover to steel as follows


- For Pile - 50mm
- For footing - 50mm
- For column - 40mm
- For beam - 25mm
- For slab - 15mm

6. Lap length for all bars shall be 50 times the dia of the bar unless
otherwise Specified

7. Provide 8 Ø @ 300 c/c as Distribution steel for all top


reinforcement

8. Spacer bar to be provided in between two layers of reinforcement


of same dia @ every 1000 c/c

9. Cantilever props should not be released until the roof is concreted


E E
10. Removal of Form works
1) For slabs
a. Slabs spanning upto 4.5 m - 7days
Ld

b. Slabs spanning over 4.5 m - 14days


2) For beams and arches
a. Beams and arches spanning upto 6m - 14 days
b. Beams and arches spanning Above 6m - 21 days

11. All reinforcements shall be placed and maintained in the


position shown in the drawing (cross section) by proving proper
cover blocks, spacers & supporting bars.

12. First stirrup in the beam is 50mm away from face of support.

13. All dimensions are in 'millimeters' unless otherwise specifically


stated.

14. Do not scale the drawings, written dimensions to be followed.

D 15. The GSSPL is not responsible the failure due to improper D


TYPICAL LONGITUDINAL SECTION execution

16. The foundation is designed for MS building only.

17. Avoid clay soil filling in the basement.


BEAM END SPAN(L.H.S)
S.NO MID SPAN END SPAN(R.H.S) REMARKS 18. Use OPC for all concrete works.
SIZES 19. Use chair rods for top reinforcement.

20. All footing rods bent 100mm up.


BEAM - PB:1
21. All beam top rods shall be properly anchored in columns.

22. All column rods should be staggered

C
2-Y12(Thro) 3-Y12(Thro) 2-Y12(Thro) C

Y8@200C/C Y8@200C/C
1 230x375
ISSUED FOR APPROVAL

Y8@200C/C SENT ON _________________________________


IN ORDER TO SCHEDULE THIS PROJECT IN THE MOST
EFFICIENT MANNER, RETURN THESE DOCUMENTS, MARKED
WITH YOUR COMMENTS, WITHIN ONE WEEKS FROM THE
ABOVE MENTIONED DATE.

RIGHT
ANY CHANGES MADE AFTER APPROVAL OF THESE DRAWINGS
MAY DELAY THE FABRICATION AND DELIVERY PROCESS.

3-Y12(Thro) 5-Y12(Thro) 3-Y12(Thro) 1.


THESE DRAWINGS ARE NOT FOR CONSTRUCTION.

NO CHANGES. PROCEED WITH FABRICATION.

2.
FABRICATION MAY PROCEED ON THE BASIS
RIGHT OF CORRECTIONS INDICATED.
LEFT
REVIEWED BY ___________________________
NAME
B _________________________ __________ B
SIGNATURE DATE

ISSUED FOR CONSTRUCTION

ENGINEERS :

BALU STEEL BUILDINGS


COIMBATORE.
A A
GSSPL QUOTE NO : MS - 2018 DWG.NO SHEET
GSSPL JOB NO : MS - 345 GA / 006 A3
PROJECT NAME : DATE SCALE
CLIENT : 05.09.18 NTS
JOB SITE LOCATION : COIMBATORE REV.NO N
TITLE :
PLINTH BEAM LAYOUT A
1 2 3 4 5 6 7 8 9 10