Beijing Kingpeng International Agriculture Corporation

Address: 7th Floor, Advanced Material Building, No. 7 Feng Hui Zhong Lu,
Haidian District, Beijing, 100094, China
Tel: 86-10-58711536 Fax: 86-10-58711560
KjftJGpEJMG
E-mail: richard@chinakingpeng.com info@chinakingpeng.com
Website: www.kingpengintl.comwww.chinakingpeng.com

QUOTATION

TO: Omar Ardati


Address: Lebanon

No.: KP20180903001 Date:2018-09-03

Greenhouse

Bay 9.6m Section Size 4m

Bay Length 9.6m*4span=38.4m Section Length 4*7=28m

Gutter Height 4.0m Roof Height 6.0m

Area 1075.2qm Brick Wall height 0.5m

Unit Price Sub-Total


SN. Item Description Quantity Unit
(USD) (USD)

Hot dipped galvanized steel framework,


with steel gutter, 2
1075.2 m 17.33 18633
Design wind load 90KM/m2, snow 200
N/m2. Hot galvanization: 275g/m2

Hot dipped galvanized steel frame of greenhouse main body, including


connectors, steel foundation anchor etc.
1 Steel Structure A. Gable & Side Post: □ 90x50x2.5mm hot dipped galvanized rectangular
tube;
B. Inside Post: □ 90x50x2.5mm hot dipped galvanized rectangular tube;
C. Shed and side rail 50x30x2mm hot dipped galvanized rectangular tube;
D. Main Truss:Q32x2mm hot dipped galvanized round tube; Distance 2m.
E. Vertical Pole: $25x1.5mm hot dipped galvanized round tube;
F.The trough is 2mm C type steel with strengthened structures, which
increase the drainage capacity.
E. Two doors;

The roof is covered with 0.2mm PE plastic


Covering 2
2 sheet. 3 years guarantee. Anti- UV, anti- 1392 m 1.59 2213
Material
drop.
The four sides are covered with 8mm PC
sheet. 10 years guarantee. Anti-UV, anti-
751 m1 9.70 7287
drop. Can be purchased by the buyer
Covering from local.
3
Material
The four side aluminum profiles,
galvanized fixtures and sealing parts etc, 751 m2 4.56 3425
for 8mm PC sheet

Roof window, 1 window for 1 roof,


Roof Window 2windows totally. Film roller driven 4 set 218.50 874
window, China made motor.
4
Insect Net Roof window insect net system, 1 system
4 set 84.80 339
System for every window.

Exhaust fans: 44000m3/ hr air flow, the


Exhaust fan control room has no exhaust fan. 8 set 228.00 1824
1.38*1.38m

Pad Wet pad, 10cm thickness,2m height 76.8 m2

33.50 2573
Pad Gutter Aluminum pad gutter and steel pad frame 76.8 m2
5
for 10cm thickness wet pad

Circling Water 1.1kw, provide water for wet pad,


2 set 580.00 1160
System including pump, filter, pipes.

Outside the wet pad to keep warm in


Wet Pad
winter. Film roller driven window with 1 set 388.50 389
Window
insect net.

Hanging Circulation fan inside


6 Circulation Fan greenhouse to make the temperature and 8 se t 84 672
air humidity uniform.

200,000 Cal oil type air heater. 1 set 3492.5 3493

7 Heating System
50,000 Cal oil type air heater. 1 set 2522.5 2523

Adopted for shading in the summer time,


Inside shading and thermal in winter time. Adopt high
8 1075.2 m2 5.2 5591
system quality rack and pinion system driven by
motor.

Water supply and drainage system inside 2


9 Water System 1075.2 m 0.95 1021
greenhouse

Electricity Cables, lamp, plug base, cable channels,


10 and Electrical electrical control cabinet, electrical 1 set 5697.2 5697
Control control units.

11 Total EXW Price (USD) 57714

TOTAL FOB Tianjin Port Price 59714


1 50% by T/T within 15 days before the container loading.
Commercial Conditions:
Note : It is estimated that 1 40' container and 1 20' container can hold all the greenhouse materials. The final charge
of shipping cost will be based on reality. If more than 300 dollars is charged, money is more charged will
be returned to the buyer, and if more than 300 dollars is under charged, money is less charged will be charged.
Note2 : The price does not include any tax or duties or social security insurance outside China.
Note 3: The cost of foundation, installation is not included in this quotation.
Note 4: The calculation is based on 1USD=6.80 CNY. Price validity is 15 days.
Note 5: The price does not include any inspection, test report or special certificate. If need any inspection, the cost
shall be paid by the buyer separately

Delivery time:
All Materials will be ready for Departure from China Port within 70 days after the down payment come into seller's
account.

1, The seller can send 1 engineer from China to supervise the installation, the buyer should pay the seller for the
supervisor with the rate: 150 USD/DAY/ PERSON.
2, The buyer should be responsible for the all round air tickets, local transportation and accommodation and also
the visa. The standard of accommodation for supervisor should be same level with local site manager.
3, The payment of supervisor over 30 days should be done before end of each month.

1, The seller shall be responsible to repair any materials supplied by seller if the defect is found to be the seller's
reason or quality reason, the cost to repair will be on the Seller's account.
2, The seller will be responsible to replace any materials that can not be repaired to meet the performance
description in the PI, then the seller will replace it/them on its own account.
3, Any defect or short than the right design or packing list, the buyer shall email the seller with photos and/or
other proof within 48 hours of downloading the materials, other short over this period will be treated as lost on site,
not the seller's responsibility. After the seller get the email, the seller shall feedback in 24 hours to confirm the
acceptance of email, and in another 24 hours feedback the time schedule of treatment to buyer for confirmation.
4, The Buyer shall supply service and necessary assistance free of charge to help the Seller for the import
customs of the replaced materials or shorted materials delivery either by air or shipment. 1 2 2

Payment Terms:
2 50% by T/T as down payment within 7 days after the PI signature.