Final Alignment Monitoring

IR Number Equipment Name Date of Inspection Inspection Conducted Inspection Comments Remarks
SWRO Pump A May 11, 2018  Soof Foot  Shim installed not a full Coupling spacer to be
 Flange parallelism suction bearing. installed by
 Flange Parallelism discharge  Suction Parallelism commissioning team
 Holding down bolt torque maximum reading
 Distance between shaft end 0.84mm
(DBSE)  Discharge parallelism
 Face and rim method run out maximum reading
reading (before, piping not 1.45mm
connected and after, piping  Suction distance
connected with bolt torque) between flange
 Pipe stresses (Torque value of maximum reading
suction and discharge are 5.49mm
obtained)
IR Number Equipment Name Date of Inspection Inspection Conducted Inspection Comments Remarks
SWRO Pump B May 12, 2018  Soof Foot  Shim installed not a full Coupling spacer to be
 Flange parallelism suction bearing. installed by
 Flange Parallelism discharge  TIR reading @ 180- commissioning team
 Holding down bolt torque degree Rim + 0.06mm
 Distance between shaft end Face + 0.06mm
(DBSE)  Suction distance
 Face and rim method run out between flange
reading (before, piping not maximum reading
connected and after, piping 5.20mm
connected with bolt torque)
 Pipe stresses (Torque value of
suction and discharge are
obtained)
Final Alignment Monitoring
IR Number Equipment Name Date of Inspection Inspection Conducted Inspection Comments Remarks
CIP Pump A May 18, 2018  Soof Foot  Shim installed not a full Coupling spacer to be
 Flange parallelism suction bearing. installed by
 Flange Parallelism discharge  Suction Parallelism commissioning team
 Holding down bolt torque maximum reading
 Distance between shaft end 0.57mm
(DBSE)  Discharge parallelism
 Face and rim method run out maximum reading
reading (before, piping not .81mm
connected and after, piping  Discharge distance
connected with bolt torque) between flange
 Pipe stresses (Torque value of maximum reading
suction and discharge are 4.99mm
obtained)
IR Number Equipment Name Date of Inspection Inspection Conducted Inspection Comments Remarks
CIP Pump Pump B May 18, 2018  Soof Foot  Shim installed not a full Coupling spacer to be
 Flange parallelism suction bearing. installed by
 Flange Parallelism discharge  Suction Parallelism commissioning team
 Holding down bolt torque maximum reading
 Distance between shaft end 0.61mm
(DBSE)  Discharge parallelism
 Face and rim method run out maximum reading
reading (before, piping not 1.24mm
connected and after, piping  Discharge distance
connected with bolt torque) between flange
 Pipe stresses (Torque value of maximum reading
suction and discharge are 4.98mm
obtained)