20. Calibration log for monitoring and measuring devices on project basis to be maintained.
Page 1 of 3
21. Log for Approved QC inspectors and Technicians shall me maintained with the approval
copy.
24. NDT % coverage for welders to be followed up weekly or with defined intervals.
27. Repair status for welders and Weld joints coverage to be monitored and updated on weekly
basis.
28. Action points on internal and client minutes of meeting to be followed up and closed.
32. Material identification and traceability to be verified in CNC cutting shop and fabrication
yard.
37. Contractor shall implement ongoing training program for familiarize project quality
requirements for their area of responsibility
38. Contractor shall plan for monitoring, measuring, analysis and improvement of process (i.e,
internal and external audits, internal and external NCRs, repeat violation, process
performance measures, data analysis, management reviews, corrective action , preventive
actions,
41. Red line markup drawings to be filed and to be incorporated in the next revision of drawings.
Page 2 of 3
42. Lesson learnt from previous projects
43. Contractor shall forward all non-conformities raised with in 48hours to company (7.5.5)
44. Contractor shall respond to all Nonconformities and LBEs with in 48 hours receiving
notification and proposed corrective action (7.5.6)
45. Contractor shall notify the company representative prior to closure of any
nonconformity(7.5.7)
46. Analysis of Data: Monthly quality management report contains, quality audits completed, in
progress and planning for next month, open ncr, log books, TQs, No of approved welders &
Inspectors.
47. MTCs to be checked for ease of traceability with reference to unique IDs.
48. Calibration certificates for welding machines, quivers, baking and holding ovens shall be
available at satellite stores.