____Verify that automatic isolation valves are installed ____Verify proper coordination between individual
and operate correctly, if applicable. (Automatic isolation setpoints and reset strategies. For example, the hot water
valves are typically installed when multiple boilers are temperature reset and air handling unit discharge air
connected to a common supply header. Boilers with temperature rest control strategies are compatible.
dedicated pumps generally do not have automatic Without coordination between hot water temperature
isolation valves.) When an individual boiler is not reset and discharge air temperature reset, the air handler
operating, the isolation valve should be closed to prevent may be trying to make hotter air than is possible with the
water from circulating through the unit. This hot water supply temperature. This situation would result
configuration reduces pumping energy and prevents in boilers being staged ON even though there is no load
dilution of the hot water temperature by blending on the system, wasting a significant amount of energy.
unheated water, flowing through the non-operational
boilers, with hot water, coming from the operating ____Verify that the control algorithms generate the
unit(s). proper water temperature setpoint based on the reset
parameters specifies in the sequence of operations.
____Verify proper boiler staging under normal operation,
as well as under all failure and emergency operating ____Verify that the reset parameters are optimized for the
modes, especially if multiple units are installed which are system. In addition, ensure the reset control strategy does
unequal in size. Close coordination between boiler not result in a return water temperature from the building
staging and actual load will minimize energy usage. For loads, which can cause the flue gasses to condense in
example, it is beneficial to use a small boiler with good non-condensing boiler systems.
turn-down efficiency to meet low loads and to enable a
____Verify that the O2 trim controls, if applicable for a Savings Vs. Implementation Cost
specific project, operate to ensure that excess oxygen in 1. No cost to implement (<$200)
flue gas is maintained at setpoint. If O2 trim controls are
not installed, review flue gas report and verify the boiler A. Change operating mode
was tuned at high-fire and at least one intermediate part- 1) Reduce steam pressure (up to 10%)
load operating point.
2) Reduce low fire operation (up to 10%)
Control Accuracy and Stability 3) Fix leakage (steam & water 5-25%)
4) Eliminate standby generator (5%)
____Verify that all control loops stabilize within a 2. Low Cost (<$3K)
reasonable amount of time (typically 2 to 5 minutes) after
A. Boiler tune up (10% temporary)
a significant load change such as start-up or
automatic/manual recovery from shut down. B. Boiler Chemistry Treatment (5-10% permanent)
1) Feedwater pretreatment (softener)
Some projects may require full-load capacity and part- 2) Boiler water treatment changes
load turndown performance testing. Tests should be
performed when the loads generated can be dissipated C. Ducted air intake (5%)
adequately. Verify the boiler meets the manufacturer’s D. Insulation program (5 – 15%)
stated part load performance under actual operating
E. Steam trap program (5 – 15%)
conditions.
F. Change burner nozzle (5 – 10%)
Final boiler system testing can be best achieved through 3. Investment (>$3K)
trending under normal operation. A. Preheat combustion air (10%)
B. Waste heat recovery (15%)
C. Fuel switching (5 – 20%)
D. Preheat feedwater (economizer) (10%)
E. Install Oxygen trim (5%)
F. High efficiency burner (10%)
G. DSOM installation (35%)
FEDERAL FACILITY ASSESSMENT GUIDE
Boiler System Checklist
Install Small Modular Boilers
Evaluate the opportunity to install multiple small boilers to meet the heating load of a given facility. It is more
efficient to operate smaller boilers when the heating load is 25% to 50% of the design capacity and can significantly
reduce heating system energy use. Specify minimum boiler efficiency 89% (AFUE)
Reset Hot Water Supply Temperature Based on Heating Coil Valve Position
Adjust the hot water supply temperature based on heating coil valve position. The hot water supply temperature
should be reset based on manufacturer’s recommendations for the particular boiler. The control algorithm should be
set up such that the coil with the largest cooling load maintains the valve at 90% open.