Escolar Documentos
Profissional Documentos
Cultura Documentos
CCRs
Identify critical measures that are Identify input, process, and output UCL Input, process, and
Input Process Output CCR
2.0 output indicators
Sigma=
necessary to evaluate the success indicators
Develop Measurement Plan & operational Checksheets Operational definitions
of meeting critical customer Input
Measure requirements, develop a definitions Indicator
A
A
A
B
B
B
X
Measurement Plan
A1
Performance Measurement Plan to effectively Measurement Systems Analysis A1
A1
D1 Cause & effect Diagram
D1 LCL
collect data, and establish Evaluate baseline performance Process
D1
D2
D2 CCR
Sigma=
Baseline performance
D2
baseline performance Process Control & Capability Indicator Process A2
A2
EXECUTE
Indicator A2 X
Output Indicator
Gap
Identify and validate the root causes Identify potential root causes Results of data analysis
Validate root causes Quantified Root Causes
of poor performance. Determine Validated root causes
3.0 sources of variation and potential Use statistical tools Potential solutions
Analyze failure modes that lead to customer Comparative Methods Indicators &
50%
Regression analysis
25%
(effect)
EXECUTE
Control charts
Process/Product: FMEA Date: (original)
FMEA T eam: (Revised)
Black Belt: Page: of
Risk Priori ty
Risk Priorit y
Occurrence
Occurrence
Item Potential P otential P otential Current Recom- Responsibility Action
Detection
Detect ion
Severi ty
Process Failure Effects of Cause(s) Controls mended and Target Taken
Severity
Steps Mode Failure of Failure Action Completion
Date
Cost Benefit
Solutions to implement
Surface Plot of Y11
Improvement impacts
1.0
0 0.5
X2
1,500
B
Jim
Sue
Warranty for 5 years
introduced through solution Prepare Implementation Plan 1,800
Total benefits
$6,800
C Lynn
implementation
EXECUTE
Degree of Effect
Process Control
Implemented Solution Process control plan to
Verify results of solution
Process Occurrence Prevention
Step#
(Countermeasure)
Detection
Severity
Total
Assemble all • Back injury • Carry-all • Back 0 • Purchase two new carry-alls for
System
Integrate and manage solution(s) in daily Solution(s) results
outbound during lift not available injuries, mailroom
Control
Determine • Non-standard • Vendor • Container 2 • Inspect for non-standard pallets and
correct pallet used pallets kept stack over + return to vendors
opportunities standardization
4.2.4
pallet not to before 1 1 1 3
exceed two starting
high second layer
Load pallets in • Tie down • Tie down • Injured 0 • Update and clarify loading guidelines
vehicle with lines guidelines fingers, +
lift truck and damage bulk not clear damaged 1
Closure activities
CCR
4.2.5 secure mail when outbound 1 2 1 4
tightened mail
CCR
EXECUTE
Project Workplan
X
Gap