> Why PS 100 ?


> Examples of architectures
> PS 100 Main features and benefits
> HMI & lay out
> Communication and Monitoring

> References & Logistic


> Documentation
> Conclusions

Schneider Electric - Easergy –PS100 presentation – Feb 2012 v4 2


Why PS 100 ?

● The “PS 100” unit supplies back-up operating power for :


• MV switchgear electrical mechanism ( motors and coils )
• Transmission equipment ( e.g radio )
• Protection relays , Fault passage indicators or others IEDs
• And all others devices in MV/LV substations (LV breakers, PLC concentrator..)

● The “PS 100” has been designed for supplying power in distributed
architectures ( SC110A, Flair 23VD, VIP410, Sepam…) to fit in LV cubicles of SM6,
Premset * …
* New MV switchgear range (ex- Matrix project)

● The “PS 100” will offer a new elegant solution in application in current MV/LV
substations without RTU ( Remote Terminal Unit)
- is integrated in Advan6 wave 3
- in repetitive MV/LV substation with SM6, MH 24+, FBX & RM6 (3 or 4
functions)

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 3


e.g : RM6 or M24,SM6 in MV/LV SS
protection transformer power

PS100

VIP410 or
Sepam 10

Functions :
Transformer Protection,
DGPT2, DMCR or thermal
or
protection activating coil tripping of
Fuse switch combination or Circuit
breaker

IM Switch units Circuit breaker Fuse switch


wo electrical unit with Combination
mechanism autonomous unit
protection or
Schneider Electric - Easergy – 01/2013 /PS100 Introduction
Sepam 4
e.g : SM6 in CIB SS
( in commercial and industrial building)

protection transformer power


PS100

VIP410 or
Sepam 10

Functions :
Transformer Protection,
DGPT2, DMCR or thermal
protection activating coil tripping of or
Fuse switch combination or Circuit
breaker

IM Switch units Circuit breaker Fuse switch


wo electrical unit with Combination
mechanism autonomous unit
protection or
Schneider Electric - Easergy – 01/2013 /PS100 Introduction
Sepam 5
e.g : RM6 or M24+ or SM6 in MV/LV SS
Monitoring & protection transformer

R200 PS100
L500
Third Party 220Vac
IEC 101
IEC 104 RS 485
DNP3 48Vcc
over radio, GSM,
GPRS,…
Functions :
Coil / Transformer Protection by 12V
Fuse switch combination or Circuit
breaker
Feeder automation
- FPI
LV monitoring

Load management
Alarms management IM Switch units Fuse switch
(wo Electrical Combination or
mechanism) circuit breaker
unit
Schneider Electric - Easergy – 01/2013 /PS100 Introduction 6
e.g : Premset or FBX+ RMU in Utilities
Full feeder automation in distributed architecture

DMS R200 PS100 F23D SC110A PM800 VIP


MDM

IEC 101
Functions : IEC 104
DNP3
Transformer Protection over radio,
GSM,
Feeder automation GPRS,…
- FPI
- Switchgear control by Switch PLC
controller SC110A or SC105 connection

- Sectionalizer
- LV monitoring

Load management
Alarms management Smart meters

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 7


PS 100 Main features
High-availability back-up power supply for medium voltage substations

Uninterrupted power supply


24 or 48 V dc
LV main power supply
100-250 V ac or 90W + 300W 1mn
110 V dc Uninterrupted power supply
12 Vdc
25 W

PS100
Communication devices
• RTU
• Modem
Charging or
• Radio
supplying

Power supply

Information
Schneider Electric - Easergy – 01/2013 /PS100 Introduction
12 Vdc battery
8
PS 100 Main features
IP 20 / IK 7

Dimensions : 125 x 165 x 160 mm & 2,6 kg

Installation on Din rail mounting

Battery size : 38 AH
170 x 165 x 197 mm

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 9


PS 100 : HMI & lay out
250 Vac main power
supply terminals Battery & Sector state outputs

2 rotary switches for Modbus


address configuration

Display AC power
supply OFF

Battery fault

Status of the
Reset button unit

24 or 48V ON

12V ON
2 RJ45 connectors for
Data transmission Communication
life indicator
12 -24 or 48 V
Vcc outputs

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 10


Autonomy
● Autonomy up to 24 hours
● Depend on
● Mainly the permanent Load (PL)
● the “Energy backup” (Pb)
● The type of battery (38Ah, 24Ah)
● Temperature
● Battery age
● The non permanent load is estimated
to 16 Open&Close cycles of
Switchgear. (Ps)

I.e : 4 operating Sepam10 (4x8=32 W)


allows 12 hours of autonomy

● PS100 Autonomy

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 11


PS100 supply capacity
● 3 examples of maximum number of
devices for 1 PS100: ● 1 PS100 supplies up to 2 protection
relays or 16 switches

CB with Switch with ATS with 2 SW


protection Fault or 2CB
relay and detector and ● With 3 or 4 protection relays, it is
motorization motorization
recommended to use 2 PS100 with
2 4 0 redundancy
1 15 0
0 8 1 ● With an Automatic Transfer Switch
device, it is recommended to use a
second PS100 for protection relays.

● For more than 4 Protection relays ,


PS100 isn’t usable

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 12


Benefits
Optimized battery backup
● Only one battery to simplify the replacement
● The PS100 needs only one battery, simplifying replacement vs traditional
backup power supplies require a set of 2 or 4 batteries to produce 12V or
48V, with complicated replacement and adjustment of the battery pack.
● Battery can be purchased easily, anywhere in the world : sealed lead 12V
battery ,10 years life

● To prevent power network cuts


● Enables output voltage backup in case of cuts up to 24 hours

● PS100 protects and optimizes the battery duration


● Ensures its charge with a regulated and temperature-compensated charger
● Checks the battery and prevents the battery deep discharge level
● Measures battery ageing and alarms before battery end of life

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 13


Benefits
High availability

● PS100 is robust to the harsh environment of electrical substation


● Reliability is a key point for Electrical substations :
Insulation: 10 kV, - 40°C to +70°C operating temperature...
● Electronic protection against over voltage, overloads and short circuit
● Automatic restart after fault

● Additional “Energy back up” to restart the installation after a prolonged network
cut
● an optional Energy back up can be enabled with a local push button to provide
energy for restarting the protection relays and electrical control of MV
switchgears at installation restarting.
● Forecast backup reservation : 300 W - 1mm

● Modbus communication port forwards monitoring data to allow optimized


maintenance operations.

● A limitation, dedicated for radio units, is set up to avoid the battery deep discharge

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 14


Benefits
Redundancy to increase availability and power

Power supply paralleling

- more availability

- or additional power

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 15


Communication and monitoring

Protocol Modbus RS 485- configuration of Modbus address by means of 2


rotary switches
Connector RJ45 2

Data Measuring &  AC supply presence


status Data with  Battery state ( disconnected, failure, available capacity,
transmission date and time optional back-up reservation)
 PS100 Global Status (Ready /internal Fault)
 12V & 48V or 24V output failure
 Threshold Serious discharge, threshold Energy back-up
 Charge indicator, diagnosis information
 Reset

Settings  AC voltage loss threshold , DC serious battery discharge


threshold
 Battery Test frequency
 Energy Back-up enable / disable
Command  Restart 12/48 V ( Energy Back-up)
 Run led test
 Run battery test
Time stamped  100 events ( clock resolution 1ms )
events

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 16


References
DESIGNATION REFERENCE FEATURE

PS100-24V EMS58580 Back-up Power supply - 12V, 24V output

PS100-48V EMS58581 Back-up Power supply - 12V, 48V output

Bat 24AH EMS58582 Long life battery - 12V - 24A.h

Bat38AH EMS58583 Long life battery - 12V - 38A.h

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 17


e.g : integration PS 100 in IP 31 cabinet

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 18


Documentation

User guide – Manuel d’utilisation

Leaflet – Notice technique

Sales support - Memo vente

Schneider Electric - Easergy – 01/2013 /PS100 Introduction 19