HARGA
NO. PERALATAN SATUAN MINIMUM MAKSIMUM KET.
(Rp) (Rp)
HARGA
NO. JENIS BAHAN SATUAN MINIMUM MAKSIMUM KET.
(Rp) (Rp)
1 Pekerja Hr 30,000 33,000
2 Mandor Hr 43,000 45,000
3 Tukang listrik Hr 40,000 43,000
4 Tukang kayu Hr 40,000 43,000
5 Kep. tk. kayu Hr 45,000 47,000
6 Tukang batu Hr 40,000 43,000
7 Kep. tk. batu Hr 45,000 47,000
8 Tukang besi Hr 40,000 43,000
9 Kep. tk. besi Hr 45,000 47,000
10 Tukang cat Hr 40,000 43,000
11 Kep. tk. cat Hr 45,000 47,000
12 Tukang plitur Hr 40,000 43,000
13 Tukang jalan Hr 35,000 37,500
14 Tukang gali Hr 32,500 35,000
15 Tukang masak aspal Hr 35,000 37,500
16 Tk. leideng Hr 40,000 43,000
17 Masinis Hr 45,000 50,000
18 Pemb. Masinis Hr 40,000 45,000
19 Penjaga api Hr 35,000 40,000
20 Penjaga malam Hr 30,000 35,000
21 Sopir Hr 45,000 50,000
22 Pembantu Sopir Hr 32,000 35,000
HARGA
(Rp) (Rp)
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 110,000 120,000
Bulat Belah m3 120,000 130,000
Pecah 10/15 m3 140,000 145,000
Pecah 5/7 m3 140,000 150,000
Pecah 3/5 m3 145,000 155,000
2 KERIKIL Timbun m3 85,000 90,000
Sawur / Koral m3 115,000 120,000
Beton 0,5/1 m3 165,000 180,000
Beton ,1/2 m3 165,000 175,000
Beton ,2/3 m3 160,000 170,000
Biasa m3 115,000 120,000
Tras Giling m3 190,000 205,000
3 BATU BATA ex lokal bh 400 450
(Rp) (Rp)
4 GENTENG KACA
Vlaam tebal 2 mm bh 5,850 6,000
Vlaam tebal 3 mm bh 5,750 8,000
Kodok tebal 2 mm bh 5,500 6,000
Kodok tebal 3 mm bh 6,000 7,000
(Rp) (Rp)
4 UBIN PORSELIN
Lokal 11 X 11 putih dos 27,500 30,000
11 X 11 warna dos 29,000 30,000
Lokal 15 X 15 putih dos 28,000 29,000
15 X 15 warna dos 32,000 33,000
5 MOZAIK PORSELIN
10 X 20 cm m2 31,000 35,000
15 X 15 cm m2 32,000 35,000
20 X 20 cm m2 28,500 35,000
20 X 25 cm m2 23,000 33,000
(Rp) (Rp)
VI . B A H A N B E S I
1 BESI BETON besi beton polos kg 9,000 10,000
besi beton prestress kg 14,000 15,500
besi beton ulir kg 10,500 11,000
VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 19,000 20,000 panjang 4 m
Pipa PVC DN 25 ( ¾" ) AW JIS btg 22,000 22,500 panjang 4 m
Pipa PVC DN 32 ( 1" ) AW JIS btg 27,500 28,000 panjang 4 m
Pipa PVC DN 40 ( 1½" ) btg 45,000 51,200 panjang 6 m
HARGA
(Rp) (Rp)
Pipa PVC DN 63 ( 2" ) btg 57,000 77,000 panjang 6 m
Pipa PVC DN 90 ( 3" ) btg 122,500 139,250 panjang 6 m
Pipa PVC DN 110 ( 4" ) btg 170,000 202,950 panjang 6 m
Pipa PVC DN 160 ( 6" ) btg 325,000 423,000 panjang 6 m
Pipa PVC DN 200 ( 8" ) btg 590,000 660,000 panjang 6 m
Pipa PVC DN 250 ( 10" ) btg 1,010,000 1,025,000 panjang 6 m
Pipa PVC DN 315 ( 12" ) btg 1,380,000 1,390,000 panjang 6 m
VIII . B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr 4,700 4,750
30 X 60 lbr 11,000 12,000
60 X 120 lbr 37,000 38,000
List Kayu Profil m' 4,200 5,000
2 SOFT BOARD-uk: 4'X 8'
Gypsum tebal 9 mm lbr 55,000 59,000
3 HARD BOARD-uk: 4'X 8' lbr 60,000 62,000
4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr 38,000 40,000
. 120 X 240 X 3 mm lbr 75,000 85,000
. 90 X 210 X 4 mm lbr 51,000 55,000
. 90 X 210 X 9 mm lbr 140,000 145,000
. 90 X 210 X 12 mm lbr 170,000 172,500
. 90 X 210 X 15 mm lbr 220,000 225,000
. 90 X 210 X 18 mm lbr 270,000 275,000
Tripleks
. 120 X 240 X 3 mm lbr 40,000 42,000
. 120 X 240 X 4 mm lbr 47,500 50,000
. 120 X 240 X 6 mm lbr 61,000 67,500
Multipleks
. 120 X 240 X 9 mm lbr 95,000 105,000
. 120 X 240 X 12 mm lbr 127,500 135,000
. 120 X 240 X 15 mm lbr 152,500 162,500
. 120 X 240 X 18 mm lbr 180,000 185,000
Formika ukuran pintu lbr 45,000 50,000
IX . B A H A N F I N I S H I N G
1 KAYU
Menie kg 11,000 15,000
Dempul plamur kg 11,000 12,000
Ambril/amplas lbr 3,000 3,200
Batu Apung kg 5,000 5,500
Cat dasar kg 13,000 13,200
. Emco kg 38,000 39,000
. Yunior 66 (nippon paint) kg 37,000 39,000
HARGA
(Rp) (Rp)
. Deculux kg 42,000 45,000
. Siralax ons 6,500 8,000
. Spiritus ltr 8,000 8,500
. Plitur jadi ltr 29,000 31,000
2 TEMBOK
Kalkarium kg 4,000 4,200
Kapur sirih kg 4,500 4,750
Plamur kg 9,000 10,500
Cat Tembok kg 12,500 15,000
Sintex 5 kg 60,000 65,000
Danabride 5 kg 70,500 75,000
Catylac 5 kg 75,000 78,000
Mowilex 5 kg 125,000 135,000
3 BESI
Menie kg 13,000 18,000
Cat mengkilat kg 35,000 42,000
Cat kg 12,500 13,000
Thinner A ltr 8,000 9,000
Minyak cat ltr 6,000 8,000
Thinner Super ltr 8,000 9,000
Residu (teer/aspal) drum 50,000 54,000
Fibre glass (tanki air)
kapasitas 550 liter. bh 650,000 675,000
kapasitas 1100 liter. bh 950,000 1,100,000
Lem Aica Aibon kg 32,000 35,000
X.BAHAN KACA
1 POLOS 3 mm m2 50,000 55,000
5 mm m2 60,000 65,000
1 KABEL LISTRIK
N YA : . 1 X 1 1/2 mm2 m' 3,000 3,100
SPLN LMK 1 X 2 1/2 mm2 m' 3,150 3,300
. 1X4 mm2 m' 4,700 5,000
1X6 mm2 m' 6,900 7,000
NYY :. 2 X 1 1/2 mm2 m' 9,300 9,500
PRIMA 2 X 2 1/2 mm2 m' 10,250 10,500
. 2X4 mm2 m' 16,650 16,700
2X6 mm2 m' 20,100 20,500
3 X 1 1/2 mm2 m' 11,450 11,750
3 X 2 1/2 mm2 m' 15,400 15,750
3X4 mm2 m' 20,000 20,500
3X6 mm2 m' 27,800 28,000
NYM :. 2 X 1 1/2 mm2 m' 6,600 7,000
PRIMA 2 X 2 1/2 mm2 m' 9,000 10,000
. 2X4 mm2 m' 13,000 14,000
3 X 1 1/2 mm2 m' 8,450 9,000
HARGA
(Rp) (Rp)
3 X 2 1/2 mm2 m' 12,000 12,500
3X4 mm2 m' 17,400 18,000
3X6 mm2 m' 23,800 24,500
2 SKAKELAR
Out bauw . Seri bh 15,000 17,500
. Engkel bh 12,000 13,000
In bauw . Seri bh 11,500 15,000
. Engkel bh 9,500 11,000
2 KLOSET JONGKOK
bh 80,000 105,000
3 WASTAFEL PEDESTAL
bh 625,000 650,000
HARGA
(Rp) (Rp)
4 WASTAFEL MEJA OVAL
bh 700,000 750,000
XV . POMPA AIR.
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh 185,000 190,000
2 POMPA AIR LISTRIK
Sanyo 100 watt bh 325,000 475,000
Fuji 250 watt bh 850,000 900,000
Shimizu . 100 watt bh 285,000 350,000
. 90 watt bh 190,000 220,000
Dab . 125 watt bh 215,000 250,000
. 175 watt bh 320,000 340,000
X VI . PAVING BLOCK
1 SQUARE Abu-abu m2 30,000 37,500
Merah/hitam m2 38,000 40,000
2 HOLLAND Abu-abu m2 35,000 36,000
Merah/hitam m2 39,000 41,000
3 UNIDECOR Abu-abu m2 30,500 35,000
Merah/hitam m2 33,000 40,000
4 UNI Abu-abu m2 35,000 37,000
Merah/hitam m2 40,000 42,000
5 TRIHEX Abu-abu m2 30,000 35,000
Merah/hitam m2 33,000 40,000
HARGA
(Rp) (Rp)
6 OLYMPIA HEXA Abu-abu m2 31,000 35,000
7 HEXAGONAL Abu-abu m2 40,000 40,000
Merah/hitam m2 35,000 37,000
8 CASTLE Abu-abu m2 40,000 42,000
9 TRAPEZ Abu-abu m2 30,000 35,000
10 TRAPEZ GRASS BLOCK
Abu-abu m2 41,000 42,000
11 STANDARD GRASS BLOCK ABU-ABU m2 38,000 48,000
12 BATACO m2 2,000 2,250
13 KANSTEEN m' 22,500 28,500
XVII. L A I N - L A I N
1 KREI 25 MM m2 40,000 45,000
2 Sliding Pintu J4 bh 185,000 200,000
3 Naco per Daun bh 7,000 7,500
4 Rolling door Besi m2 225,000 230,000
Rolling door Almunium m2 210,000 215,000
5 Awning Almunium m2 75,000 80,000
6 Kusen Almunium 4" Putih m' 68,000 70,000
7 WIDE FLANGE BEAM
150 X 75 X 5 X 7 X 12 btg 1,250,000 1,260,000
8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum 1,275,000 1,300,000
397638689.xls 13 sat.pekerjaan
HARGA SATUAN PEKERJAAN
NO. SNI KODE URAIAN PEKERJAAN SAT MINIMUM MAKSIMUM
(Rp) (Rp)
6.8 Memasang Plesteran 1 Pc : 8 Pp Tebal 15 mm m2 23,573.80 25,462.00
6.9 Memasang Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm m2 25,172.00 26,984.00
6.10 Memasang Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm m2 23,539.00 25,451.50
6.11 Memasang Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm m2 20,874.00 22,914.00
6.12 Memasang Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm m2 20,994.00 23,034.00
6.13 Memasang Plesteran 1 Pc : 2 Pp Tebal 20 mm m2 39,534.60 41,994.00
6.14 Memasang Plesteran 1Pc : 3Pp Tebal 20 mm m2 32,020.40 34,061.00
6.15 Memasang Plesteran 1 Pc : 4 Pp Tebal 20 mm m2 34,582.00 37,050.00
6.16 Memasang Plesteran 1Pc : 5Pp Tebal 20 mm m2 33,478.60 35,974.00
6.17 Memasang Plesteran 1Pc : 6Pp Tebal 20 mm m2 32,528.40 35,026.00
6.18 Memasang Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm m2 29,021.00 31,764.00
6.19 Memasang Berapen 1 Pc : 5Pp Tebal 15 mm m2 16,897.20 18,059.00
6.20 Memasang Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm m' 22,522.00 24,251.25
6.23 Memasang Plesteran Ciprat 1Pc : 2 Pp m2 19,381.00 20,775.00
6.24 Memasang Finishing Siar Pasangan Dinding Bata Merah (=20 m') m2 11,467.40 12,213.25
6.25 Memasang Finishing Siar Pasangan Dinding Conblock ekspose (=8 m') m2 5,532.00 5,883.00
6.26 Memasang Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp m2 24,477.00 26,146.25
6.27 Memasang Acian m2 14,292.50 15,273.13
397638689.xls 14 sat.pekerjaan
HARGA SATUAN PEKERJAAN
NO. SNI KODE URAIAN PEKERJAAN SAT MINIMUM MAKSIMUM
(Rp) (Rp)
6.28 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) m3 2,402,575.00 2,627,225.00
6.29 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3 2,966,700.00 3,255,755.00
6.30 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) m3 5,652,564.00 6,157,251.00
6.31 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) m3 4,365,059.00 4,737,986.00
6.32 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting) m3 3,999,595.00 4,323,405.00
6.33 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting) m3 3,999,460.00 4,319,264.00
6.34 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting) m3 4,060,704.00 4,409,171.00
6.35 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm m' 43,774.50 48,002.00
6.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm m' 58,385.00 63,926.75
X 6 PEKERJAAN SANITASI
6.1 Memasang Closet Duduk / Mono Blok Unit 1,103,925.00 1,329,447.00
6.2 Memasang Closet Jongkok Porselen Unit 251,930.00 287,975.00
6.4 Memasang Urinoir Unit 443,850.00 482,975.00
6.5 Memasang Wastafel Unit 970,400.00 1,040,160.00
6.8 Memasang Bak Mandi Batu Bata Vol. 0,30 m3 Unit 763,900.00 828,190.91
6.14 Memasang Pipa Beton, Ø 15 cm - 20 cm m' 47,230.00 55,489.00
6.15 Memasang Pipa Beton, Ø 30 cm - 100 cm m' 242,287.00 268,631.75
6.20 Memasang Pipa Galvanis Ø ¾" m' 35,719.33 37,515.00
6.23 Memasang Pipa Galvanis Ø 3" m' 132,898.87 136,393.00
6.24 Memasang Pipa Galvanis Ø 4" m' 165,479.90 169,201.83
6.25 Memasang Pipa PVC type AW Ø ½" m' 11,189.90 11,881.00
6.29 Memasang Pipa PVC type AW Ø 2" m' 20,466.10 26,088.17
6.31 Memasang Pipa PVC type AW Ø 3" m' 40,259.63 45,242.92
6.33 Memasang Bak Cuci Piring Stainles Steel Buah 304,314.50 335,367.50
6.35 Memasang Kran Ø ¾" atau ½" Buah 12,515.00 20,360.00
6.36 Memasang Floor Drain Buah 8,715.00 9,325.00
397638689.xls 15 sat.pekerjaan
HARGA SATUAN PEKERJAAN
NO. SNI KODE URAIAN PEKERJAAN SAT MINIMUM MAKSIMUM
(Rp) (Rp)
6.16 Memasang Kawat Nyamuk m2 220,972.55 246,727.43
6.17 Memasang Jendela Nako & Tralis m2 26,293.00 28,535.00
6.18 Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm m' 138,200.00 145,985.00
6.19 Memasang Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm m' 63,724.00 67,760.00
397638689.xls 16 sat.pekerjaan
DAFTAR ANALISA PE K E R JAAN
6.2 1 m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 450,150.00 463,066.25
6.2.1 Bahan 428,390.00 439,426.25
1.25 Btg Kayu Dolken diameter 8 - 10 / 400 cm 17,000.00 18,000.00 21,250.00 22,500.00
2.5 Kg Portalnd Semen 1,050.00 1,062.50 2,625.00 2,656.25
1.2 Lbr Seng Gelombang 3" - 5" 65,000.00 67,000.00 78,000.00 80,400.00
0.005 m3 Pasir Beton 140,000.00 150,000.00 700.00 750.00
0.009 m3 Koral Beton 115,000.00 120,000.00 1,035.00 1,080.00
0.072 m3 Kayu 5/7X4m Kayu Kruing 4,500,000.00 4,600,000.00 324,000.00 331,200.00
0.06 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 780.00 840.00
0.45 Kg Meni Besi 13,000.00 18,000.00 5,850.00 8,100.00
6.15 1 m3 Mengurug Sirtu Padat untuk Peninggian Lantai Bangunan 146,575.00 153,375.00
6.15.1 Bahan 138,000.00 144,000.00
1.2 m3 Sirtu 115,000.00 120,000.00 138,000.00 144,000.00
6.6 1 m3 Memasang Pondasi Batu Kali 1Kp : 1Sm : 2Pp 321,650.00 353,450.00
6.6.1 Bahan 240,050.00 264,800.00
1.2 m3 Batu Belah 15/20 120,000.00 130,000.00 144,000.00 156,000.00
0.17 m3 Kapur Pasang (KP) 195,000.00 210,000.00 33,150.00 35,700.00
0.17 Kg Semen Merah (SM) 120,000.00 150,000.00 20,400.00 25,500.00
0.340 m3 Pasir Pasang 125,000.00 140,000.00 42,500.00 47,600.00
6.10 1 m3 Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah 1,663,375.00 1,817,980.00
6.10.1 Bahan 1,517,100.00 1,658,485.00
0.480 m3 Batu Belah 15/20 cm 120,000.00 130,000.00 57,600.00 62,400.00
126 Kg Besi Beton 9,000.00 10,000.00 1,134,000.00 1,260,000.00
194 Kg Portland Semen 1,050.00 1,062.50 203,700.00 206,125.00
0.312 m3 Pasir Beton 140,000.00 150,000.00 43,680.00 46,800.00
0.468 m3 Koral Beton 115,000.00 120,000.00 53,820.00 56,160.00
1.8 Kg Kawat Beton 13,500.00 15,000.00 24,300.00 27,000.00
6.1 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 2Pp 139,865.00 151,108.75
6.1.1 Bahan 111,675.00 120,418.75
140 Buah Bata Merah 400.00 450.00 56,000.00 63,000.00
43.5 Kg Portland Semen (PC) 1,050.00 1,062.50 45,675.00 46,218.75
0.08 m3 Pasir Pasang (PP) 125,000.00 140,000.00 10,000.00 11,200.00
6.2 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3PP 130,162.50 141,439.38
6.2.1 Bahan 101,972.50 110,749.38
140 Buah Bata Merah 400.00 450.00 56,000.00 63,000.00
32.95 Kg Portland Semen (PC) 1,050.00 1,062.50 34,597.50 35,009.38
0.091 m3 Pasir Pasang (PP) 125,000.00 140,000.00 11,375.00 12,740.00
6.3 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 4PP 123,692.50 134,919.38
6.3.1 Bahan 95,502.50 104,229.38
140 Buah Bata Merah 400.00 450.00 56,000.00 63,000.00
26.55 Kg Portland Semen (PC) 1,050.00 1,062.50 27,877.50 28,209.38
0.093 m3 Pasir Pasang (PP) 125,000.00 140,000.00 11,625.00 13,020.00
6.4 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 5PP 120,250.00 131,557.50
6.4.1 Bahan 92,060.00 100,867.50
140 Buah Bata Merah 400.00 450.00 56,000.00 63,000.00
22.2 Kg Portland Semen (PC) 1,050.00 1,062.50 23,310.00 23,587.50
0.102 m3 Pasir Pasang (PP) 125,000.00 140,000.00 12,750.00 14,280.00
6.5 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 6PP 118,865.00 130,426.25
6.5.1 Bahan 90,675.00 99,736.25
140 Buah Bata Merah 400.00 450.00 56,000.00 63,000.00
18.5 Kg Portland Semen (PC) 1,050.00 1,062.50 19,425.00 19,656.25
0.122 m3 Pasir Pasang (PP) 125,000.00 140,000.00 15,250.00 17,080.00
6.6 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3 KP :10PP 111,699.00 123,125.00
6.6.1 Bahan 83,509.00 92,435.00
140 Buah Bata Merah 400.00 450.00 56,000.00 63,000.00
10.08 Kg Portland Semen (PC) 1,050.00 1,062.50 10,584.00 10,710.00
0.0925 m3 Pasir Pasang (PP) 125,000.00 140,000.00 11,562.50 12,950.00
0.0275 m3 Kapur Pasang (KP) 195,000.00 210,000.00 5,362.50 5,775.00
6.7 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 2PP 66,742.50 72,299.38
6.7.1 Bahan 52,647.50 56,954.38
70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
18.95 Kg Portland Semen 1,050.00 1,062.50 19,897.50 20,134.38
0.038 m3 Pasir Pasang 125,000.00 140,000.00 4,750.00 5,320.00
6.9 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 4PP 59,545.00 65,083.75
6.9.1 Bahan 45,450.00 49,738.75
70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
11.50 Kg Portland Semen 1,050.00 1,062.50 12,075.00 12,218.75
0.043 m3 Pasir Pasang 125,000.00 140,000.00 5,375.00 6,020.00
6.10 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 5PP 57,884.00 63,430.00
Bahan 43,789.00 48,085.00
6.10.1 70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
9.68 Kg Portland Semen 1,050.00 1,062.50 10,164.00 10,285.00
0.045 m3 Pasir Pasang 125,000.00 140,000.00 5,625.00 6,300.00
6.11 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 6PP 56,956.00 62,545.00
6.11.1 Bahan 42,861.00 47,200.00
70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
8.32 Kg Portland Semen 1,050.00 1,062.50 8,736.00 8,840.00
0.049 m3 Pasir Pasang 125,000.00 140,000.00 6,125.00 6,860.00
6.12 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 8PP 55,170.00 60,751.25
6.12.1 Bahan 41,075.00 45,406.25
70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
6.50 Kg Portland Semen 1,050.00 1,062.50 6,825.00 6,906.25
0.05 m3 Pasir Pasang 125,000.00 140,000.00 6,250.00 7,000.00
6.13 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3KP : 10PP 55,995.00 61,776.25
6.13.1 Bahan 41,900.00 46,431.25
70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
4.5 Kg Portland Semen 1,050.00 1,062.50 4,725.00 4,781.25
0.05 m3 Pasir Pasang 125,000.00 140,000.00 6,250.00 7,000.00
0.015 m3 Kapur Padam 195,000.00 210,000.00 2,925.00 3,150.00
6.24 1 m2 Memasang Finishing Siar Pasangan Dinding Bata Merah (=20 m') 11,467.40 12,213.25
6.24.1 Bahan 3,263.40 3,302.25
3.108 Kg Portland Semen 1,050.00 1,062.50 3,263.40 3,302.25
6.25 1 m2 Memasang Finishing Siar Pasangan Dinding Conblock ekspose (=8 m') 5,532.00 5,883.00
6.25.1 Bahan 1,680.00 1,700.00
1.600 Kg Portland Semen 1,050.00 1,062.50 1,680.00 1,700.00
6.26 1 m2 Memasang Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp 24,477.00 26,146.25
6.26.1 Bahan 8,157.00 8,416.25
6.34 Kg Pc 1,050.00 1,062.50 6,657.00 6,736.25
0.012 m3 PP 125,000.00 140,000.00 1,500.00 1,680.00
6.2 1 m3 Membuat Kosen Pintu & Jendela Kayu klas II atau III 7,028,150.00 7,947,600.00
6.2.1 Bahan 6,034,250.00 6,877,500.00
1.2 m3 Kayu Klas II (Kamfer) , Balok 5,000,000.00 5,700,000.00 6,000,000.00 6,840,000.00
1.25 kg Paku Biasa 2" - 5 " 13,000.00 14,000.00 16,250.00 17,500.00
1 kg Lem Kayu 18,000.00 20,000.00 18,000.00 20,000.00
6.2.2 Tenaga 993,900.00 1,070,100.00
6.00 OH Pekerja 30,000.00 33,000.00 180,000.00 198,000.00
18.00 OH Tukang Kayu 40,000.00 43,000.00 720,000.00 774,000.00
1.80 OH Kepala Tukang 45,000.00 47,000.00 81,000.00 84,600.00
0.30 OH Mandor 43,000.00 45,000.00 12,900.00 13,500.00
6.3 1 m2 Membuat Pintu KlampStandard Kayu Klas II (Kayu Kamfer) 290,649.00 311,145.00
6.3.1 Bahan 232,650.00 248,700.00
0.040 m3 Kayu Klas II (Kamfer), papan 5,800,000.00 6,200,000.00 232,000.00 248,000.00
0.05 Kg Paku Biasa 2" - 5 " 13,000.00 14,000.00 650.00 700.00
6.5 1 m2 Membuat Daun Pintu Panel Kayu Klas I atau II 398,550.00 427,350.00
6.5.1 Bahan 232,900.00 249,000.00
0.04 m3 Kayu Klas II (Kamfer), papan 5,800,000.00 6,200,000.00 232,000.00 248,000.00
0.050 kg Lem Kayu 18,000.00 20,000.00 900.00 1,000.00
6.5.2 Tenaga 165,650.00 178,350.00
1 OH Pekerja 30,000.00 33,000.00 30,000.00 33,000.00
3.0 OH Tukang Kayu 40,000.00 43,000.00 120,000.00 129,000.00
0.30 OH Kepala Tukang 45,000.00 47,000.00 13,500.00 14,100.00
0.05 OH Mandor 43,000.00 45,000.00 2,150.00 2,250.00
6.6 1 m2 Membuat Pintu & Jendela Kaca Kayu Klas I atau II 277,120.00 297,480.00
6.6.1 Bahan 144,600.00 154,800.00
0.024 m3 Kayu Klas II (Kamfer), papan 5,800,000.00 6,200,000.00 139,200.00 148,800.00
0.300 kg Lem Kayu 18,000.00 20,000.00 5,400.00 6,000.00
6.6.2 Tenaga 132,520.00 142,680.00
0.800 OH Pekerja 30,000.00 33,000.00 24,000.00 26,400.00
2.400 OH Tukang Kayu 40,000.00 43,000.00 96,000.00 103,200.00
0.240 OH Kepala Tukang 45,000.00 47,000.00 10,800.00 11,280.00
0.040 OH Mandor 43,000.00 45,000.00 1,720.00 1,800.00
6.7 1 m2 Membuat Pintu & Jendela Jalusi Kayu Klas I atau II 1,518,650.00 1,596,350.00
6.7.1 Bahan 1,353,000.00 1,418,000.00
0.064 m3 Kayu Klas I (Jati), papan 21,000,000.00 22,000,000.00 1,344,000.00 1,408,000.00
0.5 kg Lem Kayu 18,000.00 20,000.00 9,000.00 10,000.00
6.7.2 Tenaga 165,650.00 178,350.00
1 OH Pekerja 30,000.00 33,000.00 30,000.00 33,000.00
3 OH Tukang Kayu 40,000.00 43,000.00 120,000.00 129,000.00
0.3 OH Kepala Tukang 45,000.00 47,000.00 13,500.00 14,100.00
0.05 OH Mandor 43,000.00 45,000.00 2,150.00 2,250.00
6.8 1 m2 Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm) 321,345.00 345,265.00
6.8.1 Bahan 205,390.00 220,420.00
0.025 m3 Kayu Klas II (Kamfer), papan 5,800,000.00 6,200,000.00 145,000.00 155,000.00
0.030 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 390.00 420.00
0.500 Ltr Lem Kayu 18,000.00 20,000.00 9,000.00 10,000.00
1.000 Lbr Plywood tebal 4 mm uk.90x220cm 51,000.00 55,000.00 51,000.00 55,000.00
6.9 1 m2 Membuat Pintu Plywood rangkap, rangka expose kayu klas I atau II 341,390.00 366,820.00
6.9.1 Bahan 208,870.00 224,140.00
0.0256 m3 Kayu Klas II (Kamfer), papan 5,800,000.00 6,200,000.00 148,480.00 158,720.00
0.03 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 390.00 420.00
0.5 Ltr Lem Kayu 18,000.00 20,000.00 9,000.00 10,000.00
1 Lbr Plywood tebal 4 mm uk.90x220cm 51,000.00 55,000.00 51,000.00 55,000.00
6.9.2 Tenaga 132,520.00 142,680.00
0.800 OH Pekerja 30,000.00 33,000.00 24,000.00 26,400.00
2.400 OH Tukang Kayu 40,000.00 43,000.00 96,000.00 103,200.00
0.240 OH Kepala Tukang 45,000.00 47,000.00 10,800.00 11,280.00
0.040 OH Mandor 43,000.00 45,000.00 1,720.00 1,800.00
6.11 1 m2 Membuat Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I 714,310.00 754,100.00
6.11.1 Bahan 581,790.00 611,420.00
0.025 m3 Kayu Klas I (Jati), papan 21,000,000.00 22,000,000.00 525,000.00 550,000.00
0.03 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 390.00 420.00
0.3 kg Lem Kayu 18,000.00 20,000.00 5,400.00 6,000.00
1 Lbr Teakwood (90 x 220) cm x 4 mm 51,000.00 55,000.00 51,000.00 55,000.00
6.12 1 m2 Membuat Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II 361,154.00 388,640.00
6.12.1 Bahan 220,330.00 237,020.00
0.025 m3 Kayu Klas II (Kamfer), papan 5,800,000.00 6,200,000.00 145,000.00 155,000.00
0.03 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 390.00 420.00
0.08 kg Lem Kayu 18,000.00 20,000.00 1,440.00 1,600.00
1 Lbr Teakwood (90 x 220) cm x 4 mm 51,000.00 55,000.00 51,000.00 55,000.00
0.5 Lbr Formika 45,000.00 50,000.00 22,500.00 25,000.00
6.12.2 Tenaga 140,824.00 151,620.00
0.850 OH Pekerja 30,000.00 33,000.00 25,500.00 28,050.00
2.550 OH Tukang Kayu 40,000.00 43,000.00 102,000.00 109,650.00
0.255 OH Kepala Tukang 45,000.00 47,000.00 11,475.00 11,985.00
0.043 OH Mandor 43,000.00 45,000.00 1,849.00 1,935.00
6.13 1 m3 Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter 6,444,800.00 7,278,900.00
6.13.1 Bahan 5,782,800.00 6,565,900.00
1.1 m3 Kayu Kamfer, balok 5,000,000.00 5,700,000.00 5,500,000.00 6,270,000.00
15 Kg Besi Strip 14,000.00 14,500.00 210,000.00 217,500.00
5.6 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 72,800.00 78,400.00
6.16 1 m2 Memasang Rangka Atap Genteng Keramik, Kayu Klas II 98,915.00 112,115.00
6.16.1 Bahan 91,250.00 103,820.00
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm 5,000,000.00 5,700,000.00 70,000.00 79,800.00
0.0036 m3 Reng (2x3) cm 5,000,000.00 5,700,000.00 18,000.00 20,520.00
0.25 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 3,250.00 3,500.00
6.17 1 m2 Memasang Rangka Atap Genteng Beton, Kayu Klas II 116,915.00 132,635.00
6.17.1 Bahan 109,250.00 124,340.00
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm 5,000,000.00 5,700,000.00 70,000.00 79,800.00
0.0072 m3 Reng (2x3) cm 5,000,000.00 5,700,000.00 36,000.00 41,040.00
0.25 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 3,250.00 3,500.00
6.19 1 m2 Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II atau III 100,675.00 113,215.00
6.19.1 Bahan 79,600.00 90,580.00
0.0154 m3 Kayu Klas II (Kamfer), balok 5,000,000.00 5,700,000.00 77,000.00 87,780.00
0.2 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 2,600.00 2,800.00
6.20 1 m2 Memasang Rangka Langit-langit (60x60) cm, kayu Klas II atau III 104,530.00 117,770.00
6.20.1 Bahan 84,750.00 96,410.00
0.0163 m3 Kayu Klas II (Kamfer), balok 5,000,000.00 5,700,000.00 81,500.00 92,910.00
0.25 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 3,250.00 3,500.00
6.21 1 m' Memasang Listplank Uk. (3x20)cm Kayu klas I atau II 240,215.00 252,065.00
6.21.1 Bahan 228,100.00 239,000.00
0.0108 m3 Kayu klas I (Jati), papan 21,000,000.00 22,000,000.00 226,800.00 237,600.00
0.10 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 1,300.00 1,400.00
6.22 1 m' Memasang Listplank Uk. (3x30)cm Kayu klas I atau klas II 76,565.00 81,965.00
6.22.1 Bahan 64,450.00 68,900.00
0.011 m3 Kayu klas II (Kamfer), papan 5,800,000.00 6,200,000.00 63,800.00 68,200.00
0.05 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 650.00 700.00
6.23 1 m2 Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III 166,819.00 188,475.00
6.23.1 Bahan 141,950.00 161,700.00
0.028 m3 Kayu klas II (Kamfer), balok 5,000,000.00 5,700,000.00 140,000.00 159,600.00
0.15 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 1,950.00 2,100.00
6.24 1 m2 Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II 220,759.00 246,975.00
6.24.1 Bahan 195,890.00 220,200.00
0.028 m3 Kayu klas II (Kamfer), balok 5,000,000.00 5,700,000.00 140,000.00 159,600.00
0.15 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 1,950.00 2,100.00
0.86 Lbr Teakwood 120 x 240 cm tebal 4mm 51,000.00 55,000.00 43,860.00 47,300.00
0.56 Ltr Lem 18,000.00 20,000.00 10,080.00 11,200.00
6.27 1 m2 Memasang Dinding Lambriziring dari Plywood ukuran (120x240) cm 25,203.00 27,171.00
6.27.1 Bahan 21,050.00 22,700.00
0.4 Lbr Plywood (120 X 240) cm x 4mm 51,000.00 55,000.00 20,400.00 22,000.00
0.05 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 650.00 700.00
6.28 1 m2 Memasang Dinding Bilik, Rangka Kayu Klas III atau IV 86,908.60 93,943.00
6.28.1 Bahan 81,468.60 88,033.00
1.500 m2 Bilik Bambu 15,000.00 17,500.00 22,500.00 26,250.00
0.014 m3 Kayu Klas III (Meranti) 4,200,000.00 4,400,000.00 58,800.00 61,600.00
0.012 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 156.00 168.00
0.003 m' List Kayu 2/4 4,200.00 5,000.00 12.60 15.00
6.2 1 m3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 524,931.91 544,159.59
6.2.1 Bahan 459,602.91 472,833.59
276 Kg Portland Semen 1,050.00 1,062.50 289,800.00 293,250.00
828 kg Pasir Beton 100.00 107.14 82,800.00 88,714.29
1,012 kg Kerikil (maksimum 30 mm) 85.19 88.89 86,207.41 89,955.56
215 ltr Air 3.70 4.25 795.50 913.75
6.2.2 Tenaga 65,329.00 71,326.00
1.65 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00
6.3 1 m3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 546,607.83 565,934.39
6.3.1 Bahan 481,278.83 494,608.39
299 Kg Portland Semen 1,050.00 1,062.50 313,950.00 317,687.50
799 kg Pasir Beton 100.00 107.14 79,900.00 85,607.14
1,017 kg Kerikil (maksimum 30 mm) 85.19 88.89 86,633.33 90,400.00
215 ltr Air 3.70 4.25 795.50 913.75
6.3.2 Tenaga 65,329.00 71,326.00
1.65 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00
6.4 1 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 464,183.19 481,602.46
6.4.1 Bahan 419,025.19 432,192.46
230 Kg Portland Semen 1,050.00 1,062.50 241,500.00 244,375.00
893 kg Pasir Beton 100.00 107.14 89,300.00 95,678.57
1,027 kg Kerikil (maksimum 30 mm) 85.19 88.89 87,485.19 91,288.89
200 ltr Air 3.70 4.25 740.00 850.00
6.4.2 Tenaga 45,158.00 49,410.00
1.2 OH Pekerja 30,000.00 33,000.00 36,000.00 39,600.00
0.2 OH Tukang Batu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.006 OH Mandor 43,000.00 45,000.00 258.00 270.00
6.5 1 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 572,080.06 591,509.99
6.5.1 Bahan 506,751.06 520,183.99
326 Kg Portland Semen 1,050.00 1,062.50 342,300.00 346,375.00
760 Kg Pasir Beton 100.00 107.14 76,000.00 81,428.57
1,029 Kg Kerikil (maksimum 30 mm) 85.19 88.89 87,655.56 91,466.67
215 ltr Air 3.70 4.25 795.50 913.75
6.5.2 Tenaga 65,329.00 71,326.00
1.65 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00
6.6 1 m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 596,650.43 616,205.62
6.6.1 Bahan 531,321.43 544,879.62
352 Kg Portland Semen 1,050.00 1,062.50 369,600.00 374,000.00
731 Kg Pasir Beton 100.00 107.14 73,100.00 78,321.43
1,031 Kg Kerikil (maksimum 30 mm) 85.19 88.89 87,825.93 91,644.44
215 ltr Air 3.70 4.25 795.50 913.75
6.6.2 Tenaga 65,329.00 71,326.00
1.650 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00
6.7 1 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 614,663.39 634,279.63
6.7.1 Bahan 549,334.39 562,953.63
371 Kg Portland Semen 1,050.00 1,062.50 389,550.00 394,187.50
698 Kg Pasir Beton 100.00 107.14 69,800.00 74,785.71
1,047 Kg Kerikil (maksimum 30 mm) 85.19 88.89 89,188.89 93,066.67
215 ltr Air 3.70 4.25 795.50 913.75
6.7.2 Tenaga 65,329.00 71,326.00
1.650 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00
6.8 1 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 627,031.91 646,738.16
6.8.1 Bahan 561,702.91 575,412.16
384 Kg Portland Semen 1,050.00 1,062.50 403,200.00 408,000.00
692 Kg Pasir Beton 100.00 107.14 69,200.00 74,142.86
1,039 Kg Kerikil (maksimum 30 mm) 85.19 88.89 88,507.41 92,355.56
215 ltr Air 3.70 4.25 795.50 913.75
6.9 1 m3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 648,224.50 668,100.46
6.9.1 Bahan 582,895.50 596,774.46
406 Kg Portland Semen 1,050.00 1,062.50 426,300.00 431,375.00
684 kg Pasir Beton 100.00 107.14 68,400.00 73,285.71
1,026 kg Kerikil (maksimum 30 mm) 85.19 88.89 87,400.00 91,200.00
215 ltr Air 3.70 4.25 795.50 913.75
6.9.2 Tenaga 65,329.00 71,326.00
1.650 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00
6.10 1 m3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 654,848.57 674,772.09
6.10.1 Bahan 589,519.57 603,446.09
413 Kg Portland Semen 1,050.00 1,062.50 433,650.00 438,812.50
681 Kg Pasir Beton 100.00 107.14 68,100.00 72,964.29
1,021 Kg Kerikil (maksimum 30 mm) 85.19 88.89 86,974.07 90,755.56
215 ltr Air 3.70 4.25 795.50 913.75
6.11 1 m3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 697,531.80 719,279.19
6.11.1 Bahan 614,441.80 628,559.19
439 Kg Portland Semen 1,050.00 1,062.50 460,950.00 466,437.50
670 Kg Pasir Beton 100.00 107.14 67,000.00 71,785.71
1,006 Kg Kerikil (maksimum 30 mm) 85.19 88.89 85,696.30 89,422.22
215 ltr Air 3.70 4.25 795.50 913.75
6.11.2 Tenaga 83,090.00 90,720.00
2.1 OH Pekerja 30,000.00 33,000.00 63,000.00 69,300.00
0.35 OH Tukang Batu 40,000.00 43,000.00 14,000.00 15,050.00
0.035 OH Kepala Tukang 45,000.00 47,000.00 1,575.00 1,645.00
0.105 OH Mandor 43,000.00 45,000.00 4,515.00 4,725.00
6.12 1 m3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 706,170.69 727,986.92
6.12.1 Bahan 623,080.69 637,266.92
448 Kg Portland Semen 1,050.00 1,062.50 470,400.00 476,000.00
667 Kg Pasir Beton 100.00 107.14 66,700.00 71,464.29
1,000 Kg Kerikil (maksimum 30 mm) 85.19 88.89 85,185.19 88,888.89
215 ltr Air 3.70 4.25 795.50 913.75
6.12.2 Tenaga 83,090.00 90,720.00
2.10 OH Pekerja 30,000.00 33,000.00 63,000.00 69,300.00
0.350 OH Tukang Batu 40,000.00 43,000.00 14,000.00 15,050.00
0.035 OH Kepala Tukang 45,000.00 47,000.00 1,575.00 1,645.00
0.105 OH Mandor 43,000.00 45,000.00 4,515.00 4,725.00
6.28 1 m3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) 2,402,575.00 2,627,225.00
6.28.1 Bahan 2,138,575.00 2,339,450.00
0.2 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 110,000.00 130,000.00
1.5 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 19,500.00 21,000.00
0.4 Ltr Minyak Bekisting 8,000.00 10,000.00 3,200.00 4,000.00
157.5 Kg Besi Beton Polos 9,000.00 10,000.00 1,417,500.00 1,575,000.00
2.25 Kg Kawat Beton 13,500.00 15,000.00 30,375.00 33,750.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00
6.29 1 m3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) 2,966,700.00 3,255,755.00
6.29.1 Bahan 2,667,800.00 2,930,200.00
0.27 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 148,500.00 175,500.00
2 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 26,000.00 28,000.00
0.6 Ltr Minyak Bekisting 8,000.00 10,000.00 4,800.00 6,000.00
210 Kg Besi Beton Polos 9,000.00 10,000.00 1,890,000.00 2,100,000.00
3 Kg Kawat Beton 13,500.00 15,000.00 40,500.00 45,000.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00
6.30 1 m3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) 5,652,564.00 6,157,251.00
6.30.1 Bahan 5,246,750.00 5,716,700.00
0.4 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 220,000.00 260,000.00
4 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 52,000.00 56,000.00
2 Ltr Minyak Bekisting 8,000.00 10,000.00 16,000.00 20,000.00
315 kg Besi Beton Polos 9,000.00 10,000.00 2,835,000.00 3,150,000.00
4.5 kg Kawat Beton 13,500.00 15,000.00 60,750.00 67,500.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00
0.15 m3 Kayu Klas II Balok 4,500,000.00 4,800,000.00 675,000.00 720,000.00
3.5 Lbr Plywood 9 mm 140,000.00 145,000.00 490,000.00 507,500.00
20 Btg Dolken diameter 8 / 4rm 17,000.00 18,000.00 340,000.00 360,000.00
6.31 1 m3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) 4,365,059.00 4,737,986.00
6.31.1 Bahan 4,012,900.00 4,355,500.00
0.32 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 176,000.00 208,000.00
3.2 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 41,600.00 44,800.00
1.6 Ltr Minyak Bekisting 8,000.00 10,000.00 12,800.00 16,000.00
210 Kg Besi Beton Polos 9,000.00 10,000.00 1,890,000.00 2,100,000.00
3 Kg Kawat Beton 13,500.00 15,000.00 40,500.00 45,000.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00
0.14 m3 Kayu Klas II Balok 4,500,000.00 4,800,000.00 630,000.00 672,000.00
2.8 Lbr Plywood 9 mm 140,000.00 145,000.00 392,000.00 406,000.00
16 Btg Dolken diameter 8 / 4rm 17,000.00 18,000.00 272,000.00 288,000.00
6.32 1 m3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting) 3,999,595.00 4,323,405.00
6.32.1 Bahan 3,712,275.00 4,011,250.00
0.32 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 176,000.00 208,000.00
3.2 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 41,600.00 44,800.00
1.6 Ltr Minyak Bekisting 8,000.00 10,000.00 12,800.00 16,000.00
157.5 Kg Besi Beton Polos 9,000.00 10,000.00 1,417,500.00 1,575,000.00
2.25 Kg Kawat Beton 13,500.00 15,000.00 30,375.00 33,750.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00
0.12 m3 Kayu Klas II Balok 4,500,000.00 4,800,000.00 540,000.00 576,000.00
2.8 Lbr Plywood 9 mm 140,000.00 145,000.00 392,000.00 406,000.00
32 Btg Dolken diameter 8 / 4rm 17,000.00 18,000.00 544,000.00 576,000.00
6.32.2 Tenaga 287,320.00 312,155.00
5.3 OH Pekerja 30,000.00 33,000.00 159,000.00 174,900.00
0.275 OH Tukang batu 40,000.00 43,000.00 11,000.00 11,825.00
1.3 OH Tukang Kayu 40,000.00 43,000.00 52,000.00 55,900.00
1.05 OH Tukang Besi 40,000.00 43,000.00 42,000.00 45,150.00
0.265 OH Kepala Tukang 45,000.00 47,000.00 11,925.00 12,455.00
0.265 OH Mandor 43,000.00 45,000.00 11,395.00 11,925.00
6.33 1 m3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting) 3,999,460.00 4,319,264.00
6.33.1 Bahan 3,712,275.00 4,007,250.00
0.24 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 132,000.00 156,000.00
3.2 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 41,600.00 44,800.00
1.6 Ltr Minyak Bekisting 8,000.00 10,000.00 12,800.00 16,000.00
157.5 Kg Besi Beton Polos 9,000.00 10,000.00 1,417,500.00 1,575,000.00
2.25 Kg Kawat Beton 13,500.00 15,000.00 30,375.00 33,750.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00
0.16 m3 Kayu Klas II Balok 4,500,000.00 4,800,000.00 720,000.00 768,000.00
2.8 Lbr Plywood 9 mm 140,000.00 145,000.00 392,000.00 406,000.00
24 Btg Dolken diameter 8 / 4rm 17,000.00 18,000.00 408,000.00 432,000.00
6.33.2 Tenaga 287,185.00 312,014.00
5.3 OH Pekerja 30,000.00 33,000.00 159,000.00 174,900.00
0.275 OH Tukang batu 40,000.00 43,000.00 11,000.00 11,825.00
1.3 OH Tukang Kayu 40,000.00 43,000.00 52,000.00 55,900.00
1.05 OH Tukang Besi 40,000.00 43,000.00 42,000.00 45,150.00
0.262 OH Kepala Tukang 45,000.00 47,000.00 11,790.00 12,314.00
0.265 OH Mandor 43,000.00 45,000.00 11,395.00 11,925.00
6.34 1 m3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting) 4,060,704.00 4,409,171.00
6.34.1 Bahan 3,735,100.00 4,055,700.00
0.25 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 137,500.00 162,500.00
3 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 39,000.00 42,000.00
1.2 Ltr Minyak Bekisting 8,000.00 10,000.00 9,600.00 12,000.00
210 Kg Besi Beton Polos 9,000.00 10,000.00 1,890,000.00 2,100,000.00
3 Kg Kawat Beton 13,500.00 15,000.00 40,500.00 45,000.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00
0.105 m3 Kayu Klas II Balok 4,500,000.00 4,800,000.00 472,500.00 504,000.00
2.5 Lbr Plywood 9 mm 140,000.00 145,000.00 350,000.00 362,500.00
14 Btg Dolken diameter 8 / 4rm 17,000.00 18,000.00 238,000.00 252,000.00
6.34.2 Tenaga 325,604.00 353,471.00
5.65 OH Pekerja 30,000.00 33,000.00 169,500.00 186,450.00
0.275 OH Tukang batu 40,000.00 43,000.00 11,000.00 11,825.00
1.56 OH Tukang Kayu 40,000.00 43,000.00 62,400.00 67,080.00
1.4 OH Tukang Besi 40,000.00 43,000.00 56,000.00 60,200.00
0.323 OH Kepala Tukang 45,000.00 47,000.00 14,535.00 15,181.00
0.283 OH Mandor 43,000.00 45,000.00 12,169.00 12,735.00
6.35 1 m' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 43,774.50 48,002.00
6.35.1 Bahan 35,317.50 38,795.00
0.002 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 1,100.00 1,300.00
0.01 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 130.00 140.00
3 Ltr Besi Beton Polos 9,000.00 10,000.00 27,000.00 30,000.00
0.045 Kg Kawat Beton 13,500.00 15,000.00 607.50 675.00
4 Kg Portland Semen 1,050.00 1,062.50 4,200.00 4,250.00
0.006 m3 Pasir Beton 140,000.00 150,000.00 840.00 900.00
0.009 m3 Kerikil Beton 160,000.00 170,000.00 1,440.00 1,530.00
6.35.2 Tenaga 8,457.00 9,207.00
0.18 OH Pekerja 30,000.00 33,000.00 5,400.00 5,940.00
0.02 OH Tukang batu 40,000.00 43,000.00 800.00 860.00
0.02 OH Tukang Kayu 40,000.00 43,000.00 800.00 860.00
0.02 OH Tukang Besi 40,000.00 43,000.00 800.00 860.00
0.006 OH Kepala Tukang 45,000.00 47,000.00 270.00 282.00
0.009 OH Mandor 43,000.00 45,000.00 387.00 405.00
6.1 1 m2 Memasang Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm 17,517.00 18,949.00
6.1.1 Bahan 13,330.00 14,440.00
1.1 Lbr Plat Asbes 12,000.00 13,000.00 13,200.00 14,300.00
0.01 Kg Paku 13,000.00 14,000.00 130.00 140.00
6.5 1 m2 Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm 27,180.00 29,340.00
6.5.1 Bahan 19,515.00 21,045.00
0.375 Lbr Tripleks (4 mm) 51,000.00 55,000.00 19,125.00 20,625.00
0.03 Kg Paku Tripleks 13,000.00 14,000.00 390.00 420.00
6.9 1 m2 Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium 129,975.00 137,025.00
6.9.1 Bahan 91,650.00 95,550.00
3.6 m' Profil Allumunium "T" 3,500.00 4,000.00 12,600.00 14,400.00
0.15 kg Kawat Ø 4 mm 6,500.00 7,000.00 975.00 1,050.00
1.05 bh Ramset 21,500.00 22,000.00 22,575.00 23,100.00
1.5 lmb Akuatik 60 x 120 cm 37,000.00 38,000.00 55,500.00 57,000.00
X PEKERJAAN SANITASI
6.1 1 Unit Memasang Closet Duduk / Mono Blok 1,103,925.00 1,329,447.00
6.1.1 Bahan 954,000.00 1,166,000.00
1 Buah Kloset Duduk / Monoblok 900,000.00 1,100,000.00 900,000.00 1,100,000.00
0.06 Kelengkapan 6% dari harga Kloset 900,000.00 1,100,000.00 54,000.00 66,000.00
6.8 1 Unit Memasang Bak Mandi Batu Bata Vol. 0,30 m3 763,900.00 828,190.91
6.8.1 Bahan 437,500.00 473,590.91
0.4 m3 Batu Bata 300,000.00 337,500.00 120,000.00 135,000.00
120 Kg Portland Semen 1,050.00 1,062.50 126,000.00 127,500.00
0.3 m3 Pasir Pasang 125,000.00 140,000.00 37,500.00 42,000.00
360 buah Porselen 11 x 11 cm 277.78 303.03 100,000.00 109,090.91
6 Kg Semen Nat 9,000.00 10,000.00 54,000.00 60,000.00
6.33 1 Buah Memasang Bak Cuci Piring Stainles Steel 304,314.50 335,367.50
6.33.1 Bahan 290,000.00 320,000.00
1 Buah Bak Cuci Stainles Steel 145,000.00 160,000.00 145,000.00 160,000.00
1 Set Water Drain & assesories 145,000.00 160,000.00 145,000.00 160,000.00
6.18 1 m' Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm 138,200.00 145,985.00
6.18.1 Bahan 114,645.00 120,560.00
1.05 Lbr Seng Plaat 33,000.00 35,000.00 34,650.00 36,750.00
0.015 Kg Paku Biasa 1 - 2,5 cm 13,000.00 14,000.00 195.00 210.00
0.019 m3 Kayu Papan Klas II atau III 4,200,000.00 4,400,000.00 79,800.00 83,600.00
6.19 1 m' Memasang Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm 63,724.00 67,760.00
6.19.1 Bahan 45,530.00 48,140.00
1.05 Lbr Seng Plaat 38,000.00 40,000.00 39,900.00 42,000.00
0.01 Kg Paku Biasa 1 - 2,5 cm 13,000.00 14,000.00 130.00 140.00
0.5 Kg Besi strip 11,000.00 12,000.00 5,500.00 6,000.00
6.57 1 m2 Memasang Dinding Batu Paros / Batu Tempel Hitam 131,792.50 141,254.38
6.57.1 Bahan 93,712.50 99,884.38
1.10 m2 Batu Paros 70,000.00 75,000.00 77,000.00 82,500.00
11.75 Kg Portland Semen 1,050.00 1,062.50 12,337.50 12,484.38
0.035 m3 Pasir Pasang 125,000.00 140,000.00 4,375.00 4,900.00
6.63 1 m' Memasang Plint Kayu Klas II Ukuran 2x10 cm 26,603.00 28,559.50
6.63.1 Bahan 17,405.00 18,605.50
0.003 m3 Papan Kayu Klas II 5,800,000.00 6,200,000.00 17,400.00 18,600.00
0.05 kg Paku Sekrup 5 cm 100.00 110.00 5.00 5.50
6.2 1 m2 Mencuci Bidang Permukaan Tembok yang Pernah dicat 5,157.50 5,687.50
6.2.1 Bahan 550.00 625.00
0.05 Kg Sabun 11,000.00 12,500.00 550.00 625.00
6.3 1 m2 Mengerok Karat Cat Lama permukaan Baja dg cara manual 5,157.50 5,687.50
6.3.1 Bahan 550.00 625.00
0.05 Kg Sabun 11,000.00 12,500.00 550.00 625.00
6.12 1 m2 Pelaburan Bidang Kayu dg Cat Residu & Ter 4,133.00 4,515.00
6.12.1 Bahan 875.00 945.00
0.35 Ltr Residu atau Ter 2,500.00 2,700.00 875.00 945.00
6.14 1 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 9,561.00 10,383.60
2 lap. Cat Penutup)
6.14.1 Bahan 6,050.00 6,606.00
0.1 Kg Plamir 9,000.00 10,500.00 900.00 1,050.00
0.1 Kg Cat Dasar 12,500.00 15,000.00 1,250.00 1,500.00
0.26 Kg Cat Penutup 2 kali 15,000.00 15,600.00 3,900.00 4,056.00
6.14.2 Tenaga 3,511.00 3,777.60
0.02 OH Pekerja 30,000.00 33,000.00 600.00 660.00
0.063 OH Tukang Cat 40,000.00 43,000.00 2,520.00 2,709.00
0.0063 OH Kepala Tukang 45,000.00 47,000.00 283.50 296.10
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50
6.15 1 m2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup) 6,766.50 7,347.90
6.15.1 Bahan 3,950.00 4,308.00
0.1 Kg Cat Dasar 12,500.00 15,000.00 1,250.00 1,500.00
0.18 Kg Cat Penutup 2 kali 15,000.00 15,600.00 2,700.00 2,808.00
6.21 1 m2 Pengecatan Permukaan Baja dg Meni Besi & Perancah 20,555.00 22,770.00
6.21.1 Bahan 2,720.00 3,450.00
0.1 Kg Meni Besi 13,000.00 18,000.00 1,300.00 1,800.00
0.01 Kg Perekat / Lem 32,000.00 35,000.00 320.00 350.00
0.002 m3 Perancah Kayu 550,000.00 650,000.00 1,100.00 1,300.00