DAFTAR SEWA P E R A L A T AN

SUMBER DATA : PASARAN BE BAS


D A E R A H : KOTA SEMARANG
EDISI KEDUA 2012

HARGA
NO. PERALATAN SATUAN MINIMUM MAKSIMUM KET.
(Rp) (Rp)

1 Dump Truck 3 ton Jam 170,000 185,000


2 Dump Truck 5 ton Jam 195,000 200,000
3 Truk Bak Terbuka Jam 145,000 150,000
4 Truk Tanki Air Jam 135,000 140,000
5 Bulldozer Jam 205,000 220,000
6 Motor Grader Jam 160,000 170,000
7 Wheel Loader Jam 160,000 175,000
8 Excavator Jam 160,000 175,000
9 Crane Jam 135,000 150,000
10 Trailler Jam 190,000 200,000
11 Mesin Gilas Tandem 6 - 10 ton Jam 135,000 150,000
12 Mesin Gilas 3 roda 6 - 10 ton Jam 110,000 125,000
13 Mesin Gilas Roda Karet 8 - 10 ton Jam 150,000 170,000
14 Vibratory Roller Jam 150,000 165,000
15 Vibro roller 1 ton Jam 85,000 90,000
16 Water Pump Jam 50,000 65,000
17 Asphalt Sprayer Jam 70,000 75,000
18 Pick Up Jam 65,000 75,000
19 AMP Jam 1,600,000 1,750,000
20 Asphalt Finisher Jam 190,000 200,000
21 Concrete Vibrator Jam 75,000 80,000
22 Compressor Jam 90,000 100,000
23 Concrete Mixer Jam 75,000 80,000
24 Stamper Jam 50,000 60,000
25 Genset Jam 180,000 190,000
26 Alat Pengecat Marka Jam 70,000 80,000
DAFTAR UPAH PEKERJA

SUMBER DATA : PASARAN BE BAS


D A E R A H : KOTA SEMARANG
EDISI KEDUA 2012

HARGA
NO. JENIS BAHAN SATUAN MINIMUM MAKSIMUM KET.
(Rp) (Rp)
1 Pekerja Hr 30,000 33,000
2 Mandor Hr 43,000 45,000
3 Tukang listrik Hr 40,000 43,000
4 Tukang kayu Hr 40,000 43,000
5 Kep. tk. kayu Hr 45,000 47,000
6 Tukang batu Hr 40,000 43,000
7 Kep. tk. batu Hr 45,000 47,000
8 Tukang besi Hr 40,000 43,000
9 Kep. tk. besi Hr 45,000 47,000
10 Tukang cat Hr 40,000 43,000
11 Kep. tk. cat Hr 45,000 47,000
12 Tukang plitur Hr 40,000 43,000
13 Tukang jalan Hr 35,000 37,500
14 Tukang gali Hr 32,500 35,000
15 Tukang masak aspal Hr 35,000 37,500
16 Tk. leideng Hr 40,000 43,000
17 Masinis Hr 45,000 50,000
18 Pemb. Masinis Hr 40,000 45,000
19 Penjaga api Hr 35,000 40,000
20 Penjaga malam Hr 30,000 35,000
21 Sopir Hr 45,000 50,000
22 Pembantu Sopir Hr 32,000 35,000

397638689.xls 54 daftar upah tenaga kerja


p

397638689.xls 54 daftar upah tenaga kerja


DAFTAR HARGA SATUAN BAHAN BANGUNAN

SUMBER DATA : PASARAN BEBAS


D A E R A H : KOTA SEMARANG
EDISI KEDUA 2012

HARGA

NO. J E N I S B A H A N SATUAN MINIMUM MAKSIMUM KETERANGAN

(Rp) (Rp)

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 110,000 120,000
Bulat Belah m3 120,000 130,000
Pecah 10/15 m3 140,000 145,000
Pecah 5/7 m3 140,000 150,000
Pecah 3/5 m3 145,000 155,000
2 KERIKIL Timbun m3 85,000 90,000
Sawur / Koral m3 115,000 120,000
Beton 0,5/1 m3 165,000 180,000
Beton ,1/2 m3 165,000 175,000
Beton ,2/3 m3 160,000 170,000
Biasa m3 115,000 120,000
Tras Giling m3 190,000 205,000
3 BATU BATA ex lokal bh 400 450

4 PASIR Urug m3 75,000 85,000


Pasang m3 125,000 140,000
Beton m3 140,000 150,000
5 TANAH Padas m3 45,000 50,000
Liat m3 45,000 50,000
6 KAPUR Pasang m3 195,000 210,000
Semen Merah m3 120,000 150,000
7 PORTLAND CEMENT
Holcim 40 kg zak 42,000 42,500
Holcim 50 kg zak 51,000 52,000
Cibinong 40 kg zak 42,000 43,000
Cibinong 50 kg zak 51,000 51,500
Semen Putih 40 kg zak 57,000 65,000
Semen Putih 50 kg zak 70,000 78,500
Semen warna kg 9,000 10,000

II BAHAN PENUTUP ATAP

1 SIRAP (100 lbr) pak 140,000 150,000

2 GENTENG BETON Genteng Beton Warna standard bh 3,000 3,200


Genteng Beton Warna Special bh 4,200 4,500
Genteng Beton Warna Khusus bh 4,700 5,000
Kerpus Beton Warna Standard bh 3,750 4,000
Kerpus Beton Warna Special bh 4,500 4,750
Kerpus Beton Warna Khusus bh 8,700 10,000
3 GENTENG TANAH LIAT
Vlaam bh 1,050 1,200
Kodok bh 1,300 1,500
Kodok Glasur bh 2,500 2,700
Nok kerpus Kodok bh 3,100 3,200
Nok kerpus Kodok Glasur bh 6,500 7,000
Plentong super besar 18 bh/m2 bh 2,800 3,000
Nok kerpus plentong super bh 6,750 7,000
HARGA

NO. J E N I S B A H A N SATUAN MINIMUM MAKSIMUM KETERANGAN

(Rp) (Rp)
4 GENTENG KACA
Vlaam tebal 2 mm bh 5,850 6,000
Vlaam tebal 3 mm bh 5,750 8,000
Kodok tebal 2 mm bh 5,500 6,000
Kodok tebal 3 mm bh 6,000 7,000

5 ASBES GELOMBANG BESAR


. 200 cm X 102 cm X 5 mm bh 67,000 70,000
. 250 cm X 102 cm X 5 mm bh 80,000 82,000
. 225 cm X 102 cm X 5 mm bh 73,500 76,000
. 200 cm X 102 cm X 6 mm bh 55,000 58,000
. 225 cm X 102 cm X 6 mm bh 62,500 63,000
. 250 cm X 102 cm X 6 mm bh 66,500 71,000
Asbes Gelombang Kecil
. 150 cm X 105 cm X 4 mm bh 35,000 37,000
. 180 cm X 105 cm X 4 mm bh 38,500 42,000
. 210 cm X 105 cm X 4 mm bh 48,000 51,000
. 240 cm X 105 cm X 4 mm bh 57,000 59,000
. 270 cm X 105 cm X 4 mm bh 64,000 67,000
. 300 cm X 105 cm X 4 mm bh 73,500 75,000
Onduline 95 cm x 200 cm x 3 mm lbr 130,000 *) belum PPn
Ondovilla 40 cm x 106 cm x 3 mm lbr 55,000 *) belum PPn
NOK Jabes nok
. Kerpus Genteng bh 19,500 21,000
. Stel Besar bh 36,000 45,000
. Paten Besar bh 35,800 39,000
Nokstel gelombang harflex
. Stel Besar bh 37,500 41,500
. Patent Besar bh 17,300 18,000
. Plat besar bh 47,000 49,000
Onduline
50 cm x 90 cm x 3 mm lbr 75,000 *) belum PPn
6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 11,000 12,000
. 100cm X 100 cm X 4 mm bh 12,000 13,000
. 50 cm X 200 cm X 3 mm bh 10,000 11,000
. 40 cm X 200 cm X 3 mm bh 10,000 11,000
Gyproc unt dinding 120 cm x 240 cm x 12 mm lbr 56,000 58,000 *) belum PPn
/ plafond 120 cm x 240 cm x 9 mm lbr 45,000 47,000 *) belum PPn

7 FIBRE GLASS (JABES)


180 X 92 cm bh 55,000 60,000
200 X 92 cm bh 60,000 70,000
250 X 92 cm bh 65,000 72,000
180 X 105 cm bh 40,000 42,000
210 X 105 cm bh 45,000 46,000
250 X 105 cm bh 49,000 52,000
8 SENG PLAT
BJLS 0,18 lebar 55 cm m' 18,000 20,000
BJLS 0,20 lebar 55 cm m' 23,000 27,000
BJLS 0,28 lebar 55 cm m' 33,000 35,000
BJLS 0,30 lebar 55 cm m' 38,000 40,000
9 SENG GELOMBANG
BJLS 0,18 panjang 180 cm lbr 55,000 57,000
BJLS 0,20 panjang 180 cm lbr 57,000 60,000
BJLS 0,30 panjang 180 cm lbr 65,000 67,000
BJLS 0,40 panjang 180 cm lbr 73,000 75,000
III . B A H A N K A Y U
1 JATI Papan m3 21,000,000 22,000,000
Balok/pesagen m3 18,500,000 19,000,000
HARGA

NO. J E N I S B A H A N SATUAN MINIMUM MAKSIMUM KETERANGAN

(Rp) (Rp)

2 KAMPER Papan m3 5,800,000 6,200,000


Balok/pesagen m3 5,000,000 5,700,000

3 KRUING Papan m3 4,500,000 4,800,000


Balok/pesagen m3 4,500,000 4,600,000

4 MERANTI Papan m3 4,200,000 4,400,000


Balok/pesagen m3 3,900,000 4,000,000

5 LANAN Papan m3 850,000 1,000,000


Balok/pesagen m3 750,000 850,000

6 BENGKIRAI Papan m3 7,000,000 7,300,000


Balok/pesagen m3 6,700,000 6,900,000

7 DOLKEN Sedang 8 x 10 x 400 cm bt 17,000 18,000


Kecil 6 x 7 x 400 cm bt 12,000 16,000
Besar 10 x 12 x 400 cm bt 23,000 26,000
Kayu cetakan m3 550,000 650,000
Kayu bakar m3 135,000 150,000
Bambu bt 7,000 10,000

IV . BAHAN PENUTUP DINDING / LANTAI


1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm m2 24,000 26,000
20 X 20 cm m2 22,500 27,000
PC warna 30 X 30 cm m2 26,000 28,000
20 X 20 cm m2 25,000 27,000
Teraso 30 X 30 cm m2 39,000 42,000
2 TEGEL PLINT
PC warna 10 X 20 cm bh 5,000 5,500
PC abu-abu 15 x 20 bh 4,500 6,000

3 POLIS UBIN Lantai/badan m' - -


Plint m' - -
Trap m' - -

4 UBIN PORSELIN
Lokal 11 X 11 putih dos 27,500 30,000
11 X 11 warna dos 29,000 30,000
Lokal 15 X 15 putih dos 28,000 29,000
15 X 15 warna dos 32,000 33,000
5 MOZAIK PORSELIN
10 X 20 cm m2 31,000 35,000
15 X 15 cm m2 32,000 35,000
20 X 20 cm m2 28,500 35,000
20 X 25 cm m2 23,000 33,000

6 Keramik 30 X 30 cm m2 31,000 33,000


20 X 20 cm m2 33,000 35,000
33 x 33 cm m2 30,000 35,000
25 x 25 cm m2 28,000 35,000
15 x 20 cm m2 34,000 36,000

7 Parquet Jati m2 140,000 150,000

8 Batu Paros m2 70,000 75,000

9 Batu Tempel Hitam m2 65,000 80,000


HARGA

NO. J E N I S B A H A N SATUAN MINIMUM MAKSIMUM KETERANGAN

(Rp) (Rp)

10 GRANITO 40 x 40 cm m2 250,000 270,000


30 x 30 cm m2 300,000 310,000
11 Marmer m2 375,000 390,000
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh 17,000 20,000
Ø 20 cm - 100 cm bh 20,000 25,000
Ø 30 cm - 100 cm bh 30,000 32,000
Ø 50 cm - 100 cm bh 55,000 65,000
Ø 60 cm - 100 cm bh 75,000 85,000
Ø 70 cm - 100 cm bh 90,000 110,000
U 10 cm - 100 cm bh 17,000 18,000
U 15 cm - 100 cm bh 22,000 25,000
U 20 cm - 100 cm bh 30,000 32,000
U 30 cm - 100 cm bh 35,000 40,000
U 50 cm - 100 cm bh - -

2 LUBANG ANGIN (ROSTER) PC + PASIR


10 X 20 cm bh 5,000 5,200
20 X 20 cm bh 5,500 6,000
25 X 25 cm bh 6,250 6,500
30 X 30 cm bh 6,300 7,000
15 X 25 cm bh 6,500 7,250
15 X 30 cm bh 7,000 7,500

VI . B A H A N B E S I
1 BESI BETON besi beton polos kg 9,000 10,000
besi beton prestress kg 14,000 15,500
besi beton ulir kg 10,500 11,000

2 BESI PLAT Besi Strip kg 11,000 12,000

3 BESI PROFIL Besi Profil kg 13,000 13,500

4 JARING - JARING BAJA


Diameter 4 - 15 kg 13,000 15,000
Diameter 6 - 15 kg 14,000 15,000

5 BESI SIKU L 40 X 40 X 4 btg 110,000 115,000


L 50 X 50 X 5 btg 165,000 171,000
L 60 X 60 X 6 btg 240,000 247,000

6 KAWAT - Ikat beton/bendrat kg 13,500 15,000


- Harmonika 12 X 45 mm m2 20,000 21,000
- Harmonika 12 X 24 mm m2 22,000 22,500
- Harmonika 14 X 30 mm m2 19,000 20,000
- Harmonika 14 X 35 mm m2 17,500 19,000
- Kawat Nyamuk Nylon m2 9,000 10,000
- Kawat Kasa m2 12,000 13,000
- Saringan pasir m2 13,000 14,500
- Kawat loket m2 8,500 9,000
- Kawat duri rol 60,000 75,000
- Kawat bronjong kg 17,500 18,000

VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 19,000 20,000 panjang 4 m
Pipa PVC DN 25 ( ¾" ) AW JIS btg 22,000 22,500 panjang 4 m
Pipa PVC DN 32 ( 1" ) AW JIS btg 27,500 28,000 panjang 4 m
Pipa PVC DN 40 ( 1½" ) btg 45,000 51,200 panjang 6 m
HARGA

NO. J E N I S B A H A N SATUAN MINIMUM MAKSIMUM KETERANGAN

(Rp) (Rp)
Pipa PVC DN 63 ( 2" ) btg 57,000 77,000 panjang 6 m
Pipa PVC DN 90 ( 3" ) btg 122,500 139,250 panjang 6 m
Pipa PVC DN 110 ( 4" ) btg 170,000 202,950 panjang 6 m
Pipa PVC DN 160 ( 6" ) btg 325,000 423,000 panjang 6 m
Pipa PVC DN 200 ( 8" ) btg 590,000 660,000 panjang 6 m
Pipa PVC DN 250 ( 10" ) btg 1,010,000 1,025,000 panjang 6 m
Pipa PVC DN 315 ( 12" ) btg 1,380,000 1,390,000 panjang 6 m

3 Pipa Medium B Galvanis - SII


Pipa Medium B Galvanis DN ½" btg 70,000 80,000 panjang 6 m
Pipa Medium B Galvanis DN 25 ( ¾" ) btg 112,000 117,000 panjang 6 m
Pipa Medium B Galvanis DN 32 ( 1" ) btg 125,000 127,500 panjang 6 m
Pipa Medium B Galvanis DN 50 ( 1½" ) btg 185,000 190,000 panjang 6 m
Pipa Medium B Galvanis DN 63 ( 2" ) btg 225,000 235,000 panjang 6 m
Pipa Medium B Galvanis DN 2½" btg 380,000 390,000 panjang 6 m
Pipa Medium B Galvanis DN 90 ( 3" ) btg 470,000 480,000 panjang 6 m
Pipa Medium B Galvanis DN 110 ( 4" ) btg 585,000 595,000 panjang 6 m
Pipa Medium B Galvanis DN 160 ( 6" ) btg - - panjang 6 m
Pipa Medium B Galvanis DN 200 ( 8" ) btg - - panjang 6 m
Pipa Medium B Galvanis DN 250 ( 10") btg - - panjang 6 m

VIII . B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr 4,700 4,750
30 X 60 lbr 11,000 12,000
60 X 120 lbr 37,000 38,000
List Kayu Profil m' 4,200 5,000
2 SOFT BOARD-uk: 4'X 8'
Gypsum tebal 9 mm lbr 55,000 59,000
3 HARD BOARD-uk: 4'X 8' lbr 60,000 62,000

4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr 38,000 40,000
. 120 X 240 X 3 mm lbr 75,000 85,000
. 90 X 210 X 4 mm lbr 51,000 55,000
. 90 X 210 X 9 mm lbr 140,000 145,000
. 90 X 210 X 12 mm lbr 170,000 172,500
. 90 X 210 X 15 mm lbr 220,000 225,000
. 90 X 210 X 18 mm lbr 270,000 275,000
Tripleks
. 120 X 240 X 3 mm lbr 40,000 42,000
. 120 X 240 X 4 mm lbr 47,500 50,000
. 120 X 240 X 6 mm lbr 61,000 67,500
Multipleks
. 120 X 240 X 9 mm lbr 95,000 105,000
. 120 X 240 X 12 mm lbr 127,500 135,000
. 120 X 240 X 15 mm lbr 152,500 162,500
. 120 X 240 X 18 mm lbr 180,000 185,000
Formika ukuran pintu lbr 45,000 50,000

IX . B A H A N F I N I S H I N G
1 KAYU
Menie kg 11,000 15,000
Dempul plamur kg 11,000 12,000
Ambril/amplas lbr 3,000 3,200
Batu Apung kg 5,000 5,500
Cat dasar kg 13,000 13,200
. Emco kg 38,000 39,000
. Yunior 66 (nippon paint) kg 37,000 39,000
HARGA

NO. J E N I S B A H A N SATUAN MINIMUM MAKSIMUM KETERANGAN

(Rp) (Rp)
. Deculux kg 42,000 45,000
. Siralax ons 6,500 8,000
. Spiritus ltr 8,000 8,500
. Plitur jadi ltr 29,000 31,000

2 TEMBOK
Kalkarium kg 4,000 4,200
Kapur sirih kg 4,500 4,750
Plamur kg 9,000 10,500
Cat Tembok kg 12,500 15,000
Sintex 5 kg 60,000 65,000
Danabride 5 kg 70,500 75,000
Catylac 5 kg 75,000 78,000
Mowilex 5 kg 125,000 135,000

3 BESI
Menie kg 13,000 18,000
Cat mengkilat kg 35,000 42,000
Cat kg 12,500 13,000
Thinner A ltr 8,000 9,000
Minyak cat ltr 6,000 8,000
Thinner Super ltr 8,000 9,000
Residu (teer/aspal) drum 50,000 54,000
Fibre glass (tanki air)
kapasitas 550 liter. bh 650,000 675,000
kapasitas 1100 liter. bh 950,000 1,100,000
Lem Aica Aibon kg 32,000 35,000

X.BAHAN KACA
1 POLOS 3 mm m2 50,000 55,000
5 mm m2 60,000 65,000

2 ES KABUR 3 mm m2 55,000 60,000


5 mm m2 65,000 70,000

3 RAY BAND 3 mm m2 60,000 65,000


5 mm m2 70,000 72,000

XI . BAHAN INSTALASI LISTRIK

1 KABEL LISTRIK
N YA : . 1 X 1 1/2 mm2 m' 3,000 3,100
SPLN LMK 1 X 2 1/2 mm2 m' 3,150 3,300
. 1X4 mm2 m' 4,700 5,000
1X6 mm2 m' 6,900 7,000
NYY :. 2 X 1 1/2 mm2 m' 9,300 9,500
PRIMA 2 X 2 1/2 mm2 m' 10,250 10,500
. 2X4 mm2 m' 16,650 16,700
2X6 mm2 m' 20,100 20,500
3 X 1 1/2 mm2 m' 11,450 11,750
3 X 2 1/2 mm2 m' 15,400 15,750
3X4 mm2 m' 20,000 20,500
3X6 mm2 m' 27,800 28,000
NYM :. 2 X 1 1/2 mm2 m' 6,600 7,000
PRIMA 2 X 2 1/2 mm2 m' 9,000 10,000
. 2X4 mm2 m' 13,000 14,000
3 X 1 1/2 mm2 m' 8,450 9,000
HARGA

NO. J E N I S B A H A N SATUAN MINIMUM MAKSIMUM KETERANGAN

(Rp) (Rp)
3 X 2 1/2 mm2 m' 12,000 12,500
3X4 mm2 m' 17,400 18,000
3X6 mm2 m' 23,800 24,500

2 SKAKELAR
Out bauw . Seri bh 15,000 17,500
. Engkel bh 12,000 13,000
In bauw . Seri bh 11,500 15,000
. Engkel bh 9,500 11,000

3 FUSE BOX (SEKERING KASA)


1 group bh 20,000 25,000
2 group bh 20,000 35,000
3 group bh 50,000 55,000

4 STEKER - Biasa bh 9,500 10,000


Arde bh 14,000 15,000
T Biasa bh 11,000 12,500
T dengan Arde bh 15,000 17,000

5 FITING Flaon bh 2,500 7,500


Gantung bh 2,250 7,500
Kap bh 9,250 15,000
Kombinasi bh 8,700 10,000

6 STOP KONTAK - Arde Outbow putih bh 7,000 12,500


Arde Outbow hitam bh 4,500 5,000
Arde IB bh 10,000 12,500
Arde Putar bh 31,000 35,000

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM Union : 1 X slag bh 45,000 50,000
2 X slag bh 60,000 65,000
Yale : 1 X slag bh 75,000 80,000
2 X slag bh 125,000 135,000
Kuda : 1 X slag bh 45,000 50,000
2 X slag bh 60,000 70,000

2 ENGSEL DAN GERENDEL


Engsel Angin bh 15,000 16,000
Kupu-kupu biasa bh 2,250 2,500
Nylon kupu-kupu bh 5,000 9,000
Espagnoled - dalam negeri bh 30,000 32,000
Grendel Tanam luar negeri bh 7,500 8,250
Grendel biasa bh 7,500 10,000
Kait Angin bh 5,000 15,000
Door Stop bh 10,000 15,000

XIII . BAHAN SANITAIR


1 KLOSET DUDUK bh 900,000 1,100,000

2 KLOSET JONGKOK
bh 80,000 105,000

3 WASTAFEL PEDESTAL
bh 625,000 650,000
HARGA

NO. J E N I S B A H A N SATUAN MINIMUM MAKSIMUM KETERANGAN

(Rp) (Rp)
4 WASTAFEL MEJA OVAL
bh 700,000 750,000

5 WASTAFEL GANTUNG BULAT


bh 275,000 300,000

6 WASTAFEL GANTUNG SUDUT


bh 240,000 250,000

7 WASTAFEL GANTUNG SUDUT KECIL


bh 210,000 230,000
8 WASTAFEL BAK CUCI
bh 145,000 160,000
9 TEMPAT SABUN GANTUNG
bh 27,500 30,000

10 TEMPAT SABUN TANAM


bh 20,000 22,500

11 SEPTIC TANK (ETERNIT GRESIK)


5 Pemakai 500 liter unit - -
10 Pemakai 1.000 liter unit - -
12 LAIN - LAIN
Kran Air bh 7,500 15,000
Seal tape bh 2,000 2,200
Floor drain bh 3,750 4,000

XIV . ALAT PENGIKAT KAYU


1 PAKU - ukuran 1" s/d 4" kg 13,000 14,000
2 PAKU - payung kg 18,000 20,000
3 PAKU - sekrup doos 13,500 15,000
4 PAKU - beton bh 18,000 20,000
5 MUR BAUT (kuda-kuda) kg 14,000 14,500
6 ANGKUR BAUT bh 12,800 13,000
7 LEM KAYU bh 18,000 20,000
8 Tali Ijuk kg 5,500 7,000

XV . POMPA AIR.
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh 185,000 190,000
2 POMPA AIR LISTRIK
Sanyo 100 watt bh 325,000 475,000
Fuji 250 watt bh 850,000 900,000
Shimizu . 100 watt bh 285,000 350,000
. 90 watt bh 190,000 220,000
Dab . 125 watt bh 215,000 250,000
. 175 watt bh 320,000 340,000

X VI . PAVING BLOCK
1 SQUARE Abu-abu m2 30,000 37,500
Merah/hitam m2 38,000 40,000
2 HOLLAND Abu-abu m2 35,000 36,000
Merah/hitam m2 39,000 41,000
3 UNIDECOR Abu-abu m2 30,500 35,000
Merah/hitam m2 33,000 40,000
4 UNI Abu-abu m2 35,000 37,000
Merah/hitam m2 40,000 42,000
5 TRIHEX Abu-abu m2 30,000 35,000
Merah/hitam m2 33,000 40,000
HARGA

NO. J E N I S B A H A N SATUAN MINIMUM MAKSIMUM KETERANGAN

(Rp) (Rp)
6 OLYMPIA HEXA Abu-abu m2 31,000 35,000
7 HEXAGONAL Abu-abu m2 40,000 40,000
Merah/hitam m2 35,000 37,000
8 CASTLE Abu-abu m2 40,000 42,000
9 TRAPEZ Abu-abu m2 30,000 35,000
10 TRAPEZ GRASS BLOCK
Abu-abu m2 41,000 42,000
11 STANDARD GRASS BLOCK ABU-ABU m2 38,000 48,000
12 BATACO m2 2,000 2,250
13 KANSTEEN m' 22,500 28,500
XVII. L A I N - L A I N
1 KREI 25 MM m2 40,000 45,000
2 Sliding Pintu J4 bh 185,000 200,000
3 Naco per Daun bh 7,000 7,500
4 Rolling door Besi m2 225,000 230,000
Rolling door Almunium m2 210,000 215,000
5 Awning Almunium m2 75,000 80,000
6 Kusen Almunium 4" Putih m' 68,000 70,000
7 WIDE FLANGE BEAM
150 X 75 X 5 X 7 X 12 btg 1,250,000 1,260,000

8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum 1,275,000 1,300,000

Hotmix Tebal = 4 Cm m2 60,000 62,500


Hotmix Tebal = 5 Cm m2 70,000 75,000
Hotmix Tebal = 6 Cm m2 85,000 90,000
Hotmix Tebal = 7 Cm m2 100,000 105,000
Binder Course ton 210,000 215,000
Wearing Course ton 120,000 125,000
Hot Roller Sheet ton 110,000 115,000
Sand Sheet ton 120,000 125,000
Sand Sheet Emulsi ton 145,000 150,000
Cold Mix ton 175,000 180,000
Prime / Tack Coard RC liter 7,900 8,100
Prime Coat MC liter 7,900 8,100
Prime / Tack Coat Emulsi liter 7,900 8,100
10 K A C A Dark Grey 5 mm m2 65,000 67,000
Grey Euro / Green 5 mm m2 87,000 88,000
Bronze / Blue / Green 5 mm m2 90,000 92,500
11 TIANG PANCANG Ø 40 cm m' - -
Tiang Pancang Beton Ø 45 cm m' - -
Ø 50 cm m' - -
Tiang Pancang Baja Diameter 40 cm, t = 12 mm m' - -
Diameter 50 cm, t = 12 mm m' - -
12 PAGAR BRC. Pagar BRC 90 A2 /lb 500,000 520,000
Pagar BRC 120 A2 /lb 600,000 620,000
13. LAIN-LAIN
Minyak Beton & bekisting ltr 8,000 10,000
Pintu Lipat Besi m2 350,000 380,000
Sunscreen Allumunim m2 265,000 280,000
Allumunium Foil m2 6,500 6,700
Soda api kg 12,000 12,500
Sabun kg 11,000 12,500
Air m3 3,700 4,250
Koas Alang-alang ikat 1,250 1,250
Solar (Industri) ltr 11,250 11,250
Premium (Industri) ltr 8,900 8,900
Pelumas ltr 29,000 29,000
DAFTAR HAR GA SAT UAN PE K E R JAAN

SUMBER DATA : PASARAN BEBAS


D A E R A H : KOTA SEMARANG
EDISI KEDUA 2012

HARGA SATUAN PEKERJAAN


NO. SNI KODE URAIAN PEKERJAAN SAT MINIMUM MAKSIMUM
(Rp) (Rp)

I 03-2835-2002 6 PEKERJAAN PERSIAPAN


6.2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m m' 450,150.00 463,066.25
6.4 Pengukuran dan Pemasangan Bouwplank m' 93,425.00 97,375.00
6.5 Pembuatan Kantor Sementara dg Lantai Plesteran m2 506,785.00 552,587.50
6.6 Pembuatan Gudang Semen dan Alat-alat m2 429,475.00 465,806.25
6.8 Membersihkan Lapangan dan Perataan m2 5,150.00 5,550.00
6.11 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm m2 22,820.90 27,462.50
6.13 Bongkaran Beton Bertulang m3 214,329.00 234,996.00
6.14 Bongkaran Dinding Tembok Bata Merah m3 201,429.00 221,496.00

II 03-2835-2008 6 PEKERJAAN TANAH


6.1 Menggali Tanah Biasa Sedalam 1 m m3 23,575.00 25,875.00
6.2 Menggali Tanah Biasa Sedalam 2 m m3 28,935.00 31,725.00
6.3 Menggali Tanah Biasa Sedalam 3 m m3 34,381.00 37,665.00
6.4 Menggali Tanah Keras Sedalam 1 m m3 31,376.00 34,440.00
6.5 Menggali Tanah Cadas Sedalam 1 m m3 47,580.00 52,200.00
6.6 Menggali Tanah Lumpur Sedalam 1 m m3 37,935.00 41,625.00
6.7 Mengerjakan Striping Tebing Setinggi 1 m m2 1,715.00 1,875.00
6.8 MembuangTanah sejauh 30 m' m3 1,715.00 1,875.00
6.9 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian) m3 1/3 x Gal.tanah
6.10 Pemadatan Tanah (per 20 cm) m3 17,150.00 18,750.00
6.11 Urugan Pasir m3 99,430.00 112,350.00
6.12 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL m3 164,225.00 180,830.00
6.14 Pemasangan Lapisan Ijuk tebal 10 cm m2 38,145.00 47,625.00
6.15 Mengurug Sirtu Padat untuk Peninggian Lantai Bangunan m3 146,575.00 153,375.00

III 03-2836-2008 6 PEKERJAAN PONDASI


6.1 Memasang Pondasi Batu Kali 1Pc : 3 PP m3 498,325.00 527,175.00
6.2 Memasang Pondasi Batu Kali 1Pc : 4 PP m3 461,750.00 490,637.50
6.3 Memasang Pondasi Batu Kali 1Pc : 5 PP m3 436,400.00 465,310.00
6.4 Memasang Pondasi Batu Kali 1Pc : 6 PP m3 418,575.00 447,502.50
6.5 Memasang Pondasi Batu Kali 1Pc : 8 PP m3 394,150.00 423,097.50
6.6 Memasang Pondasi Batu Kali 1Kp : 1Sm : 2Pp m3 321,650.00 353,450.00
6.7 Memasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 PP m3 379,815.00 409,212.50
6.8 Memasang Pondasi Batu Kali, ¼ Pc : 1Kp : 4 PP m3 355,695.00 384,602.50
6.9 Pasang Pondasi Batu Kosong m3 218,832.00 238,818.00
6.10 Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah m3 1,663,375.00 1,817,980.00
6.11 Pasang Pondasi Sumuran diameter 100 cm m3 467,917.00 490,300.00

IV 03-6897-2008 6 PEKERJAAN DINDING


6.1 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 2Pp m2 139,865.00 151,108.75
6.2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3PP m2 130,162.50 141,439.38
6.3 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 4PP m2 123,692.50 134,919.38
6.4 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 5PP m2 120,250.00 131,557.50
6.5 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 6PP m2 118,865.00 130,426.25
6.6 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3 KP :10PP m2 111,699.00 123,125.00
6.7 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 2PP m2 66,742.50 72,299.38
6.8 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3PP m2 62,183.50 67,713.13
6.9 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 4PP m2 59,545.00 65,083.75
6.10 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 5PP m2 57,884.00 63,430.00
6.11 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 6PP m2 56,956.00 62,545.00
6.12 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 8PP m2 55,170.00 60,751.25
6.13 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3KP : 10PP m2 55,995.00 61,776.25
6.20 Memasang Dinding HB/CB 10, speci camp. 1PC : 3PP m2 103,033.00 113,337.50
6.21 Memasang Dinding HB/CB 10, speci camp. 1PC : 4PP m2 102,851.50 113,478.13
6.22 Memasang Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1Pc : 2PP m2 227,795.00 252,200.00
6.23 Memasang Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1Pc : 4PP m2 225,020.00 249,432.50

V 03-2837-2008 6 PEKERJAAN PLESTERAN


6.1 Memasang Plesteran 1 Pc : 1 Pp Tebal 15 mm m2 34,599.20 36,443.00
6.2 Memasang Plesteran 1 Pc : 2 Pp Tebal 15 mm m2 29,555.20 31,393.00
6.3 Memasang Plesteran 1 Pc : 3 Pp Tebal 15 mm m2 27,359.80 29,212.00
6.4 Memasang Plesteran 1 Pc : 4 Pp Tebal 15 mm m2 25,872.00 27,720.00
6.5 Memasang Plesteran 1 Pc : 5 Pp Tebal 15 mm m2 25,013.20 26,878.00
6.6 Memasang Plesteran 1 Pc : 6 Pp Tebal 15 mm m2 24,331.80 26,202.00
6.7 Memasang Plesteran 1 Pc : 7 Pp Tebal 15 mm m2 23,952.80 25,832.00

397638689.xls 13 sat.pekerjaan
HARGA SATUAN PEKERJAAN
NO. SNI KODE URAIAN PEKERJAAN SAT MINIMUM MAKSIMUM
(Rp) (Rp)
6.8 Memasang Plesteran 1 Pc : 8 Pp Tebal 15 mm m2 23,573.80 25,462.00
6.9 Memasang Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm m2 25,172.00 26,984.00
6.10 Memasang Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm m2 23,539.00 25,451.50
6.11 Memasang Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm m2 20,874.00 22,914.00
6.12 Memasang Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm m2 20,994.00 23,034.00
6.13 Memasang Plesteran 1 Pc : 2 Pp Tebal 20 mm m2 39,534.60 41,994.00
6.14 Memasang Plesteran 1Pc : 3Pp Tebal 20 mm m2 32,020.40 34,061.00
6.15 Memasang Plesteran 1 Pc : 4 Pp Tebal 20 mm m2 34,582.00 37,050.00
6.16 Memasang Plesteran 1Pc : 5Pp Tebal 20 mm m2 33,478.60 35,974.00
6.17 Memasang Plesteran 1Pc : 6Pp Tebal 20 mm m2 32,528.40 35,026.00
6.18 Memasang Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm m2 29,021.00 31,764.00
6.19 Memasang Berapen 1 Pc : 5Pp Tebal 15 mm m2 16,897.20 18,059.00
6.20 Memasang Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm m' 22,522.00 24,251.25
6.23 Memasang Plesteran Ciprat 1Pc : 2 Pp m2 19,381.00 20,775.00
6.24 Memasang Finishing Siar Pasangan Dinding Bata Merah (=20 m') m2 11,467.40 12,213.25
6.25 Memasang Finishing Siar Pasangan Dinding Conblock ekspose (=8 m') m2 5,532.00 5,883.00
6.26 Memasang Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp m2 24,477.00 26,146.25
6.27 Memasang Acian m2 14,292.50 15,273.13

VI 03-3434-2008 6 PEKERJAAN KAYU


6.1 Membuat Kosen Pintu & Jendela Kayu klas I m3 21,543,800.00 22,185,950.00
6.2 Membuat Kosen Pintu & Jendela Kayu klas II atau III m3 7,028,150.00 7,947,600.00
6.3 Membuat Pintu KlampStandard Kayu Klas II (Kayu Kamfer) m2 290,649.00 311,145.00
6.5 Membuat Daun Pintu Panel Kayu Klas I atau II m2 398,550.00 427,350.00
6.6 Membuat Pintu & Jendela Kaca Kayu Klas I atau II m2 277,120.00 297,480.00
6.7 Membuat Pintu & Jendela Jalusi Kayu Klas I atau II m2 1,518,650.00 1,596,350.00
6.8 Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm) m2 321,345.00 345,265.00
6.9 Membuat Pintu Plywood rangkap, rangka expose kayu klas I atau II m2 341,390.00 366,820.00
6.10 Membuat Jalusi mati Kosen Kayu Klas I atau II m2 1,385,455.00 1,454,685.00
6.11 Membuat Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I m2 714,310.00 754,100.00
6.12 Membuat Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II m2 361,154.00 388,640.00
6.13 Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter m3 6,444,800.00 7,278,900.00
6.14 Memasang Konstruksi Kuda-kuda Expose, Kayu Klas I m3 23,591,650.00 24,290,175.00
6.15 Memasang konstruksi Gording, Kayu Klas II m3 6,146,200.00 6,957,300.00
6.16 Memasang Rangka Atap Genteng Keramik, Kayu Klas II m2 98,915.00 112,115.00
6.17 Memasang Rangka Atap Genteng Beton, Kayu Klas II m2 116,915.00 132,635.00
6.18 Memasang Rangka Atap Sirap, Kayu Klas II m2 836,798.00 953,254.00
6.19 Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II atau III m2 100,675.00 113,215.00
6.20 Memasang Rangka Langit-langit (60x60) cm, kayu Klas II atau III m2 104,530.00 117,770.00
6.21 Memasang Listplank Uk. (3x20)cm Kayu klas I atau II m' 240,215.00 252,065.00
6.22 Memasang Listplank Uk. (3x30)cm Kayu klas I atau klas II m' 76,565.00 81,965.00
6.23 Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III m2 166,819.00 188,475.00
6.24 Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II m2 220,759.00 246,975.00
6.26 Memasang Dinding Lambriziring dari Papan klas I m2 249,715.00 264,660.00
6.27 Memasang Dinding Lambriziring dari Plywood ukuran (120x240) cm m2 25,203.00 27,171.00
6.28 Memasang Dinding Bilik, Rangka Kayu Klas III atau IV m2 86,908.60 93,943.00

VII 03-7394-2008 6 PEKERJAAN BETON


6.1 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 m3 497,474.50 516,584.39
6.2 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 m3 524,931.91 544,159.59
6.3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 m3 546,607.83 565,934.39
6.4 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 m3 464,183.19 481,602.46
6.5 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 m3 572,080.06 591,509.99
6.6 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 596,650.43 616,205.62
6.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 614,663.39 634,279.63
6.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m3 627,031.91 646,738.16
6.9 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 m3 648,224.50 668,100.46
6.10 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 m3 654,848.57 674,772.09
6.11 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 m3 697,531.80 719,279.19
6.12 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 m3 706,170.69 727,986.92
6.17 Pembesian dg Besi Polos atau Besi Ulir 10 Kg 101,912.00 113,079.00
6.18 Kabel Presstresed Polos/strand 10 Kg 152,204.00 168,420.00
6.19 Jaring Kawat baja/Wire Mesh 1 Kg 15,818.00 18,089.00
6.20 Memasang Bekisting untuk Pondasi m2 54,988.00 61,932.00
6.21 Memasang Bekisting untuk Sloof m2 57,738.00 65,182.00
6.22 Memasang Bekisting untuk Kolom m2 215,204.00 231,356.00
6.23 Memasang Bekisting untuk Balok m2 228,704.00 245,756.00
6.24 Memasang Bekisting untuk Lantai m2 283,204.00 303,356.00
6.25 Memasang Bekisting untuk Dinding m2 269,204.00 288,856.00
6.26 Memasang Bekisting untuk Tangga m2 209,304.00 224,356.00
6.27 Memasang Jembatan Cor m2 37,889.00 42,255.00

397638689.xls 14 sat.pekerjaan
HARGA SATUAN PEKERJAAN
NO. SNI KODE URAIAN PEKERJAAN SAT MINIMUM MAKSIMUM
(Rp) (Rp)
6.28 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) m3 2,402,575.00 2,627,225.00
6.29 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3 2,966,700.00 3,255,755.00
6.30 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) m3 5,652,564.00 6,157,251.00
6.31 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) m3 4,365,059.00 4,737,986.00
6.32 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting) m3 3,999,595.00 4,323,405.00
6.33 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting) m3 3,999,460.00 4,319,264.00
6.34 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting) m3 4,060,704.00 4,409,171.00
6.35 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm m' 43,774.50 48,002.00
6.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm m' 58,385.00 63,926.75

VIII 03-3436-2002 6 PEKERJAAN PENUTUP ATAP


6.1 Pasang Atap Genteng Plentong Kecil m2 40,704.00 46,411.00
6.2 Pasang Atap Genteng Kodok / Glasur m2 70,704.00 76,411.00
6.3 Pasang Atap Genteng Plentong Super / Besar m2 57,914.00 62,172.00
6.4 Pasang Genteng Bubung Plentong m' 48,886.00 51,810.00
6.5 Pasang Genteng Bubung Kodok / Glasur m' 65,886.00 70,810.00
6.6 Pasang Genteng Bubung Plentong Besar m' 60,386.00 63,810.00
6.9 Pasang Atap Asbes Gelombang (2,25x0,92 m) x 5 mm m2 54,164.00 56,581.00
6.10 Pasang Atap Asbes Gelombang (2,00x0,92 m) x 5 mm m2 53,876.00 56,274.00
6.12 Pasang Atap Asbes Gelombang (3,00x1,05 m) x 4 mm m2 35,501.00 36,924.00
6.15 Pasang Atap Asbes Gelombang (2,10x1,05 m) x 4 mm m2 34,136.00 36,555.00
6.30 Pasang Atap Genteng Beton m2 44,270.00 47,440.00
6.33 Pasang Atap Sirap m2 103,049.00 110,563.00
6.34 Pasang Nok Genteng Beton m' 29,115.00 30,655.00
6.37 Pasang Nok Sirap m' 58,813.00 62,960.00
6.38 Pasang Atap Seng Gelombang m2 52,288.00 54,272.00
6.39 Pasang Atap Nok Seng m' 27,938.00 29,266.00
6.42 Pasang Allumunium Foil / Sisalation m2 13,894.00 14,730.00

IX 03-2839-2008 6 PEKERJAAN LANGIT-LANGIT


6.1 Memasang Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm m2 17,517.00 18,949.00
6.2 Memasang Langit-langit Akustik Ukuran (30x30) cm m2 66,248.00 67,654.00
6.3 Memasang Langit-langit Akustik Ukuran (30x60) cm m2 72,115.00 78,595.00
6.5 Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm m2 27,180.00 29,340.00
6.6 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm m2 376,450.00 396,500.00
6.7 Memasng Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm m2 26,945.00 29,036.00
6.9 Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium m2 129,975.00 137,025.00
6.10 List Langit-Langit Kayu Profil m' 8,394.00 9,560.00

X 6 PEKERJAAN SANITASI
6.1 Memasang Closet Duduk / Mono Blok Unit 1,103,925.00 1,329,447.00
6.2 Memasang Closet Jongkok Porselen Unit 251,930.00 287,975.00
6.4 Memasang Urinoir Unit 443,850.00 482,975.00
6.5 Memasang Wastafel Unit 970,400.00 1,040,160.00
6.8 Memasang Bak Mandi Batu Bata Vol. 0,30 m3 Unit 763,900.00 828,190.91
6.14 Memasang Pipa Beton, Ø 15 cm - 20 cm m' 47,230.00 55,489.00
6.15 Memasang Pipa Beton, Ø 30 cm - 100 cm m' 242,287.00 268,631.75
6.20 Memasang Pipa Galvanis Ø ¾" m' 35,719.33 37,515.00
6.23 Memasang Pipa Galvanis Ø 3" m' 132,898.87 136,393.00
6.24 Memasang Pipa Galvanis Ø 4" m' 165,479.90 169,201.83
6.25 Memasang Pipa PVC type AW Ø ½" m' 11,189.90 11,881.00
6.29 Memasang Pipa PVC type AW Ø 2" m' 20,466.10 26,088.17
6.31 Memasang Pipa PVC type AW Ø 3" m' 40,259.63 45,242.92
6.33 Memasang Bak Cuci Piring Stainles Steel Buah 304,314.50 335,367.50
6.35 Memasang Kran Ø ¾" atau ½" Buah 12,515.00 20,360.00
6.36 Memasang Floor Drain Buah 8,715.00 9,325.00

XI 03-7393-2008 6 PEKERJAAN BESI & ALLUMUNIUM


6.1 Memasang Besi Profil Kg 20,329.00 21,582.00
6.2 Memasang Rangka Kuda-kuda Baja IWF kg 19,549.00 20,502.00
6.3 Mengerjakan Pekerjaan Perakitan (Kuda-kuda Baja) 100 kg 21,970.00 22,662.00
6.4 Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku m2 638,861.00 685,925.00
6.5 Mengerjakan Pengelasan dengan Las Listrik 10 cm 16,609.50 18,617.50
6.7 Memasang Pintu Rolling Door Besi m2 314,658.00 327,110.00
6.8 Memasang Pintu Lipat (Folding Door) m2 383,726.00 416,498.00
6.9 Sunscreen Allumunium m2 303,172.00 320,980.00
6.10 Memasang Rolling Door Allumunium m2 286,650.00 297,950.00
6.11 Memasang Kusen Pintu Allumunium m' 82,593.80 85,764.60
6.12 Memasang Pintu Allumunium Strip Lebar 8 cm m2 743,713.10 826,048.50
6.13 Memasang Pintu Kaca Rangka Allumunium m2 192,570.00 222,308.00
6.14 Memasang Venetions Blinds & Vertical Blinds m2 121,849.00 129,055.00
6.15 Memasang Terali Besi Strip (2x3) cm m2 195,931.00 212,628.00

397638689.xls 15 sat.pekerjaan
HARGA SATUAN PEKERJAAN
NO. SNI KODE URAIAN PEKERJAAN SAT MINIMUM MAKSIMUM
(Rp) (Rp)
6.16 Memasang Kawat Nyamuk m2 220,972.55 246,727.43
6.17 Memasang Jendela Nako & Tralis m2 26,293.00 28,535.00
6.18 Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm m' 138,200.00 145,985.00
6.19 Memasang Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm m' 63,724.00 67,760.00

XII 6 PEKERJAAN KUNCI & KACA


6.2 Memasang Kunci Tanam Biasa Buah 145,965.00 157,525.00
6.3 Memasang Kunci Kamar Mandi Buah 65,482.50 72,012.50
6.4 Memasang Kunci Selinder Buah 145,482.50 157,012.50
6.5 Memasang Engsel Pintu Buah 12,447.50 16,987.50
6.6 Pasang Engsel Jendela Kupu-kupu Buah 7,215.00 7,825.00
6.7 Pasang Engsel Angin Buah 24,930.00 26,650.00
6.9 Pasang Kait Angin Buah 12,157.25 22,683.75
6.10 Pasang Door Closer Buah 33,857.50 40,612.50
6.11 Pasang Kunci Selot Buah 17,043.00 20,245.00
6.13 Pasang Door Stop Buah 14,771.50 20,122.50
6.14 Pasang Rel Pintu Dorong Buah 213,629.00 230,735.00
6.15 Pasang Kunci Lemari Buah 19,425.00 22,803.75
6.16 Pasang Kaca tebal 3 mm m2 62,157.25 68,183.75
6.17 Pasang Kaca tebal 5 mm m2 73,155.00 79,182.25
6.20 Pasang Kaca Cermin tebal 5 mm m2 102,857.25 104,483.75

XIII 03-7395-2008 6 PEKERJAAN PENUTUP LANTAI & DINDING


6.3 Memasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm m2 14,749.00 61,973.00
6.9 Memasang lantai Ubin Granito Uk. 40 x 40 cm m2 306,459.00 330,949.50
6.19 Pasang Plint Ubin PC Warna Uk. 10 x 20 cm m' 35,892.00 39,269.25
6.34 Memasang Lantai Keramik 33 x 33 cm m2 100,217.83 111,460.76
6.35 Memasang Lantai Keramik 30 x 30 cm m2 100,077.73 111,063.18
6.36 Pasang Lantai Keramik 20 x 20 cm m2 99,415.00 112,020.00
6.39 Memasang Plint Keramik Ukuran 10x20 cm m' 14,017.00 14,981.01
6.40 Memasang Plint Keramik Ukuran 10x10 cm m' 19,542.00 20,842.78
6.43 Memasang Lantai Marmer Ukuran 1.00x1.00 cm m2 455,654.50 476,271.88
6.44 Memasang Lantai Karpet m2 89,877.00 94,624.00
6.46 Memasang Lantai Parquet Jati m2 204,280.00 219,870.00
6.53 Memasang Dinding Keramik 10x20 cm, m2 118,585.00 130,191.25
6.54 Memasang Dinding Keramik 20x20 cm, m2 102,815.00 119,971.25
6.55 Memasang Dinding Marmer Ukuran 1.00x1.00 cm m2 490,362.11 513,552.61
6.57 Memasang Dinding Batu Paros / Batu Tempel Hitam m2 131,792.50 141,254.38
6.60 Memasang Wall Paper Lebar 50 cm m2 114,351.00 127,714.00
6.63 Memasang Plint Kayu Klas II Ukuran 2x10 cm m' 26,603.00 28,559.50

XIV 03-24 6 PEKERJAAN PENGECATAN


6.1 Mengikis / Mengerok Permukaan Cat Tembok Lama m2 5,207.50 5,687.50
6.2 Mencuci Bidang Permukaan Tembok yang Pernah dicat m2 5,157.50 5,687.50
6.3 Mengerok Karat Cat Lama permukaan Baja dg cara manual m2 5,157.50 5,687.50
6.4 Penyabun Permukaan Tembok Lama m2 5,157.50 5,687.50
6.6 Mendempul dan Menggosok Kayu m2 4,387.50 4,780.50
6.7 Pengecatan Bidang Lama m2 15,525.00 16,980.00
6.8 Pengecatan Bidang Kayu Baru (1 lap.Plamir) m2 18,777.50 20,275.50
1 lap.Cat Dasar & 2 lap.Cat Penutup
6.9 Pengecatan Bidang Kayu Baru (1 lap.Plamir) m2 25,947.50 27,819.50
1 lap.Cat Dasar & 3 lap.Cat Penutup
6.10 Pelaburan Bidang Kayu dg Teak Oil m2 17,102.50 18,262.50
6.11 Pelaburan Bidang Kayu dg Politur m2 24,365.50 26,026.50
6.12 Pelaburan Bidang Kayu dg Cat Residu & Ter m2 4,133.00 4,515.00
6.13 Pelaburan Bidang Kayu dg Vernis m2 17,242.50 18,619.50
6.14 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar m2 9,561.00 10,383.60
2 lap. Cat Penutup)
6.15 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup) m2 6,766.50 7,347.90

397638689.xls 16 sat.pekerjaan
DAFTAR ANALISA PE K E R JAAN

SUMBER DATA : PASARAN B E BAS


D A E R A H : KOTA SEMARANG
EDISI KEDUA 2012

HARGA BAHAN/UPAH JUMLAH


No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

I 03-2835-2002 PEKERJAAN PERSIAPAN

6.2 1 m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 450,150.00 463,066.25
6.2.1 Bahan 428,390.00 439,426.25
1.25 Btg Kayu Dolken diameter 8 - 10 / 400 cm 17,000.00 18,000.00 21,250.00 22,500.00
2.5 Kg Portalnd Semen 1,050.00 1,062.50 2,625.00 2,656.25
1.2 Lbr Seng Gelombang 3" - 5" 65,000.00 67,000.00 78,000.00 80,400.00
0.005 m3 Pasir Beton 140,000.00 150,000.00 700.00 750.00
0.009 m3 Koral Beton 115,000.00 120,000.00 1,035.00 1,080.00
0.072 m3 Kayu 5/7X4m Kayu Kruing 4,500,000.00 4,600,000.00 324,000.00 331,200.00
0.06 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 780.00 840.00
0.45 Kg Meni Besi 13,000.00 18,000.00 5,850.00 8,100.00

6.2.2 Tenaga 21,760.00 23,640.00


0.2 OH Tukang Kayu 40,000.00 43,000.00 8,000.00 8,600.00
0.4 OH Pekerja 30,000.00 33,000.00 12,000.00 13,200.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.02 OH Mandor 43,000.00 45,000.00 860.00 900.00

6.4 1 m' Pengukuran dan Pemasangan Bouwplank 93,425.00 97,375.00


6.4.1 Bahan 85,760.00 89,080.00
0.012 m3 Kayu 5/7x 4m Kayu Kruing 4,500,000.00 4,600,000.00 54,000.00 55,200.00
0.02 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 260.00 280.00
0.007 m3 Kayu Papan 3/20 Kruing 4,500,000.00 4,800,000.00 31,500.00 33,600.00

6.4.2 Tenaga 7,665.00 8,295.00


0.1 OH Tukang Kayu 40,000.00 43,000.00 4,000.00 4,300.00
0.1 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.5 1 m2 Pembuatan Kantor Sementara dg Lantai Plesteran 506,785.00 552,587.50


6.5.1 Bahan 311,135.00 341,237.50
1.25 Btg Kayu Dolken Ø 8 - 10 / 4 m 17,000.00 18,000.00 21,250.00 22,500.00
0.18 m3 Kayu 750,000.00 850,000.00 135,000.00 153,000.00
0.85 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 11,050.00 11,900.00
1.1 Kg Besi Strip 11,000.00 12,000.00 12,100.00 13,200.00
35 Kg Portland Sement 1,050.00 1,062.50 36,750.00 37,187.50
0.15 m3 Pasir pasang 125,000.00 140,000.00 18,750.00 21,000.00
0.1 m3 Pasir Beton 140,000.00 150,000.00 14,000.00 15,000.00
0.15 m3 Koral Beton 115,000.00 120,000.00 17,250.00 18,000.00
30 buah Batu bata Merah 400.00 450.00 12,000.00 13,500.00
0.25 Lbr Seng Plat 18,000.00 20,000.00 4,500.00 5,000.00
2 buah Jendela Naco 7,000.00 7,500.00 14,000.00 15,000.00
0.08 m2 Kaca Polos 50,000.00 55,000.00 4,000.00 4,400.00
0.15 buah Kunci Tanam 45,000.00 50,000.00 6,750.00 7,500.00
0.3 buah Engsel 2,250.00 2,500.00 675.00 750.00
0.06 Lbr Plywood 4 mm 51,000.00 55,000.00 3,060.00 3,300.00

6.5.2 Tenaga 195,650.00 211,350.00


2 OH Tukang Kayu 40,000.00 43,000.00 80,000.00 86,000.00
1 OH Tukang Batu 40,000.00 43,000.00 40,000.00 43,000.00
2 OH Pekerja 30,000.00 33,000.00 60,000.00 66,000.00
0.3 OH Kepala Tukang 45,000.00 47,000.00 13,500.00 14,100.00
0.05 OH Mandor 43,000.00 45,000.00 2,150.00 2,250.00

6.6 1 m2 Pembuatan Gudang Semen dan Alat-alat 429,475.00 465,806.25


6.6.1 Bahan 308,325.00 335,156.25
1.7 Btg Kayu Dolken diameter 8 - 10 / 400 cm 17,000.00 18,000.00 28,900.00 30,600.00
0.21 m3 Kayu 750,000.00 850,000.00 157,500.00 178,500.00
0.3 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 3,900.00 4,200.00
10.5 Kg Portland Semen 1,050.00 1,062.50 11,025.00 11,156.25
0.03 m3 Pasir Beton 125,000.00 140,000.00 3,750.00 4,200.00
0.05 m3 Koral Beton 115,000.00 120,000.00 5,750.00 6,000.00
1.5 Lbr Seng Gelombang BJLS 32 65,000.00 67,000.00 97,500.00 100,500.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.6.2 Tenaga 121,150.00 130,650.00
2 OH Tukang Kayu 40,000.00 43,000.00 80,000.00 86,000.00
1 OH Pekerja 30,000.00 33,000.00 30,000.00 33,000.00
0.2 OH Kepala Tukang 45,000.00 47,000.00 9,000.00 9,400.00
0.05 OH Mandor 43,000.00 45,000.00 2,150.00 2,250.00

6.8 1 m2 Membersihkan Lapangan dan Perataan 5,150.00 5,550.00


6.8.2 Tenaga 5,150.00 5,550.00
0.1 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.05 OH Mandor 43,000.00 45,000.00 2,150.00 2,250.00

6.11 1 m2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm 22,820.90 27,462.50


6.11.1 Bahan 8,375.00 11,750.00
1 Btg Bambu diameter 6 - 8 / 600 cm 7,000.00 10,000.00 7,000.00 10,000.00
0.25 Kg Tali Ijuk 5,500.00 7,000.00 1,375.00 1,750.00

6.11.2 Tenaga 14,445.90 15,712.50


0.17 OH Tukang Kayu 40,000.00 43,000.00 6,800.00 7,310.00
0.25 OH Pekerja 30,000.00 33,000.00 7,500.00 8,250.00
0.002 OH Kepala Tukang 45,000.00 47,000.00 90.00 94.00
0.0013 OH Mandor 43,000.00 45,000.00 55.90 58.50

6.13 1 m3 Bongkaran Beton Bertulang 214,329.00 234,996.00


6.13.2 Tenaga 214,329.00 234,996.00
6.667 OH Pekerja 30,000.00 33,000.00 200,010.00 220,011.00
0.333 OH Mandor 43,000.00 45,000.00 14,319.00 14,985.00

6.14 1 m3 Bongkaran Dinding Tembok Bata Merah 201,429.00 221,496.00


6.14.2 Tenaga 201,429.00 221,496.00
6.667 OH Pekerja 30,000.00 33,000.00 200,010.00 220,011.00
0.033 OH Mandor 43,000.00 45,000.00 1,419.00 1,485.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
II 03-2835 - 2008 PEKERJAAN TANAH

6.1 1 m3 Menggali Tanah Biasa Sedalam 1 m 23,575.00 25,875.00


6.1.2 Tenaga 23,575.00 25,875.00
0.75 OH Pekerja 30,000.00 33,000.00 22,500.00 24,750.00
0.025 OH Mandor 43,000.00 45,000.00 1,075.00 1,125.00

6.2 1 m3 Menggali Tanah Biasa Sedalam 2 m 28,935.00 31,725.00


6.2.2 Tenaga 28,935.00 31,725.00
0.90 OH Pekerja 30,000.00 33,000.00 27,000.00 29,700.00
0.045 OH Mandor 43,000.00 45,000.00 1,935.00 2,025.00

6.3 1 m3 Menggali Tanah Biasa Sedalam 3 m 34,381.00 37,665.00


6.3.2 Tenaga 34,381.00 37,665.00
1.05 OH Pekerja 30,000.00 33,000.00 31,500.00 34,650.00
0.067 OH Mandor 43,000.00 45,000.00 2,881.00 3,015.00

6.4 1 m3 Menggali Tanah Keras Sedalam 1 m 31,376.00 34,440.00


6.4.2 Tenaga 31,376.00 34,440.00
1.000 OH Pekerja 30,000.00 33,000.00 30,000.00 33,000.00
0.032 OH Mandor 43,000.00 45,000.00 1,376.00 1,440.00

6.5 1 m3 Menggali Tanah Cadas Sedalam 1 m 47,580.00 52,200.00


6.5.2 Tenaga 47,580.00 52,200.00
1.50 OH Pekerja 30,000.00 33,000.00 45,000.00 49,500.00
0.060 OH Mandor 43,000.00 45,000.00 2,580.00 2,700.00

6.6 1 m3 Menggali Tanah Lumpur Sedalam 1 m 37,935.00 41,625.00


6.6.2 Tenaga 37,935.00 41,625.00
1.200 OH Pekerja 30,000.00 33,000.00 36,000.00 39,600.00
0.045 OH Mandor 43,000.00 45,000.00 1,935.00 2,025.00

6.7 1 m2 Mengerjakan Striping Tebing Setinggi 1 m 1,715.00 1,875.00


6.7.2 Tenaga 1,715.00 1,875.00
0.05 OH Pekerja 30,000.00 33,000.00 1,500.00 1,650.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.8 1 m3 MembuangTanah sejauh 30 m' 10,330.00 11,340.00


6.8.2 Tenaga 10,330.00 11,340.00
0.330 OH Pekerja 30,000.00 33,000.00 9,900.00 10,890.00
0.010 OH Mandor 43,000.00 45,000.00 430.00 450.00

6.9 1 m3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)

6.10 1 m3 Pemadatan Tanah (per 20 cm) 17,150.00 18,750.00


6.10.2 Tenaga 17,150.00 18,750.00
0.5 OH Pekerja 30,000.00 33,000.00 15,000.00 16,500.00
0.05 OH Mandor 43,000.00 45,000.00 2,150.00 2,250.00

6.11 1 m3 Urugan Pasir 99,430.00 112,350.00


6.11.1 Bahan 90,000.00 102,000.00
1.2 m3 Pasir Urug 75,000.00 85,000.00 90,000.00 102,000.00

6.11.2 Tenaga 9,430.00 10,350.00


0.3 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.01 OH Mandor 43,000.00 45,000.00 430.00 450.00

6.12 1 m3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL 164,225.00 180,830.00


6.12.1 Bahan 118,985.00 131,750.00
0.40 m3 Pasir Pasang 125,000.00 140,000.00 50,000.00 56,000.00
0.135 m3 Kapur Padam 195,000.00 210,000.00 26,325.00 28,350.00
0.948 m3 Tanah Liat 45,000.00 50,000.00 42,660.00 47,400.00

6.12.2 Tenaga 45,240.00 49,080.00


0.800 OH Pekerja 30,000.00 33,000.00 24,000.00 26,400.00
0.400 OH Tukang Batu 40,000.00 43,000.00 16,000.00 17,200.00
0.04 OH Kepala Tukang 45,000.00 47,000.00 1,800.00 1,880.00
0.080 OH Mandor 43,000.00 45,000.00 3,440.00 3,600.00

6.14 1 m2 Pemasangan Lapisan Ijuk tebal 10 cm 38,145.00 47,625.00


6.14.1 Bahan 33,000.00 42,000.00
6.0 kg Ijuk 5,500.00 7,000.00 33,000.00 42,000.00

6.14.2 Tenaga 5,145.00 5,625.00


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.15 1 m3 Mengurug Sirtu Padat untuk Peninggian Lantai Bangunan 146,575.00 153,375.00
6.15.1 Bahan 138,000.00 144,000.00
1.2 m3 Sirtu 115,000.00 120,000.00 138,000.00 144,000.00

6.15.2 Tenaga 8,575.00 9,375.00


0.25 OH Pekerja 30,000.00 33,000.00 7,500.00 8,250.00
0.025 OH Mandor 43,000.00 45,000.00 1,075.00 1,125.00

397638689.xls 54/19 abk 2-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

III 03-2835 - 2008 PEKERJAAN PONDASI

6.1 1 m3 Memasang Pondasi Batu Kali 1Pc : 3 PP 498,325.00 527,175.00


6.1.1 Bahan 416,725.00 438,525.00
1.2 m3 Batu Belah 15/20 120,000.00 130,000.00 144,000.00 156,000.00
202 Kg Portland Sement 1,050.00 1,062.50 212,100.00 214,625.00
0.485 m3 Pasir Pasang 125,000.00 140,000.00 60,625.00 67,900.00

6.1.2 Tenaga 81,600.00 88,650.00


1.5 OH Pekerja 30,000.00 33,000.00 45,000.00 49,500.00
0.750 OH Tukang Batu 40,000.00 43,000.00 30,000.00 32,250.00
0.075 OH Kepala Tukang 45,000.00 47,000.00 3,375.00 3,525.00
0.075 OH Mandor 43,000.00 45,000.00 3,225.00 3,375.00

6.2 1 m3 Memasang Pondasi Batu Kali 1Pc : 4 PP 461,750.00 490,637.50


6.2.1 Bahan 380,150.00 401,987.50
1.2 m3 Batu Belah 15/20 120,000.00 130,000.00 144,000.00 156,000.00
163 Kg Portland Sement 1,050.00 1,062.50 171,150.00 173,187.50
0.52 m3 Pasir Pasang 125,000.00 140,000.00 65,000.00 72,800.00

6.2.2 Tenaga 81,600.00 88,650.00


1.5 OH Pekerja 30,000.00 33,000.00 45,000.00 49,500.00
0.750 OH Tukang Batu 40,000.00 43,000.00 30,000.00 32,250.00
0.075 OH Kepala Tukang 45,000.00 47,000.00 3,375.00 3,525.00
0.075 OH Mandor 43,000.00 45,000.00 3,225.00 3,375.00

6.3 1 m3 Memasang Pondasi Batu Kali 1Pc : 5 PP 436,400.00 465,310.00


6.3.1 Bahan 354,800.00 376,660.00
1.2 m3 Batu Belah 15/20 120,000.00 130,000.00 144,000.00 156,000.00
136 Kg Portland Sement 1,050.00 1,062.50 142,800.00 144,500.00
0.544 m3 Pasir Pasang 125,000.00 140,000.00 68,000.00 76,160.00

6.3.2 Tenaga 81,600.00 88,650.00


1.5 OH Pekerja 30,000.00 33,000.00 45,000.00 49,500.00
0.750 OH Tukang Batu 40,000.00 43,000.00 30,000.00 32,250.00
0.075 OH Kepala Tukang 45,000.00 47,000.00 3,375.00 3,525.00
0.075 OH Mandor 43,000.00 45,000.00 3,225.00 3,375.00

6.4 1 m3 Memasang Pondasi Batu Kali 1Pc : 6 PP 418,575.00 447,502.50


6.4.1 Bahan 336,975.00 358,852.50
1.2 m3 Batu Belah 15/20 120,000.00 130,000.00 144,000.00 156,000.00
117 Kg Portland Sement 1,050.00 1,062.50 122,850.00 124,312.50
0.561 m3 Pasir Pasang 125,000.00 140,000.00 70,125.00 78,540.00

6.4.2 Tenaga 81,600.00 88,650.00


1.5 OH Pekerja 30,000.00 33,000.00 45,000.00 49,500.00
0.750 OH Tukang Batu 40,000.00 43,000.00 30,000.00 32,250.00
0.075 OH Kepala Tukang 45,000.00 47,000.00 3,375.00 3,525.00
0.075 OH Mandor 43,000.00 45,000.00 3,225.00 3,375.00

6.5 1 m3 Memasang Pondasi Batu Kali 1Pc : 8 PP 394,150.00 423,097.50


6.5.1 Bahan 312,550.00 334,447.50
1.2 m3 Batu Belah 15/20 120,000.00 130,000.00 144,000.00 156,000.00
91 Kg Portland Sement 1,050.00 1,062.50 95,550.00 96,687.50
0.584 m3 Pasir Pasang 125,000.00 140,000.00 73,000.00 81,760.00

6.5.2 Tenaga 81,600.00 88,650.00


1.5 OH Pekerja 30,000.00 33,000.00 45,000.00 49,500.00
0.750 OH Tukang Batu 40,000.00 43,000.00 30,000.00 32,250.00
0.075 OH Kepala Tukang 45,000.00 47,000.00 3,375.00 3,525.00
0.075 OH Mandor 43,000.00 45,000.00 3,225.00 3,375.00

6.6 1 m3 Memasang Pondasi Batu Kali 1Kp : 1Sm : 2Pp 321,650.00 353,450.00
6.6.1 Bahan 240,050.00 264,800.00
1.2 m3 Batu Belah 15/20 120,000.00 130,000.00 144,000.00 156,000.00
0.17 m3 Kapur Pasang (KP) 195,000.00 210,000.00 33,150.00 35,700.00
0.17 Kg Semen Merah (SM) 120,000.00 150,000.00 20,400.00 25,500.00
0.340 m3 Pasir Pasang 125,000.00 140,000.00 42,500.00 47,600.00

6.6.2 Tenaga 81,600.00 88,650.00


1.5 OH Pekerja 30,000.00 33,000.00 45,000.00 49,500.00
0.750 OH Tukang Batu 40,000.00 43,000.00 30,000.00 32,250.00
0.075 OH Kepala Tukang 45,000.00 47,000.00 3,375.00 3,525.00
0.075 OH Mandor 43,000.00 45,000.00 3,225.00 3,375.00

6.7 1 m3 Memasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 PP 379,815.00 409,212.50


6.7.1 Bahan 298,215.00 320,562.50
1.2 m3 Batu Belah 15/20 120,000.00 130,000.00 144,000.00 156,000.00
61 kg Portland Sement 1,050.00 1,062.50 64,050.00 64,812.50
0.147 m3 Kapur Pasang 195,000.00 210,000.00 28,665.00 30,870.00
0.492 m3 Pasir 125,000.00 140,000.00 61,500.00 68,880.00

6.7.2 Tenaga 81,600.00 88,650.00


. 1.5 OH Pekerja 30,000.00 33,000.00 45,000.00 49,500.00
0.750 OH Tukang Batu 40,000.00 43,000.00 30,000.00 32,250.00
0.075 OH Kepala Tukang 45,000.00 47,000.00 3,375.00 3,525.00
0.075 OH Mandor 43,000.00 45,000.00 3,225.00 3,375.00

397638689.xls 54/20 abk 3-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.8 1 m3 Memasang Pondasi Batu Kali, ¼ Pc : 1Kp : 4 PP 355,695.00 384,602.50
6.8.1 Bahan 274,095.00 295,952.50
1.2 m3 Batu Belah 15/20 120,000.00 130,000.00 144,000.00 156,000.00
41 kg Portland Sement 1,050.00 1,062.50 43,050.00 43,562.50
0.131 m3 Kapur Pasang 195,000.00 210,000.00 25,545.00 27,510.00
0.492 m3 Pasir 125,000.00 140,000.00 61,500.00 68,880.00

6.8.2 Tenaga 81,600.00 88,650.00


. 1.5 OH Pekerja 30,000.00 33,000.00 45,000.00 49,500.00
0.750 OH Tukang Batu 40,000.00 43,000.00 30,000.00 32,250.00
0.075 OH Kepala Tukang 45,000.00 47,000.00 3,375.00 3,525.00
0.075 OH Mandor 43,000.00 45,000.00 3,225.00 3,375.00

6.9 1 m3 Pasang Pondasi Batu Kosong 218,832.00 238,818.00


6.9.1 Bahan 176,400.00 192,720.00
1.2 m3 Batu Belah 15/20 120,000.00 130,000.00 144,000.00 156,000.00
0.432 m3 Pasir Urug 75,000.00 85,000.00 32,400.00 36,720.00

6.9.2 Tenaga 42,432.00 46,098.00


. 0.78 OH Pekerja 30,000.00 33,000.00 23,400.00 25,740.00
0.39 OH Tukang Batu 40,000.00 43,000.00 15,600.00 16,770.00
0.039 OH Kepala Tukang 45,000.00 47,000.00 1,755.00 1,833.00
0.039 OH Mandor 43,000.00 45,000.00 1,677.00 1,755.00

6.10 1 m3 Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah 1,663,375.00 1,817,980.00
6.10.1 Bahan 1,517,100.00 1,658,485.00
0.480 m3 Batu Belah 15/20 cm 120,000.00 130,000.00 57,600.00 62,400.00
126 Kg Besi Beton 9,000.00 10,000.00 1,134,000.00 1,260,000.00
194 Kg Portland Semen 1,050.00 1,062.50 203,700.00 206,125.00
0.312 m3 Pasir Beton 140,000.00 150,000.00 43,680.00 46,800.00
0.468 m3 Koral Beton 115,000.00 120,000.00 53,820.00 56,160.00
1.8 Kg Kawat Beton 13,500.00 15,000.00 24,300.00 27,000.00

6.10.2 Tenaga 146,275.00 159,495.00


3.4 OH Pekerja 30,000.00 33,000.00 102,000.00 112,200.00
0.85 OH Tukang Batu 40,000.00 43,000.00 34,000.00 36,550.00
0.085 OH Kepala Tukang 45,000.00 47,000.00 3,825.00 3,995.00
0.15 OH Mandor 43,000.00 45,000.00 6,450.00 6,750.00

6.11 1 m3 Pasang Pondasi Sumuran diameter 100 cm 467,917.00 490,300.00


6.11.1 Bahan 355,200.00 367,585.00
0.45 m3 Batu Belah 15/20 cm 120,000.00 130,000.00 54,000.00 58,500.00
194 Kg Portland Semen 1,050.00 1,062.50 203,700.00 206,125.00
0.312 m3 Pasir Beton 140,000.00 150,000.00 43,680.00 46,800.00
0.468 m3 Koral Beton 115,000.00 120,000.00 53,820.00 56,160.00

6.11.2 Tenaga 112,717.00 122,715.00


2.40 OH Pekerja 30,000.00 33,000.00 72,000.00 79,200.00
0.8 OH Tukang Batu 40,000.00 43,000.00 32,000.00 34,400.00
0.08 OH Kepala Tukang 45,000.00 47,000.00 3,600.00 3,760.00
0.119 OH Mandor 43,000.00 45,000.00 5,117.00 5,355.00

397638689.xls 54/21 abk 3-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

IV 03-6897 - 2008 P E K E R JAAN DINDING

6.1 1 m2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 2Pp 139,865.00 151,108.75
6.1.1 Bahan 111,675.00 120,418.75
140 Buah Bata Merah 400.00 450.00 56,000.00 63,000.00
43.5 Kg Portland Semen (PC) 1,050.00 1,062.50 45,675.00 46,218.75
0.08 m3 Pasir Pasang (PP) 125,000.00 140,000.00 10,000.00 11,200.00

6.1.2 Tenaga 28,190.00 30,690.00


0.6 OH Pekerja 30,000.00 33,000.00 18,000.00 19,800.00
0.2 OH Tukang Batu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang Batu 45,000.00 47,000.00 900.00 940.00
0.03 OH Mandor 43,000.00 45,000.00 1,290.00 1,350.00

6.2 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3PP 130,162.50 141,439.38
6.2.1 Bahan 101,972.50 110,749.38
140 Buah Bata Merah 400.00 450.00 56,000.00 63,000.00
32.95 Kg Portland Semen (PC) 1,050.00 1,062.50 34,597.50 35,009.38
0.091 m3 Pasir Pasang (PP) 125,000.00 140,000.00 11,375.00 12,740.00

6.2.2 Tenaga 28,190.00 30,690.00


0.6 OH Pekerja 30,000.00 33,000.00 18,000.00 19,800.00
0.2 OH Tukang Batu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang Batu 45,000.00 47,000.00 900.00 940.00
0.03 OH Mandor 43,000.00 45,000.00 1,290.00 1,350.00

6.3 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 4PP 123,692.50 134,919.38
6.3.1 Bahan 95,502.50 104,229.38
140 Buah Bata Merah 400.00 450.00 56,000.00 63,000.00
26.55 Kg Portland Semen (PC) 1,050.00 1,062.50 27,877.50 28,209.38
0.093 m3 Pasir Pasang (PP) 125,000.00 140,000.00 11,625.00 13,020.00

6.3.2 Tenaga 28,190.00 30,690.00


0.6 OH Pekerja 30,000.00 33,000.00 18,000.00 19,800.00
0.2 OH Tukang Batu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang Batu 45,000.00 47,000.00 900.00 940.00
0.03 OH Mandor 43,000.00 45,000.00 1,290.00 1,350.00

6.4 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 5PP 120,250.00 131,557.50
6.4.1 Bahan 92,060.00 100,867.50
140 Buah Bata Merah 400.00 450.00 56,000.00 63,000.00
22.2 Kg Portland Semen (PC) 1,050.00 1,062.50 23,310.00 23,587.50
0.102 m3 Pasir Pasang (PP) 125,000.00 140,000.00 12,750.00 14,280.00

6.4.2 Tenaga 28,190.00 30,690.00


0.6 OH Pekerja 30,000.00 33,000.00 18,000.00 19,800.00
0.2 OH Tukang Batu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang Batu 45,000.00 47,000.00 900.00 940.00
0.03 OH Mandor 43,000.00 45,000.00 1,290.00 1,350.00

6.5 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 6PP 118,865.00 130,426.25
6.5.1 Bahan 90,675.00 99,736.25
140 Buah Bata Merah 400.00 450.00 56,000.00 63,000.00
18.5 Kg Portland Semen (PC) 1,050.00 1,062.50 19,425.00 19,656.25
0.122 m3 Pasir Pasang (PP) 125,000.00 140,000.00 15,250.00 17,080.00

6.5.2 Tenaga 28,190.00 30,690.00


0.6 OH Pekerja 30,000.00 33,000.00 18,000.00 19,800.00
0.2 OH Tukang Batu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang Batu 45,000.00 47,000.00 900.00 940.00
0.03 OH Mandor 43,000.00 45,000.00 1,290.00 1,350.00

6.6 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3 KP :10PP 111,699.00 123,125.00
6.6.1 Bahan 83,509.00 92,435.00
140 Buah Bata Merah 400.00 450.00 56,000.00 63,000.00
10.08 Kg Portland Semen (PC) 1,050.00 1,062.50 10,584.00 10,710.00
0.0925 m3 Pasir Pasang (PP) 125,000.00 140,000.00 11,562.50 12,950.00
0.0275 m3 Kapur Pasang (KP) 195,000.00 210,000.00 5,362.50 5,775.00

6.6.2 Tenaga 28,190.00 30,690.00


0.6 OH Pekerja 30,000.00 33,000.00 18,000.00 19,800.00
0.2 OH Tukang Batu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang Batu 45,000.00 47,000.00 900.00 940.00
0.03 OH Mandor 43,000.00 45,000.00 1,290.00 1,350.00

6.7 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 2PP 66,742.50 72,299.38
6.7.1 Bahan 52,647.50 56,954.38
70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
18.95 Kg Portland Semen 1,050.00 1,062.50 19,897.50 20,134.38
0.038 m3 Pasir Pasang 125,000.00 140,000.00 4,750.00 5,320.00

6.7.2 Tenaga 14,095.00 15,345.00


0.30 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.1 OH Tukang Batu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

397638689.xls 54/22 abk 4-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.8 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3PP 62,183.50 67,713.13
6.8.1 Bahan 48,088.50 52,368.13
70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
14.37 Kg Portland Semen 1,050.00 1,062.50 15,088.50 15,268.13
0.04 m3 Pasir Pasang 125,000.00 140,000.00 5,000.00 5,600.00

6.8.2 Tenaga 14,095.00 15,345.00


0.30 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.1 OH Tukang Batu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.9 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 4PP 59,545.00 65,083.75
6.9.1 Bahan 45,450.00 49,738.75
70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
11.50 Kg Portland Semen 1,050.00 1,062.50 12,075.00 12,218.75
0.043 m3 Pasir Pasang 125,000.00 140,000.00 5,375.00 6,020.00

6.9.2 Tenaga 14,095.00 15,345.00


0.30 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.1 OH Tukang Batu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.10 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 5PP 57,884.00 63,430.00
Bahan 43,789.00 48,085.00
6.10.1 70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
9.68 Kg Portland Semen 1,050.00 1,062.50 10,164.00 10,285.00
0.045 m3 Pasir Pasang 125,000.00 140,000.00 5,625.00 6,300.00

6.10.2 Tenaga 14,095.00 15,345.00


0.30 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.1 OH Tukang Batu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.11 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 6PP 56,956.00 62,545.00
6.11.1 Bahan 42,861.00 47,200.00
70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
8.32 Kg Portland Semen 1,050.00 1,062.50 8,736.00 8,840.00
0.049 m3 Pasir Pasang 125,000.00 140,000.00 6,125.00 6,860.00

6.11.2 Tenaga 14,095.00 15,345.00


0.30 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.1 OH Tukang Batu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.12 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 8PP 55,170.00 60,751.25
6.12.1 Bahan 41,075.00 45,406.25
70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
6.50 Kg Portland Semen 1,050.00 1,062.50 6,825.00 6,906.25
0.05 m3 Pasir Pasang 125,000.00 140,000.00 6,250.00 7,000.00

6.12.2 Tenaga 14,095.00 15,345.00


0.30 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.1 OH Tukang Batu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.13 1 m2 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3KP : 10PP 55,995.00 61,776.25
6.13.1 Bahan 41,900.00 46,431.25
70 Buah Bata Merah 5 x 11 x 22 400.00 450.00 28,000.00 31,500.00
4.5 Kg Portland Semen 1,050.00 1,062.50 4,725.00 4,781.25
0.05 m3 Pasir Pasang 125,000.00 140,000.00 6,250.00 7,000.00
0.015 m3 Kapur Padam 195,000.00 210,000.00 2,925.00 3,150.00

6.13.2 Tenaga 14,095.00 15,345.00


0.30 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.1 OH Tukang Batu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

397638689.xls 54/23 abk 4-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
V 03-2837 - 2008 PEKERJAAN PLESTERAN

6.1 1 m2 Memasang Plesteran 1 Pc : 1 Pp Tebal 15 mm 34,599.20 36,443.00


6.1.1 Bahan 18,279.20 18,713.00
15.504 Kg Portland Semen 1,050.00 1,062.50 16,279.20 16,473.00
0.016 m3 Pasir Pasang 125,000.00 140,000.00 2,000.00 2,240.00

6.1.2 Tenaga 16,320.00 17,730.00


0.3 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.15 OH Tukang batu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.2 1 m2 Memasang Plesteran 1 Pc : 2 Pp Tebal 15 mm 29,555.20 31,393.00


6.2.1 Bahan 13,235.20 13,663.00
10.224 Kg Portland Semen 1,050.00 1,062.50 10,735.20 10,863.00
0.020 m3 Pasir Pasang 125,000.00 140,000.00 2,500.00 2,800.00

6.2.2 Tenaga 16,320.00 17,730.00


0.3 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.15 OH Tukang batu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.3 1 m2 Memasang Plesteran 1 Pc : 3 Pp Tebal 15 mm 27,359.80 29,212.00


6.3.1 Bahan 11,039.80 11,482.00
7.776 Kg Portland Semen 1,050.00 1,062.50 8,164.80 8,262.00
0.023 m3 Pasir Pasang 125,000.00 140,000.00 2,875.00 3,220.00

6.3.2 Tenaga 16,320.00 17,730.00


0.3 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.15 OH Tukang batu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.4 1 m2 Memasang Plesteran 1 Pc : 4 Pp Tebal 15 mm 25,872.00 27,720.00


6.4.1 Bahan 9,552.00 9,990.00
6.240 Kg Portland Semen 1,050.00 1,062.50 6,552.00 6,630.00
0.024 m3 Pasir Pasang 125,000.00 140,000.00 3,000.00 3,360.00

6.4.2 Tenaga 16,320.00 17,730.00


0.3 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.15 OH Tukang batu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.5 1 m2 Memasang Plesteran 1 Pc : 5 Pp Tebal 15 mm 25,013.20 26,878.00


6.5.1 Bahan 8,693.20 9,148.00
5.184 Kg Portland Semen 1,050.00 1,062.50 5,443.20 5,508.00
0.026 m3 Pasir Pasang 125,000.00 140,000.00 3,250.00 3,640.00

6.5.2 Tenaga 16,320.00 17,730.00


0.3 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.15 OH Tukang batu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.6 1 m2 Memasang Plesteran 1 Pc : 6 Pp Tebal 15 mm 24,331.80 26,202.00


6.6.1 Bahan 8,011.80 8,472.00
4.416 Kg Portland Semen 1,050.00 1,062.50 4,636.80 4,692.00
0.027 m3 Pasir Pasang 125,000.00 140,000.00 3,375.00 3,780.00

6.6.2 Tenaga 16,320.00 17,730.00


0.3 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.15 OH Tukang batu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.7 1 m2 Memasang Plesteran 1 Pc : 7 Pp Tebal 15 mm 23,952.80 25,832.00


6.7.1 Bahan 7,632.80 8,102.00
3.936 Kg Portland Semen 1,050.00 1,062.50 4,132.80 4,182.00
0.028 m3 Pasir Pasang 125,000.00 140,000.00 3,500.00 3,920.00

6.7.2 Tenaga 16,320.00 17,730.00


0.3 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.15 OH Tukang batu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.8 1 m2 Memasang Plesteran 1 Pc : 8 Pp Tebal 15 mm 23,573.80 25,462.00


6.8.1 Bahan 7,253.80 7,732.00
3.456 Kg Portland Semen 1,050.00 1,062.50 3,628.80 3,672.00
0.029 m3 Pasir Pasang 125,000.00 140,000.00 3,625.00 4,060.00

6.8.2 Tenaga 16,320.00 17,730.00


0.30 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.15 OH Tukang batu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.9 1 m2 Memasang Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm 25,172.00 26,984.00


6.9.1 Bahan 8,258.00 8,570.00
5.760 Kg Portland Semen 1,050.00 1,062.50 6,048.00 6,120.00
0.003 m3 Kapur Pasang 195,000.00 210,000.00 585.00 630.00
0.013 m3 Pasir Pasang 125,000.00 140,000.00 1,625.00 1,820.00

397638689.xls 54/24 abk 5-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

6.9.2 Tenaga 16,914.00 18,414.00


0.36 OH Pekerja 30,000.00 33,000.00 10,800.00 11,880.00
0.12 OH Tukang batu 40,000.00 43,000.00 4,800.00 5,160.00
0.012 OH Kepala Tukang 45,000.00 47,000.00 540.00 564.00
0.018 OH Mandor 43,000.00 45,000.00 774.00 810.00

6.10 1 m2 Memasang Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm 23,539.00 25,451.50


6.10.1 Bahan 6,625.00 7,037.50
3 kg Portland Semen 1,050.00 1,062.50 3,150.00 3,187.50
0.005 m3 Kapur Padam 195,000.00 210,000.00 975.00 1,050.00
0.020 m3 Pasir Pasang 125,000.00 140,000.00 2,500.00 2,800.00

6.10.2 Tenaga 16,914.00 18,414.00


0.36 OH Pekerja 30,000.00 33,000.00 10,800.00 11,880.00
0.12 OH Tukang batu 40,000.00 43,000.00 4,800.00 5,160.00
0.012 OH Kepala Tukang 45,000.00 47,000.00 540.00 564.00
0.018 OH Mandor 43,000.00 45,000.00 774.00 810.00
\
6.11 1 m2 Memasang Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm 20,874.00 22,914.00
6.11.1 Bahan 3,960.00 4,500.00
0.009 m3 Semen Merah 120,000.00 150,000.00 1,080.00 1,350.00
0.009 m3 Kapur Padam 195,000.00 210,000.00 1,755.00 1,890.00
0.009 m3 Pasir Pasang 125,000.00 140,000.00 1,125.00 1,260.00

6.11.2 Tenaga 16,914.00 18,414.00


0.36 OH Pekerja 30,000.00 33,000.00 10,800.00 11,880.00
0.12 OH Tukang batu 40,000.00 43,000.00 4,800.00 5,160.00
0.012 OH Kepala Tukang 45,000.00 47,000.00 540.00 564.00
0.018 OH Mandor 43,000.00 45,000.00 774.00 810.00

6.12 1 m2 Memasang Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm 20,994.00 23,034.00


6.12.1 Bahan 4,080.00 4,620.00
0.007 m3 Semen Merah 120,000.00 150,000.00 840.00 1,050.00
0.007 m3 Kapur Padam 195,000.00 210,000.00 1,365.00 1,470.00
0.015 m3 Pasir Pasang 125,000.00 140,000.00 1,875.00 2,100.00

6.12.2 Tenaga 16,914.00 18,414.00


0.36 OH Pekerja 30,000.00 33,000.00 10,800.00 11,880.00
0.12 OH Tukang batu 40,000.00 43,000.00 4,800.00 5,160.00
0.012 OH Kepala Tukang 45,000.00 47,000.00 540.00 564.00
0.018 OH Mandor 43,000.00 45,000.00 774.00 810.00

6.13 1 m2 Memasang Plesteran 1 Pc : 2 Pp Tebal 20 mm 39,534.60 41,994.00


6.13.1 Bahan 17,688.60 18,264.00
13.632 kg Portland Semen 1,050.00 1,062.50 14,313.60 14,484.00
0.027 m3 Pasir Pasang 125,000.00 140,000.00 3,375.00 3,780.00

6.13.2 Tenaga 21,846.00 23,730.00


0.40 OH Pekerja 30,000.00 33,000.00 12,000.00 13,200.00
0.20 OH Tukang batu 40,000.00 43,000.00 8,000.00 8,600.00
0.020 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.022 OH Mandor 43,000.00 45,000.00 946.00 990.00

6.14 1 m2 Memasang Plesteran 1Pc : 3Pp Tebal 20 mm 32,020.40 34,061.00


6.14.1 Bahan 14,761.40 15,356.00
10.368 Kg Portland Semen 1,050.00 1,062.50 10,886.40 11,016.00
0.031 m3 Pasir Pasang 125,000.00 140,000.00 3,875.00 4,340.00

6.14.2 Tenaga 17,259.00 18,705.00


0.26 OH Pekerja 30,000.00 33,000.00 7,800.00 8,580.00
0.2 OH Tukang batu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.013 OH Mandor 43,000.00 45,000.00 559.00 585.00

6.15 1 m2 Memasang Plesteran 1 Pc : 4 Pp Tebal 20 mm 34,582.00 37,050.00


6.15.1 Bahan 12,736.00 13,320.00
8.320 kg Portland Semen 1,050.00 1,062.50 8,736.00 8,840.00
0.032 m3 Pasir Pasang 125,000.00 140,000.00 4,000.00 4,480.00

6.15.2 Tenaga 21,846.00 23,730.00


0.40 OH Pekerja 30,000.00 33,000.00 12,000.00 13,200.00
0.20 OH Tukang batu 40,000.00 43,000.00 8,000.00 8,600.00
0.020 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.022 OH Mandor 43,000.00 45,000.00 946.00 990.00

6.16 1 m2 Memasang Plesteran 1Pc : 5Pp Tebal 20 mm 33,478.60 35,974.00


6.16.1 Bahan 11,632.60 12,244.00
6.912 Kg Portland Semen 1,050.00 1,062.50 7,257.60 7,344.00
0.035 m3 Pasir Pasang 125,000.00 140,000.00 4,375.00 4,900.00

6.16.2 Tenaga 21,846.00 23,730.00


0.400 OH Pekerja 30,000.00 33,000.00 12,000.00 13,200.00
0.200 OH Tukang batu 40,000.00 43,000.00 8,000.00 8,600.00
0.020 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.022 OH Mandor 43,000.00 45,000.00 946.00 990.00

6.17 1 m2 Memasang Plesteran 1Pc : 6Pp Tebal 20 mm 32,528.40 35,026.00


6.17.1 Bahan 10,682.40 11,296.00
5.888 Kg Portland Semen 1,050.00 1,062.50 6,182.40 6,256.00
0.036 m3 Pasir Pasang 125,000.00 140,000.00 4,500.00 5,040.00

397638689.xls 54/25 abk 5-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.17.2 Tenaga 21,846.00 23,730.00
0.40 OH Pekerja 30,000.00 33,000.00 12,000.00 13,200.00
0.2 OH Tukang batu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.022 OH Mandor 43,000.00 45,000.00 946.00 990.00

6.18 1 m2 Memasang Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm 29,021.00 31,764.00


6.18.1 Bahan 5,085.00 5,760.00
0.009 m3 Semen Merah 120,000.00 150,000.00 1,080.00 1,350.00
0.009 m3 Kapur Padam 195,000.00 210,000.00 1,755.00 1,890.00
0.018 m3 Pasir Pasang 125,000.00 140,000.00 2,250.00 2,520.00

6.18.2 Tenaga 23,936.00 26,004.00


0.440 OH Pekerja 30,000.00 33,000.00 13,200.00 14,520.00
0.22 OH Tukang batu 40,000.00 43,000.00 8,800.00 9,460.00
0.022 OH Kepala Tukang 45,000.00 47,000.00 990.00 1,034.00
0.022 OH Mandor 43,000.00 45,000.00 946.00 990.00

6.19 1 m2 Memasang Berapen 1 Pc : 5Pp Tebal 15 mm 16,897.20 18,059.00


6.19.1 Bahan 8,693.20 9,148.00
5.184 Kg Portland Semen 1,050.00 1,062.50 5,443.20 5,508.00
0.026 m3 Pasir Pasang 125,000.00 140,000.00 3,250.00 3,640.00

6.19.2 Tenaga 8,204.00 8,911.00


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.075 OH Tukang batu 40,000.00 43,000.00 3,000.00 3,225.00
0.008 OH Kepala Tukang 45,000.00 47,000.00 360.00 376.00
0.008 OH Mandor 43,000.00 45,000.00 344.00 360.00

6.20 1 m' Memasang Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm 22,522.00 24,251.25


6.20.1 Bahan 2,150.00 2,351.25
0.5 Kg Portland Semen 1,050.00 1,062.50 525.00 531.25
0.013 m3 Pasir Pasang 125,000.00 140,000.00 1,625.00 1,820.00

6.20.2 Tenaga 20,372.00 21,900.00


0.080 OH Pekerja 30,000.00 33,000.00 2,400.00 2,640.00
0.40 OH Tukang batu 40,000.00 43,000.00 16,000.00 17,200.00
0.040 OH Kepala Tukang 45,000.00 47,000.00 1,800.00 1,880.00
0.004 OH Mandor 43,000.00 45,000.00 172.00 180.00

6.23 1 m2 Memasang Plesteran Ciprat 1Pc : 2 Pp 19,381.00 20,775.00


6.23.1 Bahan 5,286.00 5,430.00
4.32 Kg Portland Semen 1,050.00 1,062.50 4,536.00 4,590.00
0.006 m3 Pasir Pasang 125,000.00 140,000.00 750.00 840.00

6.23.2 Tenaga 14,095.00 15,345.00


0.30 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.1 OH Tukang batu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.24 1 m2 Memasang Finishing Siar Pasangan Dinding Bata Merah (=20 m') 11,467.40 12,213.25
6.24.1 Bahan 3,263.40 3,302.25
3.108 Kg Portland Semen 1,050.00 1,062.50 3,263.40 3,302.25

6.24.2 Tenaga 8,204.00 8,911.00


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.075 OH Tukang batu 40,000.00 43,000.00 3,000.00 3,225.00
0.008 OH Kepala Tukang 45,000.00 47,000.00 360.00 376.00
0.008 OH Mandor 43,000.00 45,000.00 344.00 360.00

6.25 1 m2 Memasang Finishing Siar Pasangan Dinding Conblock ekspose (=8 m') 5,532.00 5,883.00
6.25.1 Bahan 1,680.00 1,700.00
1.600 Kg Portland Semen 1,050.00 1,062.50 1,680.00 1,700.00

6.25.2 Tenaga 3,852.00 4,183.00


0.070 OH Pekerja 30,000.00 33,000.00 2,100.00 2,310.00
0.035 OH Tukang batu 40,000.00 43,000.00 1,400.00 1,505.00
0.004 OH Kepala Tukang 45,000.00 47,000.00 180.00 188.00
0.004 OH Mandor 43,000.00 45,000.00 172.00 180.00

6.26 1 m2 Memasang Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp 24,477.00 26,146.25
6.26.1 Bahan 8,157.00 8,416.25
6.34 Kg Pc 1,050.00 1,062.50 6,657.00 6,736.25
0.012 m3 PP 125,000.00 140,000.00 1,500.00 1,680.00

6.26.2 Tenaga 16,320.00 17,730.00


0.3 OH Pekerja 30,000.00 33,000.00 9,000.00 9,900.00
0.15 OH Tukang batu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

6.27 1 m2 Memasang Acian 14,292.50 15,273.13


6.27.1 Bahan 3,412.50 3,453.13
3.25 Kg Portland Semen 1,050.00 1,062.50 3,412.50 3,453.13

6.27.2 Tenaga 10,880.00 11,820.00


0.20 OH Pekerja 30,000.00 33,000.00 6,000.00 6,600.00
0.10 OH Tukang batu 40,000.00 43,000.00 4,000.00 4,300.00
0.010 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.010 OH Mandor 43,000.00 45,000.00 430.00 450.00

397638689.xls 54/26 abk 5-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

VI 03-3434 - 2008 PEKERJAAN K A Y U


6.1 1 m3 Membuat Kosen Pintu & Jendela Kayu klas I 21,543,800.00 22,185,950.00
6.1.2 Bahan 20,384,250.00 20,937,500.00
1.1 m3 Kayu Klas I (Jati) , Balok 18,500,000.00 19,000,000.00 20,350,000.00 20,900,000.00
1.25 kg Paku Biasa 2" - 5 " 13,000.00 14,000.00 16,250.00 17,500.00
1 kg Lem Kayu 18,000.00 20,000.00 18,000.00 20,000.00
6.1.2 Tenaga 1,159,550.00 1,248,450.00
7 OH Pekerja 30,000.00 33,000.00 210,000.00 231,000.00
21 OH Tukang Kayu 40,000.00 43,000.00 840,000.00 903,000.00
2.10 OH Kepala Tukang 45,000.00 47,000.00 94,500.00 98,700.00
0.35 OH Mandor 43,000.00 45,000.00 15,050.00 15,750.00

6.2 1 m3 Membuat Kosen Pintu & Jendela Kayu klas II atau III 7,028,150.00 7,947,600.00
6.2.1 Bahan 6,034,250.00 6,877,500.00
1.2 m3 Kayu Klas II (Kamfer) , Balok 5,000,000.00 5,700,000.00 6,000,000.00 6,840,000.00
1.25 kg Paku Biasa 2" - 5 " 13,000.00 14,000.00 16,250.00 17,500.00
1 kg Lem Kayu 18,000.00 20,000.00 18,000.00 20,000.00
6.2.2 Tenaga 993,900.00 1,070,100.00
6.00 OH Pekerja 30,000.00 33,000.00 180,000.00 198,000.00
18.00 OH Tukang Kayu 40,000.00 43,000.00 720,000.00 774,000.00
1.80 OH Kepala Tukang 45,000.00 47,000.00 81,000.00 84,600.00
0.30 OH Mandor 43,000.00 45,000.00 12,900.00 13,500.00

6.3 1 m2 Membuat Pintu KlampStandard Kayu Klas II (Kayu Kamfer) 290,649.00 311,145.00
6.3.1 Bahan 232,650.00 248,700.00
0.040 m3 Kayu Klas II (Kamfer), papan 5,800,000.00 6,200,000.00 232,000.00 248,000.00
0.05 Kg Paku Biasa 2" - 5 " 13,000.00 14,000.00 650.00 700.00

6.3.2 Tenaga 57,999.00 62,445.00


0.35 OH Pekerja 30,000.00 33,000.00 10,500.00 11,550.00
1.05 OH Tukang Kayu 40,000.00 43,000.00 42,000.00 45,150.00
0.105 OH Kepala Tukang 45,000.00 47,000.00 4,725.00 4,935.00
0.018 OH Mandor 43,000.00 45,000.00 774.00 810.00

6.5 1 m2 Membuat Daun Pintu Panel Kayu Klas I atau II 398,550.00 427,350.00
6.5.1 Bahan 232,900.00 249,000.00
0.04 m3 Kayu Klas II (Kamfer), papan 5,800,000.00 6,200,000.00 232,000.00 248,000.00
0.050 kg Lem Kayu 18,000.00 20,000.00 900.00 1,000.00
6.5.2 Tenaga 165,650.00 178,350.00
1 OH Pekerja 30,000.00 33,000.00 30,000.00 33,000.00
3.0 OH Tukang Kayu 40,000.00 43,000.00 120,000.00 129,000.00
0.30 OH Kepala Tukang 45,000.00 47,000.00 13,500.00 14,100.00
0.05 OH Mandor 43,000.00 45,000.00 2,150.00 2,250.00

6.6 1 m2 Membuat Pintu & Jendela Kaca Kayu Klas I atau II 277,120.00 297,480.00
6.6.1 Bahan 144,600.00 154,800.00
0.024 m3 Kayu Klas II (Kamfer), papan 5,800,000.00 6,200,000.00 139,200.00 148,800.00
0.300 kg Lem Kayu 18,000.00 20,000.00 5,400.00 6,000.00
6.6.2 Tenaga 132,520.00 142,680.00
0.800 OH Pekerja 30,000.00 33,000.00 24,000.00 26,400.00
2.400 OH Tukang Kayu 40,000.00 43,000.00 96,000.00 103,200.00
0.240 OH Kepala Tukang 45,000.00 47,000.00 10,800.00 11,280.00
0.040 OH Mandor 43,000.00 45,000.00 1,720.00 1,800.00

6.7 1 m2 Membuat Pintu & Jendela Jalusi Kayu Klas I atau II 1,518,650.00 1,596,350.00
6.7.1 Bahan 1,353,000.00 1,418,000.00
0.064 m3 Kayu Klas I (Jati), papan 21,000,000.00 22,000,000.00 1,344,000.00 1,408,000.00
0.5 kg Lem Kayu 18,000.00 20,000.00 9,000.00 10,000.00
6.7.2 Tenaga 165,650.00 178,350.00
1 OH Pekerja 30,000.00 33,000.00 30,000.00 33,000.00
3 OH Tukang Kayu 40,000.00 43,000.00 120,000.00 129,000.00
0.3 OH Kepala Tukang 45,000.00 47,000.00 13,500.00 14,100.00
0.05 OH Mandor 43,000.00 45,000.00 2,150.00 2,250.00

6.8 1 m2 Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm) 321,345.00 345,265.00
6.8.1 Bahan 205,390.00 220,420.00
0.025 m3 Kayu Klas II (Kamfer), papan 5,800,000.00 6,200,000.00 145,000.00 155,000.00
0.030 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 390.00 420.00
0.500 Ltr Lem Kayu 18,000.00 20,000.00 9,000.00 10,000.00
1.000 Lbr Plywood tebal 4 mm uk.90x220cm 51,000.00 55,000.00 51,000.00 55,000.00

6.8.2 Tenaga 115,955.00 124,845.00


0.700 OH Pekerja 30,000.00 33,000.00 21,000.00 23,100.00
2.100 OH Tukang Kayu 40,000.00 43,000.00 84,000.00 90,300.00
0.210 OH Kepala Tukang 45,000.00 47,000.00 9,450.00 9,870.00
0.035 OH Mandor 43,000.00 45,000.00 1,505.00 1,575.00

6.9 1 m2 Membuat Pintu Plywood rangkap, rangka expose kayu klas I atau II 341,390.00 366,820.00
6.9.1 Bahan 208,870.00 224,140.00
0.0256 m3 Kayu Klas II (Kamfer), papan 5,800,000.00 6,200,000.00 148,480.00 158,720.00
0.03 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 390.00 420.00
0.5 Ltr Lem Kayu 18,000.00 20,000.00 9,000.00 10,000.00
1 Lbr Plywood tebal 4 mm uk.90x220cm 51,000.00 55,000.00 51,000.00 55,000.00
6.9.2 Tenaga 132,520.00 142,680.00
0.800 OH Pekerja 30,000.00 33,000.00 24,000.00 26,400.00
2.400 OH Tukang Kayu 40,000.00 43,000.00 96,000.00 103,200.00
0.240 OH Kepala Tukang 45,000.00 47,000.00 10,800.00 11,280.00
0.040 OH Mandor 43,000.00 45,000.00 1,720.00 1,800.00

397638689.xls 54/27 abk 6-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.10 1 m2 Membuat Jalusi mati Kosen Kayu Klas I atau II 1,385,455.00 1,454,685.00
6.10.1 Bahan 1,261,950.00 1,322,100.00
0.06 m3 Kayu Klas I (Jati), papan 21,000,000.00 22,000,000.00 1,260,000.00 1,320,000.00
0.15 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 1,950.00 2,100.00

6.10.2 Tenaga 123,505.00 132,585.00


0.670 OH Pekerja 30,000.00 33,000.00 20,100.00 22,110.00
2.000 OH Tukang Kayu 40,000.00 43,000.00 80,000.00 86,000.00
0.200 OH Kepala Tukang 45,000.00 47,000.00 9,000.00 9,400.00
0.335 OH Mandor 43,000.00 45,000.00 14,405.00 15,075.00

6.11 1 m2 Membuat Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I 714,310.00 754,100.00
6.11.1 Bahan 581,790.00 611,420.00
0.025 m3 Kayu Klas I (Jati), papan 21,000,000.00 22,000,000.00 525,000.00 550,000.00
0.03 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 390.00 420.00
0.3 kg Lem Kayu 18,000.00 20,000.00 5,400.00 6,000.00
1 Lbr Teakwood (90 x 220) cm x 4 mm 51,000.00 55,000.00 51,000.00 55,000.00

6.11.2 Tenaga 132,520.00 142,680.00


0.80 OH Pekerja 30,000.00 33,000.00 24,000.00 26,400.00
2.40 OH Tukang Kayu 40,000.00 43,000.00 96,000.00 103,200.00
0.24 OH Kepala Tukang 45,000.00 47,000.00 10,800.00 11,280.00
0.04 OH Mandor 43,000.00 45,000.00 1,720.00 1,800.00

6.12 1 m2 Membuat Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II 361,154.00 388,640.00
6.12.1 Bahan 220,330.00 237,020.00
0.025 m3 Kayu Klas II (Kamfer), papan 5,800,000.00 6,200,000.00 145,000.00 155,000.00
0.03 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 390.00 420.00
0.08 kg Lem Kayu 18,000.00 20,000.00 1,440.00 1,600.00
1 Lbr Teakwood (90 x 220) cm x 4 mm 51,000.00 55,000.00 51,000.00 55,000.00
0.5 Lbr Formika 45,000.00 50,000.00 22,500.00 25,000.00
6.12.2 Tenaga 140,824.00 151,620.00
0.850 OH Pekerja 30,000.00 33,000.00 25,500.00 28,050.00
2.550 OH Tukang Kayu 40,000.00 43,000.00 102,000.00 109,650.00
0.255 OH Kepala Tukang 45,000.00 47,000.00 11,475.00 11,985.00
0.043 OH Mandor 43,000.00 45,000.00 1,849.00 1,935.00

6.13 1 m3 Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter 6,444,800.00 7,278,900.00
6.13.1 Bahan 5,782,800.00 6,565,900.00
1.1 m3 Kayu Kamfer, balok 5,000,000.00 5,700,000.00 5,500,000.00 6,270,000.00
15 Kg Besi Strip 14,000.00 14,500.00 210,000.00 217,500.00
5.6 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 72,800.00 78,400.00

6.13.2 Tenaga 662,000.00 713,000.00


4 OH Pekerja 30,000.00 33,000.00 120,000.00 132,000.00
12 OH Tukang Kayu 40,000.00 43,000.00 480,000.00 516,000.00
1.2 OH Kepala Tukang 45,000.00 47,000.00 54,000.00 56,400.00
0.2 OH Mandor 40,000.00 43,000.00 8,000.00 8,600.00

6.14 1 m3 Memasang Konstruksi Kuda-kuda Expose, Kayu Klas I 23,591,650.00 24,290,175.00


6.14.1 Bahan 22,482,800.00 23,095,900.00
1.2 m3 Kayu Klas I (jati), balok 18,500,000.00 19,000,000.00 22,200,000.00 22,800,000.00
15 Kg Besi Strip 14,000.00 14,500.00 210,000.00 217,500.00
5.6 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 72,800.00 78,400.00

6.14.2 Tenaga 1,108,850.00 1,194,275.00


6.7 OH Pekerja 30,000.00 33,000.00 201,000.00 221,100.00
20.1 OH Tukang Kayu 40,000.00 43,000.00 804,000.00 864,300.00
2.01 OH Kepala Tukang 45,000.00 47,000.00 90,450.00 94,470.00
0.335 OH Mandor 40,000.00 43,000.00 13,400.00 14,405.00

6.15 1 m3 Memasang konstruksi Gording, Kayu Klas II 6,146,200.00 6,957,300.00


6.15.1 Bahan 5,749,000.00 6,529,500.00
1.1 m3 Kayu Klas I (Kamfer), balok 5,000,000.00 5,700,000.00 5,500,000.00 6,270,000.00
15 Kg Besi Strip 14,000.00 14,500.00 210,000.00 217,500.00
3 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 39,000.00 42,000.00

6.15.2 Tenaga 397,200.00 427,800.00


2.4 OH Pekerja 30,000.00 33,000.00 72,000.00 79,200.00
7.2 OH Tukang Kayu 40,000.00 43,000.00 288,000.00 309,600.00
0.72 OH Kepala Tukang 45,000.00 47,000.00 32,400.00 33,840.00
0.12 OH Mandor 40,000.00 43,000.00 4,800.00 5,160.00

6.16 1 m2 Memasang Rangka Atap Genteng Keramik, Kayu Klas II 98,915.00 112,115.00
6.16.1 Bahan 91,250.00 103,820.00
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm 5,000,000.00 5,700,000.00 70,000.00 79,800.00
0.0036 m3 Reng (2x3) cm 5,000,000.00 5,700,000.00 18,000.00 20,520.00
0.25 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 3,250.00 3,500.00

6.16.2 Tenaga 7,665.00 8,295.00


0.1 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.1 OH Tukang Kayu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.17 1 m2 Memasang Rangka Atap Genteng Beton, Kayu Klas II 116,915.00 132,635.00
6.17.1 Bahan 109,250.00 124,340.00
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm 5,000,000.00 5,700,000.00 70,000.00 79,800.00
0.0072 m3 Reng (2x3) cm 5,000,000.00 5,700,000.00 36,000.00 41,040.00
0.25 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 3,250.00 3,500.00

397638689.xls 54/28 abk 6-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.17.2 Tenaga 7,665.00 8,295.00
0.1 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.1 OH Tukang Kayu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.18 1 m2 Memasang Rangka Atap Sirap, Kayu Klas II 836,798.00 953,254.00


6.18.1 Bahan 827,600.00 943,300.00
0.165 m3 Kayu Klas II (Kamfer), balok 5,000,000.00 5,700,000.00 825,000.00 940,500.00
0.2 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 2,600.00 2,800.00

6.18.2 Tenaga 9,198.00 9,954.00


0.12 OH Pekerja 30,000.00 33,000.00 3,600.00 3,960.00
0.12 OH Tukang Kayu 40,000.00 43,000.00 4,800.00 5,160.00
0.012 OH Kepala Tukang 45,000.00 47,000.00 540.00 564.00
0.006 OH Mandor 43,000.00 45,000.00 258.00 270.00

6.19 1 m2 Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II atau III 100,675.00 113,215.00
6.19.1 Bahan 79,600.00 90,580.00
0.0154 m3 Kayu Klas II (Kamfer), balok 5,000,000.00 5,700,000.00 77,000.00 87,780.00
0.2 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 2,600.00 2,800.00

6.19.2 Tenaga 21,075.00 22,635.00


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.30 OH Tukang Kayu 40,000.00 43,000.00 12,000.00 12,900.00
0.030 OH Kepala Tukang 45,000.00 47,000.00 1,350.00 1,410.00
0.075 OH Mandor 43,000.00 45,000.00 3,225.00 3,375.00

6.20 1 m2 Memasang Rangka Langit-langit (60x60) cm, kayu Klas II atau III 104,530.00 117,770.00
6.20.1 Bahan 84,750.00 96,410.00
0.0163 m3 Kayu Klas II (Kamfer), balok 5,000,000.00 5,700,000.00 81,500.00 92,910.00
0.25 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 3,250.00 3,500.00

6.20.2 Tenaga 19,780.00 21,360.00


0.2 OH Pekerja 30,000.00 33,000.00 6,000.00 6,600.00
0.3 OH Tukang Kayu 40,000.00 43,000.00 12,000.00 12,900.00
0.03 OH Kepala Tukang 45,000.00 47,000.00 1,350.00 1,410.00
0.01 OH Mandor 43,000.00 45,000.00 430.00 450.00

6.21 1 m' Memasang Listplank Uk. (3x20)cm Kayu klas I atau II 240,215.00 252,065.00
6.21.1 Bahan 228,100.00 239,000.00
0.0108 m3 Kayu klas I (Jati), papan 21,000,000.00 22,000,000.00 226,800.00 237,600.00
0.10 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 1,300.00 1,400.00

6.21.2 Tenaga 12,115.00 13,065.00


0.1 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.2 OH Tukang Kayu 40,000.00 43,000.00 8,000.00 8,600.00
0.020 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.22 1 m' Memasang Listplank Uk. (3x30)cm Kayu klas I atau klas II 76,565.00 81,965.00
6.22.1 Bahan 64,450.00 68,900.00
0.011 m3 Kayu klas II (Kamfer), papan 5,800,000.00 6,200,000.00 63,800.00 68,200.00
0.05 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 650.00 700.00

6.22.2 Tenaga 12,115.00 13,065.00


0.1 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.2 OH Tukang Kayu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.23 1 m2 Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III 166,819.00 188,475.00
6.23.1 Bahan 141,950.00 161,700.00
0.028 m3 Kayu klas II (Kamfer), balok 5,000,000.00 5,700,000.00 140,000.00 159,600.00
0.15 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 1,950.00 2,100.00

6.23.2 Tenaga 24,869.00 26,775.00


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.45 OH Tukang Kayu 40,000.00 43,000.00 18,000.00 19,350.00
0.045 OH Kepala Tukang 45,000.00 47,000.00 2,025.00 2,115.00
0.008 OH Mandor 43,000.00 45,000.00 344.00 360.00

6.24 1 m2 Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II 220,759.00 246,975.00
6.24.1 Bahan 195,890.00 220,200.00
0.028 m3 Kayu klas II (Kamfer), balok 5,000,000.00 5,700,000.00 140,000.00 159,600.00
0.15 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 1,950.00 2,100.00
0.86 Lbr Teakwood 120 x 240 cm tebal 4mm 51,000.00 55,000.00 43,860.00 47,300.00
0.56 Ltr Lem 18,000.00 20,000.00 10,080.00 11,200.00

6.24.2 Tenaga 24,869.00 26,775.00


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.45 OH Tukang Kayu 40,000.00 43,000.00 18,000.00 19,350.00
0.045 OH Kepala Tukang 45,000.00 47,000.00 2,025.00 2,115.00
0.008 OH Mandor 43,000.00 45,000.00 344.00 360.00

6.26 1 m2 Memasang Dinding Lambriziring dari Papan klas I 249,715.00 264,660.00


6.26.1 Bahan 150,325.00 157,650.00
0.007 m3 Kayu klas I (Jati), papan 21,000,000.00 22,000,000.00 147,000.00 154,000.00
0.1 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 1,300.00 1,400.00
0.15 Kg Paku Sekrup 3,5" 13,500.00 15,000.00 2,025.00 2,250.00

397638689.xls 54/29 abk 6-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.26.2 Tenaga 99,390.00 107,010.00
0.6 OH Pekerja 30,000.00 33,000.00 18,000.00 19,800.00
1.8 OH Tukang Kayu 40,000.00 43,000.00 72,000.00 77,400.00
0.18 OH Kepala Tukang 45,000.00 47,000.00 8,100.00 8,460.00
0.03 OH Mandor 43,000.00 45,000.00 1,290.00 1,350.00

6.27 1 m2 Memasang Dinding Lambriziring dari Plywood ukuran (120x240) cm 25,203.00 27,171.00
6.27.1 Bahan 21,050.00 22,700.00
0.4 Lbr Plywood (120 X 240) cm x 4mm 51,000.00 55,000.00 20,400.00 22,000.00
0.05 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 650.00 700.00

6.27.2 Tenaga 4,153.00 4,471.00


0.025 OH Pekerja 30,000.00 33,000.00 750.00 825.00
0.075 OH Tukang Kayu 40,000.00 43,000.00 3,000.00 3,225.00
0.0080 OH Kepala Tukang 45,000.00 47,000.00 360.00 376.00
0.0010 OH Mandor 43,000.00 45,000.00 43.00 45.00

6.28 1 m2 Memasang Dinding Bilik, Rangka Kayu Klas III atau IV 86,908.60 93,943.00
6.28.1 Bahan 81,468.60 88,033.00
1.500 m2 Bilik Bambu 15,000.00 17,500.00 22,500.00 26,250.00
0.014 m3 Kayu Klas III (Meranti) 4,200,000.00 4,400,000.00 58,800.00 61,600.00
0.012 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 156.00 168.00
0.003 m' List Kayu 2/4 4,200.00 5,000.00 12.60 15.00

6.28.2 Tenaga 5,440.00 5,910.00


0.1 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.05 OH Tukang Kayu 40,000.00 43,000.00 2,000.00 2,150.00
0.005 OH Kepala Tukang 45,000.00 47,000.00 225.00 235.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

397638689.xls 54/30 abk 6-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

VII 03-7394 - 2008 PEKERJAAN B E T O N


6.1 1 m3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 497,474.50 516,584.39
6.1.1 Bahan 432,145.50 445,258.39
247 Kg Portland Semen 1,050.00 1,062.50 259,350.00 262,437.50
869 Kg Pasir Beton 100.00 107.14 86,900.00 93,107.14
999 Kg Kerikil (maksimum 30 mm) 85.19 88.89 85,100.00 88,800.00
215 ltr Air 3.70 4.25 795.50 913.75
6.1.2 Tenaga 65,329.00 71,326.00
1.65 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00

6.2 1 m3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 524,931.91 544,159.59
6.2.1 Bahan 459,602.91 472,833.59
276 Kg Portland Semen 1,050.00 1,062.50 289,800.00 293,250.00
828 kg Pasir Beton 100.00 107.14 82,800.00 88,714.29
1,012 kg Kerikil (maksimum 30 mm) 85.19 88.89 86,207.41 89,955.56
215 ltr Air 3.70 4.25 795.50 913.75
6.2.2 Tenaga 65,329.00 71,326.00
1.65 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00
6.3 1 m3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 546,607.83 565,934.39
6.3.1 Bahan 481,278.83 494,608.39
299 Kg Portland Semen 1,050.00 1,062.50 313,950.00 317,687.50
799 kg Pasir Beton 100.00 107.14 79,900.00 85,607.14
1,017 kg Kerikil (maksimum 30 mm) 85.19 88.89 86,633.33 90,400.00
215 ltr Air 3.70 4.25 795.50 913.75
6.3.2 Tenaga 65,329.00 71,326.00
1.65 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00

6.4 1 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 464,183.19 481,602.46
6.4.1 Bahan 419,025.19 432,192.46
230 Kg Portland Semen 1,050.00 1,062.50 241,500.00 244,375.00
893 kg Pasir Beton 100.00 107.14 89,300.00 95,678.57
1,027 kg Kerikil (maksimum 30 mm) 85.19 88.89 87,485.19 91,288.89
200 ltr Air 3.70 4.25 740.00 850.00
6.4.2 Tenaga 45,158.00 49,410.00
1.2 OH Pekerja 30,000.00 33,000.00 36,000.00 39,600.00
0.2 OH Tukang Batu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.006 OH Mandor 43,000.00 45,000.00 258.00 270.00

6.5 1 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 572,080.06 591,509.99
6.5.1 Bahan 506,751.06 520,183.99
326 Kg Portland Semen 1,050.00 1,062.50 342,300.00 346,375.00
760 Kg Pasir Beton 100.00 107.14 76,000.00 81,428.57
1,029 Kg Kerikil (maksimum 30 mm) 85.19 88.89 87,655.56 91,466.67
215 ltr Air 3.70 4.25 795.50 913.75
6.5.2 Tenaga 65,329.00 71,326.00
1.65 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00

6.6 1 m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 596,650.43 616,205.62
6.6.1 Bahan 531,321.43 544,879.62
352 Kg Portland Semen 1,050.00 1,062.50 369,600.00 374,000.00
731 Kg Pasir Beton 100.00 107.14 73,100.00 78,321.43
1,031 Kg Kerikil (maksimum 30 mm) 85.19 88.89 87,825.93 91,644.44
215 ltr Air 3.70 4.25 795.50 913.75
6.6.2 Tenaga 65,329.00 71,326.00
1.650 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00

6.7 1 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 614,663.39 634,279.63
6.7.1 Bahan 549,334.39 562,953.63
371 Kg Portland Semen 1,050.00 1,062.50 389,550.00 394,187.50
698 Kg Pasir Beton 100.00 107.14 69,800.00 74,785.71
1,047 Kg Kerikil (maksimum 30 mm) 85.19 88.89 89,188.89 93,066.67
215 ltr Air 3.70 4.25 795.50 913.75
6.7.2 Tenaga 65,329.00 71,326.00
1.650 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00

6.8 1 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 627,031.91 646,738.16
6.8.1 Bahan 561,702.91 575,412.16
384 Kg Portland Semen 1,050.00 1,062.50 403,200.00 408,000.00
692 Kg Pasir Beton 100.00 107.14 69,200.00 74,142.86
1,039 Kg Kerikil (maksimum 30 mm) 85.19 88.89 88,507.41 92,355.56
215 ltr Air 3.70 4.25 795.50 913.75

397638689.xls 54/31 abk 7-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.8.2 Tenaga 65,329.00 71,326.00
1.650 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00

6.9 1 m3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 648,224.50 668,100.46
6.9.1 Bahan 582,895.50 596,774.46
406 Kg Portland Semen 1,050.00 1,062.50 426,300.00 431,375.00
684 kg Pasir Beton 100.00 107.14 68,400.00 73,285.71
1,026 kg Kerikil (maksimum 30 mm) 85.19 88.89 87,400.00 91,200.00
215 ltr Air 3.70 4.25 795.50 913.75
6.9.2 Tenaga 65,329.00 71,326.00
1.650 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00

6.10 1 m3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 654,848.57 674,772.09
6.10.1 Bahan 589,519.57 603,446.09
413 Kg Portland Semen 1,050.00 1,062.50 433,650.00 438,812.50
681 Kg Pasir Beton 100.00 107.14 68,100.00 72,964.29
1,021 Kg Kerikil (maksimum 30 mm) 85.19 88.89 86,974.07 90,755.56
215 ltr Air 3.70 4.25 795.50 913.75

6.10.2 Tenaga 65,329.00 71,326.00


1.650 OH Pekerja 30,000.00 33,000.00 49,500.00 54,450.00
0.275 OH Tukang Batu 40,000.00 43,000.00 11,000.00 11,825.00
0.028 OH Kepala Tukang 45,000.00 47,000.00 1,260.00 1,316.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00

6.11 1 m3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 697,531.80 719,279.19
6.11.1 Bahan 614,441.80 628,559.19
439 Kg Portland Semen 1,050.00 1,062.50 460,950.00 466,437.50
670 Kg Pasir Beton 100.00 107.14 67,000.00 71,785.71
1,006 Kg Kerikil (maksimum 30 mm) 85.19 88.89 85,696.30 89,422.22
215 ltr Air 3.70 4.25 795.50 913.75
6.11.2 Tenaga 83,090.00 90,720.00
2.1 OH Pekerja 30,000.00 33,000.00 63,000.00 69,300.00
0.35 OH Tukang Batu 40,000.00 43,000.00 14,000.00 15,050.00
0.035 OH Kepala Tukang 45,000.00 47,000.00 1,575.00 1,645.00
0.105 OH Mandor 43,000.00 45,000.00 4,515.00 4,725.00

6.12 1 m3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 706,170.69 727,986.92
6.12.1 Bahan 623,080.69 637,266.92
448 Kg Portland Semen 1,050.00 1,062.50 470,400.00 476,000.00
667 Kg Pasir Beton 100.00 107.14 66,700.00 71,464.29
1,000 Kg Kerikil (maksimum 30 mm) 85.19 88.89 85,185.19 88,888.89
215 ltr Air 3.70 4.25 795.50 913.75
6.12.2 Tenaga 83,090.00 90,720.00
2.10 OH Pekerja 30,000.00 33,000.00 63,000.00 69,300.00
0.350 OH Tukang Batu 40,000.00 43,000.00 14,000.00 15,050.00
0.035 OH Kepala Tukang 45,000.00 47,000.00 1,575.00 1,645.00
0.105 OH Mandor 43,000.00 45,000.00 4,515.00 4,725.00

6.17 10 Kg Pembesian dg Besi Polos atau Besi Ulir 101,912.00 113,079.00


6.17.1 Bahan 96,525.00 107,250.00
10.50 Kg Besi Beton (polos/ulir) 9,000.00 10,000.00 94,500.00 105,000.00
0.150 Kg Kawat Beton 13,500.00 15,000.00 2,025.00 2,250.00

6.17.2 Tenaga 5,387.00 5,829.00


0.07 OH Pekerja 30,000.00 33,000.00 2,100.00 2,310.00
0.07 OH Tukang Besi 40,000.00 43,000.00 2,800.00 3,010.00
0.007 OH Kepala Tukang 45,000.00 47,000.00 315.00 329.00
0.004 OH Mandor 43,000.00 45,000.00 172.00 180.00

6.18 10 Kg Kabel Presstresed Polos/strand 152,204.00 168,420.00


6.18.1 Bahan 148,350.00 164,250.00
10.5 Kg Besi presstred polos 14,000.00 15,500.00 147,000.00 162,750.00
0.1 Kg Kawat Beton 13,500.00 15,000.00 1,350.00 1,500.00
6.18.2 Tenaga 3,854.00 4,170.00
0.05 OH Pekerja 30,000.00 33,000.00 1,500.00 1,650.00
0.05 OH Tukang Besi 40,000.00 43,000.00 2,000.00 2,150.00
0.005 OH Kepala Tukang 45,000.00 47,000.00 225.00 235.00
0.003 OH Mandor 43,000.00 45,000.00 129.00 135.00

6.19 1 Kg Jaring Kawat baja/Wire Mesh 15,818.00 18,089.00


6.19.1 Bahan 13,935.00 16,050.00
1.02 Kg Jaring Kawat Baja dilas 13,000.00 15,000.00 13,260.00 15,300.00
0.05 Kg Kawat Beton 13,500.00 15,000.00 675.00 750.00

6.19.2 Tenaga 1,883.00 2,039.00


0.025 OH Pekerja 30,000.00 33,000.00 750.00 825.00
0.025 OH Tukang Besi 40,000.00 43,000.00 1,000.00 1,075.00
0.002 OH Kepala Tukang 45,000.00 47,000.00 90.00 94.00
0.001 OH Mandor 43,000.00 45,000.00 43.00 45.00

6.20 1 m2 Memasang Bekisting untuk Pondasi 54,988.00 61,932.00


6.20.1 Bahan 26,700.00 31,200.00
0.04 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 22,000.00 26,000.00
0.3 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 3,900.00 4,200.00
0.1 Ltr Minyak Bekisting 8,000.00 10,000.00 800.00 1,000.00

397638689.xls 54/32 abk 7-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

6.20.2 Tenaga 28,288.00 30,732.00


0.52 OH Pekerja 30,000.00 33,000.00 15,600.00 17,160.00
0.26 OH Tukang Kayu 40,000.00 43,000.00 10,400.00 11,180.00
0.026 OH Kepala Tukang 45,000.00 47,000.00 1,170.00 1,222.00
0.026 OH Mandor 43,000.00 45,000.00 1,118.00 1,170.00

6.21 1 m2 Memasang Bekisting untuk Sloof 57,738.00 65,182.00


6.21.1 Bahan 29,450.00 34,450.00
0.045 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 24,750.00 29,250.00
0.3 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 3,900.00 4,200.00
0.1 Ltr Minyak Bekisting 8,000.00 10,000.00 800.00 1,000.00

6.21.2 Tenaga 28,288.00 30,732.00


0.52 OH Pekerja 30,000.00 33,000.00 15,600.00 17,160.00
0.26 OH Tukang Kayu 40,000.00 43,000.00 10,400.00 11,180.00
0.026 OH Kepala Tukang 45,000.00 47,000.00 1,170.00 1,222.00
0.026 OH Mandor 43,000.00 45,000.00 1,118.00 1,170.00

6.22 1 m2 Memasang Bekisting untuk Kolom 215,204.00 231,356.00


6.22.1 Bahan 179,300.00 192,350.00
0.04 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 22,000.00 26,000.00
0.4 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 5,200.00 5,600.00
0.2 Ltr Minyak Bekisting 8,000.00 10,000.00 1,600.00 2,000.00
0.015 m3 Balok Kayu Klas II 4,500,000.00 4,800,000.00 67,500.00 72,000.00
0.35 Lbr Plywood tebal 9mm 140,000.00 145,000.00 49,000.00 50,750.00
2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 17,000.00 18,000.00 34,000.00 36,000.00

6.22.2 Tenaga 35,904.00 39,006.00


0.66 OH Pekerja 30,000.00 33,000.00 19,800.00 21,780.00
0.33 OH Tukang Kayu 40,000.00 43,000.00 13,200.00 14,190.00
0.033 OH Kepala Tukang 45,000.00 47,000.00 1,485.00 1,551.00
0.033 OH Mandor 43,000.00 45,000.00 1,419.00 1,485.00

6.23 1 m2 Memasang Bekisting untuk Balok 228,704.00 245,756.00


6.23.1 Bahan 192,800.00 206,750.00
0.04 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 22,000.00 26,000.00
0.4 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 5,200.00 5,600.00
0.2 Ltr Minyak Bekisting 8,000.00 10,000.00 1,600.00 2,000.00
0.018 m3 Balok Kayu Klas II 4,500,000.00 4,800,000.00 81,000.00 86,400.00
0.35 Lbr Plywood tebal 9mm 140,000.00 145,000.00 49,000.00 50,750.00
2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 17,000.00 18,000.00 34,000.00 36,000.00

6.23.2 Tenaga 35,904.00 39,006.00


0.66 OH Pekerja 30,000.00 33,000.00 19,800.00 21,780.00
0.33 OH Tukang Kayu 40,000.00 43,000.00 13,200.00 14,190.00
0.033 OH Kepala Tukang 45,000.00 47,000.00 1,485.00 1,551.00
0.033 OH Mandor 43,000.00 45,000.00 1,419.00 1,485.00

6.24 1 m2 Memasang Bekisting untuk Lantai 283,204.00 303,356.00


6.24.1 Bahan 247,300.00 264,350.00
0.04 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 22,000.00 26,000.00
0.4 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 5,200.00 5,600.00
0.2 Ltr Minyak Bekisting 8,000.00 10,000.00 1,600.00 2,000.00
0.015 m3 Balok Kayu Klas II (Borneo) 4,500,000.00 4,800,000.00 67,500.00 72,000.00
0.35 Lbr Plywood tebal 9mm 140,000.00 145,000.00 49,000.00 50,750.00
6 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 17,000.00 18,000.00 102,000.00 108,000.00

6.24.2 Tenaga 35,904.00 39,006.00


0.66 OH Pekerja 30,000.00 33,000.00 19,800.00 21,780.00
0.33 OH Tukang Kayu 40,000.00 43,000.00 13,200.00 14,190.00
0.033 OH Kepala Tukang 45,000.00 47,000.00 1,485.00 1,551.00
0.033 OH Mandor 43,000.00 45,000.00 1,419.00 1,485.00

6.25 1 m2 Memasang Bekisting untuk Dinding 269,204.00 288,856.00


6.25.1 Bahan 233,300.00 249,850.00
0.03 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 16,500.00 19,500.00
0.4 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 5,200.00 5,600.00
0.2 Ltr Minyak Bekisting 8,000.00 10,000.00 1,600.00 2,000.00
0.02 m3 Balok Kayu Klas II 4,500,000.00 4,800,000.00 90,000.00 96,000.00
0.35 Lbr Plywood tebal 9mm 140,000.00 145,000.00 49,000.00 50,750.00
3 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 17,000.00 18,000.00 51,000.00 54,000.00
4 Buah Formite/Penjaga jarak / Spacer (alat bantu) 5,000.00 5,500.00 20,000.00 22,000.00

6.25.2 Tenaga 35,904.00 39,006.00


0.66 OH Pekerja 30,000.00 33,000.00 19,800.00 21,780.00
0.33 OH Tukang Kayu 40,000.00 43,000.00 13,200.00 14,190.00
0.033 OH Kepala Tukang 45,000.00 47,000.00 1,485.00 1,551.00
0.033 OH Mandor 43,000.00 45,000.00 1,419.00 1,485.00

6.26 1 m2 Memasang Bekisting untuk Tangga 209,304.00 224,356.00


6.26.1 Bahan 173,400.00 185,350.00
0.03 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 16,500.00 19,500.00
0.4 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 5,200.00 5,600.00
0.15 Ltr Minyak Bekisting 8,000.00 10,000.00 1,200.00 1,500.00
0.015 m3 Balok Kayu Klas II 4,500,000.00 4,800,000.00 67,500.00 72,000.00
0.35 Lbr Plywood tebal 9mm 140,000.00 145,000.00 49,000.00 50,750.00
2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 17,000.00 18,000.00 34,000.00 36,000.00

397638689.xls 54/33 abk 7-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.26.2 35,904.00 39,006.00
0.66 OH Pekerja 30,000.00 33,000.00 19,800.00 21,780.00
0.33 OH Tukang Kayu 40,000.00 43,000.00 13,200.00 14,190.00
0.033 OH Kepala Tukang 45,000.00 47,000.00 1,485.00 1,551.00
0.033 OH Mandor 43,000.00 45,000.00 1,419.00 1,485.00

6.27 1 m2 Memasang Jembatan Cor 37,889.00 42,255.00


6.27.1 Bahan 30,820.00 34,560.00
0.0264 m3 Kayu Terentang 550,000.00 650,000.00 14,520.00 17,160.00
0.6 kg Paku Biasa 2" - 5" 13,000.00 14,000.00 7,800.00 8,400.00
0.5 m3 Dolken Kayu Galam diameter 8 - 10 / 4 m 17,000.00 18,000.00 8,500.00 9,000.00

6.27.2 Tenaga 7,069.00 7,695.00


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.05 OH Tukang Kayu 40,000.00 43,000.00 2,000.00 2,150.00
0.005 OH Kepala Tukang 45,000.00 47,000.00 225.00 235.00
0.008 OH Mandor 43,000.00 45,000.00 344.00 360.00

6.28 1 m3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) 2,402,575.00 2,627,225.00
6.28.1 Bahan 2,138,575.00 2,339,450.00
0.2 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 110,000.00 130,000.00
1.5 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 19,500.00 21,000.00
0.4 Ltr Minyak Bekisting 8,000.00 10,000.00 3,200.00 4,000.00
157.5 Kg Besi Beton Polos 9,000.00 10,000.00 1,417,500.00 1,575,000.00
2.25 Kg Kawat Beton 13,500.00 15,000.00 30,375.00 33,750.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00

6.28.2 Tenaga 264,000.00 287,775.00


5.3 OH Pekerja 30,000.00 33,000.00 159,000.00 174,900.00
0.275 OH Tukang batu 40,000.00 43,000.00 11,000.00 11,825.00
1.30 OH Tukang Kayu 40,000.00 43,000.00 52,000.00 55,900.00
1.05 OH Tukang Besi 40,000.00 43,000.00 42,000.00 45,150.00
0.262 OH Kepala Tukang 45,000.00 47,000.00 11,790.00 12,314.00
0.265 OH Mandor 43,000.00 45,000.00 11,395.00 11,925.00

6.29 1 m3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) 2,966,700.00 3,255,755.00
6.29.1 Bahan 2,667,800.00 2,930,200.00
0.27 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 148,500.00 175,500.00
2 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 26,000.00 28,000.00
0.6 Ltr Minyak Bekisting 8,000.00 10,000.00 4,800.00 6,000.00
210 Kg Besi Beton Polos 9,000.00 10,000.00 1,890,000.00 2,100,000.00
3 Kg Kawat Beton 13,500.00 15,000.00 40,500.00 45,000.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00

6.29.2 Tenaga 298,900.00 325,555.00


5.65 OH Pekerja 30,000.00 33,000.00 169,500.00 186,450.00
0.275 OH Tukang batu 40,000.00 43,000.00 11,000.00 11,825.00
1.56 OH Tukang Kayu 40,000.00 43,000.00 62,400.00 67,080.00
1.4 OH Tukang Besi 40,000.00 43,000.00 56,000.00 60,200.00
0.323 OH Kepala Tukang 45,000.00 47,000.00 14,535.00 15,181.00
0.283 OH Mandor 43,000.00 45,000.00 12,169.00 12,735.00

6.30 1 m3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) 5,652,564.00 6,157,251.00
6.30.1 Bahan 5,246,750.00 5,716,700.00
0.4 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 220,000.00 260,000.00
4 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 52,000.00 56,000.00
2 Ltr Minyak Bekisting 8,000.00 10,000.00 16,000.00 20,000.00
315 kg Besi Beton Polos 9,000.00 10,000.00 2,835,000.00 3,150,000.00
4.5 kg Kawat Beton 13,500.00 15,000.00 60,750.00 67,500.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00
0.15 m3 Kayu Klas II Balok 4,500,000.00 4,800,000.00 675,000.00 720,000.00
3.5 Lbr Plywood 9 mm 140,000.00 145,000.00 490,000.00 507,500.00
20 Btg Dolken diameter 8 / 4rm 17,000.00 18,000.00 340,000.00 360,000.00

6.30.2 Tenaga 405,814.00 440,551.00


7.05 OH Pekerja 30,000.00 33,000.00 211,500.00 232,650.00
0.275 OH Tukang batu 40,000.00 43,000.00 11,000.00 11,825.00
1.65 OH Tukang Kayu 40,000.00 43,000.00 66,000.00 70,950.00
2.1 OH Tukang Besi 40,000.00 43,000.00 84,000.00 90,300.00
0.403 OH Kepala Tukang 45,000.00 47,000.00 18,135.00 18,941.00
0.353 OH Mandor 43,000.00 45,000.00 15,179.00 15,885.00

6.31 1 m3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) 4,365,059.00 4,737,986.00
6.31.1 Bahan 4,012,900.00 4,355,500.00
0.32 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 176,000.00 208,000.00
3.2 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 41,600.00 44,800.00
1.6 Ltr Minyak Bekisting 8,000.00 10,000.00 12,800.00 16,000.00
210 Kg Besi Beton Polos 9,000.00 10,000.00 1,890,000.00 2,100,000.00
3 Kg Kawat Beton 13,500.00 15,000.00 40,500.00 45,000.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00
0.14 m3 Kayu Klas II Balok 4,500,000.00 4,800,000.00 630,000.00 672,000.00
2.8 Lbr Plywood 9 mm 140,000.00 145,000.00 392,000.00 406,000.00
16 Btg Dolken diameter 8 / 4rm 17,000.00 18,000.00 272,000.00 288,000.00

397638689.xls 54/34 abk 7-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

6.31.2 Tenaga 352,159.00 382,486.00


6.35 OH Pekerja 30,000.00 33,000.00 190,500.00 209,550.00
0.275 OH Tukang batu 40,000.00 43,000.00 11,000.00 11,825.00
1.65 OH Tukang Kayu 40,000.00 43,000.00 66,000.00 70,950.00
1.4 OH Tukang Besi 40,000.00 43,000.00 56,000.00 60,200.00
0.333 OH Kepala Tukang 45,000.00 47,000.00 14,985.00 15,651.00
0.318 OH Mandor 43,000.00 45,000.00 13,674.00 14,310.00

6.32 1 m3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting) 3,999,595.00 4,323,405.00
6.32.1 Bahan 3,712,275.00 4,011,250.00
0.32 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 176,000.00 208,000.00
3.2 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 41,600.00 44,800.00
1.6 Ltr Minyak Bekisting 8,000.00 10,000.00 12,800.00 16,000.00
157.5 Kg Besi Beton Polos 9,000.00 10,000.00 1,417,500.00 1,575,000.00
2.25 Kg Kawat Beton 13,500.00 15,000.00 30,375.00 33,750.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00
0.12 m3 Kayu Klas II Balok 4,500,000.00 4,800,000.00 540,000.00 576,000.00
2.8 Lbr Plywood 9 mm 140,000.00 145,000.00 392,000.00 406,000.00
32 Btg Dolken diameter 8 / 4rm 17,000.00 18,000.00 544,000.00 576,000.00
6.32.2 Tenaga 287,320.00 312,155.00
5.3 OH Pekerja 30,000.00 33,000.00 159,000.00 174,900.00
0.275 OH Tukang batu 40,000.00 43,000.00 11,000.00 11,825.00
1.3 OH Tukang Kayu 40,000.00 43,000.00 52,000.00 55,900.00
1.05 OH Tukang Besi 40,000.00 43,000.00 42,000.00 45,150.00
0.265 OH Kepala Tukang 45,000.00 47,000.00 11,925.00 12,455.00
0.265 OH Mandor 43,000.00 45,000.00 11,395.00 11,925.00

6.33 1 m3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting) 3,999,460.00 4,319,264.00
6.33.1 Bahan 3,712,275.00 4,007,250.00
0.24 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 132,000.00 156,000.00
3.2 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 41,600.00 44,800.00
1.6 Ltr Minyak Bekisting 8,000.00 10,000.00 12,800.00 16,000.00
157.5 Kg Besi Beton Polos 9,000.00 10,000.00 1,417,500.00 1,575,000.00
2.25 Kg Kawat Beton 13,500.00 15,000.00 30,375.00 33,750.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00
0.16 m3 Kayu Klas II Balok 4,500,000.00 4,800,000.00 720,000.00 768,000.00
2.8 Lbr Plywood 9 mm 140,000.00 145,000.00 392,000.00 406,000.00
24 Btg Dolken diameter 8 / 4rm 17,000.00 18,000.00 408,000.00 432,000.00
6.33.2 Tenaga 287,185.00 312,014.00
5.3 OH Pekerja 30,000.00 33,000.00 159,000.00 174,900.00
0.275 OH Tukang batu 40,000.00 43,000.00 11,000.00 11,825.00
1.3 OH Tukang Kayu 40,000.00 43,000.00 52,000.00 55,900.00
1.05 OH Tukang Besi 40,000.00 43,000.00 42,000.00 45,150.00
0.262 OH Kepala Tukang 45,000.00 47,000.00 11,790.00 12,314.00
0.265 OH Mandor 43,000.00 45,000.00 11,395.00 11,925.00

6.34 1 m3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting) 4,060,704.00 4,409,171.00
6.34.1 Bahan 3,735,100.00 4,055,700.00
0.25 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 137,500.00 162,500.00
3 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 39,000.00 42,000.00
1.2 Ltr Minyak Bekisting 8,000.00 10,000.00 9,600.00 12,000.00
210 Kg Besi Beton Polos 9,000.00 10,000.00 1,890,000.00 2,100,000.00
3 Kg Kawat Beton 13,500.00 15,000.00 40,500.00 45,000.00
336 Kg Portland Semen 1,050.00 1,062.50 352,800.00 357,000.00
0.54 m3 Pasir Beton 140,000.00 150,000.00 75,600.00 81,000.00
0.81 m3 Kerikil Beton 160,000.00 170,000.00 129,600.00 137,700.00
0.105 m3 Kayu Klas II Balok 4,500,000.00 4,800,000.00 472,500.00 504,000.00
2.5 Lbr Plywood 9 mm 140,000.00 145,000.00 350,000.00 362,500.00
14 Btg Dolken diameter 8 / 4rm 17,000.00 18,000.00 238,000.00 252,000.00
6.34.2 Tenaga 325,604.00 353,471.00
5.65 OH Pekerja 30,000.00 33,000.00 169,500.00 186,450.00
0.275 OH Tukang batu 40,000.00 43,000.00 11,000.00 11,825.00
1.56 OH Tukang Kayu 40,000.00 43,000.00 62,400.00 67,080.00
1.4 OH Tukang Besi 40,000.00 43,000.00 56,000.00 60,200.00
0.323 OH Kepala Tukang 45,000.00 47,000.00 14,535.00 15,181.00
0.283 OH Mandor 43,000.00 45,000.00 12,169.00 12,735.00

6.35 1 m' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 43,774.50 48,002.00
6.35.1 Bahan 35,317.50 38,795.00
0.002 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 1,100.00 1,300.00
0.01 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 130.00 140.00
3 Ltr Besi Beton Polos 9,000.00 10,000.00 27,000.00 30,000.00
0.045 Kg Kawat Beton 13,500.00 15,000.00 607.50 675.00
4 Kg Portland Semen 1,050.00 1,062.50 4,200.00 4,250.00
0.006 m3 Pasir Beton 140,000.00 150,000.00 840.00 900.00
0.009 m3 Kerikil Beton 160,000.00 170,000.00 1,440.00 1,530.00
6.35.2 Tenaga 8,457.00 9,207.00
0.18 OH Pekerja 30,000.00 33,000.00 5,400.00 5,940.00
0.02 OH Tukang batu 40,000.00 43,000.00 800.00 860.00
0.02 OH Tukang Kayu 40,000.00 43,000.00 800.00 860.00
0.02 OH Tukang Besi 40,000.00 43,000.00 800.00 860.00
0.006 OH Kepala Tukang 45,000.00 47,000.00 270.00 282.00
0.009 OH Mandor 43,000.00 45,000.00 387.00 405.00

397638689.xls 54/35 abk 7-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.36 1 m' Membuat Ring Balok Beton Bertulang (10 x 15) cm 58,385.00 63,926.75
6.36.1 Bahan 44,420.00 48,723.75
0.003 m3 Kayu Klas III (Terentang) 550,000.00 650,000.00 1,650.00 1,950.00
0.02 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 260.00 280.00
3.6 Ltr Besi Beton Polos 9,000.00 10,000.00 32,400.00 36,000.00
0.05 Kg Kawat Beton 13,500.00 15,000.00 675.00 750.00
5.5 Kg Portland Semen 1,050.00 1,062.50 5,775.00 5,843.75
0.009 m3 Pasir Beton 140,000.00 150,000.00 1,260.00 1,350.00
0.015 m3 Kerikil Beton 160,000.00 170,000.00 2,400.00 2,550.00

6.36.2 Tenaga 13,965.00 15,203.00


0.297 OH Pekerja 30,000.00 33,000.00 8,910.00 9,801.00
0.033 OH Tukang batu 40,000.00 43,000.00 1,320.00 1,419.00
0.033 OH Tukang Kayu 40,000.00 43,000.00 1,320.00 1,419.00
0.033 OH Tukang Besi 40,000.00 43,000.00 1,320.00 1,419.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.015 OH Mandor 43,000.00 45,000.00 645.00 675.00

397638689.xls 54/36 abk 7-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

VIII 03-3436-2002 PEKERJAAN PENUTUP ATAP

6.1 1 m2 Pasang Atap Genteng Plentong Kecil 40,704.00 46,411.00


6.1.1 Bahan 32,500.00 37,500.00
25 Buah Genteng Plentong 1,300.00 1,500.00 32,500.00 37,500.00

6.1.2 Tenaga 8,204.00 8,911.00


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.075 OH Tukang Kayu 40,000.00 43,000.00 3,000.00 3,225.00
0.008 OH Kepala Tukang 45,000.00 47,000.00 360.00 376.00
0.008 OH Mandor 43,000.00 45,000.00 344.00 360.00

6.2 1 m2 Pasang Atap Genteng Kodok / Glasur 70,704.00 76,411.00


6.2.1 Bahan 62,500.00 67,500.00
25 Buah Genteng Kodok / Glasur 2,500.00 2,700.00 62,500.00 67,500.00

6.2.2 Tenaga 8,204.00 8,911.00


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.075 OH Tukang Kayu 40,000.00 43,000.00 3,000.00 3,225.00
0.008 OH Kepala Tukang 45,000.00 47,000.00 360.00 376.00
0.008 OH Mandor 43,000.00 45,000.00 344.00 360.00

6.3 1 m2 Pasang Atap Genteng Plentong Super / Besar 57,914.00 62,172.00


6.3.1 Bahan 50,400.00 54,000.00
18 Buah Genteng Plentong Super / Besar 2,800.00 3,000.00 50,400.00 54,000.00

6.3.2 Tenaga 7,514.00 8,172.00


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.06 OH Tukang Kayu 40,000.00 43,000.00 2,400.00 2,580.00
0.006 OH Kepala Tukang 45,000.00 47,000.00 270.00 282.00
0.008 OH Mandor 43,000.00 45,000.00 344.00 360.00

6.4 1 m' Pasang Genteng Bubung Plentong 48,886.00 51,810.00


6.4.1 Bahan 27,900.00 28,980.00
5 Buah Genteng Bubung Plentong 3,100.00 3,200.00 15,500.00 16,000.00
8 Kg Portland Semen 1,050.00 1,062.50 8,400.00 8,500.00
0.032 m3 Pasir Pasang 125,000.00 140,000.00 4,000.00 4,480.00

6.4.2 Tenaga 20,986.00 22,830.00


0.4 OH Pekerja 30,000.00 33,000.00 12,000.00 13,200.00
0.2 OH Tukang Kayu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.002 OH Mandor 43,000.00 45,000.00 86.00 90.00

6.5 1 m' Pasang Genteng Bubung Kodok / Glasur 65,886.00 70,810.00


6.5.1 Bahan 44,900.00 47,980.00
5 Buah Genteng Bubung Kodok / Glasur 6,500.00 7,000.00 32,500.00 35,000.00
8 Kg Portland Semen 1,050.00 1,062.50 8,400.00 8,500.00
0.032 m3 Pasir Pasang 125,000.00 140,000.00 4,000.00 4,480.00

6.5.2 Tenaga 20,986.00 22,830.00


0.4 OH Pekerja 30,000.00 33,000.00 12,000.00 13,200.00
0.2 OH Tukang Kayu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.002 OH Mandor 43,000.00 45,000.00 86.00 90.00

6.6 1 m' Pasang Genteng Bubung Plentong Besar 60,386.00 63,810.00


6.6.1 Bahan 39,400.00 40,980.00
4 Buah Genteng Bubung Plentong Besar 6,750.00 7,000.00 27,000.00 28,000.00
8 Kg Portland Semen 1,050.00 1,062.50 8,400.00 8,500.00
0.032 m3 Pasir Pasang 125,000.00 140,000.00 4,000.00 4,480.00
6.6.2 Tenaga 20,986.00 22,830.00
0.4 OH Pekerja 30,000.00 33,000.00 12,000.00 13,200.00
0.2 OH Tukang Kayu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.002 OH Mandor 43,000.00 45,000.00 86.00 90.00

6.9 1 m2 Pasang Atap Asbes Gelombang (2,25x0,92 m) x 5 mm 54,164.00 56,581.00


6.9.1 Bahan 46,260.00 48,000.00
0.6 Lbr Asbes Gelombang 73,500.00 76,000.00 44,100.00 45,600.00
0.12 Kg Paku Pancing 60 x 230 18,000.00 20,000.00 2,160.00 2,400.00

6.9.2 Tenaga 7,904.00 8,581.00


0.14 OH Pekerja 30,000.00 33,000.00 4,200.00 4,620.00
0.075 OH Tukang Kayu 40,000.00 43,000.00 3,000.00 3,225.00
0.008 OH Kepala Tukang 45,000.00 47,000.00 360.00 376.00
0.008 OH Mandor 43,000.00 45,000.00 344.00 360.00

6.10 m2 Pasang Atap Asbes Gelombang (2,00x0,92 m) x 5 mm 53,876.00 56,274.00


6.10.1 Bahan 46,260.00 48,000.00
0.6 Lbr Asbes Gelombang 73,500.00 76,000.00 44,100.00 45,600.00
0.12 Kg Paku Pancing 60 x 230 18,000.00 20,000.00 2,160.00 2,400.00

6.10.2 Tenaga 7,616.00 8,274.00


0.14 OH Pekerja 30,000.00 33,000.00 4,200.00 4,620.00
0.07 OH Tukang Kayu 40,000.00 43,000.00 2,800.00 3,010.00
0.007 OH Kepala Tukang 45,000.00 47,000.00 315.00 329.00
0.007 OH Mandor 43,000.00 45,000.00 301.00 315.00

397638689.xls 54/37 abk 8-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.12 1 m2 Pasang Atap Asbes Gelombang (3,00x1,05 m) x 4 mm 35,501.00 36,924.00
6.12.1 Bahan 27,885.00 28,650.00
0.35 Lbr Asbes Gelombang 73,500.00 75,000.00 25,725.00 26,250.00
0.12 Kg Paku Pancing 60 x 230 18,000.00 20,000.00 2,160.00 2,400.00

6.12.2 Tenaga 7,616.00 8,274.00


0.14 OH Pekerja 30,000.00 33,000.00 4,200.00 4,620.00
0.07 OH Tukang Kayu 40,000.00 43,000.00 2,800.00 3,010.00
0.007 OH Kepala Tukang 45,000.00 47,000.00 315.00 329.00
0.007 OH Mandor 43,000.00 45,000.00 301.00 315.00

6.15 1 m2 Pasang Atap Asbes Gelombang (2,10x1,05 m) x 4 mm 34,136.00 36,555.00


6.15.1 Bahan 26,640.00 28,410.00
0.51 Lbr Asbes Gelombang 48,000.00 51,000.00 24,480.00 26,010.00
0.12 Kg Paku Pancing 60 x 230 18,000.00 20,000.00 2,160.00 2,400.00

6.15.2 Tenaga 7,496.00 8,145.00


0.14 OH Pekerja 30,000.00 33,000.00 4,200.00 4,620.00
0.067 OH Tukang Kayu 40,000.00 43,000.00 2,680.00 2,881.00
0.007 OH Kepala Tukang 45,000.00 47,000.00 315.00 329.00
0.007 OH Mandor 43,000.00 45,000.00 301.00 315.00

6.30 1 m2 Pasang Atap Genteng Beton 44,270.00 47,440.00


6.30.1 Bahan 33,390.00 35,620.00
11 Lbr Genteng Beton Standrad 3,000.00 3,200.00 33,000.00 35,200.00
0.03 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 390.00 420.00

6.30.2 Tenaga 10,880.00 11,820.00


0.2 OH Pekerja 30,000.00 33,000.00 6,000.00 6,600.00
0.1 OH Tukang Kayu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.01 OH Mandor 43,000.00 45,000.00 430.00 450.00

6.33 1 m2 Pasang Atap Sirap 103,049.00 110,563.00


6.33.1 Bahan 86,600.00 92,800.00
60 Lbr Genteng Sirap 1,400.00 1,500.00 84,000.00 90,000.00
0.2 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 2,600.00 2,800.00

6.33.2 Tenaga 16,449.00 17,763.00


0.166 OH Pekerja 30,000.00 33,000.00 4,980.00 5,478.00
0.25 OH Tukang Kayu 40,000.00 43,000.00 10,000.00 10,750.00
0.025 OH Kepala Tukang 45,000.00 47,000.00 1,125.00 1,175.00
0.008 OH Mandor 43,000.00 45,000.00 344.00 360.00

6.34 1 m' Pasang Nok Genteng Beton 29,115.00 30,655.00


6.34.1 Bahan 29,115.00 30,655.00
3.5 Buah Nok Genteng Beton 3,750.00 4,000.00 13,125.00 14,000.00
0.05 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 650.00 700.00
10.8 Kg Portland Semen 1,050.00 1,062.50 11,340.00 11,475.00
0.032 m3 Pasir Pasang 125,000.00 140,000.00 4,000.00 4,480.00
1 Kg Semen Warna 9,000.00 10,000.00 9,000.00 10,000.00

6.34.2 Tenaga 21,760.00 23,640.00


0.4 OH Pekerja 30,000.00 33,000.00 12,000.00 13,200.00
0.2 OH Tukang Kayu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.02 OH Mandor 43,000.00 45,000.00 860.00 900.00

6.37 1 m' Pasang Nok Sirap 58,813.00 62,960.00


6.37.1 Bahan 43,680.00 46,640.00
0.4 Lbr Seng Plaat 3" x 6" BJLS 28 33,000.00 35,000.00 13,200.00 14,000.00
0.06 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 780.00 840.00
0.5 Kg Paku Biasa 2" - 5" 13,000.00 14,000.00 6,500.00 7,000.00
0.004 m3 Kayu Kamfer Papan Tebal 3 cm 5,800,000.00 6,200,000.00 23,200.00 24,800.00

6.37.2 Tenaga 15,133.00 16,320.00


0.125 OH Pekerja 30,000.00 33,000.00 3,750.00 4,125.00
0.25 OH Tukang Kayu 40,000.00 43,000.00 10,000.00 10,750.00
0.025 OH Kepala Tukang 45,000.00 47,000.00 1,125.00 1,175.00
0.006 OH Mandor 43,000.00 45,000.00 258.00 270.00

6.38 1 m2 Pasang Atap Seng Gelombang 52,288.00 54,272.00


6.38.1 Bahan 45,760.00 47,180.00
0.7 Lbr Seng Gelombang 3" x 6" BJLS 28 65,000.00 67,000.00 45,500.00 46,900.00
0.02 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 260.00 280.00
6.38.2 Tenaga 6,528.00 7,092.00
0.12 OH Pekerja 30,000.00 33,000.00 3,600.00 3,960.00
0.06 OH Tukang Kayu 40,000.00 43,000.00 2,400.00 2,580.00
0.006 OH Kepala Tukang 45,000.00 47,000.00 270.00 282.00
0.006 OH Mandor 43,000.00 45,000.00 258.00 270.00

6.39 1 m' Pasang Atap Nok Seng 27,938.00 29,266.00


6.39.1 Bahan 20,020.00 20,660.00
0.3 Lbr Seng Plaat 3" x 6" BJLS 28 65,000.00 67,000.00 19,500.00 20,100.00
0.04 Kg Paku Biasa 1/2" - 1" 13,000.00 14,000.00 520.00 560.00
6.39.2 Tenaga 7,918.00 8,606.00
0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.07 OH Tukang Kayu 40,000.00 43,000.00 2,800.00 3,010.00
0.008 OH Kepala Tukang 45,000.00 47,000.00 360.00 376.00
0.006 OH Mandor 43,000.00 45,000.00 258.00 270.00

397638689.xls 54/38 abk 8-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

6.42 1 m2 Pasang Allumunium Foil / Sisalation 13,894.00 14,730.00


6.42.1 Bahan 6,825.00 7,035.00
1.05 m2 Sisalation / Allumunium Foil 6,500.00 6,700.00 6,825.00 7,035.00
6.42.2 Tenaga 7,069.00 7,695.00
0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.05 OH Tukang Kayu 40,000.00 43,000.00 2,000.00 2,150.00
0.005 OH Kepala Tukang 45,000.00 47,000.00 225.00 235.00
0.008 OH Mandor 43,000.00 45,000.00 344.00 360.00

397638689.xls 54/39 abk 8-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

IX 03-2839 - 2008 PEKERJAAN LANGIT - LANGIT

6.1 1 m2 Memasang Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm 17,517.00 18,949.00
6.1.1 Bahan 13,330.00 14,440.00
1.1 Lbr Plat Asbes 12,000.00 13,000.00 13,200.00 14,300.00
0.01 Kg Paku 13,000.00 14,000.00 130.00 140.00

6.1.2 Tenaga 4,187.00 4,509.00


0.03 OH Pekerja 30,000.00 33,000.00 900.00 990.00
0.07 OH Tukang Kayu 40,000.00 43,000.00 2,800.00 3,010.00
0.007 OH Kepala Tukang 45,000.00 47,000.00 315.00 329.00
0.004 OH Mandor 43,000.00 45,000.00 172.00 180.00

6.2 1 m2 Memasang Langit-langit Akustik Ukuran (30x30) cm 66,248.00 67,654.00


6.2.1 Bahan 57,050.00 57,700.00
12.0 Lbr Akustik Uk.30 x 30 cm 4,700.00 4,750.00 56,400.00 57,000.00
0.05 Kg Paku 13,000.00 14,000.00 650.00 700.00

6.2.2 Tenaga 9,198.00 9,954.00


0.12 OH Pekerja 30,000.00 33,000.00 3,600.00 3,960.00
0.12 OH Tukang Kayu 40,000.00 43,000.00 4,800.00 5,160.00
0.012 OH Kepala Tukang 45,000.00 47,000.00 540.00 564.00
0.006 OH Mandor 43,000.00 45,000.00 258.00 270.00

6.3 1 m2 Memasang Langit-langit Akustik Ukuran (30x60) cm 72,115.00 78,595.00


6.3.1 Bahan 64,450.00 70,300.00
5.80 Lbr Akustik 11,000.00 12,000.00 63,800.00 69,600.00
0.05 Kg Paku 13,000.00 14,000.00 650.00 700.00

6.3.2 Tenaga 7,665.00 8,295.00


0.10 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.10 OH Tukang Kayu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.5 1 m2 Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm 27,180.00 29,340.00
6.5.1 Bahan 19,515.00 21,045.00
0.375 Lbr Tripleks (4 mm) 51,000.00 55,000.00 19,125.00 20,625.00
0.03 Kg Paku Tripleks 13,000.00 14,000.00 390.00 420.00

6.5.2 Tenaga 7,665.00 8,295.00


0.10 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.10 OH Tukang Kayu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.6 1 m2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm 376,450.00 396,500.00


6.6.1 Bahan 315,130.00 330,140.00
0.015 m3 Kayu Jati,Papan 21,000,000.00 22,000,000.00 315,000.00 330,000.00
0.01 Kg Paku 13,000.00 14,000.00 130.00 140.00

6.6.2 Tenaga 61,320.00 66,360.00


0.8 OH Pekerja 30,000.00 33,000.00 24,000.00 26,400.00
0.8 OH Tukang Kayu 40,000.00 43,000.00 32,000.00 34,400.00
0.08 OH Kepala Tukang 45,000.00 47,000.00 3,600.00 3,760.00
0.04 OH Mandor 43,000.00 45,000.00 1,720.00 1,800.00

6.7 1 m2 Memasng Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm 26,945.00 29,036.00


6.7.1 Bahan 21,505.00 23,126.00
0.364 Lbr Gypsum Board 55,000.00 59,000.00 20,020.00 21,476.00
0.11 Kg Paku Sekrup 13,500.00 15,000.00 1,485.00 1,650.00

6.7.2 Tenaga 5,440.00 5,910.00


0.1 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.05 OH Tukang Kayu 40,000.00 43,000.00 2,000.00 2,150.00
0.005 OH Kepala Tukang 45,000.00 47,000.00 225.00 235.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.9 1 m2 Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium 129,975.00 137,025.00
6.9.1 Bahan 91,650.00 95,550.00
3.6 m' Profil Allumunium "T" 3,500.00 4,000.00 12,600.00 14,400.00
0.15 kg Kawat Ø 4 mm 6,500.00 7,000.00 975.00 1,050.00
1.05 bh Ramset 21,500.00 22,000.00 22,575.00 23,100.00
1.5 lmb Akuatik 60 x 120 cm 37,000.00 38,000.00 55,500.00 57,000.00

6.9.2 Tenaga 38,325.00 41,475.00


0.5 OH Pekerja 30,000.00 33,000.00 15,000.00 16,500.00
0.5 OH Tukang Kayu 40,000.00 43,000.00 20,000.00 21,500.00
0.05 OH Kepala Tukang 45,000.00 47,000.00 2,250.00 2,350.00
0.025 OH Mandor 43,000.00 45,000.00 1,075.00 1,125.00

6.10 1 m1 List Langit-Langit Kayu Profil 8,394.00 9,560.00


6.10.1 Bahan 4,540.00 5,390.00
1.05 m1 List Kayu Profil 4,200.00 5,000.00 4,410.00 5,250.00
0.01 Kg Paku 13,000.00 14,000.00 130.00 140.00

6.10.2 Tenaga 3,854.00 4,170.00


0.05 OH Pekerja 30,000.00 33,000.00 1,500.00 1,650.00
0.05 OH Tukang Kayu 40,000.00 43,000.00 2,000.00 2,150.00
0.005 OH Kepala Tukang 45,000.00 47,000.00 225.00 235.00
0.003 OH Mandor 43,000.00 45,000.00 129.00 135.00

397638689.xls 54/40 abk 9-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

X PEKERJAAN SANITASI
6.1 1 Unit Memasang Closet Duduk / Mono Blok 1,103,925.00 1,329,447.00
6.1.1 Bahan 954,000.00 1,166,000.00
1 Buah Kloset Duduk / Monoblok 900,000.00 1,100,000.00 900,000.00 1,100,000.00
0.06 Kelengkapan 6% dari harga Kloset 900,000.00 1,100,000.00 54,000.00 66,000.00

6.1.2 Tenaga 149,925.00 163,447.00


3.3 OH Pekerja 30,000.00 33,000.00 99,000.00 108,900.00
1.1 OH Tukang Batu 40,000.00 43,000.00 44,000.00 47,300.00
0.001 OH Kepala Tukang 45,000.00 47,000.00 45.00 47.00
0.16 OH Mandor 43,000.00 45,000.00 6,880.00 7,200.00

6.2 1 Unit Memasang Closet Jongkok Porselen 251,930.00 287,975.00


6.2.1 Bahan 87,550.00 112,775.00
1 Buah Kloset Jongkok 80,000.00 105,000.00 80,000.00 105,000.00
6 Kg Portland Semen 1,050.00 1,062.50 6,300.00 6,375.00
0.01 m3 Pasir Pasang 125,000.00 140,000.00 1,250.00 1,400.00

6.2.2 Tenaga 164,380.00 175,200.00


1 OH Pekerja 30,000.00 33,000.00 30,000.00 33,000.00
1.5 OH Tukang Batu 40,000.00 43,000.00 60,000.00 64,500.00
1.5 OH Kepala Tukang 45,000.00 47,000.00 67,500.00 70,500.00
0.16 OH Mandor 43,000.00 45,000.00 6,880.00 7,200.00

6.4 1 Unit Memasang Urinoir 443,850.00 482,975.00


6.4.1 Bahan 365,050.00 397,775.00
1 Buah Urinoir 275,000.00 300,000.00 275,000.00 300,000.00
0.3 - Perlengkapan 30% Harga Urinoir 275,000.00 300,000.00 82,500.00 90,000.00
6 Kg Portland Semen 1,050.00 1,062.50 6,300.00 6,375.00
0.01 m3 Pasir Pasang 125,000.00 140,000.00 1,250.00 1,400.00

6.4.1 Tenaga 78,800.00 85,200.00


1 OH Pekerja 30,000.00 33,000.00 30,000.00 33,000.00
1 OH Tukang Batu 40,000.00 43,000.00 40,000.00 43,000.00
0.1 OH Kepala Tukang 45,000.00 47,000.00 4,500.00 4,700.00
0.1 OH Mandor 43,000.00 45,000.00 4,300.00 4,500.00

6.5 1 Unit Memasang Wastafel 970,400.00 1,040,160.00


6.5.1 Bahan 917,550.00 982,775.00
1 Buah Wastafel Meja Oval 700,000.00 750,000.00 700,000.00 750,000.00
0.3 - Perlengkapan 30% Harga Wastafel 700,000.00 750,000.00 210,000.00 225,000.00
6 Kg Portland Semen 1,050.00 1,062.50 6,300.00 6,375.00
0.01 m3 Pasir Pasang 125,000.00 140,000.00 1,250.00 1,400.00

6.5.2 Tenaga 52,850.00 57,385.00


1.2 OH Pekerja 30,000.00 33,000.00 36,000.00 39,600.00
0.145 OH Tukang Batu 40,000.00 43,000.00 5,800.00 6,235.00
0.15 OH Kepala Tukang 45,000.00 47,000.00 6,750.00 7,050.00
0.1 OH Mandor 43,000.00 45,000.00 4,300.00 4,500.00

6.8 1 Unit Memasang Bak Mandi Batu Bata Vol. 0,30 m3 763,900.00 828,190.91
6.8.1 Bahan 437,500.00 473,590.91
0.4 m3 Batu Bata 300,000.00 337,500.00 120,000.00 135,000.00
120 Kg Portland Semen 1,050.00 1,062.50 126,000.00 127,500.00
0.3 m3 Pasir Pasang 125,000.00 140,000.00 37,500.00 42,000.00
360 buah Porselen 11 x 11 cm 277.78 303.03 100,000.00 109,090.91
6 Kg Semen Nat 9,000.00 10,000.00 54,000.00 60,000.00

6.8.2 Tenaga 326,400.00 354,600.00


6 OH Pekerja 30,000.00 33,000.00 180,000.00 198,000.00
3 OH Tukang Batu 40,000.00 43,000.00 120,000.00 129,000.00
0.3 OH Kepala Tukang 45,000.00 47,000.00 13,500.00 14,100.00
0.3 OH Mandor 43,000.00 45,000.00 12,900.00 13,500.00

6.14 1 m' Memasang Pipa Beton, Ø 15 cm - 20 cm 47,230.00 55,489.00


6.14.1 Bahan 39,614.00 47,215.00
1.1 Buah Pipa Beton 20,000.00 25,000.00 22,000.00 27,500.00
0.027 m3 Batu Bata 300,000.00 337,500.00 8,100.00 9,112.50
0.68 Kg Portland Semen 1,050.00 1,062.50 714.00 722.50
0.056 m3 Pasir Pasang 125,000.00 140,000.00 7,000.00 7,840.00
0.024 m3 Pasir Urug 75,000.00 85,000.00 1,800.00 2,040.00

6.14.2 Tenaga 7,616.00 8,274.00


0.14 OH Pekerja 30,000.00 33,000.00 4,200.00 4,620.00
0.07 OH Tukang Batu 40,000.00 43,000.00 2,800.00 3,010.00
0.007 OH Kepala Tukang 45,000.00 47,000.00 315.00 329.00
0.007 OH Mandor 43,000.00 45,000.00 301.00 315.00

6.15 1 m' Memasang Pipa Beton, Ø 30 cm - 100 cm 242,287.00 268,631.75


6.15.1 Bahan 221,615.00 246,173.75
1.1 Buah Pipa Beton 30,000.00 32,000.00 33,000.00 35,200.00
0.55 m3 Batu Bata 300,000.00 337,500.00 165,000.00 185,625.00
10.3 Kg Portland Semen 1,050.00 1,062.50 10,815.00 10,943.75
0.061 m3 Pasir Pasang 125,000.00 140,000.00 7,625.00 8,540.00
0.069 m3 Pasir Urug 75,000.00 85,000.00 5,175.00 5,865.00
6.15.2 Tenaga 20,672.00 22,458.00
0.38 OH Pekerja 30,000.00 33,000.00 11,400.00 12,540.00
0.19 OH Tukang Batu 40,000.00 43,000.00 7,600.00 8,170.00
0.019 OH Kepala Tukang 45,000.00 47,000.00 855.00 893.00
0.019 OH Mandor 43,000.00 45,000.00 817.00 855.00

397638689.xls54/41 abk 10-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

6.20 1 m' Memasang Pipa Galvanis Ø ¾" 35,719.33 37,515.00


6.20.1 Bahan 28,933.33 30,225.00
1.2 m' Pipa Galvanis 18,666.67 19,500.00 22,400.00 23,400.00
0.35 Perlengkapan 35% Harga Pipa 18,666.67 19,500.00 6,533.33 6,825.00
6.20.2 Tenaga 6,786.00 7,290.00
0.054 OH Pekerja 30,000.00 33,000.00 1,620.00 1,782.00
0.09 OH Tukang Ledeng 40,000.00 43,000.00 3,600.00 3,870.00
0.009 OH Kepala Tukang 45,000.00 47,000.00 405.00 423.00
0.027 OH Mandor 43,000.00 45,000.00 1,161.00 1,215.00

6.23 1 m' Memasang Pipa Galvanis Ø 3" 132,898.87 136,393.00


6.23.1 Bahan 121,416.67 124,000.00
1.2 m' Pipa Galvanis 78,333.33 80,000.00 94,000.00 96,000.00
0.35 Perlengkapan 35% Harga Pipa 78,333.33 80,000.00 27,416.67 28,000.00

6.23.2 Tenaga 11,482.20 12,393.00


0.108 OH Pekerja 30,000.00 33,000.00 3,240.00 3,564.00
0.18 OH Tukang Ledeng 40,000.00 43,000.00 7,200.00 7,740.00
0.018 OH Kepala Tukang 45,000.00 47,000.00 810.00 846.00
0.0054 OH Mandor 43,000.00 45,000.00 232.20 243.00

6.24 1 m' Memasang Pipa Galvanis Ø 4" 165,479.90 169,201.83


6.24.1 Bahan 151,125.00 153,708.33
1.2 m' Pipa Galvanis 97,500.00 99,166.67 117,000.00 119,000.00
0.35 Perlengkapan 35% Harga Pipa 97,500.00 99,166.67 34,125.00 34,708.33

6.24.2 Tenaga 14,354.90 15,493.50


0.135 OH Pekerja 30,000.00 33,000.00 4,050.00 4,455.00
0.225 OH Tukang Ledeng 40,000.00 43,000.00 9,000.00 9,675.00
0.0225 OH Kepala Tukang 45,000.00 47,000.00 1,012.50 1,057.50
0.0068 OH Mandor 43,000.00 45,000.00 292.40 306.00

6.25 1 m' Memasang Pipa PVC type AW Ø ½" 11,189.90 11,881.00


6.25.1 Bahan 7,362.50 7,750.00
1.2 m' Pipa PVC 4,750.00 5,000.00 5,700.00 6,000.00
0.35 Perlengkapan 35% Harga Pipa 4,750.00 5,000.00 1,662.50 1,750.00

6.25.2 Tenaga 3,827.40 4,131.00


0.036 OH Pekerja 30,000.00 33,000.00 1,080.00 1,188.00
0.06 OH Tukang Ledeng 40,000.00 43,000.00 2,400.00 2,580.00
0.006 OH Kepala Tukang 45,000.00 47,000.00 270.00 282.00
0.0018 OH Mandor 43,000.00 45,000.00 77.40 81.00

6.29 1 m' Memasang Pipa PVC type AW Ø 2" 20,466.10 26,088.17


6.29.1 Bahan 14,725.00 19,891.67
1.2 m' Pipa PVC 9,500.00 12,833.33 11,400.00 15,400.00
0.35 Perlengkapan 35% Harga Pipa 9,500.00 12,833.33 3,325.00 4,491.67

6.29.2 Tenaga 5,741.10 6,196.50


0.054 OH Pekerja 30,000.00 33,000.00 1,620.00 1,782.00
0.09 OH Tukang Ledeng 40,000.00 43,000.00 3,600.00 3,870.00
0.009 OH Kepala Tukang 45,000.00 47,000.00 405.00 423.00
0.0027 OH Mandor 43,000.00 45,000.00 116.10 121.50

6.31 1 m' Memasang Pipa PVC type AW Ø 3" 40,259.63 45,242.92


6.31.1 Bahan 31,645.83 35,972.92
1.2 m' Pipa PVC 20,416.67 23,208.33 24,500.00 27,850.00
0.35 Perlengkapan 35% Harga Pipa 20,416.67 23,208.33 7,145.83 8,122.92
6.31.2 Tenaga 8,613.80 9,270.00
0.081 OH Pekerja 30,000.00 33,000.00 2,430.00 2,673.00
0.135 OH Tukang Ledeng 40,000.00 43,000.00 5,400.00 5,805.00
0.014 OH Kepala Tukang 45,000.00 45,000.00 607.50 607.50
0.0041 OH Mandor 43,000.00 45,000.00 176.30 184.50

6.33 1 Buah Memasang Bak Cuci Piring Stainles Steel 304,314.50 335,367.50
6.33.1 Bahan 290,000.00 320,000.00
1 Buah Bak Cuci Stainles Steel 145,000.00 160,000.00 145,000.00 160,000.00
1 Set Water Drain & assesories 145,000.00 160,000.00 145,000.00 160,000.00

6.33.2 Tenaga 14,314.50 15,367.50


0.03 OH Pekerja 30,000.00 33,000.00 900.00 990.00
0.3 OH Tukang Ledeng 40,000.00 43,000.00 12,000.00 12,900.00
0.03 OH Kepala Tukang 45,000.00 47,000.00 1,350.00 1,410.00
0.0015 OH Mandor 43,000.00 45,000.00 64.50 67.50

6.35 1 Buah Memasang Kran Ø ¾" atau ½" 12,515.00 20,360.00


6.35.1 Bahan 7,550.00 15,055.00
1 Buah Kran Air 7,500.00 15,000.00 7,500.00 15,000.00
0.025 Set Seal Tape 2,000.00 2,200.00 50.00 55.00

6.35.2 Tenaga 4,965.00 5,305.00


0.01 OH Pekerja 30,000.00 33,000.00 300.00 330.00
0.1 OH Tukang Ledeng 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 45,000.00 450.00 450.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

397638689.xls54/42 abk 10-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.36 1 Buah Memasang Floor Drain 8,715.00 9,325.00
6.36.1 Bahan 3,750.00 4,000.00
1 Buah Floor Drain 3,750.00 4,000.00 3,750.00 4,000.00

6.36.2 Tenaga 4,965.00 5,325.00


0.01 OH Pekerja 30,000.00 33,000.00 300.00 330.00
0.1 OH Tukang Batu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

397638689.xls54/43 abk 10-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

XI 03-7393 - 2008 PEKERJAAN BESI & ALLUMUNIUM


6.1 1 Kg Memasang Besi Profil 20,329.00 21,582.00
6.1.1 Bahan 15,730.00 16,605.00
1.15 Kg Besi Profil 13,000.00 13,500.00 14,950.00 15,525.00
0.06 Kg Meni Besi 13,000.00 18,000.00 780.00 1,080.00

6.1.2 Tenaga 4,599.00 4,977.00


0.06 OH Pekerja 30,000.00 33,000.00 1,800.00 1,980.00
0.06 OH Tukang Besi 40,000.00 43,000.00 2,400.00 2,580.00
0.006 OH Kepala Tukang 45,000.00 47,000.00 270.00 282.00
0.003 OH Mandor 43,000.00 45,000.00 129.00 135.00

6.2 1 kg Memasang Rangka Kuda-kuda Baja IWF 19,549.00 20,502.00


6.2.1 Bahan 14,950.00 15,525.00
1.15 kg Besi Baja IWF 13,000.00 13,500.00 14,950.00 15,525.00

6.2.2 Tenaga 4,599.00 4,977.00


0.06 OH Pekerja 30,000.00 33,000.00 1,800.00 1,980.00
0.06 OH Tukang Besi 40,000.00 43,000.00 2,400.00 2,580.00
0.006 OH Kepala Tukang 45,000.00 47,000.00 270.00 282.00
0.003 OH Mandor 43,000.00 45,000.00 129.00 135.00

6.3 100 kg Mengerjakan Pekerjaan Perakitan (Kuda-kuda Baja) 21,970.00 22,662.00


6.3.1 Bahan 14,150.00 14,150.00
1 ltr Solar 11,250.00 11,250.00 11,250.00 11,250.00
0.1 ltr Minyak Pelumas 29,000.00 29,000.00 2,900.00 2,900.00
6.3.2 Tenaga 7,820.00 8,512.00
0.100 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.100 OH Tukang Besi 40,000.00 43,000.00 4,000.00 4,300.00
0.001 OH Kepala Tukang 45,000.00 47,000.00 45.00 47.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00
0.008 Jam Sewa Alat 70,000.00 80,000.00 560.00 640.00
6.4 1 m2 Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku 638,861.00 685,925.00
6.4.1 Bahan 558,400.00 598,850.00
15 Kg Besi Siku L.30.30.3 13,000.00 13,500.00 195,000.00 202,500.00
32.8 Kg Besi Plat Baja 11,000.00 12,000.00 360,800.00 393,600.00
0.05 Kg Kawat Las 52,000.00 55,000.00 2,600.00 2,750.00

6.4.2 Tenaga 80,461.00 87,075.00


1.05 OH Pekerja 30,000.00 33,000.00 31,500.00 34,650.00
1.05 OH Tukang Besi 40,000.00 43,000.00 42,000.00 45,150.00
0.105 OH Kepala Tukang 45,000.00 47,000.00 4,725.00 4,935.00
0.052 OH Mandor 43,000.00 45,000.00 2,236.00 2,340.00

6.5 10 cm Mengerjakan Pengelasan dengan Las Listrik 16,609.50 18,617.50


6.5.1 Bahan 2,533.50 2,653.50
0.04 kg Kawat Las 52,000.00 55,000.00 2,080.00 2,200.00
0.03 ltr Solar 11,250.00 11,250.00 337.50 337.50
0.004 ltr Minyak Pelumas 29,000.00 29,000.00 116.00 116.00

6.5.2 Tenaga 14,076.00 15,964.00


0.04 OH Pekerja 30,000.00 33,000.00 1,200.00 1,320.00
0.02 OH Tukang Besi 40,000.00 43,000.00 800.00 860.00
0.002 OH Kepala Tukang 45,000.00 47,000.00 90.00 94.00
0.002 OH Mandor 43,000.00 45,000.00 86.00 90.00
0.17 Jam Sewa Alat 70,000 80,000 11,900.00 13,600.00

6.7 1 m2 Memasang Pintu Rolling Door Besi 314,658.00 327,110.00


Bahan 225,000.00 230,000.00
6.7.1 1 m2 Pintu Gulung Besi 225,000.00 230,000.00 225,000.00 230,000.00

6.7.2 Tenaga 89,658.00 97,110.00


1.2 OH Pekerja 30,000.00 33,000.00 36,000.00 39,600.00
1.2 OH Tukang Besi 40,000.00 43,000.00 48,000.00 51,600.00
0.12 OH Kepala Tukang 45,000.00 47,000.00 5,400.00 5,640.00
0.006 OH Mandor 43,000.00 45,000.00 258.00 270.00

6.8 1 m2 Memasang Pintu Lipat (Folding Door) 383,726.00 416,498.00


6.8.1 Bahan 350,000.00 380,000.00
1 m2 Pintu Lipat 350,000.00 380,000.00 350,000.00 380,000.00

6.8.2 Tenaga 33,726.00 36,498.00


0.44 OH Pekerja 30,000.00 33,000.00 13,200.00 14,520.00
0.44 OH Tukang Besi 40,000.00 43,000.00 17,600.00 18,920.00
0.044 OH Kepala Tukang 45,000.00 47,000.00 1,980.00 2,068.00
0.022 OH Mandor 43,000.00 45,000.00 946.00 990.00

397638689.xls 54/44 abk 11-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.9 1 m2 Sunscreen Allumunium 303,172.00 320,980.00
6.9.1 Bahan 265,000.00 280,000.00
1 m2 Sunscreen Allumunium 265,000.00 280,000.00 265,000.00 280,000.00

6.9.2 Tenaga 38,172.00 40,980.00


0.08 OH Pekerja 30,000.00 33,000.00 2,400.00 2,640.00
0.8 OH Tukang Besi 40,000.00 43,000.00 32,000.00 34,400.00
0.08 OH Kepala Tukang 45,000.00 47,000.00 3,600.00 3,760.00
0.004 OH Mandor 43,000.00 45,000.00 172.00 180.00

6.10 1 m2 Memasang Rolling Door Allumunium 286,650.00 297,950.00


6.10.1 Bahan 210,000.00 215,000.00
1 m2 Rolling Allumunium 210,000.00 215,000.00 210,000.00 215,000.00

6.10.2 Tenaga 76,650.00 82,950.00


1 OH Pekerja 30,000.00 33,000.00 30,000.00 33,000.00
1 OH Tukang Besi 40,000.00 43,000.00 40,000.00 43,000.00
0.1 OH Kepala Tukang 45,000.00 47,000.00 4,500.00 4,700.00
0.05 OH Mandor 43,000.00 45,000.00 2,150.00 2,250.00

6.11 1 m' Memasang Kusen Pintu Allumunium 82,593.80 85,764.60


6.11.1 Bahan 79,300.00 82,200.00
1.1 m' Profil Allumunium 68,000.00 70,000.00 74,800.00 77,000.00
2 buah Skrup Fixer 750.00 800.00 1,500.00 1,600.00
0.06 Tube Sealant 50,000.00 60,000.00 3,000.00 3,600.00

6.11.2 Tenaga 3,293.80 3,564.60


0.043 OH Pekerja 30,000.00 33,000.00 1,290.00 1,419.00
0.043 OH Tukang Besi 40,000.00 43,000.00 1,720.00 1,849.00
0.0043 OH Kepala Tukang 45,000.00 47,000.00 193.50 202.10
0.0021 OH Mandor 43,000.00 45,000.00 90.30 94.50

6.12 1 m2 Memasang Pintu Allumunium Strip Lebar 8 cm 743,713.10 826,048.50


6.12.1 Bahan 737,200.00 819,000.00
4.4 m' Profil Allumunium 68,000.00 70,000.00 299,200.00 308,000.00
14.6 m' Allumunium Strip 30,000.00 35,000.00 438,000.00 511,000.00

6.12.2 Tenaga 6,513.10 7,048.50


0.085 OH Pekerja 30,000.00 33,000.00 2,550.00 2,805.00
0.085 OH Tukang Besi 40,000.00 43,000.00 3,400.00 3,655.00
0.0085 OH Kepala Tukang 45,000.00 47,000.00 382.50 399.50
0.0042 OH Mandor 43,000.00 45,000.00 180.60 189.00

6.13 1 m2 Memasang Pintu Kaca Rangka Allumunium 192,570.00 222,308.00


6.13.1 Bahan 186,000.00 215,200.00
4.4 m' Pintu Allumunium 30,000.00 35,000.00 132,000.00 154,000.00
4.5 m' Profil Kaca 9,000.00 10,000.00 40,500.00 45,000.00
0.27 tube Sealant 50,000.00 60,000.00 13,500.00 16,200.00

6.13.2 Tenaga 6,570.00 7,108.00


0.085 OH Pekerja 30,000.00 33,000.00 2,550.00 2,805.00
0.085 OH Tukang Besi 40,000.00 43,000.00 3,400.00 3,655.00
0.009 OH Kepala Tukang 45,000.00 47,000.00 405.00 423.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.14 1 m2 Memasang Venetions Blinds & Vertical Blinds 121,849.00 129,055.00


6.14.1 Bahan 95,000.00 100,000.00
1 m2 Venetions Blinds atau Vertical Blinds (tirai) 95,000.00 100,000.00 95,000.00 100,000.00

6.14.2 Tenaga 26,849.00 29,055.00


0.35 OH Pekerja 30,000.00 33,000.00 10,500.00 11,550.00
0.35 OH Tukang Besi 40,000.00 43,000.00 14,000.00 15,050.00
0.035 OH Kepala Tukang 45,000.00 47,000.00 1,575.00 1,645.00
0.018 OH Mandor 43,000.00 45,000.00 774.00 810.00

6.15 1 m2 Memasang Terali Besi Strip (2x3) cm 195,931.00 212,628.00


6.15.1 Bahan 67,947.00 74,124.00
6.177 m' Besi Strip 2x3 11,000.00 12,000.00 67,947.00 74,124.00
27.08 cm Pengelasan 16,609.50 18,617.50 449,785.26 504,161.90

6.15.2 Tenaga 127,984.00 138,504.00


1.67 OH Pekerja 30,000.00 33,000.00 50,100.00 55,110.00
1.67 OH Tukang Las 40,000.00 43,000.00 66,800.00 71,810.00
0.167 OH Kepala Tukang 45,000.00 47,000.00 7,515.00 7,849.00
0.083 OH Mandor 43,000.00 45,000.00 3,569.00 3,735.00

6.16 1 m2 Memasang Kawat Nyamuk 220,972.55 246,727.43


6.16.1 Bahan 213,307.55 238,432.43
1.1 m2 Kawat Nyamuk nylon 9,000.00 10,000.00 9,900.00 11,000.00
11.11 cm Pengelasan 16,609.50 18,617.50 184,531.55 206,840.43
1.716 kg Baja Strip (0,2x2) cm 11,000.00 12,000.00 18,876.00 20,592.00

397638689.xls 54/45 abk 11-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

6.16.2 Tenaga 7,665.00 8,295.00


0.1 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.1 OH Tukang Kayu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.0050 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.17 1 m2 Memasang Jendela Nako & Tralis 26,293.00 28,535.00


6.17.1 Bahan 11,350.00 12,350.00
1.1 m2 Jendela Nako 7,000.00 7,500.00 7,700.00 8,250.00
10 buah Paku Skrup 1 - 2,5 cm 50.00 60.00 500.00 600.00
7 m' Besi Strip 450.00 500.00 3,150.00 3,500.00

6.17.2 Tenaga 14,943.00 16,185.00


0.2 OH Pekerja 30,000.00 33,000.00 6,000.00 6,600.00
0.2 OH Tukang Kayu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.001 OH Mandor 43,000.00 45,000.00 43.00 45.00

6.18 1 m' Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm 138,200.00 145,985.00
6.18.1 Bahan 114,645.00 120,560.00
1.05 Lbr Seng Plaat 33,000.00 35,000.00 34,650.00 36,750.00
0.015 Kg Paku Biasa 1 - 2,5 cm 13,000.00 14,000.00 195.00 210.00
0.019 m3 Kayu Papan Klas II atau III 4,200,000.00 4,400,000.00 79,800.00 83,600.00

6.18.2 Tenaga 23,555.00 25,425.00


0.20 OH Pekerja 30,000.00 33,000.00 6,000.00 6,600.00
0.4 OH Tukang Kayu 40,000.00 43,000.00 16,000.00 17,200.00
0.025 OH Kepala Tukang 45,000.00 47,000.00 1,125.00 1,175.00
0.01 OH Mandor 43,000.00 45,000.00 430.00 450.00

6.19 1 m' Memasang Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm 63,724.00 67,760.00
6.19.1 Bahan 45,530.00 48,140.00
1.05 Lbr Seng Plaat 38,000.00 40,000.00 39,900.00 42,000.00
0.01 Kg Paku Biasa 1 - 2,5 cm 13,000.00 14,000.00 130.00 140.00
0.5 Kg Besi strip 11,000.00 12,000.00 5,500.00 6,000.00

6.19.2 Tenaga 18,194.00 19,620.00


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.3 OH Tukang Kayu 40,000.00 43,000.00 12,000.00 12,900.00
0.03 OH Kepala Tukang 45,000.00 47,000.00 1,350.00 1,410.00
0.008 OH Mandor 43,000.00 45,000.00 344.00 360.00

397638689.xls 54/46 abk 11-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

XII PEKERJAAN KUNCI dan KACA

6.2 1 Buah Memasang Kunci Tanam Biasa 145,965.00 157,525.00


6.2..1 Bahan 125,000.00 135,000.00
1 Buah Kunci Tanam Biasa 125,000.00 135,000.00 125,000.00 135,000.00

6.2.2 Tenaga 20,965.00 22,525.00


0.01 OH Pekerja 30,000.00 33,000.00 300.00 330.00
0.5 OH Tukang Kayu 40,000.00 43,000.00 20,000.00 21,500.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.3 1 Buah Memasang Kunci Kamar Mandi 65,482.50 72,012.50


6.3.1 Bahan 45,000.00 50,000.00
1 Buah Kunci Tanam Kamar Mandi 45,000.00 50,000.00 45,000.00 50,000.00

6.3..2 Tenaga 20,482.50 22,012.50


0.005 OH Pekerja 30,000.00 33,000.00 150.00 165.00
0.5 OH Tukang Kayu 40,000.00 43,000.00 20,000.00 21,500.00
0.005 OH Kepala Tukang 45,000.00 47,000.00 225.00 235.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.4 1 Buah Memasang Kunci Selinder 145,482.50 157,012.50


6.4.1 Bahan 125,000.00 135,000.00
1 Buah Kunci Selinder 125,000.00 135,000.00 125,000.00 135,000.00

6.4.2 Tenaga 20,482.50 22,012.50


0.005 OH Pekerja 30,000.00 33,000.00 150.00 165.00
0.5 OH Tukang Kayu 40,000.00 43,000.00 20,000.00 21,500.00
0.005 OH Kepala Tukang 45,000.00 47,000.00 225.00 235.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.5 1 Buah Memasang Engsel Pintu 12,447.50 16,987.50


6.5.1 Bahan 5,000.00 9,000.00
1 Buah Engsel pintu 5,000.00 9,000.00 5,000.00 9,000.00

6.5.2 Tenaga 7,447.50 7,987.50


0.015 OH Pekerja 30,000.00 33,000.00 450.00 495.00
0.15 OH Tukang Kayu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.0075 OH Mandor 43,000.00 45,000.00 322.50 337.50

6.6 1 Buah Pasang Engsel Jendela Kupu-kupu 7,215.00 7,825.00


6..6.1 Bahan 2,250.00 2,500.00
1 Buah Engsel Jendela 2,250.00 2,500.00 2,250.00 2,500.00

6.6.2 Tenaga 4,965.00 5,325.00


0.01 OH Pekerja 30,000.00 33,000.00 300.00 330.00
0.1 OH Tukang Kayu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.7 1 Buah Pasang Engsel Angin 24,930.00 26,650.00


6.7.1 Bahan 15,000.00 16,000.00
1 Buah Engsel Angin 15,000.00 16,000.00 15,000.00 16,000.00

6.7.2 Tenaga 9,930.00 10,650.00


0.02 OH Pekerja 30,000.00 33,000.00 600.00 660.00
0.2 OH Tukang Kayu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.01 OH Mandor 43,000.00 45,000.00 430.00 450.00

6.9 1 Buah Pasang Kait Angin 12,157.25 22,683.75


6.9.1 Bahan 5,000.00 15,000.00
1 Buah Kait Angin 5,000.00 15,000.00 5,000.00 15,000.00

6.9.2 Tenaga 7,157.25 7,683.75


0.015 OH Pekerja 30,000.00 33,000.00 450.00 495.00
0.15 OH Tukang Kayu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.00075 OH Mandor 43,000.00 45,000.00 32.25 33.75

6.10 1 Buah Pasang Door Closer 33,857.50 40,612.50


6.10.1 Bahan 10,000.00 15,000.00
1 Buah Door Closer 10,000.00 15,000.00 10,000.00 15,000.00

6.10.2 Tenaga 23,857.50 25,612.50


0.05 OH Pekerja 30,000.00 33,000.00 1,500.00 1,650.00
0.5 OH Tukang Kayu 40,000.00 43,000.00 20,000.00 21,500.00
0.05 OH Kepala Tukang 45,000.00 47,000.00 2,250.00 2,350.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.11 1 Buah Pasang Kunci Selot 17,043.00 20,245.00


6.11.1 Bahan 7,500.00 10,000.00
1 Buah Kunci Selot 7,500.00 10,000.00 7,500.00 10,000.00
6.11.2 Tenaga 9,543.00 10,245.00
0.02 OH Pekerja 30,000.00 33,000.00 600.00 660.00
0.2 OH Tukang Kayu 40,000.00 43,000.00 8,000.00 8,600.00
0.02 OH Kepala Tukang 45,000.00 47,000.00 900.00 940.00
0.001 OH Mandor 43,000.00 45,000.00 43.00 45.00

397638689.xls 54/47 abk 12-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.13 1 Buah Pasang Door Stop 14,771.50 20,122.50
6.12.1 Bahan 10,000.00 15,000.00
1 Buah Door Stop 10,000.00 15,000.00 10,000.00 15,000.00
6.12.2 Tenaga 4,771.50 5,122.50
0.01 OH Pekerja 30,000.00 33,000.00 300.00 330.00
0.1 OH Tukang Kayu 40,000.00 43,000.00 4,000.00 4,300.00
0.01 OH Kepala Tukang 45,000.00 47,000.00 450.00 470.00
0.0005 OH Mandor 43,000.00 45,000.00 21.50 22.50
6.14 1 Buah Pasang Rel Pintu Dorong 213,629.00 230,735.00
6.14.1 Bahan 185,000.00 200,000.00
1 Buah Rel Pintu Dorong 185,000.00 200,000.00 185,000.00 200,000.00

6.14.2 Tenaga 28,629.00 30,735.00


0.06 OH Pekerja 30,000.00 33,000.00 1,800.00 1,980.00
0.6 OH Tukang Kayu 40,000.00 43,000.00 24,000.00 25,800.00
0.06 OH Kepala Tukang 45,000.00 47,000.00 2,700.00 2,820.00
0.003 OH Mandor 43,000.00 45,000.00 129.00 135.00

6.15 1 Buah Pasang Kunci Lemari 19,425.00 22,803.75


6.15.1 Bahan 7,500.00 10,000.00
1 Buah Kunci Lemari 7,500.00 10,000.00 7,500.00 10,000.00

6.15.2 Tenaga 11,925.00 12,803.75


0.025 OH Pekerja 30,000.00 33,000.00 750.00 825.00
0.25 OH Tukang Kayu 40,000.00 43,000.00 10,000.00 10,750.00
0.025 OH Kepala Tukang 45,000.00 47,000.00 1,125.00 1,175.00
0.00125 OH Mandor 40,000.00 43,000.00 50.00 53.75

6.16 1 m2 Pasang Kaca tebal 3 mm 62,157.25 68,183.75


6.16.1 Bahan 55,000.00 60,500.00
1.1 m2 Kaca tebal 3mm 50,000.00 55,000.00 55,000.00 60,500.00

6.16.2 Tenaga 7,157.25 7,683.75


0.015 OH Pekerja 30,000.00 33,000.00 450.00 495.00
0.15 OH Tukang Kayu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.00075 OH Mandor 43,000.00 45,000.00 32.25 33.75

6.17 1 m2 Pasang Kaca tebal 5 mm 73,155.00 79,182.25


6.17.1 Bahan 66,000.00 71,500.00
1.1 m2 Kaca tebal 5mm 60,000.00 65,000.00 66,000.00 71,500.00

6.17.2 Tenaga 7,155.00 7,682.25


0.015 OH Pekerja 30,000.00 33,000.00 450.00 495.00
0.15 OH Tukang Kayu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.00075 OH Mandor 40,000.00 43,000.00 30.00 32.25

6.20 1 m2 Pasang Kaca Cermin tebal 5 mm 102,857.25 104,483.75


6.20.1 Bahan 95,700.00 96,800.00
1.1 m2 Kaca Cermin 87,000.00 88,000.00 95,700.00 96,800.00

6.20.2 Tenaga 7,157.25 7,683.75


0.015 OH Pekerja 30,000.00 33,000.00 450.00 495.00
0.15 OH Tukang Kayu 40,000.00 43,000.00 6,000.00 6,450.00
0.015 OH Kepala Tukang 45,000.00 47,000.00 675.00 705.00
0.00075 OH Mandor 43,000.00 45,000.00 32.25 33.75

397638689.xls 54/48 abk 12-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

XIII 03-7395 - 2008 PEKERJAAN PENUTUP LANTAI dan DINDING

6.3 1 m2 Memasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm 14,749.00 61,973.00


6.3.1 Bahan 17.00 45,970.00
26.5 Buah Ubin Abu-abu 20x20 cm 900.00 1,080.00 23,850.00 28,620.00
10.4 Kg Portland Semen 1,050.00 1,062.50 10,920.00 11,050.00
0.0450 m3 Pasir Pasang 125,000.00 140,000.00 5,625.00 6,300.00

6.3.2 Tenaga 14,732.00 16,003.00


0.27 OH Pekerja 30,000.00 33,000.00 8,100.00 8,910.00
0.135 OH Tukang Batu 40,000.00 43,000.00 5,400.00 5,805.00
0.014 OH Kepala Tukang 45,000.00 47,000.00 630.00 658.00
0.014 OH Mandor 43,000.00 45,000.00 602.00 630.00

6.9 1 m2 Memasang lantai Ubin Granito Uk. 40 x 40 cm 306,459.00 330,949.50


6.9.1 Bahan 292,815.00 316,128.50
6.63 Buah Ubin Granito 40x40 cm 40,000.00 43,200.00 265,200.00 286,416.00
9.8 Kg Portland Semen 1,050.00 1,062.50 10,290.00 10,412.50
0.045 m3 Pasir Pasang 125,000.00 140,000.00 5,625.00 6,300.00
1.300 Kg Semen Warna 9,000.00 10,000.00 11,700.00 13,000.00

6.9.2 Tenaga 13,644.00 14,821.00


0.250 OH Pekerja 30,000.00 33,000.00 7,500.00 8,250.00
0.125 OH Tukang Batu 40,000.00 43,000.00 5,000.00 5,375.00
0.013 OH Kepala Tukang 45,000.00 47,000.00 585.00 611.00
0.013 OH Mandor 43,000.00 45,000.00 559.00 585.00

6.19 1 m' Pasang Plint Ubin PC Warna Uk. 10 x 20 cm 35,892.00 39,269.25


6.19.1 Bahan 28,972.00 31,781.25
5.3 Buah Plint Ubin PC Warna 10 x 20 cm 5,000.00 5,500.00 26,500.00 29,150.00
1.14 Kg Portland Semen 1,050.00 1,062.50 1,197.00 1,211.25
0.003 m3 Pasir Pasang 125,000.00 140,000.00 375.00 420.00
0.1 Kg Semen Warna 9,000.00 10,000.00 900.00 1,000.00

6.19.2 Tenaga 6,920.00 7,488.00


0.09 OH Pekerja 30,000.00 33,000.00 2,700.00 2,970.00
0.09 OH Tukang Batu 40,000.00 43,000.00 3,600.00 3,870.00
0.009 OH Kepala Tukang 45,000.00 47,000.00 405.00 423.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.34 1 m2 Memasang Lantai Keramik 33 x 33 cm 100,217.83 111,460.76


6.34.1 Bahan 62,137.83 70,090.76
10 Buah Ubin Keramik 33 x 33 cm 3,333.33 3,888.89 33,333.33 38,888.89
8.19 Kg Portland Semen 1,050.00 1,062.50 8,599.50 8,701.88
0.045 m3 Pasir Pasang 125,000.00 140,000.00 5,625.00 6,300.00
1.62 Kg Semen Warna 9,000.00 10,000.00 14,580.00 16,200.00

6.34.2 Tenaga 38,080.00 41,370.00


0.70 OH Pekerja 30,000.00 33,000.00 21,000.00 23,100.00
0.35 OH Tukang Batu 40,000.00 43,000.00 14,000.00 15,050.00
0.035 OH Kepala Tukang 45,000.00 47,000.00 1,575.00 1,645.00
0.035 OH Mandor 43,000.00 45,000.00 1,505.00 1,575.00

6.35 1 m2 Memasang Lantai Keramik 30 x 30 cm 100,077.73 111,063.18


6.35.1 Bahan 61,997.73 69,693.18
11.87 Buah Ubin Keramik 30 x 30 cm 2,727.27 3,181.82 32,372.73 37,768.18
10.00 Kg Portland Semen 1,050.00 1,062.50 10,500.00 10,625.00
0.045 m3 Pasir Pasang 125,000.00 140,000.00 5,625.00 6,300.00
1.50 Kg Semen Warna 9,000.00 10,000.00 13,500.00 15,000.00

6.35.2 Tenaga 38,080.00 41,370.00


0.70 OH Pekerja 30,000.00 33,000.00 21,000.00 23,100.00
0.35 OH Tukang Batu 40,000.00 43,000.00 14,000.00 15,050.00
0.035 OH Kepala Tukang 45,000.00 47,000.00 1,575.00 1,645.00
0.035 OH Mandor 43,000.00 45,000.00 1,505.00 1,575.00

6.36 1 m2 Pasang Lantai Keramik 20 x 20 cm 99,415.00 112,020.00


6.36.1 Bahan 61,335.00 70,650.00
26.5 Buah Ubin Keramik 20 x 20 cm 1,140.00 1,400.00 30,210.00 37,100.00
10.40 Kg Portland Semen 1,050.00 1,062.50 10,920.00 11,050.00
0.045 m3 Pasir Pasang 125,000.00 140,000.00 5,625.00 6,300.00
1.62 Kg Semen Warna 9,000.00 10,000.00 14,580.00 16,200.00

6.36.2 Tenaga 38,080.00 41,370.00


0.70 OH Pekerja 30,000.00 33,000.00 21,000.00 23,100.00
0.35 OH Tukang Batu 40,000.00 43,000.00 14,000.00 15,050.00
0.035 OH Kepala Tukang 45,000.00 47,000.00 1,575.00 1,645.00
0.035 OH Mandor 43,000.00 45,000.00 1,505.00 1,575.00

6.39 1 m' Memasang Plint Keramik Ukuran 10x20 cm 14,017.00 14,981.01


6.39.1 Bahan 7,097.00 7,493.01
5.3 Buah Ubin Keramik 1,000.00 1,058.82 5,300.00 5,611.76
1.14 Kg Portland Semen 1,050.00 1,062.50 1,197.00 1,211.25
0.003 m3 Pasir Pasang 125,000.00 140,000.00 375.00 420.00
0.025 Kg Semen Warna 9,000.00 10,000.00 225.00 250.00

6.39.2 Tenaga 6,920.00 7,488.00


0.09 OH Pekerja 30,000.00 33,000.00 2,700.00 2,970.00
0.09 OH Tukang Batu 40,000.00 43,000.00 3,600.00 3,870.00
0.009 OH Kepala Tukang 45,000.00 47,000.00 405.00 423.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

6.40 1 m' Memasang Plint Keramik Ukuran 10x10 cm 19,542.00 20,842.78


6.40.1 Bahan 12,622.00 13,354.78
10.6 Buah Ubin Keramik 1,000.00 1,058.82 10,600.00 11,223.53
1.14 Kg Portland Semen 1,050.00 1,062.50 1,197.00 1,211.25
0.003 m3 Pasir Pasang 125,000.00 140,000.00 375.00 420.00
0.05 Kg Semen Warna 9,000.00 10,000.00 450.00 500.00

Tenaga 6,920.00 7,488.00


0.09 OH Pekerja 30,000.00 33,000.00 2,700.00 2,970.00
0.09 OH Tukang Batu 40,000.00 43,000.00 3,600.00 3,870.00
0.009 OH Kepala Tukang 45,000.00 47,000.00 405.00 423.00
0.005 OH Mandor 43,000.00 45,000.00 215.00 225.00

6.43 1 m2 Memasang Lantai Marmer Ukuran 1.00x1.00 cm 455,654.50 476,271.88


6.43.1 Bahan 417,574.50 434,901.88
1.06 buah Marmer 375,000.00 390,000.00 397,500.00 413,400.00
8.19 kg Portland Semen 1,050.00 1,062.50 8,599.50 8,701.88
0.045 m3 Pasir Pasang 125,000.00 140,000.00 5,625.00 6,300.00
0.65 kg Semen Warna 9,000.00 10,000.00 5,850.00 6,500.00

Tenaga 38,080.00 41,370.00


0.7 OH Pekerja 30,000.00 33,000.00 21,000.00 23,100.00
0.35 OH Tukang Batu 40,000.00 43,000.00 14,000.00 15,050.00
0.035 OH Kepala Tukang 45,000.00 47,000.00 1,575.00 1,645.00
0.035 OH Mandor 43,000.00 45,000.00 1,505.00 1,575.00

6.44 1 m2 Memasang Lantai Karpet 89,877.00 94,624.00


6.44.1 Bahan 76,825.00 80,500.00
1.05 m2 Karpet 62,500.00 65,000.00 65,625.00 68,250.00
0.35 kg Lem 32,000.00 35,000.00 11,200.00 12,250.00

6.44.2 Tenaga 13,052.00 14,124.00


0.17 OH Pekerja 30,000.00 33,000.00 5,100.00 5,610.00
0.17 OH Tukang Batu 40,000.00 43,000.00 6,800.00 7,310.00
0.017 OH Kepala Tukang 45,000.00 47,000.00 765.00 799.00
0.009 OH Mandor 43,000.00 45,000.00 387.00 405.00

6.46 1 m2 Memasang Lantai Parquet Jati 204,280.00 219,870.00


6.46.1 Bahan 166,200.00 178,500.00
1.05 m2 Parquet Jati 140,000.00 150,000.00 147,000.00 157,500.00
0.6 Kg Lem Vynil 32,000.00 35,000.00 19,200.00 21,000.00

6.46.2 Tenaga 38,080.00 41,370.00


0.70 OH Pekerja 30,000.00 33,000.00 21,000.00 23,100.00
0.35 OH Tukang Batu 40,000.00 43,000.00 14,000.00 15,050.00
0.035 OH Kepala Tukang 45,000.00 47,000.00 1,575.00 1,645.00
0.035 OH Mandor 43,000.00 45,000.00 1,505.00 1,575.00

6.53 1 m2 Memasang Dinding Keramik 10x20 cm, 118,585.00 130,191.25


6.53.1 Bahan 69,625.00 77,001.25
53 Buah Keramik 620.00 700.00 32,860.00 37,100.00
9.3 Kg Portland Semen 1,050.00 1,062.50 9,765.00 9,881.25
0.018 m3 Pasir Pasang 125,000.00 140,000.00 2,250.00 2,520.00
2.75 Kg Semen Warna 9,000.00 10,000.00 24,750.00 27,500.00

6.53.2 Tenaga 48,960.00 53,190.00


0.9 OH Pekerja 30,000.00 33,000.00 27,000.00 29,700.00
0.45 OH Tukang Batu 40,000.00 43,000.00 18,000.00 19,350.00
0.045 OH Kepala Tukang 45,000.00 47,000.00 2,025.00 2,115.00
0.045 OH Mandor 43,000.00 45,000.00 1,935.00 2,025.00

6.54 1 m2 Memasang Dinding Keramik 20x20 cm, 102,815.00 119,971.25


6.54.1 Bahan 53,855.00 66,781.25
26.5 Buah Keramik 920.00 1,320.00 24,380.00 34,980.00
9.3 Kg Portland Semen 1,050.00 1,062.50 9,765.00 9,881.25
0.018 m3 Pasir Pasang 125,000.00 140,000.00 2,250.00 2,520.00
1.94 Kg Semen Warna 9,000.00 10,000.00 17,460.00 19,400.00

6.54.2 Tenaga 48,960.00 53,190.00


0.9 OH Pekerja 30,000.00 33,000.00 27,000.00 29,700.00
0.45 OH Tukang Batu 40,000.00 43,000.00 18,000.00 19,350.00
0.045 OH Kepala Tukang 45,000.00 47,000.00 2,025.00 2,115.00
0.045 OH Mandor 43,000.00 45,000.00 1,935.00 2,025.00

6.55 1 m2 Memasang Dinding Marmer Ukuran 1.00x1.00 cm 490,362.11 513,552.61


6.55.1 Bahan 419,642.11 436,722.61
1.06 buah Marmer 375,000.00 390,000.00 397,500.00 413,400.00
3.003 buah Paku 12 cm 35.00 35.00 105.11 105.11
12.44 kg Portlan Semen 1,050.00 1,062.50 13,062.00 13,217.50
0.025 m3 Pasir Pasang 125,000.00 140,000.00 3,125.00 3,500.00
0.65 kg Semen Warna 9,000.00 10,000.00 5,850.00 6,500.00

6.55.2 Tenaga 70,720.00 76,830.00


1.3 OH Pekerja 30,000.00 33,000.00 39,000.00 42,900.00
0.65 OH Tukang Batu 40,000.00 43,000.00 26,000.00 27,950.00
0.065 OH Kepala Tukang 45,000.00 47,000.00 2,925.00 3,055.00
0.065 OH Mandor 43,000.00 45,000.00 2,795.00 2,925.00

6.57 1 m2 Memasang Dinding Batu Paros / Batu Tempel Hitam 131,792.50 141,254.38
6.57.1 Bahan 93,712.50 99,884.38
1.10 m2 Batu Paros 70,000.00 75,000.00 77,000.00 82,500.00
11.75 Kg Portland Semen 1,050.00 1,062.50 12,337.50 12,484.38
0.035 m3 Pasir Pasang 125,000.00 140,000.00 4,375.00 4,900.00

6.57.2 Tenaga 38,080.00 41,370.00


0.70 OH Pekerja 30,000.00 33,000.00 21,000.00 23,100.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
0.35 OH Tukang Batu 40,000.00 43,000.00 14,000.00 15,050.00
0.035 OH Kepala Tukang 45,000.00 47,000.00 1,575.00 1,645.00
0.035 OH Mandor 43,000.00 45,000.00 1,505.00 1,575.00

6.60 1 m2 Memasang Wall Paper Lebar 50 cm 114,351.00 127,714.00


6.60.1 Bahan 96,000.00 107,750.00
2.2 m' Wall Paper 40,000.00 45,000.00 88,000.00 99,000.00
0.25 kg Lem 32,000.00 35,000.00 8,000.00 8,750.00

6.60.2 Tenaga 18,351.00 19,964.00


0.35 OH Pekerja 30,000.00 33,000.00 10,500.00 11,550.00
0.175 OH Tukang Batu 40,000.00 43,000.00 7,000.00 7,525.00
0.017 OH Kepala Tukang 45,000.00 47,000.00 765.00 799.00
0.002 OH Mandor 43,000.00 45,000.00 86.00 90.00

6.63 1 m' Memasang Plint Kayu Klas II Ukuran 2x10 cm 26,603.00 28,559.50
6.63.1 Bahan 17,405.00 18,605.50
0.003 m3 Papan Kayu Klas II 5,800,000.00 6,200,000.00 17,400.00 18,600.00
0.05 kg Paku Sekrup 5 cm 100.00 110.00 5.00 5.50

6.61.2 Tenaga 9,198.00 9,954.00


0.12 OH Pekerja 30,000.00 33,000.00 3,600.00 3,960.00
0.12 OH Tukang Batu 40,000.00 43,000.00 4,800.00 5,160.00
0.012 OH Kepala Tukang 45,000.00 47,000.00 540.00 564.00
0.006 OH Mandor 43,000.00 45,000.00 258.00 270.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

XIV 03- -2002 PEKERJAAN PENGECATAN

6.1 1 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama 5,207.50 5,687.50


6.1.1 Bahan 600.00 625.00
0.05 Kg Soda Api 12,000.00 12,500.00 600.00 625.00

6.1.2 Tenaga 4,607.50 5,062.50


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.2 1 m2 Mencuci Bidang Permukaan Tembok yang Pernah dicat 5,157.50 5,687.50
6.2.1 Bahan 550.00 625.00
0.05 Kg Sabun 11,000.00 12,500.00 550.00 625.00

6.2.2 Tenaga 4,607.50 5,062.50


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.3 1 m2 Mengerok Karat Cat Lama permukaan Baja dg cara manual 5,157.50 5,687.50
6.3.1 Bahan 550.00 625.00
0.05 Kg Sabun 11,000.00 12,500.00 550.00 625.00

6.3.2 Tenaga 4,607.50 5,062.50


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.4 1 m2 Penyabun Permukaan Tembok Lama 5,157.50 5,687.50


6.4.1 Bahan 550.00 625.00
0.05 Kg Sabun 11,000.00 12,500.00 550.00 625.00

6.4.2 Tenaga 4,607.50 5,062.50


0.15 OH Pekerja 30,000.00 33,000.00 4,500.00 4,950.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.6 1 m2 Mendempul dan Menggosok Kayu 4,387.50 4,780.50


6.6.1 Bahan 1,300.00 1,440.00
0.08 Kg Dempul Jadi 11,000.00 12,000.00 880.00 960.00
0.02 Kg Minyak Cat 6,000.00 8,000.00 120.00 160.00
0.1 lbr Amplas 3,000.00 3,200.00 300.00 320.00
6.6.2 Tenaga 3,087.50 3,340.50
0.04 OH Pekerja 30,000.00 33,000.00 1,200.00 1,320.00
0.04 OH Tukang Cat 40,000.00 43,000.00 1,600.00 1,720.00
0.004 OH Kepala Tukang 45,000.00 47,000.00 180.00 188.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.7 1 m2 Pengecatan Bidang Lama 15,525.00 16,980.00


6.7.1 Bahan 9,980.00 10,980.00
0.15 Kg Plamir 11,000.00 12,000.00 1,650.00 1,800.00
0.17 Kg Cat Dasar 11,000.00 15,000.00 1,870.00 2,550.00
0.17 Kg Cat Penutup 38,000.00 39,000.00 6,460.00 6,630.00

6.7.2 Tenaga 5,545.00 6,000.00


0.07 OH Pekerja 30,000.00 33,000.00 2,100.00 2,310.00
0.075 OH Tukang Cat 40,000.00 43,000.00 3,000.00 3,225.00
0.0075 OH Kepala Tukang 45,000.00 47,000.00 337.50 352.50
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.8 1 m2 Pengecatan Bidang Kayu Baru (1 lap.Plamir) 18,777.50 20,275.50


1 lap.Cat Dasar & 2 lap.Cat Penutup
6.8.1 Bahan 15,940.00 17,184.00
0.2 Kg Cat Meni 11,000.00 15,000.00 2,200.00 3,000.00
0.15 Kg Plamir 11,000.00 12,000.00 1,650.00 1,800.00
0.17 Kg Cat Dasar 13,000.00 13,200.00 2,210.00 2,244.00
0.26 Kg Cat Penutup 2 kali 38,000.00 39,000.00 9,880.00 10,140.00

6.8.2 Tenaga 2,837.50 3,091.50


0.07 OH Pekerja 30,000.00 33,000.00 2,100.00 2,310.00
0.009 OH Tukang Cat 40,000.00 43,000.00 360.00 387.00
0.006 OH Kepala Tukang 45,000.00 47,000.00 270.00 282.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.9 1 m2 Pengecatan Bidang Kayu Baru (1 lap.Plamir) 25,947.50 27,819.50


1 lap.Cat Dasar & 3 lap.Cat Penutup
6.9.1 Bahan 19,360.00 20,694.00
0.2 Kg Cat Meni 11,000.00 15,000.00 2,200.00 3,000.00
0.15 Kg Plamir 11,000.00 12,000.00 1,650.00 1,800.00
0.17 Kg Cat Dasar 13,000.00 13,200.00 2,210.00 2,244.00
0.35 Kg Cat Penutup 2 kali 38,000.00 39,000.00 13,300.00 13,650.00

6.9.2 Tenaga 6,587.50 7,125.50


0.07 OH Pekerja 30,000.00 33,000.00 2,100.00 2,310.00
0.105 OH Tukang Cat 40,000.00 43,000.00 4,200.00 4,515.00
0.004 OH Kepala Tukang 45,000.00 47,000.00 180.00 188.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.10 1 m2 Pelaburan Bidang Kayu dg Teak Oil 17,102.50 18,262.50


6.10.1 Bahan 10,440.00 11,160.00
0.36 Ltr Teak Oil 29,000.00 31,000.00 10,440.00 11,160.00

397638689.xls 54/52 abk 14-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.10.2 Tenaga 6,662.50 7,102.50
0.04 OH Pekerja 30,000.00 33,000.00 1,200.00 1,320.00
0.063 OH Tukang Cat 40,000.00 43,000.00 2,520.00 2,709.00
0.063 OH Kepala Tukang 45,000.00 47,000.00 2,835.00 2,961.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.11 1 m2 Pelaburan Bidang Kayu dg Politur 24,365.50 26,026.50


6.11.1 Bahan 21,138.00 22,582.00
0.15 Ltr Politur 29,000.00 31,000.00 4,350.00 4,650.00
0.372 Ltr Politur Jadi 29,000.00 31,000.00 10,788.00 11,532.00
2 Lbr Ampelas 3,000.00 3,200.00 6,000.00 6,400.00
6.11.2 Tenaga 3,227.50 3,444.50
0.06 OH Tukang Cat 40,000.00 43,000.00 2,400.00 2,580.00
0.016 OH Kepala Tukang 45,000.00 47,000.00 720.00 752.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.12 1 m2 Pelaburan Bidang Kayu dg Cat Residu & Ter 4,133.00 4,515.00
6.12.1 Bahan 875.00 945.00
0.35 Ltr Residu atau Ter 2,500.00 2,700.00 875.00 945.00

6.12.2 Tenaga 3,258.00 3,570.00


0.1 OH Pekerja 30,000.00 33,000.00 3,000.00 3,300.00
0.006 OH Mandor 43,000.00 45,000.00 258.00 270.00

6.13 1 m2 Pelaburan Bidang Kayu dg Vernis 17,242.50 18,619.50


6.13.1 Bahan 5,215.00 5,595.00
0.15 Ltr Vernis 29,000.00 31,000.00 4,350.00 4,650.00
0.05 Ltr Dempul 11,000.00 12,000.00 550.00 600.00
0.1 Lbr Ampelas 3,000.00 3,200.00 300.00 320.00
0.01 Buah Kuas 1,500.00 2,500.00 15.00 25.00
6.13.2 Tenaga 12,027.50 13,024.50
0.16 OH Pekerja 30,000.00 33,000.00 4,800.00 5,280.00
0.16 OH Tukang Cat 40,000.00 43,000.00 6,400.00 6,880.00
0.016 OH Kepala Tukang 45,000.00 47,000.00 720.00 752.00
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.14 1 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 9,561.00 10,383.60
2 lap. Cat Penutup)
6.14.1 Bahan 6,050.00 6,606.00
0.1 Kg Plamir 9,000.00 10,500.00 900.00 1,050.00
0.1 Kg Cat Dasar 12,500.00 15,000.00 1,250.00 1,500.00
0.26 Kg Cat Penutup 2 kali 15,000.00 15,600.00 3,900.00 4,056.00
6.14.2 Tenaga 3,511.00 3,777.60
0.02 OH Pekerja 30,000.00 33,000.00 600.00 660.00
0.063 OH Tukang Cat 40,000.00 43,000.00 2,520.00 2,709.00
0.0063 OH Kepala Tukang 45,000.00 47,000.00 283.50 296.10
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.15 1 m2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup) 6,766.50 7,347.90
6.15.1 Bahan 3,950.00 4,308.00
0.1 Kg Cat Dasar 12,500.00 15,000.00 1,250.00 1,500.00
0.18 Kg Cat Penutup 2 kali 15,000.00 15,600.00 2,700.00 2,808.00

6.15.2 Tenaga 2,816.50 3,039.90


0.028 OH Pekerja 30,000.00 33,000.00 840.00 924.00
0.042 OH Tukang Cat 40,000.00 43,000.00 1,680.00 1,806.00
0.0042 OH Kepala Tukang 45,000.00 47,000.00 189.00 197.40
0.0025 OH Mandor 43,000.00 45,000.00 107.50 112.50

6.20 1 m2 Pengecatan Permukaan Baja dg Meni Besi 10,740.00 11,954.00


6.20.1 Bahan 1,620.00 2,150.00
0.1 Kg Meni Besi 13,000.00 18,000.00 1,300.00 1,800.00
0.01 Kg Perekat / Lem 32,000.00 35,000.00 320.00 350.00

6.20.2 Tenaga 9,120.00 9,804.00


0.02 OH Pekerja 30,000.00 33,000.00 600.00 660.00
0.2 OH Tukang Cat 40,000.00 43,000.00 8,000.00 8,600.00
0.002 OH Kepala Tukang 45,000.00 47,000.00 90.00 94.00
0.01 OH Mandor 43,000.00 45,000.00 430.00 450.00

6.21 1 m2 Pengecatan Permukaan Baja dg Meni Besi & Perancah 20,555.00 22,770.00
6.21.1 Bahan 2,720.00 3,450.00
0.1 Kg Meni Besi 13,000.00 18,000.00 1,300.00 1,800.00
0.01 Kg Perekat / Lem 32,000.00 35,000.00 320.00 350.00
0.002 m3 Perancah Kayu 550,000.00 650,000.00 1,100.00 1,300.00

6.21.2 Tenaga 17,835.00 19,320.00


0.25 OH Pekerja 30,000.00 33,000.00 7,500.00 8,250.00
0.225 OH Tukang Cat 40,000.00 43,000.00 9,000.00 9,675.00
0.0225 OH Kepala Tukang 45,000.00 47,000.00 1,012.50 1,057.50
0.0075 OH Mandor 43,000.00 45,000.00 322.50 337.50

397638689.xls 54/53 abk 14-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PAKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6.24 1 m2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara 75,400.00 81,000.00
Manual sistem 3 lap. Cat Konvensional dg Tebal 200 μm
6.24.1 Bahan 6,300.00 7,000.00
0.11 Kg Cat dasar 12,500.00 13,000.00 1,375.00 1,430.00
0.17 Kg Cat Antara 12,500.00 13,000.00 2,125.00 2,210.00
0.08 Kg Cat Penutup 35,000.00 42,000.00 2,800.00 3,360.00
6.24.2 Tenaga 69,100.00 74,000.00
0.50 OH Pekerja 30,000.00 33,000.00 15,000.00 16,500.00
0.80 OH Tukang Cat 40,000.00 43,000.00 32,000.00 34,400.00
0.30 OH Kepala Tukang 45,000.00 47,000.00 13,500.00 14,100.00
0.20 OH Mandor 43,000.00 45,000.00 8,600.00 9,000.00

397638689.xls 54/54 abk 14-14

Você também pode gostar

  • ALMINI Blok D.3
    ALMINI Blok D.3
    Documento6 páginas
    ALMINI Blok D.3
    arief judiantoro
    Ainda não há avaliações
  • Pagar Tholib
    Pagar Tholib
    Documento2 páginas
    Pagar Tholib
    arief judiantoro
    Ainda não há avaliações
  • KBK Misto
    KBK Misto
    Documento8 páginas
    KBK Misto
    arief judiantoro
    Ainda não há avaliações
  • Payment B13
    Payment B13
    Documento6 páginas
    Payment B13
    arief judiantoro
    Ainda não há avaliações
  • RAB Type 62.B13
    RAB Type 62.B13
    Documento176 páginas
    RAB Type 62.B13
    arief judiantoro
    Ainda não há avaliações
  • Pemakaian Material
    Pemakaian Material
    Documento41 páginas
    Pemakaian Material
    arief judiantoro
    Ainda não há avaliações
  • Payment B13
    Payment B13
    Documento6 páginas
    Payment B13
    arief judiantoro
    Ainda não há avaliações
  • Rab Type 103.c21
    Rab Type 103.c21
    Documento147 páginas
    Rab Type 103.c21
    arief judiantoro
    Ainda não há avaliações
  • PO Do Inv
    PO Do Inv
    Documento7 páginas
    PO Do Inv
    arief judiantoro
    Ainda não há avaliações
  • Arief - Cost Control
    Arief - Cost Control
    Documento43 páginas
    Arief - Cost Control
    arief judiantoro
    Ainda não há avaliações
  • Payment C21
    Payment C21
    Documento22 páginas
    Payment C21
    arief judiantoro
    Ainda não há avaliações
  • Arief - Cost Control
    Arief - Cost Control
    Documento43 páginas
    Arief - Cost Control
    arief judiantoro
    Ainda não há avaliações
  • Absensi Tukang
    Absensi Tukang
    Documento3 páginas
    Absensi Tukang
    arief judiantoro
    Ainda não há avaliações
  • Absensi Tukang
    Absensi Tukang
    Documento2 páginas
    Absensi Tukang
    arief judiantoro
    Ainda não há avaliações
  • Arief Cashflow
    Arief Cashflow
    Documento96 páginas
    Arief Cashflow
    arief judiantoro
    100% (1)
  • Absensi Tukang
    Absensi Tukang
    Documento2 páginas
    Absensi Tukang
    arief judiantoro
    Ainda não há avaliações