Method of getting Cost Code

YYY - Work Section (Area Code)

Existing Road Improvement


Headrace Tunnel - General
Protection Work - Railway
Headpond Area - General

Access Tunnel to D/S SC

SY Ventilation Buildings
River & Slope Protection

St. Clare Viewing Galery


Slope Treatment - Land

SY Maintenance Office
Relocation Road across

Upstream Surge Tank -

Architechtural Works -

ID Maintenance Office
ID Gate Control House
SY Standby Generator
Powerhouse - General
Intake Dam - General

Solid Waste Disposal

SY Control Building
Dewatering Channel

Outdoor Switchyard

ID Control Building
A7 Highway Bridge

D/S Surge Chamber


Penstock - General
Land Reclamation

Land Reclamation

Tailrace - General
Reclamation Area

Reclamation Area
RB Service Road

LB Service Road

Relocation of A7

Penstock Tunnel
Cost Code = XX-YYY-ZZ

Intake Facilities
River Diversion

Service Road to

Tailrace Tunnel
Dam Structure

Access Tunnel
Power Cavern

Guard Houses
Cable Tunnel

Power House
Bridge No. 2

Car Shelters
Surge Tank
HR Tunnel
Slide Area

Building
Railway
General

General

General
Adit - 1

Adit - 2

Adit - 4
Facility

Out Let

SWDA

SWDA
Bridge

Adit 5

Adit 6
050 100 110 120 130 140 150 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 400 410 420 430 440 500 510 520 530 540 600 610 620 630 700 710 720 730 740 800 900 910 920 930 940 950 960 970 980 990 991 992
00 Land
01 General
02 Site Investigation & Testing
03 Site Installations and Services
04 Surveying
05 River Diversion and Care of Water
06 Clearing, Grubbing, and Stripping
07 Open Excavation
08 Underground Excavation
09 Banking and Backfill
10 Drilling and Grouting
11 Concrete Works
12 Reinforcing Steel
13 Masonry for Civil Works
14 Shotcreting
15 Rock Bolt
XX - Specification Work Activity (BQ Code)

16 Steel Support
17 Slope Protection
18 Drainage
19 Instrumentation
20 Road Work
21 Concrete Bridge
22 Grounding System
23 Metal Work for Civil Works
24 Miscellanious Work for Civil Structures
25 Structural Steel Works
26 Metal Work for Buildings
27 Masonry Works for Buildings
28 Painting
29 Waterproofing
30 Plaster
31 Tiling
32 Finishing Work
33 Door and Window
34 Architectural Miscellanious Works
35 Illumination System and Power Control System
36 Fire Protectioin System
37 Plumbing System
38 Ventilation and Air-Conditioning System
39 Elevator
40 Miscellanious Building and Facilities
41 Utilities
42 Environmental & Safety
43 Temporary Works

ZZ - Resource Unit (Cost Code)


01 Cement
02 Aggregates
03 Tunnel Steel Material
04 Reinforcements
05 Other Steel Material
06 Wooden Material
07 Explosives and Detonators
08 Electrical
09 Other materials
10 Plant and equipments
11 Labour
12 Fuel, Oil and Lubricants
13 Sub-Contractors
14 Land
15 Overheads
16 Spare parts

20 All others

97 E.P.F.
98 E.T.F
99 VAT