Você está na página 1de 4

ASSIGNMENT BRIEF AND FEEDBACK FORM

Learner name

Course title HND in Construction and the Built Environment


Assessor name M.Sheltonraj
Unit number and title Unit: 1. Design Principles and Application
Assignment title Planning and Designing

4. Understand the roles and responsibilities of all parties involved in construction


Outcome number(s) projects
and statement(s) 5. Understand how technology affects the design and production phases of
construction projects.

Date set 15.7.2013 Hand out date 22.7.2013 Date of Submission 25.8.2013
Initial Submission date Re-submission Date

GRADING OPPORTUNITIES AVAILABLE

Outcomes LO1 LO2 LO3 LO4 LO5 M1.3 M2.4 M3.1 D1.1 D2.2 D3.3
grade
√ √ √ √ √ √ √ √
descriptors

OUTCOMES/GRADE DESCRIPTORS ACHIEVED

Outcomes LO1 LO2 LO3 LO4 LO5 M1.3 M2.4 M3.1 D1.1 D2.2 D3.3
Grade Achieved
Initially
Grade Achieved
On Re-
submission

Student declaration

I,………………………………………………………………….hereby confirm that this assignment is my own work and not


copied or plagiarized. All the sources, from which information has been obtained for this assignment, have
been referenced.
Further I confirm that I have read and understood the IIS City Campus rules and regulations about
plagiarism and copying and agree to be bound by them.

Student’s Signature: …………………………… Date: .…………………

Assessor signature Date

Internal Verifier Date


signature
Lead Internal Verifier Date
signature
INTRODUCTION
Purpose/aims To provide learners with the opportunity to develop an understanding of the design
process and how the planning and design phases are coordinated and managed..
‘Citadel’, a modern township is to be constructed in the city of Jaffna. The site is about
a km2 in extent, flat and sandy and situated about 500 meters away from the lagoon.
The locality is supplied only with drinking water and there is no sewerage scheme
either. But there is a public solid waste collection system.
The township comprises 8 number 5 story buildings and all infra structural facilities.
‘Buildart’, the leading contractors & builders have undertaken the design and
Problem construction of the scheme.
Domain or
You work as the Assistant Designs Engineer in ‘Buildart’ and have been entrusted by
Scenario your employers with the task of planning and designing the Community Center Complex
for ‘Citadel’.
All the 8 blocks in the proposed scheme are identical, with 4 separate residential
apartments in each of the top 4 stories and the ground floors of all blocks are meant for
shops and services.

TASK
Number (Include the grading statement from the published specifications) Criteria
covered
1 The roles and responsibilities of all parties involved in the planning & Design LO4.1
phases to be explained
The roles and responsibilities of all parties involved in the production phase LO4.2
2 to be explained.
3 The corporate and personal responsibilities of all parties involved in LO4.3
construction projects to be evaluated.
4 The modern technology available to designers, planners and builders to be LO5.1
discussed.
5 The effect of technological advances on the various phases of construction LO5.2
projects to be evaluated
ASSESSMENT CRITERIA
Grade descriptors for Pass Possible evidence Feedback
LO4 Understand the roles and
responsibilities of all parties involved in
construction projects
LO4.1 Explain the roles and responsibilities of Report: The roles and responsibilities of
all parties involved in the planning and design all parties involved in the planning &
phases Design phases to be explained
Report: The roles and responsibilities of
LO4.2 Explain the roles and responsibilities of
all parties involved in the production phase
all parties involved in the production phase
to be explained.
LO4.3 Evaluate the corporate and personal Report: The corporate and personal
responsibilities of all parties involved in responsibilities of all parties involved in
construction projects construction projects to be evaluated.
LO5 Understand how technology affects
the design and production phases of
construction projects
Report: The modern technology available
LO5.1 Discuss the modern technology available
to designers, planners and builders to be
to designers, planners and builders
discussed.
LO5.2 Evaluate the effect of technological Report: The effect of technological
advances on the various phases of construction advances on the various phases of
projects construction projects to be evaluated
Grade descriptors for Merit Possible evidence Feedback
M1.3 An effective approach to study and
M1. Identify and apply strategies to find research has been made in understanding
appropriate solutions the roles and responsibilities of all parties
involved in planning & Design phases.
M2.4 Selection of methods and
M2. Select/design and apply appropriate techniques/ has been justified in
methods/ techniques evaluating and personal responsibilities of
all parties involved in construction projects
M3.1 The appropriate structure and
M3. Present and communicate appropriate approach has been used in discussing the
findings modern technology available to designers,
planners and builders
Grade descriptors for Distinction Possible evidence Feedback

D1.1 Conclusions have been arrived


through synthesis of ideas and have been
D1. Use critical reflection to evaluate own work
justified in evaluating the corporate and
and justify valid conclusions.
personal responsibilities of all parties
involved in construction projects.
D2.2 Substantial activities, projects or
investigations have been planned,
D2. Take responsibility for managing and
managed and organized in discussing the
organizing activities.
modern technology available to designers,
planners and builders
D3.3 Convergent and lateral thinking have
D3. Demonstrate convergent/lateral /creative been applied in evaluating the effect of
thinking technological advances on the various
phases of construction projects

Você também pode gostar