● PROJECT NAME : CHILCAUNO POWER STATION ADD-ON PROJECT
□ For Approval
● DOCUMENT No. : 0-WD325-EM670-00101
□ For Construction
● TITLE : Vendor Document List & Schedule
□ For Bid
● OWNER : EnerSur S.A.
■ AS-BUILT

AB Nov.20.2012 K.J.Yoon J.Y.Lee S.D.Park AS-BUILT

PREP’D REVIEWED APPR’D REVIEWED APPR’D


Rev.
DATE DESCRIPTION
No.
DEC POSCO E&C
Owner

EnerSur S.A.

Contractor Subcontractor
VENDOR DOCUMENT REGISTER LIST
CHILCA UNO COMBINED CYCLE CONVERSION PROJECT
Package Name :
P.O. No. :
Vendor Name : HYOSUNG GOODSPRINGS Last updated on :
1st 2nd 3rd 4td 5td 6td
For Con
VDR First Issue Submit Return Submit Return Submit Return Submit Return Submit Return Submit Return
No. Document Title Purpose Dept. Remark
No. date(Plan) Transmittal Transmittal Transmittal Transmittal Transmittal Transmittal Transmittal Transmittal Transmittal Transmittal Transmittal Transmittal Transmittal
Date Rev. No. Date Status Date Rev. No. Date Status Date Rev. No. Date Status Date Rev. No. Date Status Date Rev. No. Date Status Date Date Status Date
No. No. No. No. No. No. No. No. No. No. No. No. No.

1 0-WD325-EM670-00101 Vendor Document List & Schedule FA MEC

2 0-WD325-EM460-00101 Pump Data Sheet FA MEC

3 0-WD325-EM460-00102 Pump Performance Curves FA MEC

4 0-WD325-EM100-00101 Outline Drawing FA MEC

5 0-WD325-EM100-00102 Sectional Drawing FA MEC

6 0-WD325-EM100-00103 Mechanical Seal Drawing FA MEC

7 0-WD325-EM300-00101 Anchor Bolt Caculation Sheet FA MEC

8 0-WD325-EM100-00105 Auxiliary Piping Drawing FA MEC

9 0-WD325-EM432-00101 Lubricant List FA MEC

10 0-WD325-EM445-00101 Instrument List FA MEC

11 0-WD325-EM420-00101 Spare Part List FA MEC

12 0-WD325-EM244-00101 Shop Painting & Rust Preventive Procedures FA MEC

13 0-WD325-EM250-00101 Shop Inspection & Test Procedures For Pump FA MEC

14 0-WD325-EM200-00101 Motor Specification FA MEC

15 0-WD325-EM768-00101 Inspection and Test Report FI MEC

16 0-WD325-EM610-00101 Installation, Operation & Maintenance Manual FI MEC

17 0-WD325-EM670-00102 Sub-vendor List FA MEC

18 0-WD325-EM731-00101 Packing Procedures FA MEC

19 0-WD325-EM100-00106 Strainer Drawing FA MEC

20 0-WD325-EM100-00107 Pump Junction Box Drawing FA MEC

21 0-WD325-EM250-00001 Shop Inspection & Test Plan For Pump FA MEC

22 0-WD325-EM250-00002 Shop Inspection & Test Plan For Motor FA MEC

23 0-WD325-EM250-00102 Shop Inspection & Test Procedure For Motor FA MEC

24 0-WD325-EZ711-00101 Organization Chart FA MEC

25 0-WD325-EZ261-00101 WPS & PQR FA MEC

26 0-WD325-EZ731-00102 NDE Procedure FA MEC

27 0-WD325-EM100-00108 Expansion Joint Drawing FA MEC

28 0-WD325-EM445-00102 DPIT for Strainer FA MEC

29 0-WD325-EM445-00109 Name Plate Drawing FA MEC

30

Note 1) Category : FA - Issued for approval, FI - Issued for information, FR - Issued for Review / Comment , FC - Issued for Construction

2) Dept : MEC /ELE / I&C / …

3) Status : 1. Approved / 2. Approved with Comment / 3. Reject / 4. Information

4) Coloring A. Finished, Documents for Construction was approved.

B. Action Required by Vendor

C. Action Required by POSCO & DEC


D. Delayed

1페이지 중 1페이지

Você também pode gostar