2.1.1 PWD Schedule 2018 Layout and marking for earthwork in excavation in foundation sqm 13,545.00
Item No. 02.1.1 accepted by the Engineer. [Trench area shall be considered for
measurement]
2.1.2 PWD Schedule 2018 Earthwork in excavation in foundation trenches up to 5.5 m depth cum 43,617.27
Item No. 02.1.4 and maximum 10 m lead: in very stiff (hard) clayey soil/ rubbish etc.
2.1.3 PWD Schedule 2018 Bailing out trapped water caused by inundation due to seepage hour 1,080.00
Item No. 02.19.1 or rain, by a 1 cusec diesel operated pump from trenches where
documentation on rain fall, seepage rate, volume of inundation shall
strictly be made.
2.2 PWD Schedule 2014 Shore protection work during excavation (east side of the trench) sqm 9,665.00
Item No. 02.7.2 in foundation trenches to protect loss due to damage of property by
Palisading beyond 1.5 m depth accepted by the Engineer [the rate
is including cost of vertical post, horizontal wooden plank and
removal]
2.3 Shore protection work by sheet piling (U sheet pile, 12m length, rm 1,933.00
12mm thickness and 400mm wide) including runner driving, lifting,
welding, including all other items etc. 140 rm segment (horizontally)
along the railway track side (west side of the trench) will be driven
segment by segment. The trench will be excavated and GRP pipe
laid. After completion of laying 140 segment the pile will be
withdrawn and placed in the next segment for excavation and pipe
laying. This will be continued until the total length is covered (2 km).
The contractor will take away the piles after completion of the works.
2.5 PWD Schedule 2018 Removing sludge or semi-liquid clay/substances etc not cum 12,111.90
Item No. 02.9 suitable for pumping out or carrying by head load from the bottom of
any marshy land, lake, ditch, pond by mixing fine local sand of F.M.
0.8 or less to a proportion such that it can be carried to an
intermediate point of disposal and cutting the same including
stacking and spreading properly on a suitable place to dry in the sun
for a certain days and dispose the dried sludge or clay to a safe
distance etc. complete and accepted by the Engineer subject to
submit method statement to the Engineer for carrying out the works
including ultimate disposal of the sludge under this item for
approval. However Engineer’s approval shall not relieve the
Contractor of his responsibilities and obligations under the contract.
2.6 PWD Schedule 2018 Sand filling in foundation trenches and plinth with sand having cum 81,562.54
Item No. 02.10.1 F.M. 0.5 to 0.8 in 150mm layers including leveling, watering and
compaction to achieve minimum dry density of 95% with optimum
moisture content (Modified proctor test) by ramming each layer up
to finished level as per design supplied by the design office only, all
complete and accepted by the Engineer.
2.7 PWD Schedule 2018 Sand filling in foundation trenches and plinth with coarse sand cum 3,853.00
Item No. 02.10.3 having min. F.M. ≥2.2 in 150mm layers including leveling,
watering and compaction to achieve minimum dry density of 95%
with optimum moisture content (Modified proctor test) by ramming
each layer up to finished level as per design supplied by the design
office only etc. all complete and accepted by the Engineer.
2.8 PWD Schedule 2018 50 mm down graded picked jhama Khoa consolidation in cum 6,421.66
Item No. 02.11 foundation trenches by mixing the same with best quality local
sand (F.M. ≥1.2 in (2:1) (khoa:sand) proportion to achieve
minimum dry density of 95% with optimum moisture content
(Modified proctor test) including breaking and screening chips,laying
and spreading in150mm layers uniformly and compacting etc. all
complete and accepted by the Engineer.
2.10 PWD Schedule 2018 For Dhaka Metropolitan Area cum 1,000.00
Item No. 02.15.1
3.2 Cost of Laying in excavated trenches, Joining of Pipes ("O" joint), rm 3,840.00
field testing of Joints with Joint tester, pressure testing of pipes after
laying in trenches as per design supplied by the design office and
accepted by the Engineer. Contractor may quote other types of joint
along with this.
3.3 RHD Schd., 2018 Single Layer Brick Flat Soling (First class brick) sqm 319.20
Item Code 05/1/01
3.4 RHD Schd., 2018 Lean concrete M15 cum 95.00
Item Code 05/1/2b Cement : Sand : Aggregate 1:2:4 with 0.4 water
Concrete class-20 (Concrete Mixer)
3.5 RHD Schd., 2018 Cement : Sand : Aggregate 1:0.25:0.5 cum 449.82
Item Code 05/01/3m Concrete Class - 45 (45 Mpa, Batching Plant)
Including shuttering.
3.6 RHD Schd., 2018 High Yield Reinforcement Bars: High strength deformed bar Ton 48.70
Item Code 05/02/02 having minimum yield strength of 517 MPa and conforming to ASTM
A615/A615M-04a or equivalent
3.7 Minimum 20 mm thick cement sand (F.M 1.2) plaster (1:3) with neat sqm 396.00
cement finishing to wall with neat cement finishing including
washing of sand, finishing the edges and corners and curing at least
for 7 days cost of water, electricity and other charges etc. all
complete in all respect as per drawing and accepted by the
Engineer.
3.8 Supply and fitting of Ladder (size 2500mm x 500mm with 25mm Nos. 12.00
Solid SS Bar) and composite manhole cover (0.6m dia)
Total Amount
in BDT
Total Amount
in BDT
Total Amount
in BDT