B – PROCEED, CHANGE AS NOTED ®

AND RESUBMIT
Authorization to proceed does not relieve Contractor/Supplier of its responsibility
or liability under the Contract and or Purchase Order.
By Mark Welch (mark.welch@fluor.com) at 11:49 am, 23 Jul 2012

GULF ASIA CONTRAC lING COMPANY LLC

MA'ADEN ALUMINUM COMPLEX INTEGRATED INFRASTRUCTURE PROJECT-K042( K003-PA-0671

~ALC:OA I mllADEI~ull.sul
*-
FLUOR.
1II11IlQaIllllltCII"" _ ...............

Ma'aden Aluminum Proj ec t

INSPECTION AND TEST PLAN FOR CEMENT PLASTER WORK


Document No.: GA-FLUOR-MA'ADEN-CIV-ITP-004. REV.OOO
Contract No:-

A Proceeded Ready for Construction


B Proceeded as noted. Change as noted and Resubmit
C Do not Proceeded Change as noted and Resubmit
0 Information only Not Required
Drawing and/or Data
Q I Correct and Resubmit
I Quality below Standard
Legend

Comments:

000 I 16-JUL-2012

INSPECTION AND TEST PLAN FOR CEMENT PLATER WORKS


1 of 6
MA’ADEN ALUMINUM COMPLEX INTEGRATED
INFRASTRUCTURE PROJECT- K003-PCA067

INSPECTION AND TEST PLAN FOR CEMENT


PLASTER WORK

Doc. GA-FLOUR-MA'ADEN-CIV-ITP-004 Rev.:000, Date : 16-JUL-2012

ATTACHMENTS

Document no: Revision Sheets Document name


GA-FLOUR-MA’ADEN- 000 2 Inspection and test plan for Concrete
CIV-ITP-004 Construction
GA-EMP-MA’ADEN-QC- 000 1 INSPECTION NOTIFICATION
FM-001
FORM NO :F73010 000 1 PLASTER CHECKLIST

TOTAL PAGES =6 NOS (INCLUDING COVER PAGE’S)

INSPECTION AND TEST PLAN FOR CEMENT PLATER WORKS


2 of 6
GULF ASIA CONTRACTING COMPANY LLC LTD
EMPLOYER : MA'ADEN PROJECT : MA'ADEN ALUMINUM COMPLEX -K003-PCA067
CONTRACTOR : GULF ASIA LLC CONTRACT :
INSPECTION & TEST PLAN FOR CEMENT PLASTER
ITP NO: GA-FLUOR-MA'ADEN-CIV-ITP-004 REV.000
SITE ACTION
Responsible
SL# DESCRIPTION Ref. Specifications and Procedures Quality Verifing Document's THIRD REMARKS
Person GA EMP
PARTY
1 M ater ial Appr oval

Approved Material & Data


1.1 OP Cement GA-FLUOR-MA 'ADEN-CIV- MAR-0002 Fied Engr R R -
Submittal

GA-FLUOR-MA 'ADEN-CIV- MAR-0003 ASTM


1.2 Fine Aggregates (Sand) Fied Engr Third party Test Report R R H
C 897

Approved Material & Data


1.3 Bonding Agent (If required) SUBMIT METHOD ASTM C 631 Fied Engr R R -
Submittal
STATEMENT FOR
1.4 Sweet Water
PLASTERING WORKMD-405-1000-EG-ST-SPC-00052 Rev.2 Fied Engr Third party Test Report R R H
FOR FAL APPROVAL
Approved Material & Data
1.5 Plaster Accessories GA-FLUOR-MA'ADEN-CIV-MAR-0004 Fied Engr R R -
Submittal
1.6 APPROVED MORTAR MIX FOR BOTH BASE & FINISH COAT
2 During Construction

Roughening smooth concrete surface ( By Chipping,if W


2.1 Reuired ) or Fix Lathing or Apply Approved bonding GA-FLUOR-MA'ADEN-CIV-MS-0006 Supervi sor/Qc Employer Form No: F73010 W S -
Agent as per Site Situation

2.2 Removing Loose concrete , oil , grease, Dirt, Etc GA-FLUOR-MA'ADEN-CIV-MS-0006 Supervi sor/Qc Employer Form No: F73010 W S -

2.1 CONTRACTOR TO HAVE A "PLASTERING RELEASE FORM" (TO BE SIGNED BY ALL


DISCIPLINES (E.G. PIPING, ELECTRICAL ET. AL. PRIOR TO COMMENCING PLASTERING WORK.
THIS FORM TO BE ATTACHED TO ITP & APPROVE VIA CDT.

3 of 6
W=Witness,I/R=Inspection Report,D= Document Review, S=surveillance ,H=Hold Point
QVD F73010 REQUIRES LIME TO BE ADDED. CONTRACTOR TO SUBMIT MIX PROPORTION
OF CEMENT, SAND, LIME AND WATER FOR FAL ENGINEERING APPROVAL.

GULF ASIA CONTRACTING COMPANY LLC LTD


EMPLOYER : MA'ADEN PROJECT : MA'ADEN ALUMINUM COMPLEX -K003-PCA067
CONTRACTOR : GULF ASIA LLC CONTRACT :
INSPECTION & TEST PLAN FOR CEMENT PLASTER
ITP NO: GA-FLUOR-MA'ADEN-CIV-ITP-004 REV.000
SITE ACTION
Responsible
SL# DESCRIPTION Ref. Specifications and Procedures Quality Verifing Document's THIRD REMARKS
Person GA EMP
PARTY

Mixing of mortar for Base coat


2.3 GA-FLUOR-MA'ADEN-CIV-MS-0006 Supervi sor/Qc Employer Form No: F73010 W S -
(CEMENT:SAND = 1:4) Using Mechnical Mixer
SPECIFY THICKNESS OF BASE COAT

Mixing of mortar for Finish Coat


2.4 GA-FLUOR-MA'ADEN-CIV-MS-0006 Supervi sor/Qc Employer Form No: F73010 W S -
(CEMENT:SAND = 1:5) Using Mechnical Mixer
SPECIFY THICKNESS OF FINISH COAT

Fixing of Plaster accessories ( Like Corner Bead,angle


2.5 GA-FLUOR-MA'ADEN-CIV-MS-0006 Supervi sor/Qc Employer Form No: F73010 W S -
Bead lathing,etc) as indicated on IFC Drawings

Curing of Plaster will be done for at least 3days by


3 Continuous Sprinkling water or by covering with Wet GA-FLUOR-MA'ADEN-CIV-MS-0006 Supervi sor/Qc Employer Form No: F73010 W S -
Hessian Cloth
AND
W
4 Final Inspection of Plaster Work GA-FLUOR-MA'ADEN-CIV-MS-0006 Supervi sor/Qc Employer Form No: F73010 H S -

W = Witness, I/R = Inspection & Report, D = Document Review, S = Surveillance, H = Hold Point

RENJITH.B.
000 16-Jul-12 ISSUED FOR APPROVAL (QCE) KANNAN PILLAI (QCM) FLUOR MA'ADEN
REV DATE DESCRIPTION PREPARED BY CHECKED BY VERIFIED BY APPROVED BY

4 of 6
W=Witness,I/R=Inspection Report,D= Document Review, S=surveillance ,H=Hold Point
GULF ASIA CONTRACTING COMPANY LLC.

CONTRACT NO :

MA’ADEN ALUMINIUM COMPANY INTEGRATED INFRASTRUCTURE PROJECT- K003-PCA067

INSPECTION NOTIFICATION
Inspection
REV. 0 File No.
Notification No.

Inspection Request Date : Time :

Item Identification:

Inspection Place/ Area:


ITP No: Specification No:
DETAIL OF ITEM TO BE INSPECTED

Inspection Description………………….
M

SUB CONTRACTOR
Drawing No.:

GULF ASIA
CONSTRUCTION
GA DATE TIME

GULF ASIA
QC INSPECTOR

GA DATE TIME
EMPLOYER
QC Inspector

Approved w/o comment


INSPECTION RECORD

Approved w/ comment EMPLOYER DATE TIME


MA'ADEN
QC Inspector
Approved w/o comment
CLIENT

Approved w/ comment MA'ADEN DATE TIME


Remarks
Comment of Inspection

5 of 6
GA-EMP-MA'ADEN-QC-FM-001
COMPANY LOGO
FOR PCA-067

Ma’aden Aluminum Complex 000 509 F73010


Contract A6PM 30 Sep 2010
Ras Al Khair, KSA Page 1 of 1
PLASTER CHECKLIST ID A73010A
Tag Description: Tag No.:
P. O. No.: Inspection Classification Area/Unit:
Subcontractor: Subcontractor Client Turnover System:
Work Package: Sub-Project QA Other Sub – System:
Sub-Project
Item Description of Check Subcontractor
QA
Verify the correct use of plaster materials:
01 Cement
02 Lime
03 Sand
04 Water
Inspect application of plaster:
05 Proportioning of plaster mixtures per design
06 Application technique per design
07 Subsurface preparation per design
08 Thickness of application per design
09 Installations of accessories like corner beads, etc. per design
Ascertain workmanship:
10 Plaster face plumb and in one plane
11 Plaster flush with inserts
12 Troweled surface uniform
13 No defects, such as cracks and blisters

Notes:

Subcontractor Sub-Project QA Client


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:

*P1/1*
6 of 6