Você está na página 1de 5

OLADIMEJI OYEYEMI

dimscojam@yahoo.com, +2348036699803

BIODATA

DATE OF BIRTH 7TH OCTOBER 1979


NATIONALITY NIGERIAN
STATE OF ORIGIN OGUN STATE
SEX MALE
MARITAL STATUS MARRIED

OBJECTIVES

 To work in an organization deploying cutting-edge technology and using Industry best practice to
provide optimum Engineering solutions.
 To leverage my years of experience to play a direct role in the growth and success of the
organization.

EDUCATION

THE UNIVERSITY OF PORT HARCOURT B.Eng (Elect/Elect) 2006

THE POLYTECHNIC IBADAN HND (Elect/Elect) 2001

SUMMARY PROFILE

I am a versatile Design and Project engineer of more than 12years experience both in the Construction
and Oil and gas Industries.
I have competence in producing and reviewing project deliverables in the following fields:
 Electrical
 Instrumentation and Control also in:
 Telecommunication
 Piping
 Structural
EMPLOYMENT HISTORY

September 2015- TRANOS CONTRACTING LIMITED, Ilupeju-Lagos State


till date Electrical/Mechanical Design Engineer
Review/Modify drawing from clients as per project requirments.
Clarify Technical queries from clients during meetings or through email.
Generate Project Specific drawings e.g. Control Panel Wiring Layout, Single line diagrams etc.
Prepare 3D drawing and specification for AMF panels, LV Panels, Distribution Panels etc
Provide Technical input to Procurment team.
-Produced & Reviewed drawing on schedule inspite of constraints and provided cost saving advice for clients.

March 2014- DELTA AFRIK ENGINEERING LIMITED, Lekki-Lagos State


April 2015 Instrument and Control Design Engineer
Produce Project deliverables like:
Instrument Level Sketch, PAGA/Cable Block Diagrams, Logic Diagrams, 3D modelling of
Offline Instruments, Clash detection for PSS, PCS, ESD & F&G Instruments, Field
Instruments termination with SPI etc.
-Deployed my skills in PDMS to deliver jobs requiring complex 3D modelling of Instruments

April 2008- ENERECO ENGINEERING NIGERIA LIMITED, PortHarcourt-Rivers State


March 2014 CAD Engineer (Electrical, Instrument and Control) & Project Engineer
Produce and Review Electrical/Instrument & Control/Piping/Strucutral deliverables e.g.
Single Line Diagrams (SLDs), Electrical Load List, Logic Diagrams, Instrument Level Sketch,
P&ID, Fabrication drawings, Piping Isometrics etc.
Preparation of bidding documents
Represented company during Kick-Off meeting and subsequent interface meetings
Monitoring project progress and report to Project Manager on agreed milestones.
Perform site visits to gather data and produce red line drawings.
-Ability to multitask and work effectively in multi-disciplinary environment increased revenue of the company
and cut costs.

September 2004- FUNKUS AND SONS LTD, Port Harcourt-Rivers State


March 2008 CAD (Electrical, Civil), MEP design Engineer
Produce Electrical wiring diagrams of Office complexes and residential buuildings e.g.
Lighting Layout, Small Power Layout, Consumer Control Unit Layout, Power Schematics
etc., Concrete Reinforcement details for slabs, Columns and Stair Case Reinforcment details,
Sewage /Waste water Layout and Cold and Hot water Supply Layout.
-Pioneered AutoCAD drafting in the company.

July 2003- IMPACT RESOURCES, Port Harcourt-Rivers State


August 2004 CAD Instructor
Provide AutoCAD software tutelage and manuals for fresh graduates and experienced
professionals.
-Increased revenue to the company through AutoCAD training

Jan 2002- ONNE PORT COMPLEX, Port Harcourt-Rivers State


Jan 2003 National Youth Service Corps
Worked as a Trainee Engineer in the Electrical maintenance workshop

November 1997- UNIVERSAL COMPUTERS, Ibadan-Oyo State


September 2001 1 yr. Internship and Part time Work as a
Computer Hardware Maintenance Technician/ Ms. Office & AutoCAD Trainee Instructor
MAJOR PROJECTS DONE

September 2015-till PROJECT FUTURE- Deployment of Hybrid Solution of Direct Current Generator
date and Solar Panels to more than 2500 Telecoms sites to reduce OPEX on the sites.
CLIENT - BiswalCom
POSITION: Electrical Design Engineer ( with TRANOS)
Study and understand client’s specification and the requirements of the instrument/
system panels, Produce Solar Panel PV module layout in Telecoms site based on True
North orientation, Produce demolition drawings on decommissioned equipments e.g.
ATS, Rectifiers, Battery banks etc., Provide Technical Input to procurement team
Liase with sub-contractors supplying remote sensing equipments to ensure seamless
interaction with existing equipments
April 2015 UBIT PP RESTORATION EPCM PROJECT-Revamping of the platform
replacing corroded separators and associated piping and instrumentation.
CLIENT – MPN (Mobil Producing Nigeria Unlimited)
POSITION: Instrument and Control design Engineer (with DELTAAFRIK)
Production of related Project deliverables, working on PDMS model of flow station to
effect changes in design.
March 2015-April EGINA FPSO PROJECT – Detailed design of Topside EGINA FPSO
2015
CLIENT: TUPNI, TOTAL UPSTREAM NIGERIA
POSITION: Instrument and Control design Engineer (with DELTAAFRIK)
Prepared the following :
Instrument Cable Block Diagrams for PSS, PCS, ESD & F&G
PAGA Cable block diagram,Instrument Typical Installation details,Logic Diagrams
Instrument Level Sketch
PDMS modelling of:
Offline Instruments,Performed clash detection with other disciplines, Participate in 3D
model review before clients.Junction box termination to field Instruments and
Marshalling Cabinets with SPI
Preparing MTO deliverables - Cables, Air manifolds from specification references.
August 2014- NORTH OPTION PIPELINE PROJECT (Production of operational manual)-
November 2014 NOPL is a gas pipeline project envisaged to transport gas from TEPNG operations to
the ALAOJI power plant.
CLIENT- SAIPEM NIGERIA DESICON CONSORTIUM.
POSITON: Project Engineer (with ENERECO)
Represented company during Kick-Off meeting and subsequent interface meetings.
Part of design team that worked on preparation of operating manual for
Power Generation Gas/Diesel Systems, Integrated Control and Safety Systems
Cathodic Protection System, Communication and Telecommunication Systems
Monitoring project progress based on agreed upon milestones
June 2014 ELECTRICAL STUDY FOR POWER HOOK-UP OF
TOTAL RA. to SHELL RA. - Feasibility study of connection of TOTAL
Residential Area to SHELL Residential area power grid.
CLIENT-TOTAL EXPLORATION AND PRODUCTION NIGERIA LIMITED
POSITON: Project Engineer Electrical (with ENERECO)
Attended preliminary meeting with clients.
Studied client drawings to determine tie in points to SPDC Ring Main units and
location of 500KVA transformers.
Made site visit to both SPDC Electrical room , Ring Main Units and TOTAL RA
Electrical room.
Went for site verification and prepared as built power configuration of the site
Located the tie in point from existing power layout configuration of SHELL RA.
March 2013-June N-LNG Trains 4/5 GAS SUPPLY PROJECT IDU FIELD
2014 GAS DEVELOPMENT AND REVAMPING-PHASE 2 – installation of process
and service units for oil production and gas delivery to OB/OB gas plant, as
follows: Installation of NAG separator, Gas boots, New power generating system etc.
CLIENT- ALCON CONTRACTING NIGERIA LTD.
POSITION- Project Engineer / Electrical, Instrument and Control designer. (with
ENERECO)
Reviewed drawing deliverables e.g. P&ID, Instrument Location diagrams etc. and
attending to Technical queries, Tracking project progress across disciplines to keep
track of invoicing milestones. Site visitation to check deviation and co-ordinate red
lining activities across disciplines.
Oct 2011- Feb 2012 UQUO GAS FIELD DEVELOPMENT (EKID PLANT)-Uquo gas field was
developed to supply Ibom Power plant via a 62-km 18” pipeline.
CLIENT-ALCON CONTRACTING NIGERIA LIMITED
POSITION-Cad Structural Detailer (with ENERECO)
Preparation of Fabrication, Erection Drawing (with appropriate
welding symbols) for Pipe Racks (30 Tonne Steel Assembly),Pipe Supports and
Shelters. Provide Technical Support for client on fabrication and final erection of
structures. Review drawing and make comments on existing design to ensure ease of
fabrication.
March 2010 ELECTRICAL LOAD STUDY OF TOTAL VILLAGE
Electrical load study of TOTAL Residential quarters to determine peak load
consumption and to propose upgrade of the Electrical facilities e.g. HV &LV
switchgears, Preparation of AC & DC load calculations. Transformers etc.
CLIENT-TOTAL EXPLORATION AND PRODUCTION
NIGERIA LIMITED
POSITION- Field/Electrical I&C (with ENERECO)
Hook up Power Quality Analyzer to the incoming cable of the
Low Voltage Switch Gear to get the Maximum Power consumed.
Measure and log power consumption of the Village using Power
Quality Analyzer (FLUKE 434/435) (for a period of 5days)
Produce Electrical Load Analysis Report.
Carry out a survey of the existing infrastructure and produce As--built Electrical Key
Line single diagram.
Oct 2008 – Jan INTEGRATED OIL AND GAS PROJECT-(Field Logistic Base Design and
2010 Construction)
CLIENT-SHELL PETROLEUM DEVELOPMENT COMPANY
POSITION- P&ID / Structural CAD designer(with ENERECO)
Reviewed Instrument and Piping project deliverables. Quality check of the drawings in
which all possible corrections are made to achieve an error free drawing.
Coordinating with QA/QC department to effect deviation drawings on electrical
wiring diagrams for the buildings, Producing piping spools for site transportation
Producing weld maps for NDT. Produce Fabrication drawings for Production
maintenance building, Chemical store building, Fire water pumping stations etc.
March. 2008 DESIGN OF UNDERWATER CAISSON FOR REPAIR WORK AT
VARIOUS SPDC SWAMP LOCATION MANIFOLD(with FUNKUS)
CLIENT-SHELL PETROLEUM DEVELOPMENT COMPANY
Jan 2007 PROCESS AND INSTRUMENTATION DESIGN FOR LDI
CHEMICAL LINES AT BONGA FPSO
CLIENT: SNEPCO/ BAKER HUGHES
POSITION- INSTRUMENTATION/ PIPING DESIGNER(with
FUNKUS)
Sep 2004- Dec2006 Performed MEP designs to various Residential and Office complexes
COMPUTER SKILLS

Navisworks Freedom 2014, Smart Plant Instrumentation (SPI), AutoCAD (2D & 3D) , AVEVA PDMS
MS. OFFICE (Word, Excel, Power Point, Access), Ms. Project
National Instruments Circuit Design Suite 10.0, Introduction to Tekla Suites& AutoCAD Inventor

SEMINARS ATTENDED

 Electrical Safety in projects by Shell Petroleum Development Company.


 Maintenance and Reliability Professional Seminar
 AVEVA PDMS (Plant Design Management System) training.
 Project Management Training-Piston & Fusion Technology
 Control Valve selection seminar

Você também pode gostar