SME ORDNANCE SDN BHD

PREVENTIVE MAINTENANCE FOR YEAR 20____

Brand & Months


Item Frequency
Serial No.
Jan Feb Mac Apr May Jun Jul Aug Sept Oct Nov Dec

GENERATOR

a) Main Sub-Station
CAT 3508
(850kVA)

b) Production 5.56mm
CAT D349
(700kVA)

Once a
c) EPD week
CAT D349
(650kVA)

d) Pyrotechnic
PERKINS
(55kVA)

e) LAP (300kVA)
CAT 3406

Hairin Bin Azman Shaliza Bt. Kamarudin Nasri Yusoff


Senior Chargeman Maintenance Engineer Technical General Manager
SME ORDN

PREVENTIVE MAINT

Brand &
Item Frequency
Serial No.
Jan Feb Mac Apr

GENERATOR

a) Main Sub-Station
CAT 3508
(850kVA)

b) Production 5.56mm
CAT D349
(700kVA)

Once a
c) EPD week
CAT D349
(650kVA)

d) Pyrotechnic
PERKINS
(55kVA)

e) LAP (300kVA)
CAT 3406

Hairin Bin Azman


Senior Chargeman
SME ORDNANCE SDN BHD

PREVENTIVE MAINTENANCE FOR YEAR 2009

Months
Apr May Jun Jul Aug Sept Oct

Shaliza Bt. Kamarudin Maj. Ab. Jalil Mahm


Maintenance Engineer Technical General M
Oct Nov Dec

Maj. Ab. Jalil Mahmood (R)


Technical General Manager
SME ORDNANCE SDN BHD

SCHEDULE PLANNING FOR CALIBRATION

2007 2009 2010 2013 2015 2017


No. Item Frequency
Month: Month: Month: Month: Month: Month:

1 Oil Dashpot

2 Earth Fault Relay

3 Over Current Relay

4 ACB Once in
2 years
5 Inspection of cable & busbar termination

6 Transformer (Oil Test DGS)

7 OLU (Dielectric Test)

8 HFU (Dielectric Test)

Hairin Bin Azman Shaliza Bt. Kamarudin Nasri Yusoff


Senior Chargeman Maintenance Engineer Technical General Manager
SME ORDNANCE SDN BHD

SCHEDULE MAINTENANCE FOR YEAR 20____

Months
Item
Jan Feb Mac Apr May Jun Jul Aug Sept Oct Nov Dec
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
5.56mm
Powder Room
CT 1
CT 2
Loading Room

7.62mm/9mm/0.38mm
Powder Room
Loading Room
Medium Calibre

Pyro
Loading Room
SME ORDNANCE SDN BHD
PREVENTIVE MAINTENANCE

COOLING TOWER
1. Inspection
No. Location/ Sprinkler Water Water Flow Piping Water Air
Area Head Filter Temperature Sensor System Pressure Filter
5.56mm
Powder Room
1 CT 1
2 CT 2
3 Loading Room

7.62mm/9mm/0.38mm
4 Powder Room
5 Loading Room
6 Medium Calibre

Pyro
7 Loading Room

Status:
/ : Good
X : Not Good
NA : Not Available
2. Reason of Malfunction

3. Action Taken

4. Operation Time Loss

Inspected by : Confirmed by :

Signature : Signature :

Name : Name :

Date : Date :
SME ORDNANCE SDN BHD
PREVENTIVE MAINTENANCE

COOLING TOWER
1. Inspection
No. Location/ Bearing Motor Water Cooling Cooling Tower Compressor Current Supply
Belting
Area Blower Pump Tower Fan Cleanliness Current R Y B
5.56mm
Powder Room
1 CT 1
2 CT 2
3 Loading Room

7.62mm/9mm/0.38mm
4 Powder Room
5 Loading Room
6 Medium Calibre

Pyro
7 Loading Room

Status:
/ : Good
X : Not Good
NA : Not Available
2. Reason of Malfunction

3. Action Taken

4. Operation Time Loss

Inspected by : Confirmed by :

Signature : Signature :

Name : Name :

Date : Date :
SME Ordnance Sdn Bhd
Maintenance Schedule

Cooling Tower

Interval
Item Description Daily Weekly Monthly ¼ Yearly ½ Yearly Yearly Others Remarks
1 Sprinkler Head

2 Water Filter

3 Water Temperature

4 Flow Sensor

5 Piping System

6 Water Pressure

7 Air Filter

8 Belting
Bearing Motor
9
Blower
10 Water Pump

11 Cooling Tower Fan


Cooling Tower
12
Cleanliness
13 Compressor Current

14 Current Supply

Inspected by Confirmed by

Maintenance Engineer