GENERATOR
a) Main Sub-Station
CAT 3508
(850kVA)
b) Production 5.56mm
CAT D349
(700kVA)
Once a
c) EPD week
CAT D349
(650kVA)
d) Pyrotechnic
PERKINS
(55kVA)
e) LAP (300kVA)
CAT 3406
PREVENTIVE MAINT
Brand &
Item Frequency
Serial No.
Jan Feb Mac Apr
GENERATOR
a) Main Sub-Station
CAT 3508
(850kVA)
b) Production 5.56mm
CAT D349
(700kVA)
Once a
c) EPD week
CAT D349
(650kVA)
d) Pyrotechnic
PERKINS
(55kVA)
e) LAP (300kVA)
CAT 3406
Months
Apr May Jun Jul Aug Sept Oct
1 Oil Dashpot
4 ACB Once in
2 years
5 Inspection of cable & busbar termination
Months
Item
Jan Feb Mac Apr May Jun Jul Aug Sept Oct Nov Dec
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
5.56mm
Powder Room
CT 1
CT 2
Loading Room
7.62mm/9mm/0.38mm
Powder Room
Loading Room
Medium Calibre
Pyro
Loading Room
SME ORDNANCE SDN BHD
PREVENTIVE MAINTENANCE
COOLING TOWER
1. Inspection
No. Location/ Sprinkler Water Water Flow Piping Water Air
Area Head Filter Temperature Sensor System Pressure Filter
5.56mm
Powder Room
1 CT 1
2 CT 2
3 Loading Room
7.62mm/9mm/0.38mm
4 Powder Room
5 Loading Room
6 Medium Calibre
Pyro
7 Loading Room
Status:
/ : Good
X : Not Good
NA : Not Available
2. Reason of Malfunction
3. Action Taken
Inspected by : Confirmed by :
Signature : Signature :
Name : Name :
Date : Date :
SME ORDNANCE SDN BHD
PREVENTIVE MAINTENANCE
COOLING TOWER
1. Inspection
No. Location/ Bearing Motor Water Cooling Cooling Tower Compressor Current Supply
Belting
Area Blower Pump Tower Fan Cleanliness Current R Y B
5.56mm
Powder Room
1 CT 1
2 CT 2
3 Loading Room
7.62mm/9mm/0.38mm
4 Powder Room
5 Loading Room
6 Medium Calibre
Pyro
7 Loading Room
Status:
/ : Good
X : Not Good
NA : Not Available
2. Reason of Malfunction
3. Action Taken
Inspected by : Confirmed by :
Signature : Signature :
Name : Name :
Date : Date :
SME Ordnance Sdn Bhd
Maintenance Schedule
Cooling Tower
Interval
Item Description Daily Weekly Monthly ¼ Yearly ½ Yearly Yearly Others Remarks
1 Sprinkler Head
2 Water Filter
3 Water Temperature
4 Flow Sensor
5 Piping System
6 Water Pressure
7 Air Filter
8 Belting
Bearing Motor
9
Blower
10 Water Pump
14 Current Supply
Inspected by Confirmed by
Maintenance Engineer