Você está na página 1de 43

REKAPITULASI

RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN TOWER RAPPELING POS SAR LANGSA


LOKASI : KOTA LANGSA
KAB. / KOTA : LANGSA
PROVINSI : ACEH

NO. URAIAN PEKERJAAN

I. PEKERJAAN AWAL & PERSIAPAN

II. PEKERJAAN LANTAI - 1

III. PEKERJAAN LANTAI - 2

IV. PEKERJAAN LANTAI - 3

V. PEKERJAAN LANTAI - 4

JUMLAH TOTAL

PPN 10 %

JUMLAH DENGAN PPN 10%

DIBULATKAN

TERBILANG : DELAPAN RATUS DELAPAN PULUH DELAPAN JUTA LIMA RATUS ENAM PULUH RIBU RUPIAH

REKAPITULASI EE
ASI
RAN BIAYA

JUMLAH
HARGA
( Rp )

11,500,000.00

151,905,937.32

110,867,602.57

84,460,414.43

85,412,091.83

444,146,046.16

44,414,604.62

488,560,650.78

488,560,650.78

ATUS ENAM PULUH RIBU RUPIAH

Banda Aceh, Maret 2018

Dibuat Oleh :
Konsultan Perencana
CV. GRAPHIC DESIGN CONSULTANT

( Fahrul Ramadhan, ST )
Direktur

REKAPITULASI EE
RENCANA ANGGARAN BIAYA

I. PEKERJAAN AWAL & PERSIAPAN

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
( Rp ) ( Rp )

1 Direksi Keet, Gudang Dan Barak Pekerja 1.000 Unit Taksir 3,000,000.00 3,000,000.00
2 Pembersihan Lapangan 1.000 Ls. Taksir 1,000,000.00 1,000,000.00
3 Pengukuran & Setting Out 1.000 Ls. Taksir 1,000,000.00 1,000,000.00
4 Pemasangan Bouwplank 1.000 Ls. Taksir 1,000,000.00 1,000,000.00
5 Papan Nama Proyek 100 x 150 cm 1.000 Unit Taksir 500,000.00 500,000.00
6 Listrik Dan Air Kerja 1.000 Ls. Taksir 2,000,000.00 2,000,000.00
7 Administrasi & Dokumentasi 1.000 Ls. Taksir 2,000,000.00 2,000,000.00
8 Pembersihan Akhir 1.000 Ls. Taksir 1,000,000.00 1,000,000.00

JUMLAH TOTAL - I 11,500,000.00

Banda Aceh, Maret 2018

Dibuat Oleh :
Konsultan Perencana
CV. GRAPHIC DESIGN CONSULTANT

( Fahrul Ramadhan, ST )
Direktur

Page 3 of 43 I. PEK. AWAL DAN PERSIAPAN PS. LANGSA


RENCANA ANGGARAN BIAYA

II. PEKERJAAN LANTAI - 1

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
( Rp ) ( Rp )

I. PEKERJAAN TANAH & PASIR


a. Poer
1 Galian Tanah 12.029 M3 SNI-2013- A.2.3.1.1 62,818.75 755,646.74
2 Urugan Kembali 3.007 M3 SNI-2013- A.2.3.1.9 45,137.50 135,728.46
3 Pasir Alas T 5 cm 0.311 M2 SNI-2013- A.2.3.1.11 121,727.50 37,857.25

b. Tangga
1 Galian Tanah 0.061 M3 SNI-2013- A.2.3.1.1 62,818.75 3,831.94
2 Urugan Pasir 1.060 M3 SNI-2013- A.2.3.1.11 121,727.50 129,031.15
3 Pasir Alas T 5 cm 0.061 M3 SNI-2013- A.2.3.1.11 121,727.50 7,425.38

c. Sloof Gantung
1 Galian Tanah 0.633 M3 SNI-2013- A.2.3.1.1 62,818.75 39,764.27
2 Pasir Alas T 5 cm 0.317 M3 SNI-2013- A.2.3.1.11 121,727.50 38,587.62

d. Timbunan & Urugan


1 Timbunan Tanah Bawah Lantai Dalam Bangunan 5.281 M3 SNI-2013- A.2.3.1.11a 121,727.50 642,842.93
2 Urugan Pasir Bawah Lantai Bangunan T 10 cm 2.296 M3 SNI-2013- A.2.3.1.11 121,727.50 279,486.34
3 Pasir Alas Bawah Sloof Gantung T 5 cm 0.317 M3 SNI-2013- A.2.3.1.11 121,727.50 38,587.62
Sub Jumlah 2,108,789.70

II. PEKERJAAN PONDASI


a. Pondasi Sumuran
Memasukan Cincin Sumuran Ø 100 cm, Tebal 5 cm, Tinggi 45 cm,
1 Secara Manual, Termasuk Menutup Celah Antar Cincin Dengan 84.000 Unit Taksir 300,000.00 25,200,000.00
Plasteran Campuran 1 Sm : 2 Ps
2 Isian Sumuran Beton Cylopen ( K-175 ) 11.445 M3 SNI-2013- A.3.2.1.10a 948,750.00 10,858,443.75
3 Isian Sumuran Beton Cor ( K-175 ) 11.445 M3 SNI-2013- A.4.1.1.5 942,630.63 10,788,407.57
4 Besi Tulangan Polos Angkur ( fy = 240 Mpa ) 379.735 Kg SNI-2013- A.4.1.1.17 13,758.60 5,224,621.97

b. Poer
1 Beton Cor Lantai Kerja T 5 cm ( K-125 ) 0.311 M3 SNI-2013- A.4.1.1.2 870,767.50 270,808.69
2 Beton Cor Poer ( K-250 ) 2.813 M3 SNI-2013- A.4.1.1.8 1,026,428.21 2,887,342.56
3 Besi Tulangaan Polos Poer ( fy = 240 Mpa ) 373.232 Kg SNI-2013- A.4.1.1.17 13,758.60 5,135,149.80
4 Bekisting Poer 9.000 M2 SNI-2013- A.4.1.1.20 87,633.83 788,704.50
5 Beton Cor Pendestal ( K-250 ) 1.056 M3 SNI-2013- A.4.1.1.8 1,026,428.21 1,083,908.19
6 Tulangan Polos Pendestal ( fy = 240 Mpa ) 166.366 Kg SNI-2013- A.4.1.1.17 13,758.60 2,288,963.25
7 Bekisting Pendestal 10.560 M2 SNI-2013- A.4.1.1.22 170,240.25 1,797,737.04
8 Membongkar Bekisting & Merawat Beton 3.869 Ls. Taksir 150,000.00 580,350.00
Sub Jumlah 66,904,437.31

III. PEKERJAAN BETON BERTULANG


a. Sloof 20/40 cm ( S1 )
1 Beton Cor Bawah Sloof Gantung T 5 cm ( K-125 ) 0.317 M3 SNI-2013- A.4.1.1.2 870,767.50 276,033.30
2 Beton Cor ( K-250 ) 2.000 M3 SNI-2013- A.4.1.1.8 1,026,428.21 2,052,856.42
3 Tulangan Polos ( fy = 240 Mpa ) 363.867 Kg SNI-2013- A.4.1.1.17 13,758.60 5,006,300.51
4 Bekisting 20.000 M2 SNI-2013- A.4.1.1.21 95,300.50 1,906,010.00
5 Membongkar Bekisting & Merawat Beton 2.000 Ls. Taksir 150,000.00 300,000.00

Page 4 of 43 II. TOWER RAPPELING PS. LANGSA - LT. 1


Sub Jumlah - a 9,541,200.22

Page 5 of 43 II. TOWER RAPPELING PS. LANGSA - LT. 1


HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
( Rp ) ( Rp )

III. PEKERJAAN BETON BERTULANG


b. Kolom 40/40 cm ( K1 )
1 Beton Cor ( K-250 ) 3.840 M3 SNI-2013- A.4.1.1.8 1,026,428.21 3,941,484.33
2 Tulangan Polos ( fy = 240 Mpa ) 503.995 Kg SNI-2013- A.4.1.1.17 13,758.60 6,934,265.61
3 Bekisting 38.400 M2 SNI-2013- A.4.1.1.22 170,240.25 6,537,225.60
4 Membongkar Bekisting & Merawat Beton 3.840 Ls. Taksir 150,000.00 576,000.00

c. Kolom Praktis 13/13 cm ( KP )


1 Beton Cor ( K-175 ) 0.122 M3 SNI-2013- A.4.1.1.5 942,630.63 115,000.94
2 Tulangan Polos ( fy = 240 Mpa ) 27.655 Kg SNI-2013- A.4.1.1.17 13,758.60 380,494.08
3 Bekisting 2.080 M2 SNI-2013- A.4.1.1.22 170,240.25 354,099.72
4 Membongkar Bekisting & Merawat Beton 0.122 Ls. Taksir 150,000.00 18,300.00

d. Pelat Tangga T 12 cm
1 Beton Cor ( K-250 ) 0.986 M3 SNI-2013- A.4.1.1.8 1,026,428.21 1,012,058.22
2 Tulangan Polos ( fy = 240 Mpa ) 149.192 Kg SNI-2013- A.4.1.1.17 13,758.60 2,052,673.05
3 Bekisting 8.697 M2 SNI-2013- A.4.1.1.26 154,830.25 1,346,558.68
4 Membongkar Bekisting & Merawat Beton 0.986 Ls. Taksir 150,000.00 147,900.00

e. Pelat Bordes T 12 cm
1 Beton Cor ( K-250 ) 0.180 M3 SNI-2013- A.4.1.1.8 1,026,428.21 184,757.08
2 Tulangan Polos ( fy = 240 Mpa ) 29.777 Kg SNI-2013- A.4.1.1.17 13,758.60 409,689.83
3 Bekisting 1.500 M2 SNI-2013- A.4.1.1.26 154,830.25 232,245.38
4 Membongkar Bekisting & Merawat Beton 0.180 Ls. Taksir 150,000.00 27,000.00

f. Pelat Konsol T 12 cm
1 Beton Cor ( K-250 ) 0.072 M3 SNI-2013- A.4.1.1.8 1,026,428.21 73,902.83
2 Tulangan Polos ( fy = 240 Mpa ) 11.911 Kg SNI-2013- A.4.1.1.17 13,758.60 163,878.68
3 Bekisting 1.200 M2 SNI-2013- A.4.1.1.24 231,573.58 277,888.30
4 Membongkar Bekisting & Merawat Beton 0.072 Ls. Taksir 150,000.00 10,800.00

g. Balok Latei / Lintel Beam 13/15 cm ( BL1 )


1 Beton Cor ( K-175 ) 0.125 M3 SNI-2013- A.4.1.1.5 942,630.63 117,828.83
2 Tulangan Polos ( fy = 240 Mpa ) 24.152 Kg SNI-2013- A.4.1.1.17 13,758.60 332,297.71
3 Bekisting 1.920 M2 SNI-2013- A.4.1.1.23 175,415.25 336,797.28
4 Membongkar Bekisting & Merawat Beton 0.125 Ls. Taksir 150,000.00 18,750.00
Sub Jumlah - b 25,601,896.14
Sub Jumlah a+b 35,143,096.37

IV. PEKERJAAN TANGGA


1 Beton Cor Lantai Kerja T 5 cm ( K-125 ) 0.061 M3 SNI-2013- A.4.1.1.2 870,767.50 53,116.82
2 Beton Cor Anak Tangga T 7 cm ( K-175 ) 0.056 M3 SNI-2013- A.4.1.1.5 942,630.63 52,787.32
3 Pasangan Batu 1/2 Bata Campuran 1 Sm : 4 Ps 0.434 M2 SNI-2013- A.4.4.1.3 116,322.50 50,483.97
4 Plasteran Campuran 1 Sm : 4 Ps 0.868 M2 SNI-2013- A.4.4.2.4 57,149.25 49,605.55
5 Finishing Anak Tangga Dengan Acian Halus 7.070 M2 SNI-2013- A.4.4.2.27 33,716.56 238,376.10
6 Relling Tangga Dari Besi GIP Ø 3" + Angkur & Cat Besi 7.310 M' Taksir 500,000.00 3,655,000.00
Sub Jumlah 4,099,369.74

V. PEKERJAAN LANTAI
1 Beton Cor Bawah Lantai Ruangan, T 7 cm ( K-175 ) 1.680 M3 SNI-2013- A.4.1.1.5 942,630.63 1,583,619.46
2 Finishing Lantai Ruangan Dengan Acian Halus 24.000 M2 SNI-2013- A.4.4.2.27 33,716.56 809,197.50
Sub Jumlah 2,392,816.96

VI. PEKERJAAN DINDING PANJAT


1 Dinding Panjat Papan Dengan Rangka, Angkur & Cat 19.200 M2 Taksir 500,000.00 9,600,000.00

Page 6 of 43 II. TOWER RAPPELING PS. LANGSA - LT. 1


Sub Jumlah 9,600,000.00

Page 7 of 43 II. TOWER RAPPELING PS. LANGSA - LT. 1


HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
( Rp ) ( Rp )

VII. PEKERJAAN DINDING & FINISHING


1 Pasangan Dinding 1/ 2 Bata Campuran 1 Sm : 4 Ps 57.498 M2 SNI-2013- A.4.4.1.3 116,322.50 6,688,311.11
2 Plasteran Dinding Campuran 1 Sm : 4 Ps 114.996 M2 SNI-2013- A.4.4.2.4 57,149.25 6,571,935.15
3 Acian Beton Expose 37.239 M2 SNI-2013- A.4.4.2.27 33,716.56 1,255,571.07
Sub Jumlah 14,515,817.33

VIII. PEKERJAAN KUSEN, PINTU, JENDELA & VENTILASI


1 Kusen Dan Daun Pintu UPVC + Kunci & Pegantung - Type P1 1.000 Unit Taksir 3,000,000.00 3,000,000.00
2 Kusen Dan Daun Jendela UPVC + Kunci & Pegantung - Type J1 2.000 Unit Taksir 1,000,000.00 2,000,000.00
Sub Jumlah 5,000,000.00

IX. PEKERJAAN CAT


1 Cat Air Dinding & Beton ( Nipon Paint & Catylac ) 152.235 M2 SNI-2013- A.4.7.1.10 32,493.25 4,946,609.91
Sub Jumlah 4,946,609.91

X. PEKERJAAN INSTALASI LISTRIK


1 Box Panel Dengan MCB & Accesories 1.000 Set. Taksir 1,000,000.00 1,000,000.00
2 Lampu Philips LED Type Ambience Globe 18W E27 CDL 5.000 Bh. Taksir 200,000.00 1,000,000.00
3 Lampu Philips LED Type Ambience Globe 7W E27 CDL 1.000 Bh. Taksir 150,000.00 150,000.00
4 Saklar Tunggal ( Panasonic ) 4.000 Bh. Taksir 35,000.00 140,000.00
5 Saklar Ganda ( Panasonic ) 1.000 Bh. Taksir 40,000.00 40,000.00
6 Stop Kontak Tunggal ( Panasonic ) 3.000 Bh. Taksir 55,000.00 165,000.00
7 Biaya pemasangan Instalasi Lampu 6.000 Titik Taksir 100,000.00 600,000.00
8 Biaya Pemasangan Saklar 5.000 Titik Taksir 100,000.00 500,000.00
9 Biaya Pemasangan Stop Kontak 3.000 Titik Taksir 100,000.00 300,000.00
10 Kabel Instalasi Penerangan ( NYM 2 x 2,5 mm ) 50.000 M Taksir 15,000.00 750,000.00
11 Kabel Instalasi Stop Kontak ( NYM 3 x 2,5 mm ) 15.000 M Taksir 20,000.00 300,000.00
12 Kabel Power Dari Kwh Ke Box Panel Tower ( NYY 4 x 4 mm ) 50.000 M Taksir 35,000.00 1,750,000.00
13 Material Bantu 1.000 Lot. Taksir 500,000.00 500,000.00
Sub Jumlah 7,195,000.00

JUMLAH TOTAL - II 151,905,937.32

Banda Aceh, Maret 2018

Dibuat Oleh :
Konsultan Perencana
CV. GRAPHIC DESIGN CONSULTANT

( Fahrul Ramadhan, ST )
Direktur

Page 8 of 43 II. TOWER RAPPELING PS. LANGSA - LT. 1


DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME

I. PEKERJAAN AWAL & PERSIAPAN


1 Direksi Keet, Gudang Dan Barak Pekerja 1.000 Unit
2 Pembersihan Lapangan 1.000 Ls.
3 Pengukuran & Setting Out 1.000 Ls.
4 Pemasangan Bouwplank 1.000 Ls.
5 Papan Nama Proyek 100 x 150 cm 1.000 Unit
6 Listrik Dan Air Kerja 1.000 Ls.
7 Administrasi & Dokumentasi 1.000 Ls.

II. PEKERJAAN LANTAI - 1


II PEKERJAAN TANAH & PASIR
a. Poer
1 Galian Tanah 10.454 M3
ITEM PANJANG LEBAR TINGGI JUMLAH VOLUME
TP1 1.32 1.32 1.00 6.00 10.45
Sumuran

Jumlah Total Volume 10.45

2 Urugan Kembali 2.614 M3


ITEM 1/4 X VOLUME GALIAN VOLUME
TP1 10.45 2.61
Sumuran - -
DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


0.00 - -
Jumlah Total Volume 2.61

3 Pasir Alas T 5 cm 0.523 M3


ITEM PANJANG LEBAR TINGGI JUMLAH VOLUME
TP1 1.32 1.32 0.05 6.00 0.52
Sumuran - - 0.05 - -

Jumlah Total Volume 0.52

III PEKERJAAN PONDASI


a. Pondasi Sumuran
1 Cincin Sumuran 84.000 Unit
ITEM h (Tinggi Cincin Sumuran) LEBAR H JUMLAH VOLUME
Sumuran 0.45 6.00 6.00 14.00

Jumlah Untuk Volume 1.00 UNIT 14.00


Jumlah Untuk Volume 6.00 UNIT 84.00

2 Isian Sumuran Beton Cylopen ( K-175 ) #REF! M3


ITEM DIAMETER LEBAR TINGGI JUMLAH VOLUME
Sumuran 0.90 3.00 6.00 11.45
#REF! 1.18 0.15 #REF! #REF!
Jumlah Total Volume #REF!

3 Isian Sumuran Beton Cor ( K-175 ) 11.445 M3


ITEM PANJANG LUAS TINGGI JUMLAH VOLUME
DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


Sumuran 0.90 3.00 6.00 11.45

Jumlah Total Volume 11.45

4 Besi Tulangaan Polos Poer ( fy = 240 Mpa ) 541.309 Kg


ø BERAT PANJANG JLH BTG JUMLAH PANJANG JLH. BERAT
(mm) (Kg/m) (m) (Bh) (m) (Kg)
14.00 1.21 3.38 14.00 47.32 57.18
10.00 0.62 2.55 21.00 53.59 33.04
Jumlah Untuk Volume 1.00 UNIT 90.22
Jumlah Untuk Volume 6.00 UNIT 541.31

b. Poer
1 Beton Cor Lantai Kerja T 5 cm ( K-125 )
ITEM PANJANG LEBAR TINGGI JUMLAH VOLUME 0.236 M3
1.35 1.35 0.05 1.00 0.09
Dikurangi Luas Sumuran
1.00 1.00 0.05 1.00 0.04
Jumlah Untuk Volume 1.00 UNIT 0.04
Jumlah Untuk Volume 6.00 UNIT 0.24

2 Beton Cor Poer ( K-250 ) 2.813 M3


ITEM PANJANG LEBAR TINGGI JUMLAH VOLUME
Tapak 1.25 1.25 0.30 1.00 0.47

Jumlah Untuk Volume 1.00 UNIT 0.47


DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


Jumlah Untuk Volume 6.00 UNIT 2.81

3 Besi Tulangaan Polos Poer ( fy = 240 Mpa ) 395.388 Kg


ø BERAT PANJANG JLH BTG JUMLAH PANJANG JLH. BERAT
(mm) (Kg/m) (m) (Bh) (m) (Kg)
14.00 1.21 2.77 18.00 49.82 60.20
14.00 1.21 4.71 1.00 4.71 5.69
Jumlah Untuk Volume 1.00 UNIT 65.90
Jumlah Untuk Volume 6.00 UNIT 395.39

4 Bekisting Poer 9.000 M2


ITEM b h TINGGI JUMLAH VOLUME
1.25 1.25 0.30 1.00 1.50
Jumlah Untuk Volume 1.00 UNIT 1.50
Jumlah Untuk Volume 6.00 UNIT 9.00

5 Beton Cor Pendestal ( K-250 ) 0.672 M3


ITEM b h TINGGI JUMLAH VOLUME
0.40 0.40 0.70 1.00 0.11
Jumlah Untuk Volume 1.00 UNIT 0.11
Jumlah Untuk Volume 6.00 UNIT 0.67

6 Tulangan Polos Pendestal ( fy = 240 Mpa ) 328.510 Kg


DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


ø BERAT PANJANG JLH BTG JUMLAH PANJANG JLH. BERAT
(mm) (Kg/m) (m) (Bh) (m) (Kg)
14.00 1.21 2.53 12.00 30.31 36.63
12.00 0.89 2.55 8.00 20.42 18.12
Jumlah Untuk Volume 1.00 UNIT 54.75
Jumlah Untuk Volume 6.00 UNIT 328.51

7 Bekisting Pendestal 6.720 M2


ITEM b h TINGGI JUMLAH VOLUME
0.40 0.40 0.70 1.00 1.12
Jumlah Untuk Volume 1.00 UNIT 1.12
Jumlah Untuk Volume 6.00 UNIT 6.72

8 Membongkar Bekisting & Merawat Beton


ITEM VOLUME
Beton Cor Poer ( K-250 ) 2.81
Beton Cor Pendestal ( K-250 ) 0.67
Jumlah Untuk Volume 1.00 UNIT 2.81

IV PEKERJAAN BETON
a. Sloof 20/40 cm ( S1 )
1 Beton Cor Bawah Sloof Gantung T 5 cm ( K-125 ) 0.325 M3
ITEM PANJANG LEBAR TINGGI JUMLAH VOLUME
26.00 0.25 0.05 1.00 0.33
Jumlah Total Volume 0.33
DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


2 Beton Cor ( K-250 ) 2.080 M3
ITEM PANJANG b h JUMLAH VOLUME
26.00 0.20 0.40 1.00 2.08
Jumlah Total Volume 2.08

3 Tulangan Polos ( fy = 240 Mpa ) 370.927 Kg


ø BERAT PANJANG JUMLAH BATANGJUMLAH PANJANG JLH. BERAT
(mm) (Kg/m) (m) (Bh) (m) (Kg)
14.00 1.21 26.00 8.00 208.00 251.33
12.00 0.89 26.00 2.00 52.00 46.16
8.00 0.39 1.03 180.33 186.10 73.43
Jumlah Untuk Volume 1.00 UNIT 370.93

4 Bekisting 20.800 M2
ITEM PANJANG P L JUMLAH VOLUME
0.00 26.00 0.20 0.40 1.00 20.80
Jumlah Total Volume 20.80

5 Membongkar Bekisting & Merawat Beton 2.080 Ls


ITEM VOLUME
Beton Cor ( K-250 ) 2.08
Jumlah Untuk Volume 1.00 UNIT 2.08

b. Kolom 40/40 cm ( K1 )
1 Beton Cor ( K-250 ) 3.840 M3
ITEM b h TINGGI JUMLAH VOLUME
0.40 0.40 4.00 6.00 3.84
DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


Jumlah Total Volume 3.84

2 Tulangan Polos ( fy = 240 Mpa ) 516.435 Kg


ø BERAT PANJANG JLH BTG JUMLAH PANJANG JLH. BERAT
(mm) (Kg/m) (m) (Bh) (m) (Kg)
14.00 1.21 4.91 12.00 58.94 71.22
8.00 0.39 1.34 28.00 37.63 14.85
Jumlah Untuk Volume 1.00 UNIT 86.07
Jumlah Untuk Volume 6.00 UNIT 516.43

3 Bekisting 38.400 M2
ITEM b h TINGGI JUMLAH VOLUME
0.40 0.40 4.00 6.00 38.40
Jumlah Total Volume 38.40

4 Membongkar Bekisting & Merawat Beton 3.840 Ls


ITEM VOLUME
Beton Cor ( K-250 ) 3.84
Jumlah Untuk Volume 1.00 UNIT 3.84

c. Kolom Praktis 13/13 cm ( KP )


Beton Cor ( K-175 ) 0.118 M3
ITEM b h TINGGI JUMLAH VOLUME
0.13 0.13 3.48 2.00 0.12
Jumlah Total Volume 0.12

Tulangan Polos ( fy = 240 Mpa ) 51.985 Kg


DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


ø BERAT PANJANG JLH BTG JUMLAH PANJANG JLH. BERAT
(mm) (Kg/m) (m) (Bh) (m) (Kg)
14.00 1.21 1.50 12.00 18.00 21.75
8.00 0.39 1.34 8.00 10.75 4.24
Jumlah Untuk Volume 1.00 UNIT 25.99
Jumlah Untuk Volume 2.00 UNIT 51.98

Bekisting 1.040 M2
ITEM b h TINGGI JUMLAH VOLUME
0.13 0.13 1.00 2.00 1.04
Jumlah Total Volume 1.04

Membongkar Bekisting & Merawat Beton 0.118 M2


ITEM VOLUME
Beton Cor ( K-175 ) 0.12
Jumlah Untuk Volume 1.00 UNIT 0.12

d. Pelat Tangga T 12 cm
Beton Cor ( K-250 ) 1.046 M3
ITEM PANJANG LEBAR TEBAL JUMLAH VOLUME
6.02 0.80 0.12 1.00 0.58
0.80 0.30 0.26 15.00 0.47
Jumlah Total Volume 1.05

Tulangan Polos ( fy = 240 Mpa ) 188.279 Kg


ø BERAT PANJANG JLH BTG JUMLAH PANJANG JLH. BERAT
DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


(mm) (Kg/m) (m) (Bh) (m) (Kg)
sengkang plat 10.00 0.62 1.08 82.67 89.28 55.04
plat 10.00 0.62 6.78 14.00 94.92 58.52
anak tgg 10.00 0.62 0.93 80.00 74.40 45.87
sengkang anak tangga 10.00 0.62 1.04 45.00 46.80 28.85

Jumlah Untuk Volume 1.00 UNIT 188.28


Jumlah Untuk Volume 1.00 UNIT 188.28

Bekisting 8.824 M2
ITEM panjang lebar TINGGI JUMLAH VOLUME
mal bawah tangga 6.20 0.80 1.00 4.96
mal anak tangga 0.80 0.26 15.00 3.12
mal samping 6.20 0.12 1.00 0.74
Jumlah Total Volume 8.82

Membongkar Bekisting & Merawat Beton


ITEM VOLUME 0.578 M3
Beton Cor ( K-250 ) 0.58
Jumlah Untuk Volume 1.00 UNIT 0.58

e. Pelat Bordes T 12 cm
1 Beton Cor ( K-250 ) 0.180 M3
ITEM PANJANG LEBAR TEBAL JUMLAH VOLUME
1.50 1.00 0.12 1.00 0.18
DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


Jumlah Total Volume 0.18

2 Tulangan Polos ( fy = 240 Mpa ) 33.932 Kg


ø BERAT PANJANG JLH BTG JUMLAH PANJANG JLH. BERAT
(mm) (Kg/m) (m) (Bh) (m) (Kg)
10.00 0.62 2.98 11.00 32.78 20.21
10.00 0.62 3.18 7.00 22.26 13.72
Jumlah Untuk Volume 1.00 UNIT 33.93

3 Bekisting 1.500 M2
ITEM P L TINGGI JUMLAH VOLUME
1.50 1.00 1.00 1.50
Jumlah Total Volume 1.50

4 Membongkar Bekisting & Merawat Beton


ITEM VOLUME
Beton Cor ( K-250 ) 0.18
Jumlah Untuk Volume 1.00 UNIT 0.18 0.180 Ls

f. Pelat Konsol T 12 cm
1 Beton Cor ( K-250 ) 0.072 M3
ITEM PANJANG LEBAR TEBAL JUMLAH VOLUME
1.50 0.40 0.12 1.00 0.07
Jumlah Total Volume 0.07

2 Tulangan Polos ( fy = 240 Mpa ) 12.169 Kg


DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


ø BERAT PANJANG JLH BTG JUMLAH PANJANG JLH. BERAT
(mm) (Kg/m) (m) (Bh) (m) (Kg)
8.00 0.39 0.82 8.00 6.59 2.60
10.00 0.62 1.55 10.00 15.52 9.57
Jumlah Untuk Volume 1.00 UNIT 12.17

3 Bekisting 1.200 M2
ITEM P L TINGGI JUMLAH VOLUME
1.50 0.40 1.00 0.60
1.50 0.28 1.00 0.42
1.50 0.12 1.00 0.18
Jumlah Total Volume 1.20

4 Membongkar Bekisting & Merawat Beton 0.072 Ls


ITEM VOLUME
Beton Cor ( K-250 ) 0.07
Jumlah Untuk Volume 1.00 UNIT 0.07

g. Balok Latei / Lintel Beam 13/15 cm ( BL1 )


1 Beton Cor ( K-175 ) 0.078 M3
ITEM PANJANG LEBAR TINGGI JUMLAH VOLUME
4.00 0.13 0.15 1.00 0.08
Jumlah Total Volume 0.08

2 Tulangan Polos ( fy = 240 Mpa ) 15.112 Kg


ø BERAT PANJANG JLH BTG JUMLAH PANJANG JLH. BERAT
DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


(mm) (Kg/m) (m) (Bh) (m) (Kg)
10.00 0.62 4.08 4.00 16.32 10.06
8.00 0.39 0.48 26.67 12.80 5.05
Jumlah Untuk Volume 1.00 UNIT 15.11

3 Bekisting 1.200 M2
ITEM P L TINGGI JUMLAH VOLUME
4.00 0.15 2.00 1.20
Jumlah Total Volume 1.20

4 Membongkar Bekisting & Merawat Beton 0.078 Ls


ITEM VOLUME
Beton Cor ( K-175 ) 0.08
Jumlah Untuk Volume 1.00 UNIT 0.08

IV. PEKERJAAN TANGGA


1 Beton Cor Lantai Kerja T 5 cm ( K-125 ) 0.056 M3
ITEM PANJANG LEBAR TINGGI JUMLAH VOLUME
1.70 0.40 0.05 1.00 0.034
1.10 0.40 0.05 1.00 0.022
Jumlah Total Volume 0.056

2 Beton Cor Anak Tangga T 7 cm ( K-175 ) 0.055 M3


ITEM PANJANG LEBAR TINGGI JUMLAH VOLUME
1.60 0.30 0.07 1.00 0.034
1.00 0.30 0.07 1.00 0.021
DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


Jumlah Total Volume 0.055

3 Pasangan Batu 1/2 Bata Campuran 1 Sm : 4 Ps 0.442 M3


ITEM PANJANG TINGGI JUMLAH VOLUME
As-1 2.60 0.17 1.00 0.44

Jumlah Total Volume 0.44

4 Plasteran Campuran 1 Sm : 4 Ps

5 Finishing Anak Tangga Dengan Acian Halus


6 Relling Tangga Dari Besi GIP Ø 3" + Angkur & Cat Besi

V. PEKERJAAN LANTAI
1 Beton Cor Bawah Lantai Ruangan, T 7 cm ( K-175 ) 1.680 M3
ITEM PANJANG LEBAR TINGGI JUMLAH VOLUME
6.00 4.00 0.07 1.00 1.68

Jumlah Total Volume 1.68

2 Finishing Lantai Ruangan Dengan Acian Halus 24.000 M2


DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


ITEM PANJANG TINGGI JUMLAH VOLUME
6.00 4.00 1.00 24.00

Jumlah Total Volume 24.00

VI. PEKERJAAN DINDING PANJAT


1 Dinding Panjat Papan Dengan Rangka, Angkur & Cat
ITEM PANJANG LEBAR JUMLAH VOLUME
6.40 3.00 1.00 19.20

Jumlah Total Volume 19.20

VII. PEKERJAAN DINDING & FINISHING


1 Pasangan Dinding 1/ 2 Bata Campuran 1 Sm : 4 Ps 57.498 M2

ITEM PANJANG TINGGI JUMLAH PENGURA VOLUME


NGAN
LUAS P & J

As-1 3.60 3.60 1.00 5.86 7.10


As-2 3.60 3.60 1.00 12.96
As-3 5.20 3.60 1.00 18.72
As-4 5.20 3.60 1.00 - 18.72

Jumlah Total Volume 57.50

2 Plasteran Dinding Campuran 1 Sm : 4 Ps 114.996 M2


DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


ITEM VOLUME TOTAL PAS. BATA SISI JUMLAH VOLUME
PAS. BATA 1 : 2 57.50 2.00 1.00 115.00

Jumlah Total Volume 115.00

3 Acian Beton Expose


ITEM VOLUME TOTAL PAS. BATA SISI JUMLAH VOLUME
1.00 -

Jumlah Total Volume -


VIII. PEKERJAAN KUSEN, PINTU, JENDELA & VENTILASI
1 Kusen Dan Daun Pintu UPVC + Kunci & Pegantung - Type P1 1.000 Unit

2 Kusen Dan Daun Jendela UPVC + Kunci & Pegantung - Type J1 1.000 Unit

IX. PEKERJAAN CAT


1 Cat Air Dinding & Beton ( Nipon Paint & Catylac )

ITEM PANJANG TINGGI JUMLAH PENGURA VOLUME


NGAN
LUAS P & J

As-1 4.40 3.88 1.00 5.86 11.21


As-2 4.40 3.88 1.00 17.07
As-3 6.40 3.88 1.00 24.83
As-4 6.40 3.88 1.00 - 24.83
DATA PENDUKUNG (BACK UP DATA)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
ITEM PEKERJAAN :

SKETSA GAMBAR NO REKAPITULASI VOLUME


Sloof 20.00 0.20 1.00 4.00
As-1 4.00 3.88 1.00 5.86 9.66
As-2 4.00 3.88 1.00 15.52
As-3 6.00 3.88 1.00 23.28
As-4 6.00 3.88 1.00 - 23.28

Jumlah Total Volume 153.68

X. PEKERJAAN INSTALASI LISTRIK


1 Box Panel Dengan MCB & Accesories 1.000 Set.
2 Lampu Philips LED Type Ambience Globe 18W E27 CDL 5.000 Bh.
3 Lampu Philips LED Type Ambience Globe 7W E27 CDL 1.000 Bh.
4 Saklar Tunggal ( Panasonic ) 4.000 Bh.
5 Saklar Ganda ( Panasonic ) 1.000 Bh.
6 Stop Kontak Tunggal ( Panasonic ) 3.000 Bh.
7 Biaya pemasangan Instalasi Lampu 6.000 Titik
8 Biaya Pemasangan Saklar 5.000 Titik
9 Biaya Pemasangan Stop Kontak 3.000 Titik
10 Kabel Instalasi Penerangan ( NYM 2 x 2,5 mm ) 50.000 M
11 Kabel Instalasi Stop Kontak ( NYM 3 x 2,5 mm ) 15.000 M
12 Kabel Power Dari Kwh Ke Box Panel Tower ( NYY 4 x 4 mm ) 50.000 M
13 Material Bantu 1.000 Lot.
RENCANA ANGGARAN BIAYA

III. PEKERJAAN LANTAI - 2

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
( Rp ) ( Rp )

I. PEKERJAAN BETON BERTULANG


a. Balok Lantai 20/40 cm ( B1 )
1 Beton Cor ( K-250 ) 2.080 M3 SNI-2013- A.4.1.1.8 1,026,428.21 2,134,970.68
2 Tulangan Polos ( fy = 240 Mpa ) 378.407 Kg SNI-2013- A.4.1.1.17 13,758.60 5,206,350.55
3 Bekisting 26.000 M2 SNI-2013- A.4.1.1.23 175,415.25 4,560,796.50
4 Membongkar Bekisting & Merawat Beton 2.080 Ls. Taksir 150,000.00 312,000.00

b. Balok Bordes 20/30 cm ( BD1 )


1 Beton Cor ( K-250 ) 1.020 M3 SNI-2013- A.4.1.1.8 1,026,428.21 1,046,956.77
2 Tulangan Polos ( fy = 240 Mpa ) 199.000 Kg SNI-2013- A.4.1.1.17 13,758.60 2,737,961.40
3 Bekisting 13.600 M2 SNI-2013- A.4.1.1.23 175,415.25 2,385,647.40
4 Membongkar Bekisting & Merawat Beton 1.020 Ls. Taksir 150,000.00 153,000.00

c. Kolom 40/40 cm ( K1 )
1 Beton Cor ( K-250 ) 3.840 M3 SNI-2013- A.4.1.1.8 1,026,428.21 3,941,484.33
2 Tulangan Polos ( fy = 240 Mpa ) 503.995 Kg SNI-2013- A.4.1.1.17 13,758.60 6,934,265.61
3 Bekisting 38.400 M2 SNI-2013- A.4.1.1.22 170,240.25 6,537,225.60
4 Membongkar Bekisting & Merawat Beton 3.840 Ls. Taksir 150,000.00 576,000.00

d. Pelat Lantai T 12 cm
1 Beton Cor ( K-250 ) 2.880 M3 SNI-2013- A.4.1.1.8 1,026,428.21 2,956,113.25
2 Tulangan Polos ( fy = 240 Mpa ) 476.431 Kg SNI-2013- A.4.1.1.17 13,758.60 6,555,023.56
3 Bekisting 24.000 M2 SNI-2013- A.4.1.1.24 231,573.58 5,557,766.00
4 Membongkar Bekisting & Merawat Beton 2.880 Ls. Taksir 150,000.00 432,000.00

e. Pelat Tangga T 12 cm
1 Beton Cor ( K-250 ) 1.319 M3 SNI-2013- A.4.1.1.8 1,026,428.21 1,353,858.81
2 Tulangan Polos ( fy = 240 Mpa ) 219.893 Kg SNI-2013- A.4.1.1.17 13,758.60 3,025,419.83
3 Bekisting 12.758 M2 SNI-2013- A.4.1.1.26 154,830.25 1,975,324.33
4 Membongkar Bekisting & Merawat Beton 1.319 Ls. Taksir 150,000.00 197,850.00

f. Pelat Bordes T 12 cm
1 Beton Cor ( K-250 ) 0.768 M3 SNI-2013- A.4.1.1.8 1,026,428.21 788,296.87
2 Tulangan Polos ( fy = 240 Mpa ) 127.048 Kg SNI-2013- A.4.1.1.17 13,758.60 1,748,002.61
3 Bekisting 6.400 M2 SNI-2013- A.4.1.1.26 154,830.25 990,913.60
4 Membongkar Bekisting & Merawat Beton 0.768 Ls. Taksir 150,000.00 115,200.00
Sub Jumlah 62,222,427.69

II. PEKERJAAN INSTALASI SUMUR BUATAN


Dinding Sumur Buatan Material GRC PANEL 9 mm 2 Lapis,
1 17.600 M2 Taksir 350,000.00 6,160,000.00
Dengan Rangka Besi Hollow + Angkur & Pintu Darurat
2 Cat Dinding Luar Dalam ( Nippon Paint & Catylac ) 35.200 M2 SNI-2013- A.4.7.1.10 32,493.25 1,143,762.40
Sub Jumlah 7,303,762.40

III. PEKERJAAN DINDING PANJAT


1 Dinding Panjat Papan Dengan Rangka, Angkur & Cat 25.600 M2 Taksir 500,000.00 12,800,000.00
Sub Jumlah 12,800,000.00

Page 25 of 43 III. TOWER RAPPELING PS. LANGSA - LT. 2


HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
( Rp ) ( Rp )

IV. PEKERJAAN DINDING & FINISHING


1 Acian Beton Expose 105.694 M2 SNI-2013- A.4.4.2.27 33,716.56 3,563,638.36
2 Finishing Anak Tangga Dengan Acian Halus 9.000 M2 SNI-2013- A.4.4.2.27 33,716.56 303,449.06
3 Relling Dinding & Tangga Dari Besi GIP Ø 3" + Angkur & Cat Besi 40.430 M' Taksir 500,000.00 20,215,000.00
4 Finishing Lantai Dengan Acian Halus 30.400 M2 SNI-2013- A.4.4.2.27 33,716.56 1,024,983.50
5 Cat Air Dinding & Beton ( Nipon Paint & Catylac ) 105.694 M2 SNI-2013- A.4.7.1.10 32,493.25 3,434,341.57
Sub Jumlah 28,541,412.48

JUMLAH TOTAL - III 110,867,602.57

Banda Aceh, Maret 2018

Dibuat Oleh :
Konsultan Perencana
CV. GRAPHIC DESIGN CONSULTANT

( Fahrul Ramadhan, ST )
Direktur

Page 26 of 43 III. TOWER RAPPELING PS. LANGSA - LT. 2


RENCANA ANGGARAN BIAYA

IV. PEKERJAAN LANTAI - 3

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
( Rp ) ( Rp )

I. PEKERJAAN BETON BERTULANG


a. Balok Lantai 20/40 cm ( B1 )
1 Beton Cor ( K-250 ) 1.920 M3 SNI-2013- A.4.1.1.8 1,026,428.21 1,970,742.16
2 Tulangan Polos ( fy = 240 Mpa ) 349.328 Kg SNI-2013- A.4.1.1.17 13,758.60 4,806,264.22
3 Bekisting 24.000 M2 SNI-2013- A.4.1.1.23 175,415.25 4,209,966.00
4 Membongkar Bekisting & Merawat Beton 1.920 Ls. Taksir 150,000.00 288,000.00

b. Balok Bordes 20/30 cm ( BD1 )


1 Beton Cor ( K-250 ) 1.020 M3 SNI-2013- A.4.1.1.8 1,026,428.21 1,046,956.77
2 Tulangan Polos ( fy = 240 Mpa ) 199.000 Kg SNI-2013- A.4.1.1.17 13,758.60 2,737,961.40
3 Bekisting 13.600 M2 SNI-2013- A.4.1.1.23 175,415.25 2,385,647.40
4 Membongkar Bekisting & Merawat Beton 1.020 Ls. Taksir 150,000.00 153,000.00

c. Kolom 40/40 cm ( K1 )
1 Beton Cor ( K-250 ) 3.840 M3 SNI-2013- A.4.1.1.8 1,026,428.21 3,941,484.33
2 Tulangan Polos ( fy = 240 Mpa ) 503.995 Kg SNI-2013- A.4.1.1.17 13,758.60 6,934,265.61
3 Bekisting 38.400 M2 SNI-2013- A.4.1.1.22 170,240.25 6,537,225.60
4 Membongkar Bekisting & Merawat Beton 3.840 Ls. Taksir 150,000.00 576,000.00

d. Pelat Lantai T 12 cm
1 Beton Cor ( K-250 ) 0.720 M3 SNI-2013- A.4.1.1.8 1,026,428.21 739,028.31
2 Tulangan Polos ( fy = 240 Mpa ) 119.108 Kg SNI-2013- A.4.1.1.17 13,758.60 1,638,759.33
3 Bekisting 6.000 M2 SNI-2013- A.4.1.1.24 231,573.58 1,389,441.50
4 Membongkar Bekisting & Merawat Beton 0.720 Ls. Taksir 150,000.00 108,000.00

e. Pelat Tangga T 12 cm
1 Beton Cor ( K-250 ) 1.319 M3 SNI-2013- A.4.1.1.8 1,026,428.21 1,353,858.81
2 Tulangan Polos ( fy = 240 Mpa ) 219.893 Kg SNI-2013- A.4.1.1.17 13,758.60 3,025,419.83
3 Bekisting 12.758 M2 SNI-2013- A.4.1.1.26 154,830.25 1,975,324.33
4 Membongkar Bekisting & Merawat Beton 1.319 Ls. Taksir 150,000.00 197,850.00

f. Pelat Bordes T 12 cm
1 Beton Cor ( K-250 ) 0.768 M3 SNI-2013- A.4.1.1.8 1,026,428.21 788,296.87
2 Tulangan Polos ( fy = 240 Mpa ) 127.048 Kg SNI-2013- A.4.1.1.17 13,758.60 1,748,002.61
3 Bekisting 6.400 M2 SNI-2013- A.4.1.1.26 154,830.25 990,913.60
4 Membongkar Bekisting & Merawat Beton 0.768 Ls. Taksir 150,000.00 115,200.00
Sub Jumlah 49,657,608.68

II. PEKERJAAN DINDING PANJAT


1 Dinding Panjat Papan Dengan Rangka, Angkur & Cat 25.600 M2 Taksir 500,000.00 12,800,000.00
Sub Jumlah 12,800,000.00

Page 27 of 43 IV. TOWER RAPPELING PS. LANGSA - LT. 3


HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
( Rp ) ( Rp )

III. PEKERJAAN DINDING & FINISHING


1 Acian Beton Expose 89.734 M2 SNI-2013- A.4.4.2.27 33,716.56 3,025,522.02
2 Finishing Anak Tangga Dengan Acian Halus 9.000 M2 SNI-2013- A.4.4.2.27 33,716.56 303,449.06
3 Relling Dinding & Tangga Dari Besi GIP Ø 3" + Angkur & Cat Besi 30.680 M' Taksir 500,000.00 15,340,000.00
4 Finishing Lantai Dengan Acian Halus 12.400 M2 SNI-2013- A.4.4.2.27 33,716.56 418,085.38
5 Cat Air Dinding & Beton ( Nipon Paint & Catylac ) 89.734 M2 SNI-2013- A.4.7.1.10 32,493.25 2,915,749.30
Sub Jumlah 22,002,805.75

JUMLAH TOTAL - IV 84,460,414.43

Banda Aceh, Maret 2018

Dibuat Oleh :
Konsultan Perencana
CV. GRAPHIC DESIGN CONSULTANT

( Fahrul Ramadhan, ST )
Direktur

Page 28 of 43 IV. TOWER RAPPELING PS. LANGSA - LT. 3


RENCANA ANGGARAN BIAYA

V. PEKERJAAN LANTAI - 4

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
( Rp ) ( Rp )

I. PEKERJAAN BETON BERTULANG


a. Balok Lantai 20/40 cm ( B1 )
1 Beton Cor ( K-250 ) 2.080 M3 SNI-2013- A.4.1.1.8 1,026,428.21 2,134,970.68
2 Tulangan Polos ( fy = 240 Mpa ) 378.407 Kg SNI-2013- A.4.1.1.17 13,758.60 5,206,350.55
3 Bekisting 26.000 M2 SNI-2013- A.4.1.1.23 175,415.25 4,560,796.50
4 Membongkar Bekisting & Merawat Beton 2.080 Ls. Taksir 150,000.00 312,000.00

b. Balok Lantai 20/30 cm ( B2 )


1 Beton Cor ( K-250 ) 0.270 M3 SNI-2013- A.4.1.1.8 1,026,428.21 277,135.62
2 Tulangan Polos ( fy = 240 Mpa ) 52.920 Kg SNI-2013- A.4.1.1.17 13,758.60 728,105.11
3 Bekisting 3.600 M2 SNI-2013- A.4.1.1.23 175,415.25 631,494.90
4 Membongkar Bekisting & Merawat Beton 0.270 Ls. Taksir 150,000.00 40,500.00

c. Ring Balok 20/30 cm ( R1 )


1 Beton Cor ( K-250 ) 1.440 M3 SNI-2013- A.4.1.1.8 1,026,428.21 1,478,056.62
2 Tulangan Polos ( fy = 240 Mpa ) 280.804 Kg SNI-2013- A.4.1.1.17 13,758.60 3,863,469.91
3 Bekisting 19.200 M2 SNI-2013- A.4.1.1.23 175,415.25 3,367,972.80
4 Membongkar Bekisting & Merawat Beton 1.440 Ls. Taksir 150,000.00 216,000.00

d. Kolom 20/20 cm ( K2 )
1 Beton Cor ( K-250 ) 0.700 M3 SNI-2013- A.4.1.1.8 1,026,428.21 718,499.75
2 Tulangan Polos ( fy = 240 Mpa ) 232.714 Kg SNI-2013- A.4.1.1.17 13,758.60 3,201,818.84
3 Bekisting 14.000 M2 SNI-2013- A.4.1.1.22 170,240.25 2,383,363.50
4 Membongkar Bekisting & Merawat Beton 0.700 Ls. Taksir 150,000.00 105,000.00

e. Pelat Lantai T 12 cm
1 Beton Cor ( K-250 ) 3.192 M3 SNI-2013- A.4.1.1.8 1,026,428.21 3,276,358.85
2 Tulangan Polos ( fy = 240 Mpa ) 528.045 Kg SNI-2013- A.4.1.1.17 13,758.60 7,265,159.94
3 Bekisting 26.600 M2 SNI-2013- A.4.1.1.24 231,573.58 6,159,857.32
4 Membongkar Bekisting & Merawat Beton 3.192 Ls. Taksir 150,000.00 478,800.00

f. Pelat Konsol T 12 cm
1 Beton Cor ( K-250 ) 0.260 M3 SNI-2013- A.4.1.1.8 1,026,428.21 266,871.33
2 Tulangan Polos ( fy = 240 Mpa ) 43.077 Kg SNI-2013- A.4.1.1.17 13,758.60 592,679.21
3 Bekisting 4.340 M2 SNI-2013- A.4.1.1.24 231,573.58 1,005,029.35
4 Membongkar Bekisting & Merawat Beton 0.260 Ls. Taksir 150,000.00 39,000.00
Sub Jumlah 48,309,290.78

II. PEKERJAAN DINDING & FINISHING


1 Acian Beton Expose 78.900 M2 SNI-2013- A.4.4.2.27 33,716.56 2,660,236.78
2 Relling Dinding & Tangga Dari Besi GIP Ø 3" + Angkur & Cat Besi 24.000 M' Taksir 500,000.00 12,000,000.00
3 Finishing Lantai Dengan Acian Halus 26.600 M2 SNI-2013- A.4.4.2.27 33,716.56 896,860.56
4 Cat Air Dinding & Beton ( Nipon Paint & Catylac ) 78.900 M2 SNI-2013- A.4.7.1.10 32,493.25 2,563,717.43
Sub Jumlah 18,120,814.77

Page 29 of 43 V. TOWER RAPPELING PS. LANGSA - LT. 4


HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
( Rp ) ( Rp )

III. PEKERJAAN ATAP


1 Rangka Atap Baja Ringan Material Zincalume Steel 58.027 M2 Taksir 160,000.00 9,284,320.00
2 Penutup Atap Seng Primadex 0,30 mm 58.027 M2 SNI-2013- A.4.5.2.38.a 98,796.50 5,732,864.51
3 Rabung Atap Seng Primadex 0,40 mm 16.224 M' SNI-2013- A.4.5.2.39.a 74,186.50 1,203,601.78
4 List Plank Dari Material GRC PLANK 9/300 mm + Cat 27.612 M' Taksir 100,000.00 2,761,200.00
Sub Jumlah 18,981,986.28

JUMLAH TOTAL - V 85,412,091.83

Banda Aceh, Maret 2018

Dibuat Oleh :
Konsultan Perencana
CV. GRAPHIC DESIGN CONSULTANT

( Fahrul Ramadhan, ST )
Direktur

Page 30 of 43 V. TOWER RAPPELING PS. LANGSA - LT. 4


DAFTAR ANALISA
HARGA SATUAN PEKERJAAN

HARGA JUMLAH
NO. ITEM PEKERJAAN SAT. KOEF. SATUAN HARGA
( Rp ) ( Rp )

I. SNI-2013- A.2.3.1.1
Pengalian Tanah Biasa Sedalam 1 Meter

A. - BAHAN
0.00
A. Sub. Jumlah 0.00

B. - TENAGA
- Pekerja Org/Hri 0.7500 70,000.00 52,500.00
- Mandor Org/Hri 0.0250 85,000.00 2,125.00
B. Sub. Jumlah 54,625.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 54,625.00

E. OVERHEAD & PROFIT ( 15% X D ) 8,193.75


F. HARGA SATUAN PEKERJAAN ( D + E ) 62,818.75

II. SNI-2013- A.2.3.1.9


Pengurugan Kembali 1 M3 Tanah Galian
A. - BAHAN
0.00
A. Sub. Jumlah 0.00

B. - TENAGA
- Pekerja Org/Hri 0.5000 70,000.00 35,000.00
- Mandor Org/Hri 0.0500 85,000.00 4,250.00
B. Sub. Jumlah 39,250.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 39,250.00
E. OVERHEAD & PROFIT ( 15% X D ) 5,887.50

F. HARGA SATUAN PEKERJAAN ( D + E ) 45,137.50

Page 31 of 43 ANALISA HARGA SATUAN PEKERJAAN


HARGA JUMLAH
NO. ITEM PEKERJAAN SAT. KOEF. SATUAN HARGA
( Rp ) ( Rp )

III. SNI-2013- A.2.3.1.11


Pengurugan Dengan 1 M3 Pasir Urug
A. - BAHAN
- Pasir Urug M3 1.2000 70,000.00 84,000.00
A. Sub. Jumlah 84,000.00

B. - TENAGA
- Pekerja Org/Hri 0.3000 70,000.00 21,000.00
- Mandor Org/Hri 0.0100 85,000.00 850.00
B. Sub. Jumlah 21,850.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 105,850.00
E. OVERHEAD & PROFIT ( 15% X D ) 15,877.50

F. HARGA SATUAN PEKERJAAN ( D + E ) 121,727.50

IV. SNI-2013- A.2.3.1.11a


Pengurugan Dengan 1 M3 Tanah Timbun
A. - BAHAN
- Tanah Timbun M3 1.2000 70,000.00 84,000.00
A. Sub. Jumlah 84,000.00

B. - TENAGA
- Pekerja Org/Hri 0.3000 70,000.00 21,000.00
- Mandor Org/Hri 0.0100 85,000.00 850.00
B. Sub. Jumlah 21,850.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 105,850.00
E. OVERHEAD & PROFIT ( 15% X D ) 15,877.50
F. HARGA SATUAN PEKERJAAN ( D + E ) 121,727.50

Page 32 of 43 ANALISA HARGA SATUAN PEKERJAAN


HARGA JUMLAH
NO. ITEM PEKERJAAN SAT. KOEF. SATUAN HARGA
( Rp ) ( Rp )

V. SNI-2013- A.4.1.1.2
Membuat 1 M3 Beton Mutu K-125
A. - BAHAN
- Sement Portland @ 40 Kg Kg 276.0000 1,375.00 379,500.00
- Pasir Beton Kg 828.0000 114.29 94,628.57
- Kerikil Beton Kg 1,012.0000 88.89 89,955.56
- Air Liter 215.0000 200.00 43,000.00
A. Sub. Jumlah 607,084.13

B. - TENAGA
- Pekerja Org/Hri 1.6500 70,000.00 115,500.00
- Mandor Org/Hri 0.0830 85,000.00 7,055.00
- Tukang Org/Hri 0.2750 90,000.00 24,750.00
- Kepala Tukang Org/Hri 0.0280 100,000.00 2,800.00
B. Sub. Jumlah 150,105.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 757,189.13
E. OVERHEAD & PROFIT ( 15% X D ) 113,578.37

F. HARGA SATUAN PEKERJAAN ( D + E ) 870,767.50

VI. SNI-2013- A.4.1.1.5


Membuat 1 M3 Beton Mutu K-175
A. - BAHAN
- Sement Portland @ 40 Kg Kg 326.0000 1,375.00 448,250.00
- Pasir Beton Kg 760.0000 114.29 86,857.14
- Kerikil Beton Kg 1,029.0000 88.89 91,466.67
- Air Liter 215.0000 200.00 43,000.00
A. Sub. Jumlah 669,573.81

B. - TENAGA
- Pekerja Org/Hri 1.6500 70,000.00 115,500.00
- Mandor Org/Hri 0.0830 85,000.00 7,055.00
- Tukang Org/Hri 0.2750 90,000.00 24,750.00
- Kepala Tukang Org/Hri 0.0280 100,000.00 2,800.00
B. Sub. Jumlah 150,105.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 819,678.81
E. OVERHEAD & PROFIT ( 15% X D ) 122,951.82
F. HARGA SATUAN PEKERJAAN ( D + E ) 942,630.63

Page 33 of 43 ANALISA HARGA SATUAN PEKERJAAN


HARGA JUMLAH
NO. ITEM PEKERJAAN SAT. KOEF. SATUAN HARGA
( Rp ) ( Rp )

VII. SNI-2013- A.4.1.1.8


Membuat 1 M3 Beton Mutu K-250
A. - BAHAN
- Sement Portland @ 40 Kg Kg 384.0000 1,375.00 528,000.00
- Pasir Beton Kg 692.0000 114.29 79,085.71
- Kerikil Beton Kg 1,039.0000 88.89 92,355.56
- Air Liter 215.0000 200.00 43,000.00
A. Sub. Jumlah 742,441.27

B. - TENAGA
- Pekerja Org/Hri 1.6500 70,000.00 115,500.00
- Mandor Org/Hri 0.0830 85,000.00 7,055.00
- Tukang Org/Hri 0.2750 90,000.00 24,750.00
- Kepala Tukang Org/Hri 0.0280 100,000.00 2,800.00
B. Sub. Jumlah 150,105.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 892,546.27
E. OVERHEAD & PROFIT ( 15% X D ) 133,881.94

F. HARGA SATUAN PEKERJAAN ( D + E ) 1,026,428.21

VIII. SNI-2013- A.3.2.1.10a


Membuat 1 M3 Beton Cylopen
A. - BAHAN
- Batu Belah / Kali / Gunung M3 0.4800 200,000.00 96,000.00
- Sement Portland @ 40 Kg Kg 194.0000 1,375.00 266,750.00
- Pasir Beton M3 0.3120 160,000.00 49,920.00
- Kerikil Beton M3 0.4680 160,000.00 74,880.00
A. Sub. Jumlah 487,550.00

B. - TENAGA
- Pekerja Org/Hri 3.4000 70,000.00 238,000.00
- Mandor Org/Hri 0.1700 85,000.00 14,450.00
- Tukang Org/Hri 0.8500 90,000.00 76,500.00
- Kepala Tukang Org/Hri 0.0850 100,000.00 8,500.00
B. Sub. Jumlah 337,450.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 825,000.00
E. OVERHEAD & PROFIT ( 15% X D ) 123,750.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 948,750.00

Page 34 of 43 ANALISA HARGA SATUAN PEKERJAAN


HARGA JUMLAH
NO. ITEM PEKERJAAN SAT. KOEF. SATUAN HARGA
( Rp ) ( Rp )

IX. SNI-2013- A.4.1.1.17


Pembesian 10 Kg Dengan Besi Polos
A. - BAHAN
- Besi Polos Kg 10.5000 10,000.00 105,000.00
- Kawat beton Kg 0.1500 16,000.00 2,400.00
A. Sub. Jumlah 107,400.00

B. - TENAGA
- Pekerja Org/Hri 0.0700 70,000.00 4,900.00
- Mandor Org/Hri 0.0040 85,000.00 340.00
- Tukang Org/Hri 0.0700 90,000.00 6,300.00
- Kepala Tukang Org/Hri 0.0070 100,000.00 700.00
B. Sub. Jumlah 12,240.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) Diambil Untuk 1 Kg 11,964.00


E. OVERHEAD & PROFIT ( 15% X D ) 1,794.60
F. HARGA SATUAN PEKERJAAN ( D + E ) 13,758.60

X. SNI-2013- A.4.1.1.20
Memasang 1 M2 Bekisting Untuk Pondasi
A. - BAHAN
- Kayu Kelas III M3 0.0400 4,000,000.00 160,000.00
- Paku Kayu Kg 0.3000 12,000.00 3,600.00
- Minyak Bekisting Liter 0.1000 4,000.00 400.00
A. Sub. Jumlah 164,000.00

B. - TENAGA
- Pekerja Org/Hri 0.5200 70,000.00 36,400.00
- Mandor Org/Hri 0.0260 85,000.00 2,210.00
- Tukang Org/Hri 0.2600 90,000.00 23,400.00
- Kepala Tukang Org/Hri 0.0260 100,000.00 2,600.00
B. Sub. Jumlah 64,610.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) Diambil 3 Kali Pemakaian 76,203.33


E. OVERHEAD & PROFIT ( 15% X D ) 11,430.50
F. HARGA SATUAN PEKERJAAN ( D + E ) 87,633.83

Page 35 of 43 ANALISA HARGA SATUAN PEKERJAAN


HARGA JUMLAH
NO. ITEM PEKERJAAN SAT. KOEF. SATUAN HARGA
( Rp ) ( Rp )

XI. SNI-2013- A.4.1.1.21


Memasang 1 M2 Bekisting Untuk Sloof
A. - BAHAN
- Kayu Kelas III M3 0.0450 4,000,000.00 180,000.00
- Paku Kayu Kg 0.3000 12,000.00 3,600.00
- Minyak Bekisting Liter 0.1000 4,000.00 400.00
A. Sub. Jumlah 184,000.00

B. - TENAGA
- Pekerja Org/Hri 0.5200 70,000.00 36,400.00
- Mandor Org/Hri 0.0260 85,000.00 2,210.00
- Tukang Org/Hri 0.2600 90,000.00 23,400.00
- Kepala Tukang Org/Hri 0.0260 100,000.00 2,600.00
B. Sub. Jumlah 64,610.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) Diambil 3 Kali Pemakaian 82,870.00


E. OVERHEAD & PROFIT ( 15% X D ) 12,430.50

F. HARGA SATUAN PEKERJAAN ( D + E ) 95,300.50

XII. SNI-2013- A.4.1.1.22


Memasang 1 M2 Bekisting Untuk Kolom
A. - BAHAN
- Kayu Kelas III M3 0.0400 4,000,000.00 160,000.00
- Paku Kayu Kg 0.4000 12,000.00 4,800.00
- Minyak Bekisting Liter 0.2000 4,000.00 800.00
- Balok Kayu Kelas II M3 0.0150 4,500,000.00 67,500.00
- Plywood Tebal 9 mm Lbr. 0.3500 140,000.00 49,000.00
- Kayu Dolken Btg. 2.0000 40,000.00 80,000.00
A. Sub. Jumlah 362,100.00

B. - TENAGA
- Pekerja Org/Hri 0.6600 70,000.00 46,200.00
- Mandor Org/Hri 0.0330 85,000.00 2,805.00
- Tukang Org/Hri 0.3300 90,000.00 29,700.00
- Kepala Tukang Org/Hri 0.0330 100,000.00 3,300.00
B. Sub. Jumlah 82,005.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) Diambil 3 Kali Pemakaian 148,035.00

E. OVERHEAD & PROFIT ( 15% X D ) 22,205.25


F. HARGA SATUAN PEKERJAAN ( D + E ) 170,240.25

Page 36 of 43 ANALISA HARGA SATUAN PEKERJAAN


HARGA JUMLAH
NO. ITEM PEKERJAAN SAT. KOEF. SATUAN HARGA
( Rp ) ( Rp )

XIII. SNI-2013- A.4.1.1.23


Memasang 1 M2 Bekisting Untuk Balok
A. - BAHAN
- Kayu Kelas III M3 0.0400 4,000,000.00 160,000.00
- Paku Kayu Kg 0.4000 12,000.00 4,800.00
- Minyak Bekisting Liter 0.2000 4,000.00 800.00
- Balok Kayu Kelas II M3 0.0180 4,500,000.00 81,000.00
- Plywood Tebal 9 mm Lbr. 0.3500 140,000.00 49,000.00
- Kayu Dolken Btg. 2.0000 40,000.00 80,000.00
A. Sub. Jumlah 375,600.00

B. - TENAGA
- Pekerja Org/Hri 0.6600 70,000.00 46,200.00
- Mandor Org/Hri 0.0330 85,000.00 2,805.00
- Tukang Org/Hri 0.3300 90,000.00 29,700.00
- Kepala Tukang Org/Hri 0.0330 100,000.00 3,300.00
B. Sub. Jumlah 82,005.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) Diambil 3 Kali Pemakaian 152,535.00

E. OVERHEAD & PROFIT ( 15% X D ) 22,880.25


F. HARGA SATUAN PEKERJAAN ( D + E ) 175,415.25

XIV. SNI-2013- A.4.1.1.24


Memasang 1 M2 Bekisting Untuk Pelat Lantai
A. - BAHAN
- Kayu Kelas III M3 0.0400 4,000,000.00 160,000.00
- Paku Kayu Kg 0.4000 12,000.00 4,800.00
- Minyak Bekisting Liter 0.2000 4,000.00 800.00
- Balok Kayu Kelas II M3 0.0150 4,500,000.00 67,500.00
- Plywood Tebal 9 mm Lbr. 0.3500 140,000.00 49,000.00
- Kayu Dolken Btg. 6.0000 40,000.00 240,000.00
A. Sub. Jumlah 522,100.00

B. - TENAGA
- Pekerja Org/Hri 0.6600 70,000.00 46,200.00
- Mandor Org/Hri 0.0330 85,000.00 2,805.00
- Tukang Org/Hri 0.3300 90,000.00 29,700.00
- Kepala Tukang Org/Hri 0.0330 100,000.00 3,300.00
B. Sub. Jumlah 82,005.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) Diambil 3 Kali Pemakaian 201,368.33


E. OVERHEAD & PROFIT ( 15% X D ) 30,205.25

F. HARGA SATUAN PEKERJAAN ( D + E ) 231,573.58

Page 37 of 43 ANALISA HARGA SATUAN PEKERJAAN


HARGA JUMLAH
NO. ITEM PEKERJAAN SAT. KOEF. SATUAN HARGA
( Rp ) ( Rp )

XV. SNI-2013- A.4.1.1.26


Memasang 1 M2 Bekisting Untuk Pelat Tangga
A. - BAHAN
- Kayu Kelas III M3 0.0300 4,000,000.00 120,000.00
- Paku Kayu Kg 0.4000 12,000.00 4,800.00
- Minyak Bekisting Liter 0.1500 4,000.00 600.00
- Balok Kayu Kelas II M3 0.0150 4,500,000.00 67,500.00
- Plywood Tebal 9 mm Lbr. 0.3500 140,000.00 49,000.00
- Kayu Dolken Btg. 2.0000 40,000.00 80,000.00
A. Sub. Jumlah 321,900.00

B. - TENAGA
- Pekerja Org/Hri 0.6600 70,000.00 46,200.00
- Mandor Org/Hri 0.0330 85,000.00 2,805.00
- Tukang Org/Hri 0.3300 90,000.00 29,700.00
- Kepala Tukang Org/Hri 0.0330 100,000.00 3,300.00
B. Sub. Jumlah 82,005.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) Diambil 3 Kali Pemakaian 134,635.00


E. OVERHEAD & PROFIT ( 15% X D ) 20,195.25
F. HARGA SATUAN PEKERJAAN ( D + E ) 154,830.25

XVI. SNI-2013- A.4.4.1.3


Memasang 1 M2 Dinding Pasangan 1/2 Bata Campuran 1 Semen : 4 Pasir
A. - BAHAN
- Bata Merah Bh. 70.0000 659.75 46,182.50
- Semen portland @ 40 Kg Kg 11.5000 1,375.00 15,812.50
- Pasir Pasang M3 0.0430 160,000.00 6,880.00
A. Sub. Jumlah 68,875.00

B. - TENAGA
- Pekerja Org/Hri 0.3000 70,000.00 21,000.00
- Mandor Org/Hri 0.0150 85,000.00 1,275.00
- Tukang Org/Hri 0.1000 90,000.00 9,000.00
- Kepala Tukang Org/Hri 0.0100 100,000.00 1,000.00
B. Sub. Jumlah 32,275.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 101,150.00

E. OVERHEAD & PROFIT ( 15% X D ) 15,172.50


F. HARGA SATUAN PEKERJAAN ( D + E ) 116,322.50

Page 38 of 43 ANALISA HARGA SATUAN PEKERJAAN


HARGA JUMLAH
NO. ITEM PEKERJAAN SAT. KOEF. SATUAN HARGA
( Rp ) ( Rp )

XVII. SNI-2013- A.4.4.2.4


Memasang 1 M2 Plasteran Campuran 1 Semen : 4 Pasir
A. - BAHAN
- Semen portland @ 40 Kg Kg 6.2400 1,375.00 8,580.00
- Pasir Pasang M3 0.0240 160,000.00 3,840.00
A. Sub. Jumlah 12,420.00

B. - TENAGA
- Pekerja Org/Hri 0.3000 70,000.00 21,000.00
- Mandor Org/Hri 0.0150 85,000.00 1,275.00
- Tukang Org/Hri 0.1500 90,000.00 13,500.00
- Kepala Tukang Org/Hri 0.0150 100,000.00 1,500.00
B. Sub. Jumlah 37,275.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 49,695.00
E. OVERHEAD & PROFIT ( 15% X D ) 7,454.25
F. HARGA SATUAN PEKERJAAN ( D + E ) 57,149.25

XVIII. SNI-2013- A.4.4.2.27


Memasang 1 M2 Acian
A. - BAHAN
- Semen portland @ 40 Kg Kg 3.2500 1,375.00 4,468.75
A. Sub. Jumlah 4,468.75

B. - TENAGA
- Pekerja Org/Hri 0.2000 70,000.00 14,000.00
- Mandor Org/Hri 0.0100 85,000.00 850.00
- Tukang Org/Hri 0.1000 90,000.00 9,000.00
- Kepala Tukang Org/Hri 0.0100 100,000.00 1,000.00
B. Sub. Jumlah 24,850.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 29,318.75
E. OVERHEAD & PROFIT ( 15% X D ) 4,397.81
F. HARGA SATUAN PEKERJAAN ( D + E ) 33,716.56

Page 39 of 43 ANALISA HARGA SATUAN PEKERJAAN


HARGA JUMLAH
NO. ITEM PEKERJAAN SAT. KOEF. SATUAN HARGA
( Rp ) ( Rp )

XIX. SNI-2013- A.4.5.2.38.a


Memasang 1 M2 Atap Seng Gelombang
A. - BAHAN
- Atap Seng Primadex 0,30 mm M2 1.1000 60,000.00 66,000.00
- Paku Sekrup Bh. 10.0000 500.00 5,000.00
A. Sub. Jumlah 71,000.00

B. - TENAGA
- Pekerja Org/Hri 0.1200 70,000.00 8,400.00
- Mandor Org/Hri 0.0060 85,000.00 510.00
- Tukang Org/Hri 0.0600 90,000.00 5,400.00
- Kepala Tukang Org/Hri 0.0060 100,000.00 600.00
B. Sub. Jumlah 14,910.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 85,910.00
E. OVERHEAD & PROFIT ( 15% X D ) 12,886.50
F. HARGA SATUAN PEKERJAAN ( D + E ) 98,796.50

XX. SNI-2013- A.4.5.2.39.a


Memasang 1 M Nok / Rabung Seng Gelombang
A. - BAHAN
- Rabung / Nok Seng Primadex 0,40 mm M 1.1000 40,000.00 44,000.00
- Paku Sekrup Bh. 5.0000 500.00 2,500.00
A. Sub. Jumlah 46,500.00

B. - TENAGA
- Pekerja Org/Hri 0.1500 70,000.00 10,500.00
- Mandor Org/Hri 0.0060 85,000.00 510.00
- Tukang Org/Hri 0.0700 90,000.00 6,300.00
- Kepala Tukang Org/Hri 0.0070 100,000.00 700.00
B Sub. Jumlah 18,010.00

C. - PERALATAN
0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) 64,510.00
E. OVERHEAD & PROFIT ( 15% X D ) 9,676.50
F. HARGA SATUAN PEKERJAAN ( D + E ) 74,186.50

Page 40 of 43 ANALISA HARGA SATUAN PEKERJAAN


HARGA JUMLAH
NO. ITEM PEKERJAAN SAT. KOEF. SATUAN HARGA
( Rp ) ( Rp )

XXI. SNI-2013- A.4.7.1.10


Mengecat 1 M2 Dinding Tembok Baru
A. - BAHAN
- Plamur Tembok Kg 0.1000 25,000.00 2,500.00
- Cat Dasar Kg 0.1000 20,000.00 2,000.00
- Cat Penutup Kg 0.2600 30,000.00 7,800.00
A. Sub. Jumlah 12,300.00

B. - TENAGA
- Pekerja Org/Hri 0.0200 70,000.00 1,400.00
- Mandor Org/Hri 0.0030 85,000.00 255.00
- Tukang Org/Hri 0.0630 90,000.00 5,670.00
- Kepala Tukang Org/Hri 0.0063 100,000.00 630.00
B. Sub. Jumlah 7,955.00

C. - PERALATAN
- Perancah Kayu kelas III M3 0.0020 4,000,000.00 8,000.00
C. Sub. Jumlah 8,000.00

D. JUMLAH ( A + B + C ) 28,255.00
E. OVERHEAD & PROFIT ( 15% X D ) 4,238.25
F. HARGA SATUAN PEKERJAAN ( D + E ) 32,493.25

XXII. SNI-2013 - A.4.2.1.1


Memasang 1 Kg Besi Profil
A. - BAHAN
- Besi Baja Profil Kg 1.150 #REF! #REF!
A. Sub. Jumlah #REF!

B. - TENAGA
- Pekerja Org/Hri 0.060 70,000.00 4,200.00
- Mandor Org/Hri 0.003 85,000.00 255.00
- Tukang Org/Hri 0.060 90,000.00 5,400.00
- Kepala Tukang Org/Hri 0.006 100,000.00 600.00
B. Sub. Jumlah 10,455.00

C. - PERALATAN
-
C. Sub. Jumlah -

D. JUMLAH ( A + B + C ) #REF!
E. OVERHEAD & PROFIT ( 15% X D ) #REF!
F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!

Page 41 of 43 ANALISA HARGA SATUAN PEKERJAAN


HARGA JUMLAH
NO. ITEM PEKERJAAN SAT. KOEF. SATUAN HARGA
( Rp ) ( Rp )

XXIII. SNI-2013- A.4.7.1.20


Mengecat 1 M2 Permukaan Baja Dengan 3 Lapis Cat
A. - BAHAN
- Cat Menie Besi Kg 0.1100 #REF! #REF!
- Cat Besi Dasar Kg 0.1700 #REF! #REF!
- Cat Besi Mengkilat Kg 0.0800 #REF! #REF!
- Kuwas Bh 0.0100 5,000.00 50.00
- Pengencer Ltr. 0.0100 #REF! #REF!
- Perancah Kayu Kelas III M3 0.0020 4,000,000.00 8,000.00
A. Sub. Jumlah #REF!

B. - TENAGA
- Pekerja Org/Hri 0.4000 70,000.00 28,000.00
- Mandor Org/Hri 0.0200 85,000.00 1,700.00
- Tukang Org/Hri 0.8000 90,000.00 72,000.00
- Kepala Tukang Org/Hri 0.0800 100,000.00 8,000.00
B. Sub. Jumlah 109,700.00

C. - PERALATAN
- 0.00
C. Sub. Jumlah 0.00

D. JUMLAH ( A + B + C ) #REF!

E. OVERHEAD & PROFIT ( 15% X D ) #REF!


F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!

Banda Aceh, Maret 2018

Dibuat Oleh :
Konsultan Perencana
CV. GRAPHIC DESIGN CONSULTANT

( Fahrul Ramadhan, ST )
Direktur

Page 42 of 43 ANALISA HARGA SATUAN PEKERJAAN


DAFTAR HARGA
UPAH KERJA DAN MATERIAL BANGUNAN

HARGA
NO. URAIAN SATUAN
( Rp )

A. UPAH PEKERJA

1 Tukang 90,000.00 Orang / Hari


2 Kepala Tukang 100,000.00 Orang / Hari
3 Pekerja 70,000.00 Orang / Hari
4 Mandor 85,000.00 Orang / Hari

B. HARGA BAHAN DAN MATERIAL BANGUNAN

1 Air 200.00 Liter


2 Batu Bata Merah 659.75 Buah
3 Batu Belah / Kali / Gunung 200,000.00 M3
4 Besi Beton Polos 10,000.00 Kg
5 Cat Tembok Dasar 20,000.00 Kg
6 Cat Tembok Warna 30,000.00 Kg
7 Kuwas Cat 5,000.00 Buah
8 Kawat Beton 16,000.00 Kg
9 Kerikil Beton 88.89 Kg
10 Kerikil Beton 160,000.00 M3
11 Kayu Kelas II 4,500,000.00 M3
12 Kayu kelas III 4,000,000.00 M3
13 Kayu Dolken ( Ø 8 - 10 cm ) 40,000.00 Batang
14 Minyak Bekisting 4,000.00 Liter
15 Plamur Tembok 25,000.00 Kg
16 Pasir Pasang 160,000.00 M3
17 Plywood 9 mm 140,000.00 Lembar
18 Paku Sekrup 500.00 Buah
19 Paku Kayu 12,000.00 Kg
20 Pasir Urug 70,000.00 M3
21 Pasir Beton 114.29 Kg
22 Pasir Beton 160,000.00 M3
23 Rabung / Nok Seng Primadex 0,40 mm 40,000.00 M
24 Seng Primadex 0,30 mm 60,000.00 M2
25 Semen Portland Type I @ 40 Kg 1,375.00 Kg
26 Tanah Timbun 70,000.00 M3

Banda Aceh, Maret 2018

Dibuat Oleh :
Konsultan Perencana
CV. GRAPHIC DESIGN CONSULTANT

( Fahrul Ramadhan, ST )
Direktur

Page 43 of 43 DAFTAR HARGA UPAH KERJA DAN MATERIAL