Você está na página 1de 23

TECHNO-COMMERCIAL PROPOSAL FOR

8.96kW HYBRID & ON GRID PV SYSTEM

Intelli Energie Private Limited


Ref# IE-DD-134/COM/10kW
Date: Oct 19th, 2018

FIFA Building, Opposite Punjab Stadium , Ferozepur Road, Lahore, Pakistan.


Type of Business : Solar Rooftop

Customer Name : Mr. Qasif Shahid

Proposed Capacity : 8.96 KW

Business Point of Contact : Mr. Qasif Shahid

Authorizing Official : Mr. Qasif Shahid

Address : 131-B DHA Phase 1, Lahore

FIFA Building, Opposite Punjab Stadium , Ferozepur Road, Lahore, Pakistan.


TABLE OF CONTENT

1. Cover Letter

2. Technical Proposal

 Scope of Contractor
 Scope of Owner
 Technical Specification of Solar System
 Bill of Material
 Solar Layout
 Design Considerations
 System Performance Summary

3. Commercial Proposal

 Price of Work & Warranty


 General Terms & Conditions
o Price
o Validity of the offer
o Payment Terms
o Taxes, Duties & Rates
o Inclusion of Excluded Items
o Interruption in Work
o Delivery & Handover
o Security & Safety
o Civil & Structural Work
o Indemnification
o Force Majeure

4. Annexures Attached
 Annex A- Data Sheet of PV Modules
 Annex B- Data Sheet of Inverters
 Annex C- Intelli Energie – Company & Team Profile
 Annex D- Team Project List

FIFA Building, Opposite Punjab Stadium , Ferozepur Road, Lahore, Pakistan.


Oct 19, 2018

Mr. Qasif Shahid


Owner

131-B, DHA Phase 1, Lahore

Subject: Proposal for Supply of 8.96kW Hybrid/On Grid PV Solar System

Dear Sir,

Greetings from Intelli Energie!

Reference our meeting with your team today concerning techno commercial discussion of 8.96
kW Solar Solution for your office.

We are pleased to submit our techno commercial offer based three different solutions for your
kind review. The solutions are designed to give you system monitoring flexibility by monitoring
strings as well as individual module.

Our proposal will outline how we will solve your problem. Our designs are based on years of
experience with similar circumstances, which are tailored to the specific needs of our esteem
customers.

Our qualified team will bring the utmost value to you through experienced and innovative design
combined with the expert execution of our project management and construction team.

We are confident we offer the highest quality competitive solutions for the deployment of
renewable assets.

We are excited for this potential opportunity and look forward to working with you on this and
future projects.

Yours Sincerely,
Khurram Shahnawaz
CEO

FIFA Building, Opposite Punjab Stadium , Ferozepur Road, Lahore, Pakistan.


TECHNICAL PROPOSAL
INTRODUCTION
Project Site 131-B , Dha Phase 1, Lahore
Land Co-ordinates 31.4831404,74.3846840
Capacity of Solar Power System 8,960 W
Power Evacuation 220V

SCOPE OF CONTRACTOR

 Design and Engineering


 Procurement and Supply
 Installation
 Testing and Inspection of Material
 Supply & Erection
 Commissioning
 Acceptance Test
 Documentation & Handing over

SCOPE OF OWNER

APPROVALS FOR EXECUTION

 Project registration certificate and documents


 Power purchase agreement with the relevant distribution licensee/ any other organization
 Any approvals / conversion order from any local/ statutory authority with respect to Site and use
of the same for the construction & installation of solar power plant as envisaged in the contract

APPROVALS FOR TAXATION

 Registration with statutory authorities (FBR, Sales Tax, Excise & Custom)
 Submission of any bond/ undertaking / declaration to customs/ central excise/ any other tax
authorities etc. required in connection with the procurement of material (both imported and
indigenous)
 All imported items shall be supplied on high sea sale basis to the sponsor/ developer. All these
items need to be custom cleared under GOP Power Policy
 Maintaining land approvals, payment of any deposits to any authority
TECHNICAL SPECIFICATION OF SOLAR SYSTEM
DESCRIPTION SPECIFICATION MAKE
Modules Polycrystalline JA/CSUN/Astronergy/Jinko
Invertor Hybrid/On Grid Voltronics/Refusol & Chint
GI Steel Structure GI Steel – Fixed Mounting Local Make
DC Cable 4 sq. mm single core1000V cable Local / Imported

AC Cable 10 sq. mm, 6 sq mm Local / Imported


Earth wire 4 sq.mm single core Local / Imported
AC/DC Circuit Breaker 63A/3P, 21A/3P/150A Imported

BILL OF MATERIAL
SR.# DESCRIPTION QUANTITY
1 Modules 8,960 Watts
2 Invertor 01 Lot
3 GI Steel Mounting Structure As per requirement
4 DC Cable 01 Lot
5 AC Cable 01 Lot
6 Earth wire 01 Lot
7 AC DB 01 Nos.
8 AC Circuit Breaker As per requirement
9 Earthing 01 Lot
10 SPD As per requirement

SOLAR LAYOUT
DESIGN ASSUMPTIONS

GENERAL

 Client will provide store room to keep the items safe at site.
 Client will provide space for inverters
 Client will provide clear and safe access to the roof top
 Roof load bearing analysis not in the scope of Intelli Energie
 Water distribution system for panel clean will be arranged by the Client at its own cost

MODULE / RACKING LAYOUT

Intelli Energie is proposing a system on the roof to interconnect with the meter feeding your factory. The
8.96 kW solar solution is consisting of 28 Solar Panels – 320 watt modules on the existing roof. The roof
system brings the best economics to the project.

SYSTEM SIZING

The system is designed to offset the energy consumption (kWh) on the interconnecting system.

INVERTER LOCATION

Inverters will be located indoors at place near the roof or else it will incur line losses.

MODULE SELECTION

The proposed design is using Tier-1 ranking modules having 320 Watt capacity. The OEMs under
consideration are Tier -1 modules which are characterized by high yields and excellent reliability. OEM
provides a 10 year product warranty and a 25 year linear performance guarantee.

SYSTEM PERFORMANCE SUMMARY

SYSTEM PERFORMANCE SUMMARY WITH MAXPOWER HYBRID INVERTERS( 5 kW)


Estimated units generated per year 12,332 kWh
Estimated units generated per month 1027 kWh
Specific annual yield 1,330 kWh/kWp
Performance ratio 75.1%
Shading Losses 1.5%
Cable Losses 4%
Annual Degradation of Modules 0.8%
SYSTEM PERFORMANCE SUMMARY WITH VOLTRONICS HYBRID INVERTER (10 kW)
Estimated units generated per year 12,332 kWh
Estimated units generated per month 1027 kWh
Specific annual yield 1,330 kWh/kWp
Performance ratio 75.1%
Shading Losses 1.5%
Cable Losses 4%
Annual Degradation of Modules 0.8%
SYSTEM PERFORMANCE SUMMARY WITH REFUSOL ON GRID INVERTER (10 kW)
Estimated units generated per year 12,332 kWh
Estimated units generated per month 1027 kWh
Specific annual yield 1,330 kWh/kWp
Performance ratio 75.1%
Shading Losses 1.5%
Cable Losses 4%
Annual Degradation of Modules 0.8%
COMMERCIAL PROPOSAL

PRICE OF WORKS

5 kWx2

OPTION # 1

Price offer for design, engineering, supply, transportation, installation, testing & commissioning
of 4480 Watt Solar PV System under Option #1 is PKR 801,920/- (PKR 179 per Watt).
Pak Rupees Eight Hundred One Thousand Nine Hundred Twenty Only.

EQUIPMENT WARRANTY (AS PER


MANUFACTURER TERMS)
PV Module 320W– ASTRONERGY, CSUN, 10 YEAR PRODUCT & 25 YEAR
JA, JINKO PERFORMANCE
SAJ 5KW (HYBRID) 05 YEAR
TUBULAR BATTERY 02 YEAR
WORKMANSHIP 01 YEAR
10 kW

OPTION # 2

Price offer for design, engineering, supply, transportation, installation, testing & commissioning
of 8.960-Watt Solar PV System under Option #2 is PKR 1,550,080/- (PKR 173 per Watt).
Pak Rupees One Million Five Hundred Fifty Thousand Eighty Only.

EQUIPMENT WARRANTY (AS PER


MANUFACTURER TERMS)
PV Module 320W– ASTRONERGY, CSUN, 10 YEAR PRODUCT & 25 YEAR
JA, JINKO PERFORMANCE
VOLTRONICS INFINI PLUS 10kW (HYBRID) 01 YEAR
TUBULAR BATTERY 02 YEAR
WORKMANSHIP 01 YEAR
OPTION # 3

Price offer for design, engineering, supply, transportation, installation, testing & commissioning
of 8,960-Watt Solar PV System under Option #3 is PKR 1,254,400 (PKR 140 per Watt)
Pak Rupees One Million Two Hundred Fifty Four Thousand Four Hundred Only.

EQUIPMENT WARRANTY (AS PER


MANUFACTURER TERMS)
PV MODULE 320W – ASTRONERGY, 10 YEAR PRODUCT & 25 YEAR
CSUN, JA, JINKO PERFORMANCE
05 YEAR (extendable to 10 years with an
INVERTOR 10KW – REFUSOL (On Grid) additional cost of approximately 1.5% of
project cost)
WORKMANSHIP 01 YEAR
GENERAL TERMS & CONDITIONS

PRICE

The price quoted in this Proposal is inclusive of design, manufacturing, sourcing, testing, supply,
installation & commissioning, as per the bill of materials & ratings submitted by Intelli Energie along with
the final offer. Any change in scope of work addition to the bill of materials and/or ratings or any variation,
whatsoever, shall be charged extra to Customer. The price quoted is FOR site and is firm. The foreign
exchange rate is considered as 1USD = PKR 132 and any change is foreign exchange rate shall be
passed through and payable by the Customer. Foreign exchange rate shall be considered on the date of
order placement and payment of advance.

VALIDITY OF THE OFFER

The price quoted by Intelli Energie along with this Proposal is valid for (15) days from such communication
to Customer and thereafter the same shall be subject to reconfirmation by Intelli Energie.

PAYMENT TERMS

The payment terms applicable are as follows:


 80% advance at the time of award of the contract
 20% within 7 days after completion of works

TAXES , DUTIES & RATES

In this Proposal, under Sro 263 (attached) WHT, GST and custom duty on solar generating system is nil
at present and not considered. PST is applicable @ 16% on services and shall be charged accordingly.
Any variation in taxes and duties by statutory notification by the Government shall be applicable at the
time of execution. Any octroi or entry tax levied by local governments shall be paid extra at actual by the
Customer.

In case of any change in applicable taxes, duties and / or rates, or incidences of new taxes, duties and /
or rates, and where such taxes, duties and/ or rates implications is due to interpretation changes, if any,
then the impact of such changes shall be payable by the Customer.

INCLUSION OF EXCLUDED ITMES

Any item not mentioned in the bill of material and not required as per the design provided by Intelli Energie
and which are, or can be, attributed to Customer, shall be charged extra by Intelli Energie.

INTERRUPTION IN WORK
The Customer must not interrupt the works, and/ or shall abstain from any act or omission of which it can
be reasonably be expected that it may delay the works or make the work more difficult and or expansive
for Intelli Energie.

DELIVERY & HANDOVER

Intelli Energie shall complete the project in 20 days from the date of order placement, payment of advance
and acceptance of order by IE, or as mutually agreed between the parties in the Agreement. Project shall
be deemed to have been handed over to Customer by Intelli Energie, on commissioning of solar power
system.

WARRANTY

All the warranties applicable on components / equipment will be transferred back to back basis from
OEM to the Customer by Intelli Energie as per the below table:
Sr.# Description Warranty
1 PV Modules 120 Months
2 Inverter 60 Months to 120 Months
3 DC Cables 12 Months
4 AC Cables 12 Months
5 Steel Structure 12 Months
6 Balance of Plant Workmanship 12 Months
7 Batteries 24 Months

SECURITY & SAFETY

On delivery of supplies to Customer’s site in good conditions, Customer shall be responsible for safety &
security of the materials till handing over the same to Intelli Energie designated personnel for installation.
In case there is
a public disturbances at site which is not exclusively attributed to Intelli Energie, Customer shall resolve
the same at its own risk & cost, for smooth execution of the project by Intelli Energie. In such case,
Customer shall provide safety & security for Intelli Energie designated personnel working at site. Any
delay in execution or damage of materials due to public disturbances at site shall be attributable to and
compensated by Customer.

CIVIL & STRUCTURAL WORK

Intelli Energie limits itself to providing civil foundation and structures for its module mounting as per the
design submitted along with this Proposal. Any changes in design which are attributable to Customer shall
be charged extra. Customer shall allow scraping of the roof for bonding the civil foundation.

INDEMNIFICATION

Customer shall fully Indemnify and hold harmless Intelli Energie and its affiliates, associates, directors
and employees from and against, any and all losses, costs, damages, injuries, liabilities, claims and
causes of action, including without limitation arising out of or resulting from claims by third parties, acts,
omissions or breach of any of the Customer’s affiliates, suppliers, employee, agents or contractors in the
performance of Customer’s obligations under this Proposal or any resultant Agreement or otherwise
arising out of solar power system or its usage

FORCE MAJEURE

Force majeure shall mean any cause, existing or future, which is beyond the reasonable control of Intelli
Energie including, but not limited to, acts of God, storm, fire, flood, explosion, epidemics, quarantine,
earthquake, strike, riot, lockout, embargo, interference by civil or military authorities, acts, regulations or
orders of any governmental authority in their sovereign capacity, acts of war (declared or undeclared)
including any acts of terrorism, and all other such acts of similar or analogous nature (where all such acts
to be collectively referred to as “Force Majeure”). Intelli Energie shall not be liable for the failure to
perform any obligation in terms of this Proposal and if to such extent such failure is caused by Force
Majeure, provided that none of such acts of Force Majeure will relieve the Customer from meeting its
payment obligations.

The periods of performance as agreed upon shall be extended by the periods of delay caused by such
Force Majeure, as long as the period of Force Majeure does not last longer than three (3) months. If a
Force Majeure continues for more than three (3) months and the parties are not able to reach an
agreement on the continuation of work within a further term of one (1) month, the fulfillment of obligations
of Intelli Energie shall automatically be deemed impossible and shall stand suspended. Upon such
suspension, Intelli Energie shall be entitled to be paid the following amounts: (a) all the amounts payable
for the work completed until the date of suspension; (b) the cost of material which have been delivered to
the Customer, or of which Customer is liable to accept delivery; (c) any other costs and liability, including
unamortized cost of materials, which in the circumstances was reasonable incurred by Intelli Energie in
the expectations of completion of works; (d) demobilization cost of contractor personnel and equipment;
and (e) all other costs incurred by Intelli Energie on account of suspension of order on such other supply.
Annexure – C: COMPANY PROFILE
KnightsBridge Capital Group
Knightsbridge Capital Group creates opportunities for strategic partners to participate in the
equity of companies and projects in multiple sectors including energy, infrastructure, real estate,
financial and retail services.

We work closely with our partners, in structuring of innovative solutions, which include setting-up
of appropriate Investment vehicles and work to add value and accelerate growth. Our strategic
partners range from public and private funds, corporations to high net-worth individuals and
families.

Highly Reputed Team – KCG’s key team members have world-class experiences in their
respective fields. KCG is a strong business group with a reputation of highest standards, known
for innovation and ethical business practices

Intelli Energie – A brief


Intelli Energie falls under the umbrella of the Knightsbridge Capital Group (KCG).

Our ambition is to speed up the adoption of solar technology in Pakistan to decrease our
dependence on fossil fuels and bridge the Energy gap prevalent in Pakistan. In-turn we will aid
in conserving our environment and provide an environmentally friendly and sustainable power
supply.

We are a turnkey power solutions provider, offering smart solar systems for centralized and
decentralized energy supply. Our highly-qualified technical and sales teams include staff trained
by our German suppliers and engineers, thereby providing our customers with the best
experience.

TEAM – Profile
Ali Mubashar Kazmi – Director
Mr. Ali M. Kazmi is a Founder Partner of Knightsbridge Capital Group (KCG). KCG was
established in 2015. Over the last two years KCG has grown to 6 Group Companies with
approximately USD 50 million Assets under Management. Before KCG, he has over 20 years of
well diversified Corporate, Credit and Retail Banking experience with in-depth understanding of
Pakistani business and financial sector and exposure in international deals and markets. His
recent engagements include: Senior Executive Vice President (SEVP) and Group Head of
International Investments for MCB Bank. He also served as SEVP/ Retail Banking Head of MCB
Bank supervising over 13,000 employees and 1200 branches. He was also a board member of
MCB Financial Services Limited and presently sits on the board of Statelife Insurance
Corporation.
Mr. Kazmi’s previous assignments include: Country Head Commercial Banking and Member of
Asia Management Team of Retail at Royal Bank of Scotland (RBS), where he supervised Retail
businesses across 13 countries in Asia. Corporate Director of ABN AMRO Bank (ABN) - Also
Part of select Group of Global High Potential of ABN. Career Start from Bank of America-
Completed Basic Credit Training from Bank of America San Francisco.

Dr. Shahab Qadeer Khokar - Director


Dr. Shahab Khokhar is a Founder Partner of Knightsbridge Capital Group. He is also a Director
at Remington Pharmaceuticals, a company involved in the pharmaceutical business for over 30
years, having presence in over 10 countries. Dr. Khokhar was also a Co-Founder & Partner of
Winsome SA (Switzerland), a venture capital / private equity investment advisory firm focused
on investing in renewable energy companies in Europe. He also Co-Led the seed funding for
Enecsys Ltd., Cambridge (UK), a solar micro inverters company, which in total raised around
USD100 million in growth capital. He is also a Renewable Energy Expert Designate at Guidepoint
Global LLC (formerly a Standard & Poor’s company), and advises private equity firms, hedge
funds and other institutional clients. He has also been a consultant to Rio Tinto plc. (London) and
ENI SpA (Rome).

He is also the Director of DRK Pharma Solutions, Pakistan’s first international standard R&D
centre providing solutions to the pharmaceutical & biopharmaceutical industries in the areas of
product development, clinical research and contract manufacturing through highly experienced
professionals, world-class infrastructure and focus on timely delivery. He also Co-Founded
Kobec Health Sciences, which is now one of the fastest growing ophthalmology specialty
pharmaceutical companies in Pakistan. In collaboration with world's leading scientists, he co-
founded Cambridge Cell Networks (CCNet), a bioinformatics company. “Real Business”
recognized CCNet among Top 50 companies to watch in the UK. Dr. Khokhar has also been on
various Boards of the Government of Punjab (Pakistan) in the sectors of health care and technical
vocational & skill development. He has also been a Visiting Faculty in the Department of Finance
at Lahore University of Management Sciences (LUMS).
Dr. Khokhar received his PhD in Mathematical Finance from King’s College, University of
Cambridge (UK). He was awarded the Commonwealth and King's College Scholarships during
his time at the University of Cambridge.
Dr. Khokhar has been the Chapter Chair of the Young Presidents’ Organization (YPO) Indus
Chapter. He is an avid cyclist and competes in road and track races.
Ali Pervaiz Malik – Director
Mr. Ali Pervaiz Malik is a Founder Partner of Knightsbridge Capital Group. He is also the Chief
Executive of Akram Cotton Mills Limited and Director of Servaid Pharmacy (Pvt.) Limited. Mr. Ali
Pervaiz has a Masters in Finance degree from Imperial College, London, U.K. Prior to his
Masters, he completed his under-graduate degree at the prestigious Lahore University of
Management and Sciences (LUMS), Lahore, Pakistan. He was previously employed with ABN
Amro Bank N.V. as Assistant Vice President Credit Portfolio Management Group, and was
responsible for managing counterparty risks of a portfolio of leading Automotive, Consumer Food
and Diversified companies through developing thorough knowledge of each client’s
requirement.

Mr. Ali Pervaiz is additionally serving following roles in different organizations and associations:
Chairman of All Pakistan Textile Mills Association (APTMA), Board Member of Technical
Education & Vocational Training Authority (TEVTA) of the Government of Punjab, Board Member
of Board of Quaid-e-Azam Solar Power Company (Pvt.) Limited of the Government of Punjab,
Board Member of Quaid-e-Azam Wind Power Company (Pvt.) Limited of the Government of
Punjab and Member of Board of Investment (BOI) of the Government of Pakistan. He has been
involved in a number of Real Estate projects like Mahnoor Villas and Saif Town.

Khurram Shahnawaz – CEO


MR. Khurram Shahnawaz is currently working as the CEO of Intelli Energie a subsidiary of
Knights Bridge Capital Group established in 2017 providing state of the art renewable energy
solutions. He has previously served as Chief Executive Officer for EDCOM, spent a major part
of his professional career with AEPL in a variety of senior roles responsible for business
development in energy sector in three countries namely Pakistan, UAE & KSA. He has over 18
years of experience in developing new business opportunities in various sectors such as Power,
Oil & Gas, and Construction. He graduated from University of Engineering and Technology
Lahore with a degree in Mining Engineering.

Danish Zubair – Technical Lead


Mr. Danish Zubair has been affiliated with Solar Industry for the past Nine years. He has a
working experience of solar in UK and over the past few years has been solarising Pakistan. With
a collective 272,577 kW of solar installations under his belt and trained by leading market experts,
he would like to help make solar affordable for the Pakistani market.

His Electrical and Electronic Engineering Honors Degree from UK provides the technical
expertise required in this field. He has worked on all major solar equipment’s and has been
trained by German, Japanese, American and Chinese Chartered Engineers. His major
experience has been with SMA products and is experienced on all market leading simulation
solar software.

Danish has been involved in product design and development of solar segments. As a previous
member of Institution of Engineering and Technology (IET) and Institute of Electrical and
Electronic Engineers (IEEE), Danish has been working closely to implement cost effective
solutions in solar for the Pakistani market.

Whether it be Procurement & Sourcing or Quality & Control, System Designing or Installation &
Commissioning; Team Management during commercial installations have been most of Danish’s
portfolio. Later half of his experience revolves around Priority Management, Leadership skills and
Organizational Phycology.

He has been involved in solarisation of community centers, central town buildings, dairy and
agriculture farms, housing schemes, military installations and commercial roof/ground
installations. Other areas of installations covered estates, education institutes, fish farms,
pharmacies, religious congregational spaces, legal courts, sports complexes, museums and
warehouses. Industries range from Textile, Pharmaceutical, Manufacturing and Telecom.

Danish has recently ventured into behavioural sciences to better understand his abilities and the
abilities of people around him. He is certified by Richard Bandler to practice Neuro-Linguistic
Programming (NLP). He understands psychological assessments like MBTI personality traits,
Big Five tests and Keirsey Temperament Judgment Techniques.
Annexure – D: Team Project List

Ali Mubashar Kazmi


 Set up MCB Bank (20% owned by MayBank Malaysia) operation in the United Arab
Emirates
 Led the team responsible for digitizing MCB Bank and acquiring Branchless Banking
license for MCB.
 Part of the Management Team evaluating and subsequently implementing restructuring
of RBS Retail Banking across Asia
 Key member of team for Prime Bank Due Diligence and Acquisition by ABN AMRO
 SSGC advisory for LNG (technical partners Poten & Partners)
 Pakistan International Airlines USD 560 mln EXIM Backed Boeing 777 financing
 Tuwairiqi Steel USD 85 mln regional syndication
 Makro Habib – key role in identifying and creating JV
 Pakistan National Shipping Corp. USD 135 mln financing arrangement of 3 vessels
 Facilitator of China Mobile entry in Pakistan; USD 700 mln equity injection by made by
China Mobile.
 Siemens Pakistan AED 100 mln financing for substation project in UAE
 USD 500 mln ECA joint financing mandate for Warid (along withSCB)
 Euro 65mln ECA facility for Fuji Cement and Fuji Power USD 100 mln LCY Facility
Khurram Shahnawaz
Pakistan – List of Thermal Power Projects
 225MW Balloki Combined Cycle Power Project
 234MW Muridke Combined Cycle Power Project
 747MW Guddu Combined Cycle Power Project
 1320MW Sahiwal Coal Power Project
 1320MW Bin Qasim Coal Power Project
 1180MW Bhikki Combined Cycle Power Project
 1230MW Balloki Combined Cycle Power Project
 1230MW Haveli Combined Cycle Power Project
 10MW HFO Power Plant relocation from Kohinoor Faisalabad to Bestway Cement
Kalar Kahar
 18MW HFO Power Plant relocation from DG Cement DG Khan to DG Cement Hubco
 Parco Refinery Mechanical Maintenance Contract

Pakistan - Renewable Energy Projects


 50MW Sapphire Wind Power Project
 50MW Tenaga Wind Power Project
 50MW Master Wind Power Project
 50MW Jhampir Wind Power Project
 50MW Hawa Wind Power Project

Iraq – Thermal Power Projects

 1250MW Basra Simple Cycle Power Project


 250MW Karbala Simple Cycle Power Project
 250MW Hilla Simple Cycle Power Project
Danish Zubair
Pakistan – Renewable Energy Projects
 18MW Harappa Solar
 1MW SoortyTextile
 250 kW Telenor Head Office Rawal Pindi
 250kW Jacobabad Medical Institute of sciences
 100kW Elmetec Transformers
 80kW Police lines KPK
 60kW USAID University projects in Bahawalpur, Multan and DI Khan
 60kW UNICEF diplomatic enclosure
 60 kW Star Laboratories
 40kW UNICEF Muzaffarabad school
 40kW Residence Faisalabad
 40kW US textiles Faisalabad
 40kW Allied Engineering sites in Islamabad and Lahore
 30 kW residential Islamic Centre
 20kW residential Nizami House
 20kW Ashfaq Textiles Faisalabad
 15 kW Residence Islamabad Bani Gala
 15kW Residence Islamabad
 5kW residential Islamic Centre

United Kingdom – Renewable Energy Projects


Photovoltaic and Solar Thermal Projects from Good Energy, National Trust, Climate Energy,
Earth Points and Taff Housing (Each worth more than 8million GBP)
 Domestic Projects: (4kWp – Less) Roof Installations for over 2000 Houses
 Semi-Commercial Projects: (10kWp – Less)
 Major Estates: Roof/Ground Mount Installations [Little Bedwyn, Lancaster and Castleton
Manor etc.]
 Housing Schemes: Flat/Pitched Roof Installations [West lea Housing, Chippenham Flats
and Briggs/Forrester etc.]
 Houses for various Project Engineers: Roof Installations [Alison Holland, Mr Snell and
Jacqui Pycroft etc.]
 Colleges: Flat/Pitched Roof Installations [Queens, Lea and Garson and Nottingham
Trent Colleges etc.]
 Schools: Flat/Pitched Roof Installations [Lea and Garson, Walcott, Cleome and Peas
down St John School etc.]
 Horse Barnes, Dairy and Fish Farms: Flat/Pitched Roof Installations [Kennington and
Pottern Scout Hut, Ashley Gardens etc.]
 Market places and Pharmacies: Pitched Roof Installations [Pound Art Centre, Bristol
Roadside and Briggs/Forrester etc.]
 Community Projects: Flat/Pitched Roof Installations [Muslim Welfare House and Burial
site; St Georges Church and Baptist Church etc.]
 Courts and Hospitals: Roof Installations [Denbury Courts and Briggs-Finecely Hospital
etc.]
 Sports Facilities: Roof/Ground Installations [Stanley Sports Grounds and Herts Centre
Sports etc.]
 Profile Clients: Roof/Ground Installations [Executive Jet Charter, Unicef, BAE Systems
and Albion Group etc.]
 Warehouses: Roof Installations [Free source and Holly Farm etc.]
 Museums: Roof Installations [Cardiff, Bristol, British Museums south of country etc.]
 Assisted the Technical Design Manager in Commercial Projects: (50kWp – 5MWp)
 Commercial Sites: Roof/Ground Installations [British Waterways and Dorothy House
Hospice etc.]
 Community Centres in Cities and Towns: Flat/Pitched Roof Installations [Bathspa,
Bristol, Cardiff and Swindon etc.]
 Dairy and Agricultural Farms: Roof/Ground Installations [Holly, Attwells, Culeze and
Linley Farms etc.]
 Military Sites: Flat/Pitched Roof Installations [Ministry of Defence etc.]
 Housing Schemes: Flat/Pitched Roof Installations [Cymru/Welsh, Taff and Gloucester
Housing etc.]