Rev: 03
MASTER SCHEDULE FOR INTERNAL AUDITS Date: Jul 06, 2005
Page: 1 of 1
S.No. BA/BSD/Project Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 Business Development (BD)
2 Human Resource Development (HRD)
3 Project Personnel & Administration (PP&A)
4 Administration P
Projects
i 5005-Mangla Dam Project PS2
vii 2210-Oxychem
11 Lahore Manufacturing - BA P
12 Karachi Manufacturing - BA
13 Qatar -BA
Projects
i 8002- Olefin Project
ii 8005-Pearl GTL Project
iii Dukhan Cement Plant
14 UAE-BA
i Manufacturing Shop, Hamriyah
ii Borouge -2 Fabrication of Ethylene Furnaces
iii EPC For upgrade of Wellhead control & Safety
iv 1311-AGD-II
v Offshore Associated Gases
vi Fertil Urea-Debottlenecking Project
15 KSA-BA
i Manufacturing Shop, Jubail
ii Manufacturing ShopYanbu
iii Petro Rabigh
iv Sahara Project
P PS1 PS2 NC
PS3
Planned audit Stage 1 Stage 2 Stage 3 Connector Not Conducted Audit carried out and no Non-Conformities reported Audit carried out and Non-Conformities reported CAR(s)/PAR(s) Closed through follow ups
Audit Audit Audit
Prepared by: Checked by: Approved by:
Khalid Aziz ( Asstt Officer QA) QMF (I/C QA) ASB (Head QA&QC)
This document is the intellectual property of Descon Engineering Limited. Any unathorized use, including modification and reproduction of the content is strictly prohibited.© Copyrights Ordinance 2002, All rights reserved.