Você está na página 1de 185

PHASE-l

Description UOM Total Quantity


A- Widening and strengthening of existing road
including Reconstruction
(1) Embankment Filling M3
(2) Subgrade 500 mm M3 73229
(3) GSB 200 mm M3 27992
(4) Dry Lean Concrete 150 mm M3 16430
(5) Pavement Quality Concrete 280 mm M3 26968
(6) PCC M15 M3
(7) RCC M20 M3
(8) RCC M25 NO
(9) RCC M30 M3
(10) RCC M35 M3
(11) RCC M40 M3
M2
M3
TO
M3
M
M2
M3
M3
M3
M3
TO
M
M3
Total Amount Oct-18 Nov-18 Dec-18
Qty Amount Qty Amount Qty Amount

189942085.9286
63342521.117281
246889310.5114

15500
86.1111111111
Jan-19 Feb-19 Mar-19 Apr-19
Qty Amount Qty Amount Qty Amount Qty Amount
May-19 Jun-19 Jul-19 Aug-19
Qty Amount Qty Amount Qty Amount Qty Amount
Sep-19 Oct-19 Nov-19 Total Qty
Qty Amount Qty Amount Qty Amount
Total Amount(Lacs)
ANNEXURE -II
SCHEDULE-H ABSTRACT

2 Laning with Paved Shoulder from Km 30+800 to Km 70+800 and 2 Laning without Paved Should
Project
Karnataka on EPC mode
Authority National Highways Authority of India (NHAI)
Authority's Engineer
EPC Contractor M/s Dilip Buildcon Ltd (DBL)
Title of the Document SCHEDULE-H ABSTRACT
Bill No.
Period

Sr.
Particulars of Item Amount
No. Unit Quantity Min units per unit Amount
(in Rs)

Road works including culverts, minor bridges,


underpasses, overpasses, approaches to
ROB/RUB/Major Bridges/Structures (excluding
service roads)
Widening/Strengthening/Reconstruction & Raising
A
of existing road
1 Earthwork up to top of the sub-grade Km 50.526 539,747,706.90 5.05 10,682,573.00
2 Granular work (sub-base, base, shoulders) Km 50.526 150,404,416.97 5.05 2,976,773.00
3 Non Bituminous Base Course Km 0 0.00 0.00
4 Bituminous Base Course Km 0 0.00 0.00
5 Wearing Coat Km 0 0.00 0.00
Sr.
Particulars of Item Amount
No. Unit Quantity Min units per unit Amount
(in Rs)

6 Dry Lean Concrete Km 50.526 234,147,596.51 5.05 4,634,200.00


7 Pavement Quality Concrete Km 50.526 912,634,003.83 5.05 18,062,661.00
8 Widening and repair of culverts Km 0 0.00
New 2-lane realignment /by pass (flexible
B.1
pavement)
1 Earthwork up to top of the sub-grade Km 0 0.00
2 Sub Base Course Km 0 0.00
3 Non Bituminous Base Course Km 0 0.00
4 Bituminous Base Course Km 0 0.00
5 Wearing Coat Km 0 0.00
New 2-lane realignment /by pass (flexible
B.2
pavement)
1 Earthwork up to top of the sub-grade Km 0 0.00
2 Sub Base Course Km 0 0.00
3 Dry Lean Concrete (DLC) Course Km 0 0.00
4 Pavement Quality Concrete (PQC) Course Km 0 0.00
Reconstruction/New Service road (Flexible
C.1
Pavement)
1 Earthwork up to top of the sub-grade Km 50.526 14,790,462.06 5.00 292,730.00
2 Sub Base Course Km 50.526 12,082,349.29 5.00 239,131.00
3 Non Bituminous Base Course Km 50.526 13,540,563.86 5.00 267,992.00
4 Bituminous Base Course Km 50.526 12,707,298.39 5.00 251,500.00
Sr.
Particulars of Item Amount
No. Unit Quantity Min units per unit Amount
(in Rs)

5 Wearing Coat Km 50.526 10,415,818.35 5.00 206,148.00


Reconstruction/New Service road (Rigid
C.2
Pavement)
1 Earthwork up to top of the sub-grade Km 0 0.00
2 Sub Base Course Km 0 0.00
3 Dry Lean Concrete (DLC) Course Km 0 0.00
4 Pavement Quality Concrete (PQC) Course Km 0 0.00
Re-Construction and New Culverts on existing
D
road, realignments, bypasses:
1 Culverts (length<6 m)/ Reptile Underpasses No 120 183,132,244.67 5 1,526,102.00
Minor bridges, underpasses, overpasses
Widening and Repair of Minor bridges (Iength> 6
A.1
m and <60 m)

6 Minor bridges M 0 0.00 0 0.00

A.2 New Minor bridges (length >6 and <60 m.)


1 Foundation +Sub- Structure: On completion of the
foundation work including foundations for wing and 5 (Length=
No 64,498,031.03 1 12,899,606.00
return walls, abutments, piers upto the abutment/pier 181.00 m)
cap.
2
Super-structure: On completion of the superstructure 5 (Length=
in all respects including wearing coat. bearings, No 51,579,565.75 1 10,315,913.00
181.00 m)
expansion joints, hand rails, crash barriers. road
signs&. markings, tests on completion etc.
Sr.
Particulars of Item Amount
No. Unit Quantity Min units per unit Amount
(in Rs)

3 Approaches: On completion of approaches including


Retaining walls, stone pitching, protection works 5 (Length=
complete in all respect and fit for use. No 1,131,544.40 1 226,309.00
181.00 m)

4 Guide Bunds anti River Training Works: On 5 (Length=


completion ofGuide Bunds and river Training Works No 0.00 - 0.00
181.00 m)
complete in all respects
B.1
Widening and Repair of underpasses/ overpasses
Underpasses/ Overpasses 0 0 0.00 - 0.00
B.2 New underpasses/ overpasses
1 Foundation +Sub-Structure: On completion of the
foundation work including foundations for wing and 8 (Length=
return walls, abutments, piers upto the abutment/pier No 118,152,094.85 1 14,769,012.00
334.00 m)
cap.
2 Super-structure: On completion of the super structure
in all respects including wearing coat, bearings,
expansion joints, hand rails, crash barriers, road signs 8 (Length=
& markings. tests on completion etc. complete in all No 151,909,836.24 1 18,988,730.00
334.00 m)
respect completion etc. complete. in all respect

Wearing Coat (a) in case of Overpass- wearing coat


including expansion joints complete in all respects as
specified and (b) in case ofunderpass- rigid pavement
including drainage facility complete in all respects as
specified as specified.
Sr.
Particulars of Item Amount
No. Unit Quantity Min units per unit Amount
(in Rs)

3 Approaches. On completion of approaches including


Retaining walls/ Reinforced Earth walls, stone pitching, 8 (Length=
protection works complete in all respect and fit for use. No 555,588,302.36 1 69,448,538.00
334.00 m)

Major bridge works and ROB/RUB


A Widening and repairs of Major Bridges
1 Foundation No 0 0.00 - 0.00
2 Sub-structure No 0 0.00 - 0.00

3 Super-structure (including crash barriers etc complete) Lm 5(203.5) 1 0.00

A New Major Bridges


1 Foundation No 1 11,633,106.55 1 11,633,107.00
2 Sub-structure No 1 37,744,827.71 1 37,744,828.00
3 Super-structure (including bearings) No 1 57,872,612.78 1 57,872,613.00
4 Wearing Coat including expansion joints No 1 5,942,090.39 1 5,942,090.00
5 Miscellaneous Items like hand rails, crash barriers, No 1 7,030,078.78 1 7,030,079.00
6 Wing walls/return walls No 1 7,950,684.33 1 7,950,684.00
7 Guide Bunds, River Training works etc. No 1 0.00 1 0.00
8 Approaches (including Retaining walls, stone pitching
and protection works) No 1 920,605.55 1 920,606.00

B New ROB/RUB
Sr.
Particulars of Item Amount
No. Unit Quantity Min units per unit Amount
(in Rs)

1 Foundation No 2 17,784,425.48 1 8,892,213.00


2 Sub-structure No 2 38,958,353.22 1 19,479,177.00
3 Super-structure (including hearings} No 2 50,758,842.59 1 25,379,421.00
4 Wearing Coat: (a) in case of ROB- wearing coat
including expansionjoints complete in all respects as
specified and (b) in case of RUB- rigid pavement No 2 4,142,724.99 1 2,071,362.00
under RUB including drainage facility complete in all
respects as specified as specified

5 Miscellaneous items like hand rails, crash barriers,


road markings erc.) No 2 4,435,644.94 1 2,217,822.00
6 Wing walls/return walls No 2 2,636,279.54 1 1,318,140.00
7 Approaches (including Retaining walls/Reinforced No 2 170,646,793.15 1 85,323,397.00
Earth wall. stone pitching and protectionworks) No 2 0.00 1 0.00
B Widening and repair of
Sr.
Particulars of Item Amount
No. Unit Quantity Min units per unit Amount
(in Rs)

(a) ROB No 0 0.00 - 0.00


(b) RUB No 0 0.00 - 0.00
C New Major Bridges
1 Foundation No 6 1 0.00
2 Sub-structure No 6 1 0.00
Super- structure (including crash barriers etc.
3 No 5 1 0.00
complete)
4 Protection work No 5 1 0.00
D New rail-road bridges
(a) ROB No 0 0.00 - 0.00
(b) RUB No 0 0.00 - 0.00
Structures (elevated sections, reinforced earth)
1 Foundation No 0 0.00 - 0.00
2 Sub-structure No 0 0.00 - 0.00

3 Super-structure (including crash barriers etc complete) No 0 0.00 - 0.00

4 Reinforced Earth No 0 0.00 - 0.00


Other works
(i) Toll Plaza No 1 68,907,907.22 1 68,907,907.00
(ii) Road side drains

(a) Unlined Drain Km 1 1,387,407.53 1 1,387,408.00

(b) Open Lined Drain Km 0 0.00 1 0.00


Sr.
Particulars of Item Amount
No. Unit Quantity Min units per unit Amount
(in Rs)

(c) Lined Covered Drain Km 1 391,320.07 1 391,320.00


(iii) Road signs, markings, Km stones, safety devices Km 52.3 67,591,648.80 7.95 1,292,383.00
(iv) Project facilities
(a) Bus Bays No 4 8,964,787.10 1 2,241,197.00
(b) Truck lay-byes No 0 0.00 - 0.00
(c) Rest areas No 0 0.00 - 0.00
(d) Others (Traffic Aid Post, Vehicle Rescue, Lighting
etc.) No 1 29,349,005.40 1.00 29,349,005.00

(iv) Road side plantation Km 52.3 1,921,025.81 7.95 36,731.00


(vi) Repair of protection works other than approaches to
the bridges, elevated sections flyovers/grade Km 52.3 13,376,031.55 7.95 255,756.00
separators and ROBs/RUBs.
(vii) Safety Management construction and traffic during
Km 52.3 0.00 0.00 0.00
construction
(viii) Protection works Km 52.3 93,703,369.97 1 1,791,651.00
(ix) Junctions No 98 70,188,591.10 1 716,210.00
(x) Retaining Wall (Except Structure Locations) No 0.00
(xi) Breast Wall No 0.00

3,800,700,000.00
Sr.
Particulars of Item Amount
No. Unit Quantity Min units per unit Amount
(in Rs)

For DBL
-II
STRACT

2 Laning without Paved Shoulder from Km 70+800 to Karnataka/Goa Border (km 84+120) of NH-4A in the State of

Quantity Amount
Upto
Previous This Bill Upto date Upto Previous Bill This Bill Upto date
Bill

5.05 53,946,994.00 53,946,994.00


5.05 15,032,704.00 15,032,704.00

- -
Quantity Amount
Upto
Previous This Bill Upto date Upto Previous Bill This Bill Upto date
Bill
5.05 23,402,710.00 23,402,710.00
5.05 91,216,438.05 91,216,438.00

- -

- -
- -
- -
- -

- -

- -
- -
- -
- -

- -

- -
- -
- -
- -
Quantity Amount
Upto
Previous This Bill Upto date Upto Previous Bill This Bill Upto date
Bill

- -

- -
- -
- -
- -

- -

15.00 22,891,530.00 22,891,530.00

- -

- -

- -

- -
Quantity Amount
Upto
Previous This Bill Upto date Upto Previous Bill This Bill Upto date
Bill

- -

- -
Quantity Amount
Upto
Previous This Bill Upto date Upto Previous Bill This Bill Upto date
Bill

- -
- -
- -
- -

- -

- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
Quantity Amount
Upto
Previous This Bill Upto date Upto Previous Bill This Bill Upto date
Bill
- -
- -
- -

- -

- -

- -
- -
- -
- -
Quantity Amount
Upto
Previous This Bill Upto date Upto Previous Bill This Bill Upto date
Bill
- -
- -
- -
- -
- -

- -

- -
- -
- -
- -
- -
- -
- -

- -

- -
- -
- -
- -
Quantity Amount
Upto
Previous This Bill Upto date Upto Previous Bill This Bill Upto date
Bill

- -
- -
- -
- -
- -

- -

- -

- -

- -
- -

- 206,490,376.05 206,490,376.00
Quantity Amount
Upto
Previous This Bill Upto date Upto Previous Bill This Bill Upto date
Bill

For Authority's Engineer


Stage Payment terms aof Main Contract
CV
Weightage in
percentage to Percentage
Item Stage for Payment
the Contract weightage
Price

Road works 54.81% A- Widening/strengthening/Reconstruction & Raising of


including existing road
culverts, widening
and repair of
culverts (1) Earthwork up to top of the sub-grade 25.91%
(2)Granular works (Sub-Base-Course) 7.22%
(3) Non Bituminous Base Course 0.00%

(4) Bituminous Base Course 0.00%

(5) Wearing Coat 0.00%

(6) Dry Lean Concrete 11.24%


(7) Pavement Quality Concrete 43.81%
(8) Widening and repair of culverts 0.00%

B.1 - New 2-lane realignment /by pass (flexible pavement)

(1) Earthwork up to top of the sub-grade 0.00%


(2) Sub Base Course 0.00%
(3) Non Bituminous Base Course 0.00%
(4) Bituminous Base Course 0.00%
(5) Wearing Coat 0.00%
B.2 - New 2-lane realignment /by pass (rigid pavement)
(1) Earthwork up to top of the sub-grade 0.00%
(2) Sub Base Course 0.00%
(3) Dry Lean Concrete (DLC) Course 0.00%
(4) Pavement Quality Concrete (PQC) Course 0.00%

C.1 - Reconstruction/New Service road (Flexible Pavement)

(1) Earthwork up to top of the sub-grade 0.71%


(2) Sub Base Course 0.58%
(3) Non Bituminous Base Course 0.65%
(4) Bituminous Base Course 0.61%
(5) Wearing Coat 0.50%

C.2 - Reconstruction/New Service road (Rigid Pavement)


(1) Earthwork up to top of the sub-grade 0.00%
(2) Sub Base Course 0.00%
(3) Dry Lean Concrete (DLC) Course 0.00%
(4) Pavement Quality Concrete (PQC) Course 0.00%
D - Re-Construction and New Culverts on existing road,
realignments, bypasses:
Culverts (length<6 m)/ Reptile Underpasses 8.76%

Minor Bridges/ 24.81% A.I- Widening and Repair of Minor bridges (Iength> 6 m and
Underpasses/ <60 m)
Over passes
Minor bridges 0.00%
A.2- New Minor bridges (length >6 and <60 m.)
(1) Foundation +Sub- Structure: On completion of the
foundation work including foundations for wing and return walls,
abutments, piers upto the abutment/pier cap. 6.84%
(2) Super-structure: On completion of the superstructure in all
respects including wearing coat. bearings, expansion joints, hand
rails, crash barriers. road signs&. markings, tests on completion
etc. 5.47%
(3) Approaches: On completion of approaches including
Retaining walls, stone pitching, protection works complete in all
respect and fit for use. 0.12%

(4) Guide Bunds anti River Training Works: On completion


ofGuide Bunds and river Training Works complete in all respects 0.00%
B.1- Widening and Repair of underpasses/ overpasses 0
Underpasses/ Overpasses 0
B.2- New underpasses/ overpasses
1 Foundation +Sub-Structure: On completion of the foundation
work including foundations for wing and return walls, abutments, 12.53%
piers upto the abutment/pier cap.
2 Super-structure: On completion of the super structure in all
respects including wearing coat, bearings, expansion joints, hand
rails, crash barriers, road signs & markings. tests on completion 16.11%
etc. complete in all respect completion etc. complete. in all
respect

Wearing Coat (a) in case of Overpass- wearing coat including


expansion joints complete in all respects as specified and (b) in 0
case ofunderpass- rigid pavement including drainage facility
complete in all respects as specified as specified.
(3) Approaches. On completion of approaches including Retaining
walls/ Reinforced Earth walls, stone pitching, protection works 58.92%
complete in all respect and fit for use.

Major 11.01% A.1 Widening and repairs of Major Bridges


Bridge(length>60
m.) works and
ROB/RUB/
elevated sections/
Flyovers
Major 11.01%
Bridge(length>60 (I) Foundation 0.00%
m.) works and
( 2) Sub-structure 0.00%
ROB/RUB/
elevated sections/ (3) Super-structure (including bearings) 0.00%
Flyovers ( 4) Wearing Coat including expansion Joints 0.00%
including (5) Miscellaneous Items like hand rails. crash barriers.road
viaducts, if any 0.00%
markings etc.)
(6) Wing walls/ return wall 0.00%
(7) Guide Bunds. River Training works etc 0.00%
(8) Approaches (including Retaining walls. stone pitching and 0.00%
protection works.
A.2 New Major bridges
( 1 ) Foundation 2.78%
(2) Sub-structure 9.02%
(3) Super-structure (including bearings) 13.83%
( 4) Wearing Coat including expansion joints 1.42%
(5) Miscellaneous Items like hand rails, crash barriers, 1.68%
(6) Wing walls/return walls 1.90%
(7) Guide Bunds, River Training works etc. 0.00%
(8) Approaches (including Retaining walls, stone pitching and
protection works) 0.22%
B.1- Widening and repair of ROB/RUB
(I) Foundation 0.00%
(2) Sub-structure 0.00%
(3) Super-structure (including bearings) 0.00%
(4) Wearing Coat:
(a) in case of ROB- wearing coat. including expansion joints
complete in all respects as, specified and 0.00%

(b) in case of RUB-rigid pavement under RUB including drainage


facility complete in all respects as specified as specified. 0.00%
(5) Miscellaneous Items like hand rails, crash barriers. road
markings etc.) 0.00%
(6) Wing walls/return walls 0.00%
(7) Approaches (including Retaining walls, stone pitching and
protection works) 0.00%
B.2- New ROB/RUB
(1)Foundation 4.25%
(2) Sub-structure 9.31%
(3) Super-structure (including hearings} 12.13%

(4) Wearing Coat: (a) in case of ROB- wearing coat including


expansionjoints complete in all respects as specified and (b) in
case of RUB- rigid pavement under RUB including drainage
facility complete in all respects as specified as specified 0.99%
(5) Miscellaneous Hems like hand rails, crash barriers, road mark
ings erc.) 1.06%
(6) Wing walls/return walls 0.63%
(7) Approaches (including Retaining walls/Reinforced 40.78%
Earth wall. stone pitching and protectionworks)
C.1- Widening and repair of Elevated Section/Flyovers/Grade
Separators
( 1) Foundation 0.00%
(2) Sub-structure 0.00%
(3) Super-structure (including bearings) 0.00%
(4) Wearing Coat including expansion joints 0.00%
(5) Miscellaneous Items like band rails, crash barriers. road
markings etc.) 0.00%
( 6) Wing walls/return walls 0.00%
(7) Approaches (including Retaining walls/Reinforced 0.00%
Earth wall, stone pitching and protection works)
C.2-New Elevated Section/Flyovers/ Gracie Separators
( 1) Foundation 0.00%
(2) Sub-structure 0.00%
(3) Super-structure (including bearings) 0.00%
(4) Wearing Coat including expansion joints 0.00%
(5) Miscellaneous Items like hand rails, crash barriers. road
markings etc.) 0.00%
(6) Wing walls/return walls 0.00%
(7) Approaches (including Retaining walls/Reinforced Earth wail,
stone pitching and protection works) 0.00%
Other works 9.36% (i) Toll Plaza 19.37%
a) Bus bays (ii) Road side drains 0
b) Truck lay byes
(a) Unlined Drain 0.39%
c) Rest areas
d) others (b) Open Lined Drain 0.00%
(c) Lined Covered Drain 0.11%
(iii) Road signs. markings. km stones, safety devices, 19.00%
(iv) Project facilities 0
(a) Bus Bays 2.52%
(b) Truck lay-byes 0.00%
( c) Rest areas 0.00%
(d) Others (Traffic Aid Post, Vehicle Rescue, Lighting etc.) 8.25%
(v) Road side plantation 0.54%
(vi) Repair of protection works other than approaches to the
bridges, elevated sections flyovers/grade separators and
ROBs/RUBs. 3.76%
(vii) Safety Management construction and traffic during
construction 0.00%
(viii) Protection Works 26.34%
(ix) Junctions 19.73%
(x) Retaining Wall (Except Structure Locations) 0.00%
(xi) Breast Wall 0.00%
Total
38007

Value as
Total
Weightage
Amount
of Contract

In Lacs In Lacs

20831.64

5397.48
1504.04
0.00

0.00

0.00

2341.48
9126.34
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

147.90
120.82
135.41
127.07
104.16
0.00
0.00
0.00
0.00

1824.85

9429.537
0.00
0.00

644.98

515.80

11.32

0.00

0.00
0.00

1181.52

1519.10

0.00

5555.88

4184.571
0.00
0.00
0.00
0.00

0.00

0.00
0.00

0.00

0.00
116.33
377.45
578.73
59.42
70.30
79.51
0.00

9.21

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00
177.84
389.58
507.59

41.43

44.36
26.36
1706.47
0.00

0.00

0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

689.08 3557.455
0.00
13.87
0.00
3.91
675.92
0.00
89.65
0.00
0.00
293.49
19.21

133.76

0.00

937.03
701.89
0.00
0.00
38007 38007
WBS Description BOQ Description

Embankment Embankment with borrow earth


UOM Total Amount 43374 43405 43435
Qty Amount Qty Amount Qty Amount

M3 208316367 2.33283333
43466 43497 43525 43556
Qty Amount Qty Amount Qty Amount Qty Amount
43586 43617 43647 43678
Qty Amount Qty Amount Qty Amount Qty Amount
43709 43739 43770 Total Qty
Qty Amount Qty Amount Qty Amount

45940
Total Amount(Lacs)

143.7922
Road works mcluding culverrs, widening and repair of culverts 54.81%
A - Widening and strengthening of existing road including Reconstruction
(1)Earthwork up to top of the sub-grade 25.91%
(2) Granular works (Sub-Base Course) 7.22%
(3) Non Bituminous Base Course 0
(4)Bituminous Base Course 0
(5) Wearing Coat 0
(6) Dry Lean Concrete 11.24%
(7)Pavement Quality Concrete 43.82%
(8)Widening and repair of culverts 0
B.1- New 2 lane realignment / bypass ( Flexible Pavement) 0
B.2 New 2 lane realignment / bypass ( Rigid Pavement) 0
C.1- Reconstruction/ New service road (Flexible pavement)
WBS
Level WBS WBS Description Network
Status

5 Clearing and Grubbing 500018810 5000188


5 Dismantling 500018820 5000188
5 Dismantling 500018820 5000188
5 Dismantling 500018820 5000188
5 Dismantling 500018820 5000188
5 Dismantling 500018820 5000188
5 Dismantling 500018820 5000188
5 Dismantling 500018820 5000188
5 Dismantling 500018820 5000188
5 Cutting Trees 500018830 5000188
5 Cutting Trees 500018830 5000188
5 Cutting Trees 500018830 5000188
5 Cutting Trees 500018830 5000188
5 Excavation 500018840 5000188
5 Embankment 500018850 5000188
5 Embankment 500018850 5000188
5 Embankment 500018850 5000188
5 Subgrade 500018860 5000188
5 Subgrade 500018860 5000188
5 GSB 500018870 5000188
5 WMM 500018880 5000188
5 Prime & Tack Coat 500018890 5000188
5 Prime & Tack Coat 500018890 5000188
5 Prime & Tack Coat 500018890 5000188
5 DBM 500018810 5000188
5 DBM 500018810 5000188
5 BC 500018811 5000188
5 BC 500018811 5000188
5 SDBC 500018812 5000188
5 Scarifying 500018813 5000188
5 Excavation 500018814 5000188
5 Concrete 500018815 5000188
5 Concrete 500018815 5000188
5 Excavation 500018816 5000188
5 Excavation 500018816 5000188
5 Concrete 500018817 5000188
5 Concrete 500018817 5000188
5 Reinforcement 500018818 5000188
5 Apron 500018819 5000188
5 Apron 500018819 5000188
5 Excavation 500018820 5000188
5 Excavation 500018820 5000188
5 Concrete 500018821 5000188
5 Concrete 500018821 5000188
5 Concrete 500018821 5000188
5 Finishing Work 500018822 5000188
5 Finishing Work 500018822 5000188
5 Finishing Work 500018822 5000188
5 Finishing Work 500018822 5000188
5 Finishing Work 500018822 5000188
5 Finishing Work 500018822 5000188
5 Finishing Work 500018822 5000188
5 Finishing Work 500018822 5000188
5 Finishing Work 500018822 5000188
5 Crash Barrier 500018823 5000188
5 Wearing course 500018824 5000188
5 Excavation 500018825 5000188
5 Backfilling 500018826 5000188
5 Backfilling 500018826 5000188
5 Foundation Concrete 500018827 5000188
5 Foundation Concrete 500018827 5000188
5 Foundation Concrete 500018827 5000188
5 Foundation Reinforcement 500018828 5000188
5 Well Sinking 500018829 5000188
5 Well Sinking 500018829 5000188
5 Well Sinking 500018829 5000188
5 Well Sinking 500018829 5000188
5 Well Sinking 500018829 5000188
5 Well Sinking 500018829 5000188
5 Well Concrete 500018830 5000188
5 Well Concrete 500018830 5000188
5 Well Concrete 500018830 5000188
5 Well Concrete 500018830 5000188
5 Well Concrete 500018830 5000188
5 Substructure Concrete 500018831 5000188
5 Substructure Concrete 500018831 5000188
5 Substructure Concrete 500018831 5000188
5 Substructure Reinforcement 500018832 5000188
5 Superstructure Concrete 500018833 5000188
5 Superstructure Concrete 500018833 5000188
5 Superstructure Reinforcement 500018834 5000188
5 Superstructure Reinforcement 500018834 5000188
5 Bearings 500018835 5000188
5 Bearings 500018835 5000188
5 Bearings 500018835 5000188
5 Bearings 500018835 5000188
5 Bearings 500018835 5000188
5 Expansion Joint 500018836 5000188
5 Expansion Joint 500018836 5000188
5 Expansion Joint 500018836 5000188
5 Approach Slab 500018837 5000188
5 Approach Slab 500018837 5000188
5 Wearing course 500018838 5000188
5 Crash Barrier 500018839 5000188
5 Railing 500018840 5000188
5 Finishing Work 500018841 5000188
5 Finishing Work 500018841 5000188
5 Finishing Work 500018841 5000188
5 Finishing Work 500018841 5000188
5 Finishing Work 500018841 5000188
5 Finishing Work 500018841 5000188
5 Finishing Work 500018841 5000188
5 Finishing Work 500018841 5000188
5 Finishing Work 500018841 5000188
5 Repair & Rehabilitation 500018842 5000188
5 Repair & Rehabilitation 500018842 5000188
5 Excavation 500018843 5000188
5 Concrete 500018844 5000188
5 Concrete 500018844 5000188
5 Concrete 500018844 5000188
5 Concrete 500018844 5000188
5 Reinforcement 500018845 5000188
5 Wearing course 500018846 5000188
5 Crash Barrier 500018847 5000188
5 Crash Barrier 500018847 5000188
5 Finishing Work 500018848 5000188
5 Finishing Work 500018848 5000188
5 Finishing Work 500018848 5000188
5 RCC Panels 500018849 5000188
5 Drain 500018850 5000188
5 Drain 500018850 5000188
5 Drain 500018850 5000188
5 Drain 500018850 5000188
5 Drain 500018850 5000188
5 Drain 500018850 5000188
5 Drain 500018850 5000188
5 Prtection Work 500018851 5000188
5 Prtection Work 500018851 5000188
5 Prtection Work 500018851 5000188
5 Prtection Work 500018851 5000188
5 Prtection Work 500018851 5000188
5 Prtection Work 500018851 5000188
5 Prtection Work 500018851 5000188
5 Prtection Work 500018851 5000188
5 Prtection Work 500018851 5000188
5 Prtection Work 500018851 5000188
5 MCB 500018852 5000188
5 Railing 500018853 5000188
5 DLC & PQC 500018854 5000188
5 DLC & PQC 500018854 5000188
5 Toll Plaza Building 500018855 5000188
5 Toll Collection System 500018856 5000188
5 HTMS System 500018857 5000188
5 Services 500018858 5000188
5 Services 500018858 5000188
5 Electricification 500018859 5000188
5 Lighting 500018860 5000188
5 Foothpath 500018861 5000188
5 Kerb 500018862 5000188
5 Kerb 500018862 5000188
5 Road Marking 500018863 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Signages & Signboards 500018864 5000188
5 Road Furniture 500018865 5000188
5 Road Furniture 500018865 5000188
5 Road Furniture 500018865 5000188
5 Road Furniture 500018865 5000188
5 Road Furniture 500018865 5000188
5 Road Furniture 500018865 5000188
5 Others Miscellaneous 500018866 5000188
5 Others Miscellaneous 500018866 5000188
5 Others Miscellaneous 500018866 5000188
5 Others Miscellaneous 500018866 5000188
5 Others Miscellaneous 500018866 5000188
5 Others Miscellaneous 500018866 5000188
5 Plantation 500018867 5000188
5 Plantation 500018867 5000188
5 Diversion of road during construction 500018868 5000188
5 Diversion of road during construction 500018868 5000188
5 Diversion of road during construction 500018868 5000188
5 Maintenance of existing road 500018869 5000188
5 Clearing and Grubbing 500018870 5000188
5 Dismantling 500018871 5000188
5 Dismantling 500018871 5000188
5 Dismantling 500018871 5000188
5 Dismantling 500018871 5000188
5 Dismantling 500018871 5000188
5 Dismantling 500018871 5000188
5 Dismantling 500018871 5000188
5 Dismantling 500018871 5000188
5 Cutting Trees 500018872 5000188
5 Cutting Trees 500018872 5000188
5 Cutting Trees 500018872 5000188
5 Cutting Trees 500018872 5000188
5 Excavation 500018873 5000188
5 Embankment 500018874 5000188
5 Embankment 500018874 5000188
5 Embankment 500018874 5000188
5 Subgrade 500018875 5000188
5 Subgrade 500018875 5000188
5 GSB 500018876 5000188
5 WMM 500018877 5000188
5 Prime & Tack Coat 500018878 5000188
5 Prime & Tack Coat 500018878 5000188
5 Prime & Tack Coat 500018878 5000188
5 DBM 500018879 5000188
5 DBM 500018879 5000188
5 BC 500018880 5000188
5 BC 500018880 5000188
5 SDBC 500018881 5000188
5 Scarifying 500018882 5000188
5 Excavation 500018883 5000188
5 Concrete 500018884 5000188
5 Concrete 500018884 5000188
5 Excavation 500018885 5000188
5 Backfilling 500018886 5000188
5 Concrete 500018887 5000188
5 Concrete 500018887 5000188
5 Reinforcement 500018888 5000188
5 Apron 500018889 5000188
5 Apron 500018889 5000188
5 Excavation 500018890 5000188
5 Backfilling 500018891 5000188
5 Backfilling 500018891 5000188
5 Foundation 500018892 5000188
5 Foundation 500018892 5000188
5 Foundation 500018892 5000188
5 Foundation Reinforcement 500018893 5000188
5 Well Sinking 500018894 5000188
5 Well Sinking 500018894 5000188
5 Well Sinking 500018894 5000188
5 Well Sinking 500018894 5000188
5 Well Sinking 500018894 5000188
5 Well Sinking 500018894 5000188
5 Well Concrete 500018895 5000188
5 Well Concrete 500018895 5000188
5 Well Concrete 500018895 5000188
5 Well Concrete 500018895 5000188
5 Well Concrete 500018895 5000188
5 Substructure Concrete 500018896 5000188
5 Substructure Concrete 500018896 5000188
5 Substructure Concrete 500018896 5000188
5 Substructure Reinforcement 500018897 5000188
5 Superstructure Concrete 500018898 5000188
5 Superstructure Concrete 500018898 5000188
5 Superstructure Reinforcement 500018899 5000188
5 Superstructure Reinforcement 500018899 5000188
5 Bearings 500018810 5000188
5 Bearings 500018810 5000188
5 Bearings 500018810 5000188
5 Bearings 500018810 5000188
5 Bearings 500018810 5000188
5 Expansion Joint 500018810 5000188
5 Expansion Joint 500018810 5000188
5 Expansion Joint 500018810 5000188
5 Approac Slab 500018810 5000188
5 Approac Slab 500018810 5000188
5 Wearing course 500018810 5000188
5 Crash Barrier 500018810 5000188
5 Railing 500018810 5000188
5 Finishing Work 500018810 5000188
5 Finishing Work 500018810 5000188
5 Finishing Work 500018810 5000188
5 Finishing Work 500018810 5000188
5 Finishing Work 500018810 5000188
5 Finishing Work 500018810 5000188
5 Finishing Work 500018810 5000188
5 Finishing Work 500018810 5000188
5 Finishing Work 500018810 5000188
5 Repair & Rehabilitation 500018810 5000188
5 Repair & Rehabilitation 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Prtection Work 500018810 5000188
5 Prtection Work 500018810 5000188
5 Prtection Work 500018810 5000188
5 Prtection Work 500018810 5000188
5 Prtection Work 500018810 5000188
5 Prtection Work 500018810 5000188
5 Prtection Work 500018810 5000188
5 Prtection Work 500018810 5000188
5 Prtection Work 500018810 5000188
5 Prtection Work 500018810 5000188
5 MCB 500018811 5000188
5 Railing 500018811 5000188
5 Lighting 500018811 5000188
5 Foothpath 500018811 5000188
5 Kerb 500018811 5000188
5 Kerb 500018811 5000188
5 Road Marking 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Signages & Signboards 500018811 5000188
5 Road Furniture 500018811 5000188
5 Road Furniture 500018811 5000188
5 Road Furniture 500018811 5000188
5 Road Furniture 500018811 5000188
5 Road Furniture 500018811 5000188
5 Road Furniture 500018811 5000188
5 Others Miscellaneous 500018811 5000188
5 Others Miscellaneous 500018811 5000188
5 Others Miscellaneous 500018811 5000188
5 Others Miscellaneous 500018811 5000188
5 Plantation 500018811 5000188
5 Plantation 500018811 5000188
5 Diversion of road during construction 500018812 5000188
5 Diversion of road during construction 500018812 5000188
5 Diversion of road during construction 500018812 5000188
5 Maintenance of existing road 500018812 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
3 Electrical Line Shifting 500018851 5000188
5 Embankment 500018850 5000188
5 Concrete 500018815 5000188
5 Concrete 500018815 5000188
5 Concrete 500018815 5000188
5 Concrete 500018817 5000188
5 Excavation 500018820 5000188
5 Concrete 500018821 5000188
5 Concrete 500018821 5000188
5 Foundation Concrete 500018827 5000188
5 Foundation Concrete 500018827 5000188
5 Foundation Concrete 500018827 5000188
5 Substructure Reinforcement 500018832 5000188
5 Substructure Reinforcement 500018832 5000188
5 Superstructure Concrete 500018833 5000188
5 Superstructure Concrete 500018833 5000188
5 Finishing Work 500018841 5000188
5 Finishing Work 500018841 5000188
5 Finishing Work 500018841 5000188
5 Finishing Work 500018841 5000188
5 Repair & Rehabilitation 500018842 5000188
5 Finishing Work 500018848 5000188
5 Finishing Work 500018848 5000188
5 Drain 500018850 5000188
5 Drain 500018850 5000188
5 Drain 500018850 5000188
5 Drain 500018850 5000188
5 Concrete 500018884 5000188
5 Concrete 500018884 5000188
5 Concrete 500018884 5000188
5 Concrete 500018887 5000188
5 Foundation 500018892 5000188
5 Foundation 500018892 5000188
5 Foundation 500018892 5000188
5 Substructure Concrete 500018896 5000188
5 Substructure Concrete 500018896 5000188
5 Superstructure Concrete 500018898 5000188
5 Superstructure Concrete 500018898 5000188
5 Finishing Work 500018810 5000188
5 Finishing Work 500018810 5000188
5 Finishing Work 500018810 5000188
5 Finishing Work 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
5 Drain 500018810 5000188
6 Well Concrete_Pile 500018857 5000188
6 Well Concrete_Pile 500018857 5000188
6 Well Concrete_Pile 500018857 5000188
6 Well Concrete_Pile 500018857 5000188
6 Drain Cross Culvert 500018857 5000188
6 Drain Cross Culvert 500018857 5000188
6 Drain Cross Culvert 500018857 5000188
6 Drain Cross Culvert 500018857 5000188
6 Drain Cross Culvert 500018857 5000188
6 TMT Fe 500 reinforcement_Pile 500018857 5000188
6 TMT Fe 500 reinforcement_Pile 500018857 5000188
6 TMT Fe 500 reinforcement_Pile 500018857 5000188
6 TMT Fe 500 reinforcement_Pile 500018857 5000188
5 Embankment 500018850 5000188
5 WMM 500018880 5000188
5 Embankment 500018874 5000188
5 WMM 500018877 5000188
3 Value Engineering 500018857 5000188
3 Value Engineering 500018857 5000188
5 Road maintenance of Isolux package 500018812 5000188
5 Subgrade 500018860 5000188
5 Subgrade 500018875 5000188
Actvity
Acivity Descripti BOQ BOQ Description Group Code
on
10 Clearing an 1220 Clearing & grubbing road land CLG-CG
20 Dismantling 1230 Dismantling of RCC CLG-DISM
20 Dismantling 1240 Dismantling bit layer/flexible wear coat CLG-DISM
20 Dismantling 1250 Dismantling existing nonbituminouscourse CLG-DISM
20 Dismantling 1260 Dismantling Hume pipe upto 900 mm dia CLG-DISM
20 Dismantling 1270 Dismantling of Brick masonry CLG-DISM
20 Dismantling 1280 Dismantling of 5th KM stone CLG-DISM
20 Dismantling 1290 Dismantling of KM stone CLG-DISM
20 Dismantling 1300 Dismantling of Hec. M stone CLG-DISM
30 Cutting Tre 1310 Cutting trees Girth above 300mm to 600mm CLG-TRCUT
30 Cutting Tre 1320 Cutting trees Girth above 600mm to 900mm CLG-TRCUT
30 Cutting Tre 1330 Cutting trees Girth above 900mm to1800mm CLG-TRCUT
30 Cutting Tre 1340 Cutting of trees Girth above 1800 mm CLG-TRCUT
40 Excavation 1350 Exc all types of soil incl. marshy soil EXC-SOIL
50 Embankmen 1360 Embankment with borrow earth EMB-BOR
50 Embankmen 1370 Emb. With appr.Material -excavated earth EMB-RDW
50 Embankmen 1380 Filling median/island with borrow earth EMB-MED
60 Subgrade 1390 Subgrade - borrow earth EMB-SGBOR
60 Subgrade 1400 Loosening & recompting subgrade EMB-SGBOR
70 GSB 1410 Granular sub base SB-GSB
80 WMM 1420 Wet mix macadam SB-WMM
90 Prime & Tac 1430 Prime coat granular surface(6/kg/10sqm) BIT-PC
90 Prime & Tac 1440 Tack Coat granular surface(2.5 kg/10sqm) BIT-TC
90 Prime & Tac 1450 Tack Coat Bituminous surf(2.0 kg/10sqm) BIT-TC
100 DBM 1460 DBM course BIT-DBM
100 DBM 1470 Profile corrective course (DBM) BIT-DBM
110 BC 1480 Bituminous concrete BIT-BC
110 BC 1490 BM course BIT-BM
120 SDBC 1500 Semi dense bit concrete - 25 mm thick BIT-SDBC
130 Scarifying 1510 Scarifying existing bituminous surface SCARF
140 Excavation 1520 Exc in foundation in all types of soil EXC-SOIL
150 Concrete 1530 M 20 PCC:Head walls CONC-M20A20
150 Concrete 1540 RCC NP-4 pipes for culverts - Dia 1200mm HP-1200
160 Excavation 1550 Exc in foundation in all types of soil EXC-SOIL
160 Excavation 1560 Back behind walls with granular material FILL-GRNL
170 Concrete 1570 M 15 PCC CONC-M15A20
170 Concrete 1580 M 25 RCC -box culverts CONC-M25A20
180 Reinforcem 1590 TMT Fe 500 reinforcement REIN-FE500
190 Apron 1600 Stone soling/boulder apron PITCH-BLD
190 Apron 1610 M 10 PCC -Flat stone CONC-M10A20
200 Excavation 1620 Exc in foundation in all types of soil EXC-SOIL
200 Excavation 1630 Back behind walls with granular material FILL-GRNL
210 Concrete 1640 M 25 RCC in Foundation CONC-M25A20
210 Concrete 1650 M 25 RCC in Substrucutre CONC-M25A20
210 Concrete 1660 M25 in Superstructure CONC-M25A20
220 Finishing W 1670 Filter media behind abut/ret wall FILL-FILTER
220 Finishing W 1680 Filter media underneath stone pitching FILL-FILTER
220 Finishing W 1690 Stone pitching for revetment PITCH-BLD
220 Finishing W 1700 100 mm dia PVC pipes for weep holes. WEEP-HOLE
220 Finishing W 1710 Drainage spout DRAIN-SPOUT
220 Finishing W 1720 Tar paper bearings BRJT-TAR
220 Finishing W 1730 Asphaltic plug joint BRJT-BITF
220 Finishing W 1740 Ordinary paint on surface of culverts OTH
220 Finishing W 1750 Painting of culverts no&span arrangement OTH
230 Crash Barri 1760 M40 RCC Crash barrier BAR-RCCCR
240 Wearing co 1770 Wearing course 56mm(50mm BC +6mm mastic) CONC-WRCOAT
250 Excavation 1780 Exc in foundation in soil ( upto 0-3 m) EXC-SOIL
260 Backfilling 1790 Fill behind abutment with granular earth FILL-GRNL
260 Backfilling 1800 Sand filling FILL-GRNL
270 Foundation 1810 M-15 PCC in foundation CONC-M15A20
270 Foundation 1820 M30 RCC in foundation CONC-M30A20
270 Foundation 1830 MS cutting edge STRSTL-CE
280 Foundation 1840 TMT Fe 500 reinforcement REIN-FE500
290 Well Sinkin 1850 6.0m dia well : depth 0 to 10m WELLSIN-6.0
290 Well Sinkin 1860 6.0m dia well : depth 10 to 20 m WELLSIN-6.0
290 Well Sinkin 1870 6.0m dia well : depth 20 to 40 m WELLSIN-6.0
290 Well Sinkin 1880 8m dia well : depth 0 to 10m WELLSIN-8.0
290 Well Sinkin 1890 8m dia well : depth 10 to 20 m WELLSIN-8.0
290 Well Sinkin 1900 8m dia well : depth 20 to 30 m WELLSIN-8.0
300 Well Concre 1910 M 35 RCC Well curb CONC-M35A20
300 Well Concre 1920 M 35 RCC Well steining CONC-M35A20
300 Well Concre 1930 M-25 in bottom plug CONC-M25A20
300 Well Concre 1940 M-25 in top plug CONC-M25A20
300 Well Concre 1950 M 35 RCC Well Cap CONC-M35A20
310 Substructur 1960 M25 RCC in substructure CONC-M25A20
310 Substructur 1970 M30 RCC in substructure CONC-M30A20
310 Substructur 1980 M35 RCC in substructure CONC-M35A20
320 Substructu 1990 TMT Fe 500 reinforcement REIN-FE500
330 Superstruct 2000 M 45 PSC I girder CONC-M45A20
330 Superstruct 2010 M 35 RCC Superstructure Deck slab CONC-M35A20
340 Superstruct 2020 TMT Fe 500 reinforcement REIN-FE500
340 Superstruct 2030 HT strands PRSTRS-PRSTRS
350 Bearings 2040 420 T vertical BRJT-POT
350 Bearings 2050 120T Horizontal BRJT-POT
350 Bearings 2060 38T Horizontal BRJT-POT
350 Bearings 2070 Elastomeric bearings OTH
350 Bearings 2080 Tar paper bearings BRJT-TAR
360 Expansion J 2090 Asphaltic plug joint BRJT-BITF
360 Expansion J 2100 Filler type expansion joints BRJT-BITF
360 Expansion J 2110 Strip seal type expansion joint 40 mm BRJT-STRP
370 Approach S 2120 M15 PCC below approach slab CONC-M15A20
370 Approach S 2130 M 30 RCC Approach slab incl. reinf. CONC-M30A20
380 Wearing co 2140 Wearing course 65 mm thk. ( 25MA + 40BC) CONC-WRCOAT
390 Crash Barri 2150 M40 RCC Crash barrier BAR-RCCCR
400 Railing 2160 M30 RCC railing BAR-RAIL
410 Finishing W 2170 80 mm NB MS pipe incl epoxy paint OTH-PIPE
410 Finishing W 2180 100 mm dia AC weep holes WEEP-HOLE
410 Finishing W 2190 2 coat of syn enamel pain on plaste surf OTH
410 Finishing W 2200 Painting of bridge no & span arrangement OTH
410 Finishing W 2210 Rubble/ stone masonry[CM 1:3] MSNR-STN
410 Finishing W 2220 Flexible apron PITCH-BLD
410 Finishing W 2230 Filter material below revetment FILL-FILTER
410 Finishing W 2240 Filter media behind abut/ret wall FILL-FILTER
410 Finishing W 2250 Drainage spout DRAIN-SPOUT
420 Repair & Re 2260 Replacement of Rocker roller bearings OTH
420 Repair & Re 2270 Cleaning of drainage spouts OTH
430 Excavation 2280 Soil excavation EXC-SOIL
440 Concrete 2290 PCC M 15 CONC-M15A20
440 Concrete 2300 RCC M 35 - substructure CONC-M35A20
440 Concrete 2310 M15 PCC -Below Approach slab CONC-M15A20
440 Concrete 2320 M30 RCC -Approach slab incl reinf CONC-M30A20
450 Reinforcem 2330 TMT Fe 500 reinf. REIN-FE500
460 Wearing co 2340 Wearing course [40mm AC + 25mm MA] CONC-WRCOAT
470 Crash Barri 2350 M40 RCC Crash Barrier BAR-RCCCR
470 Crash Barri 2360 Crash Barrier with friction slab BAR-RCCCR
480 Finishing W 2370 Drainage spout DRAIN-SPOUT
480 Finishing W 2380 Painting of bridge no & span arrangement OTH
480 Finishing W 2390 Chequered tiles OTH
490 RCC Panels 2400 M35 RCC Facia panels incl reinf REWALL
500 Drain 2410 Open unlined drain DRN-LIN
500 Drain 2420 Median drain @ superelevation DRN-LIN
500 Drain 2430 Soil excavation EXC-SOIL
500 Drain 2440 PCC M15 CONC-M15A20
500 Drain 2450 Concrete M20 CONC-M20A20
500 Drain 2460 Reinforcement REIN-FE500
500 Drain 2470 Erection of precast cover CONC-M20A20
510 Proection 2480 Stone pitching on slopes -300 mm thk. PITCH-BLD
510 Proection 2490 PCC M15 CONC-M15A20
510 Proection 2500 Filter media beneath pitching FILL-FILTER
510 Proection 2510 Catch pit ( 1.2 x 1.2 m x 1.5m) OTH
510 Proection 2520 Drainage Chutes OTH
510 Proection 2530 M 15 Energy dissipation basin OTH
510 Proection 2540 Turfing of emb slopes, verge, shoulders TRFG
510 Proection 2550 Rain water harvesting structure OTH
510 Proection 2560 M S Iron Grating[200X200mm]inlet drain OTH
510 Proection 2570 P/L NP-4 300 mm dia pipe for cross roads OTH-PIPE
520 MCB 2580 Metal beam crash barrier - SSSB BAR-MCB
530 Railing 2590 P/F MS railing BAR-RAIL
540 DLC & PQC 2600 DLC M 15 CONC-DLC
540 DLC & PQC 2610 PQC M 40 CONC-PQC
550 Toll Plaza B 2620 Toll Plaza complex (civil works) TOLL-PLAZA
560 Toll Collect 2630 Toll collection system TOLL-PLAZA
570 HTMS Syst 2640 HTMS system [ civil works] TOLL-PLAZA
580 Services 2650 Electronic weigh bridge-100T TOLL-PLAZA
580 Services 2660 DG-125Kva TOLL-PLAZA
590 Electricific 2670 Toll plaza electrification TOLL-PLAZA
600 Lighting 2680 Highway lighting OTH-ELEC
610 Foothpath 2690 P/C Footpath /paved shoulders OTH
620 Kerb 2700 M20 Median/edge Kerb KRB-M
620 Kerb 2710 M20 Median Kerb - with channel KRB-M
630 Road Marki 2720 Thermoplastic markings - lane markings RFN-MARK
640 Signages & 2730 Information sign [ upto >0.9sqm size] RFN-SING
640 Signages & 2740 Direction,AdvDirect/Destination(800x600) RFN-SING
640 Signages & 2750 Bus-Stop (800 x 600mm) RFN-SING
640 Signages & 2760 Facility inform signs( 450 mm x 600 mm) RFN-SING
640 Signages & 2770 600 mm circular RFN-SING
640 Signages & 2780 Left/right curve (900mm triangular) RFN-SING
640 Signages & 2790 Octagon 900 mm ht. RFN-SING
640 Signages & 2800 Route marker sign RFN-SING
640 Signages & 2810 Two way Hazard marker RFN-SING
640 Signages & 2820 Object marker RFN-SING
640 Signages & 2830 Road stud RFN-SING
640 Signages & 2840 Road way delinator RFN-SING
640 Signages & 2850 Cantilever sign board 1500 x 2400 mm RFN-SINGNAGE
640 Signages & 2860 Four lane oh tubular gantry sign -55sqm RFN-SINGNAGE
650 Road Furnit 2870 Boundary stones RFN-SING
650 Road Furnit 2880 Hectometer stones RFN-SING
650 Road Furnit 2890 Km stones RFN-SING
650 Road Furnit 2900 5th Km stone RFN-SING
650 Road Furnit 2910 Guard stone incl. exc. PCC RCC & reinf. RFN-SING
650 Road Furnit 2920 RCC Jersey Barrier in Median BAR-RCCCR
660 Others Mis 2930 Bus bays -Passenger shelter OTH-BLDG
660 Others Mis 2940 Traffic Aid posts OTH-BLDG
660 Others Mis 2950 Medical Aid posts OTH-BLDG
660 Others Mis 2960 Colour record photographs with negatives OTH-MISC
660 Others Mis 2970 Additional print of coloured photograph OTH-MISC
660 Others Mis 2980 Colour video cassette records OTH-MISC
670 Plantation 2990 Avenue/tree plantation OTH-MISC
670 Plantation 3000 Median plantation OTH-MISC
680 Diversion o 3010 Excavation in all types of soil incl EXC-SOIL
680 Diversion o 3020 Granular subbase(Table 400-1,Grading- I) SB-GSB
680 Diversion o 3030 Premix carpet-20mm thk WC-PREMIX
690 Maintenance 3040 Repair of potholes/patches( 25mm +25mm) OTH-MAINT
700 Clearing an 3050 Clearing & grubbing road land CLG-CG
710 Dismantling 3060 Dismantling of RCC CLG-DISM
710 Dismantling 3070 Dismantling bit layer/flexi wearing coat CLG-DISM
710 Dismantling 3080 Dismantling exist non-bituminou course CLG-DISM
710 Dismantling 3090 Dismantling Hume pipe upto 900 mm dia CLG-DISM
710 Dismantling 3100 Dismantling of Brick masonry CLG-DISM
710 Dismantling 3110 Dismantling of 5th KM stone CLG-DISM
710 Dismantling 3120 Dismantling of KM stone CLG-DISM
710 Dismantling 3130 Dismantling of Hec. M stone CLG-DISM
720 Cutting Tre 3140 Cutting trees Girth above 300mm to 600mm CLG-TRCUT
720 Cutting Tre 3150 Cutting trees Girth above 600mm to 900mm CLG-TRCUT
720 Cutting Tre 3160 Cutting trees Girth above 900mm to1800mm CLG-TRCUT
720 Cutting Tre 3170 Cutting of trees Girth above 1800 mm CLG-TRCUT
730 Excavation 3180 Exc all types of soil incl. marshy soil EXC-SOIL
740 Embankmen 3190 Embankment with borrow earth EMB-BOR
740 Embankmen 3200 Emb.With appr. Material -excavated earth EMB-RDW
740 Embankmen 3210 Filling in median/island borrow earth EMB-MED
750 Subgrade 3220 Subgrade - borrow earth EMB-SGBOR
750 Subgrade 3230 Loosening & recompting subgrade EMB-SGBOR
760 GSB 3240 Granular sub base SB-GSB
770 WMM 3250 Wet mix macadam SB-WMM
780 Prime & Tac 3260 Prime coat granular surface (6/kg/10sqm) BIT-PC
780 Prime & Tac 3270 Tack Coat granular surf (2.5 kg/10 sqm) BIT-TC
780 Prime & Tac 3280 Tack Coat Bituminous surf(2.0 kg/10sqm) BIT-TC
790 DBM 3290 DBM course BIT-DBM
790 DBM 3300 Profile corrective course (DBM) BIT-DBM
800 BC 3310 Bituminous concrete BIT-BC
800 BC 3320 BM course BIT-BM
810 SDBC 3330 Semi dense bit concrete - 25 mm thick BIT-SDBC
820 Scarifying 3340 Scarifying existing bituminous surface SCARF
830 Excavation 3350 Exc in foundation in all types of soil EXC-SOIL
840 Concrete 3360 M 20 PCC:Head walls CONC-M20A20
840 Concrete 3370 RCC NP-4 pipes for culverts - Dia 1200mm HP-1200
850 Excavation 3380 Exc in foundation in all types of soil EXC-SOIL
860 Backfilling 3390 B/F behind ant/wing walls granular mat FILL-GRNL
870 Concrete 3400 M 15 PCC CONC-M15A20
870 Concrete 3410 M 25 RCC -box culverts CONC-M25A20
880 Reinforcem 3420 TMT Fe 500 reinf. REIN-FE500
890 Apron 3430 Stone soling/boulder apron PITCH-BLD
890 Apron 3440 M 10 PCC -Flat stone CONC-M10A20
900 Excavation 3450 Exc in foundation in soil (upto 0-3 m) EXC-SOIL
910 Backfilling 3460 Fill behind abutment with granular earth FILL-GRNL
910 Backfilling 3470 Sand filling FILL-GRNL
920 Foundation 3480 M-15 PCC in foundations CONC-M15A20
920 Foundation 3490 M30 RCC in foundation CONC-M30A20
920 Foundation 3500 MS cutting edge STRSTL-CE
930 Foundation 3510 TMT Fe 500 reinforcement REIN-FE500
940 Well Sinkin 3520 6.0m dia well : depth 0 to 10m WELLSIN-6.0
940 Well Sinkin 3530 6.0m dia well : depth 10 to 20 m WELLSIN-6.0
940 Well Sinkin 3540 6.0m dia well : depth 20 to 40 m WELLSIN-6.0
940 Well Sinkin 3550 8m dia well : depth 0 to 10m WELLSIN-8.0
940 Well Sinkin 3560 8m dia well : depth 10 to 20 m WELLSIN-8.0
940 Well Sinkin 3570 8m dia well : depth 20 to 30 m WELLSIN-8.0
950 Well Concre 3580 M 35 RCC Well curb CONC-M35A20
950 Well Concre 3590 M 35 RCC Well steining CONC-M35A20
950 Well Concre 3600 M-25 in bottom plug CONC-M25A20
950 Well Concre 3610 M-25 in top plug CONC-M25A20
950 Well Concre 3620 M 35 RCC Well Cap CONC-M35A20
960 Substructur 3630 M25 RCC in substructure CONC-M25A20
960 Substructur 3640 M30 RCC in substructure CONC-M30A20
960 Substructur 3650 M35 RCC in substructure CONC-M35A20
970 Substructu 3660 TMT Fe 500 reinforcement REIN-FE500
980 Superstruct 3670 M 45 PSC I girder CONC-M45A20
980 Superstruct 3680 M 35 RCC Superstructure Deck slab CONC-M35A20
990 Superstruct 3690 TMT Fe 500 reinforcement REIN-FE500
990 Superstruct 3700 HT strands PRSTRS-PRSTRS
1000 Bearings 3710 420 T vertical BEARING-FIX
1000 Bearings 3720 120T Horizontal BEARING-FIX
1000 Bearings 3730 38T Horizontal BEARING-FIX
1000 Bearings 3740 Elastomeric bearings BRJT-NEOP
1000 Bearings 3750 Tar paper bearings BRJT-TAR
1010 Expansion J 3760 Asphaltic plug joint OTH-PROWO
1010 Expansion J 3770 Filler type expansion joints BRJT-BITF
1010 Expansion J 3780 Strip seal type expansion joint 40 mm BRJT-STRP
1020 Approac Sl 3790 M15 PCC below approach slab CONC-M15A20
1020 Approac Sl 3800 M 30 RCC Approach slab incl. reinf. CONC-M30A20
1030 Wearing co 3810 Wearing course 65 mm thk. ( 25MA + 40BC) CONC-WRCOAT
1040 Crash Barri 3820 M40 RCC Crash barrier BAR-RCCCR
1050 Railing 3830 M30 RCC railing BAR-RAIL
1060 Finishing W 3840 80 mm NB MS pipe incl epoxy paint SUPPLY-PIPE-0-1M
1060 Finishing W 3850 100 mm dia AC weep holes WEEP-HOLE
1060 Finishing W 3860 2coat synthetic enamel paint plaste surf OTH
1060 Finishing W 3870 Painting of bridge no & span arrangement OTH
1060 Finishing W 3880 Rubble/ stone masonry[CM 1:3] MSNR-RR
1060 Finishing W 3890 Flexible apron PITCH-BLD
1060 Finishing W 3900 Filter material below revetment FILL-FILTER
1060 Finishing W 3910 Filter media behind abut/ret wall FILL-FILTER
1060 Finishing W 3920 Drainage spout DRAIN-SPOUT
1070 Repair & Re 3930 Replacement of Rocker roller bearings OTH-CUCO
1070 Repair & Re 3940 Cleaning of drainage spouts DRN-UNLIN
1080 Drain 3950 Open unlined drain DRN-LIN
1080 Drain 3960 Median drain @ superelevation DRN-LIN
1080 Drain 3970 Soil excavation EXC-SOIL
1080 Drain 3980 PCC M15 CONC-M15A20
1080 Drain 3990 Concrete M20 CONC-M20A20
1080 Drain 4000 Reinforcement REIN-FE500
1080 Drain 4010 Erection of precast cover CONC-M20A20
1090 Protection 4020 stone pitching on slopes -300 mm thk. PITCH-BLD
1090 Protection 4030 PCC M15 CONC-M15A20
1090 Protection 4040 Filter media beneath pitching FILL-FILTER
1090 Protection 4050 Catch pit ( 1.2 x 1.2 m x 1.5m) OTH
1090 Protection 4060 Drainage Chutes OTH
1090 Protection 4070 M 15 Energy dissipation basin OTH
1090 Protection 4080 Turfing of emb slopes, verge, shoulders TRFG
1090 Protection 4090 Rain water harvesting structure OTH
1090 Protection 4100 M S Iron Grating[200X200mm] inlet drain OTH
1090 Protection 4110 P/L NP-4 300 mm dia pipe for cross roads OTH-PIPE
1100 MCB 4120 Metal beam crash barrier - SSSB BAR-MCB
1110 Railing 4130 P/F MS railing BAR-RAIL
1120 Lighting 4140 Highway lighting OTH-ELEC
1130 Foothpath 4150 P/C Footpath /paved shoulders OTH
1140 Kerb 4160 M20 Median/edge Kerb KRB-M
1140 Kerb 4170 M20 Median Kerb - with channel KRB-M
1150 Road Marki 4180 Thermoplastic markings - lane markings RFN-MARK
1160 Signages & 4190 Information sign [ upto >0.9sqm size] RFN-SING
1160 Signages & 4200 Direct,Adv. Direct/Destination(800x600) RFN-SING
1160 Signages & 4210 Bus-Stop (800 x 600mm) RFN-SING
1160 Signages & 4220 Facility inform signs( 450 mm x 600 mm) RFN-SING
1160 Signages & 4230 600 mm circular RFN-SING
1160 Signages & 4240 Left/right curve (900mm triangular) RFN-SING
1160 Signages & 4250 Octagon 900 mm ht. RFN-SING
1160 Signages & 4260 Route marker sign RFN-SING
1160 Signages & 4270 Two way Hazard marker RFN-SING
1160 Signages & 4280 Object marker RFN-SING
1160 Signages & 4290 Road stud RFN-SING
1160 Signages & 4300 Road way delinator RFN-SING
1160 Signages & 4310 Cantilever sign board 1500 x 2400 mm RFN-SINGNAGE
1160 Signages & 4320 Four lane tubular gantry sign - 55sqm RFN-SINGNAGE
1170 Road Furnit 4330 Boundary stones RFN-SING
1170 Road Furnit 4340 Hectometer stones RFN-SING
1170 Road Furnit 4350 Km stones RFN-SING
1170 Road Furnit 4360 5th Km stone RFN-SING
1170 Road Furnit 4370 Guard stone incl. exc. PCC RCC & reinf. RFN-SING
1170 Road Furnit 4380 RCC Jersey Barrier in Median BAR-RCCCR
1180 Others Mis 4390 Bus bays -Passenger shelter OTH-BLDG
1180 Others Mis 4400 Colour record photographs with negatives OTH-MISC
1180 Others Mis 4410 Additional prints of coloured photograph OTH-MISC
1180 Others Mis 4420 Colour video cassette records OTH-MISC
1190 Plantation 4430 Avenue/tree plantation OTH-MISC
1190 Plantation 4440 Median plantation OTH-MISC
1200 Diversion o 4450 Excavation in all types of soil incl EXC-SOIL
1200 Diversion o 4460 Granular subbase(Table 400-1,Grading- I) SB-GSB
1200 Diversion o 4470 Premix carpet-20mm thk WC-PREMIX
1210 Maintenance 4480 Repair of pot holes/patches(25mm +25 mm) OTH-MAINT
5180 Electrical L 5190 Estimate for Dismantling of Existing LT, OTH-ELEC
5180 Electrical L 5200 Estimate for 33KV Line from Numaligarh t OTH-ELEC
5180 Electrical L 5210 Estimate for 11KV Line from Numaligarh t OTH-ELEC
5180 Electrical L 5220 Estimate for 11KV Line from Numaligarh t OTH-ELEC
5180 Electrical L 5230 Estimate for Construction of 11KV line C OTH-ELEC
5180 Electrical L 5240 Estimate for Construction of 3Ph 4W Comp OTH-ELEC
5180 Electrical L 5250 Estimate for Construction of 3Ph 4W Comp OTH-ELEC
5180 Electrical L 5260 Estimate for Reinstallation of 250 KVA T OTH-ELEC
5180 Electrical L 5270 Estimate for Reinstallation of 100 KVA T OTH-ELEC
5180 Electrical L 5280 Estimate for Reinstallation of 63 KVA Tr OTH-ELEC
5180 Electrical L 5290 Estimate for Reinstallation of 25 KVA Tr OTH-ELEC
5180 Electrical L 5300 Estimate for Construction of 11/0, 433KV OTH-ELEC
5180 Electrical L 5310 Estimate for Construction of 11/0, 63KV, OTH-ELEC
5180 Electrical L 5320 Estimate for 1 Phase & 3 Phase Service c OTH-ELEC
5180 Electrical L 5330 Estimate for Construction of 33KV Line f OTH-ELEC
5180 Electrical L 5340 Estimate for Dismentling of 33KV Line fr OTH-ELEC
5180 Electrical L 5350 Estimate for Construction of 11KV & LT ( OTH-ELEC
5180 Electrical L 5360 Estimate for Dismentling of 11KV Line fr OTH-ELEC
5180 Electrical L 5370 Estimate for Dismentling of LT Line from OTH-ELEC
5180 Electrical L 5380 Estimate for Construction of 2(two) Nos OTH-ELEC
5180 Electrical L 5390 Estimate for Construction of 4(four) Nos OTH-ELEC
5180 Electrical L 5400 Estimate for Construction of 6(Six) Nos OTH-ELEC
5180 Electrical L 5410 Estimate for Dismentling of 1No. 63KVA S OTH-ELEC
5180 Electrical L 5420 Estimate for Dismentling of 6(Six) Nos 2 OTH-ELEC
5180 Electrical L 5430 Estimate for new service connection due OTH-ELEC
5180 Electrical L 5440 Estimate for Dismentling of existing ser OTH-ELEC
5180 Electrical L 5450 Estimate for Construction of 33KV Line f OTH-ELEC
5180 Electrical L 5460 Estimate for Dismentling of 33KV Line fr OTH-ELEC
5180 Electrical L 5470 Estimate for Construction of 11KV & LT ( OTH-ELEC
5180 Electrical L 5480 Estimate for Dismentling of 11KV Line fr OTH-ELEC
5180 Electrical L 5490 Estimate for Dismentling of LT Line from OTH-ELEC
5180 Electrical L 5500 Estimate for Construction of 1 No 500KVA OTH-ELEC
5180 Electrical L 5510 Estimate for Construction of 16(Sixteen) OTH-ELEC
5180 Electrical L 5520 Estimate for Construction of 10 Nos 100K OTH-ELEC
5180 Electrical L 5530 Estimate for Construction of 8 Nos 63KVA OTH-ELEC
5180 Electrical L 5540 Estimate for Dismentling of transformers OTH-ELEC
5180 Electrical L 5550 Estimate for Construction of 10 Nos 25KV OTH-ELEC
5180 Electrical L 5560 Estimate for new service connection due OTH-ELEC
5180 Electrical L 5570 Estimate for Construction of 33 KV line OTH-ELEC
5180 Electrical L 5580 Estimate for Construction of 11 KV & LT OTH-ELEC
5180 Electrical L 5590 Estimate for Construction of 11 KV doubl OTH-ELEC
5180 Electrical L 5600 Estimate for Dismentling of 11 KV line f OTH-ELEC
5180 Electrical L 5610 Estimate for Dismentling of LT line 1 Ph OTH-ELEC
5180 Electrical L 5620 Estimate for Construction of 250 KVA S/S OTH-ELEC
5180 Electrical L 5630 Estimate for Construction of 100 KVA Tra OTH-ELEC
5180 Electrical L 5640 Estimate for Construction of 25 KVA Tran OTH-ELEC
5180 Electrical L 5650 Estimate for Dismentling of Sub-Station OTH-ELEC
5180 Electrical L 5660 Estimate for new service connection from OTH-ELEC
5180 Electrical L 5670 Estimate for Dismentling of existing ser OTH-ELEC
5180 Electrical L 5680 Estimate for Construction of 33/11 KV RR OTH-ELEC
5180 Electrical L 5690 Estimate for shifting of Existing 1 x 3. OTH-ELEC
5180 Electrical L 5700 Estimate for construction of Boundary wa OTH-ELEC
5180 Electrical L 5710 Estimate for construction of Complain bo OTH-ELEC
5180 Electrical L 5720 Estimate for construction of toilet room OTH-ELEC
5180 Electrical L 5730 Estimate for construction of transformer OTH-ELEC
5180 Electrical L 5740 Dismentling of Infrastructure at 33KV / OTH-ELEC
50 Embankmen 1361 Selected Earth fill in RE wall with Fi - EMB-BOR
150 Concrete 1541 PCC M15 for pipe bedding & below headwa CONC-M15A20
150 Concrete 1542 RCC M20 for catch pits CONC-M20A20
150 Concrete 1543 Reinforcement Fe 500 REIN-FE500
170 Concrete 1581 M 25 RCC - foundation (Utrough + cutain CONC-M25A20
200 Excavation 1631 M-15 PCC in Foundation CONC-M15A20
210 Concrete 1661 M30 in Superstructure CONC-M25A20
210 Concrete 1662 TMT Fe 500 reinforcement REIN-FE500
270 Foundation 1831 M25 for Independent Retaining walls foun CONC-M25A20
270 Foundation 1832 M35 RCC in Foundation CONC-M35A20
270 Foundation 1833 M20 PCC ABUTMENTS of exst, Bridges CONC-M20A20
320 Substructu 1991 M40 RCC in substructure CONC-M40A20
320 Substructu 1992 M50 RCC in substructure CONC-M50A20
330 Superstruct 2011 M30 RCC in Superstucture CONC-M30A20
330 Superstruct 2012 M 50 RCC Slab & cross girder CONC-M50A20
410 Finishing W 2251 Compacted sand bed below foundation for FILL-SAND
410 Finishing W 2252 Rigid Floor apron 450 mm thk FILL-SCNDAR
410 Finishing W 2253 Curtain wall PCC M20 in steps at u/s an CONC-M20A20
410 Finishing W 2254 Drilling of Holes in Deck slab for CB re DRL-EXPHOL
420 Repair & Re 2271 Repaiir and rehablitation & testing of b OTH
480 Finishing W 2391 100 MM DIA WEEP HOLES OTH
480 Finishing W 2392 600 MM Thk Filter media behind abut/ret FILL-FILTER
500 Drain 2421 Excavation EXC-SOIL
500 Drain 2422 CONC-M15A20 CONC-M15A20
500 Drain 2423 CONC-M20A20 CONC-M20A20
500 Drain 2424 REIN-FE500 REIN-FE500
840 Concrete 3371 PCC M15 for pipe bedding & below headwa CONC-M15A20
840 Concrete 3372 RCC M20 for catch pits CONC-M20A20
840 Concrete 3373 Reinforcement Fe 500 REIN-FE500
870 Concrete 3411 M 25 RCC - foundation (Utrough + cutain CONC-M25A20
920 Foundation 3501 M25 for Independent Retaining walls foun CONC-M25A20
920 Foundation 3502 M35 RCC in Foundation CONC-M35A20
920 Foundation 3503 M20 PCC ABUTMENTS of exst, Bridges CONC-M20A20
960 Substructur 3651 M40 RCC in substructure CONC-M40A20
960 Substructur 3652 M50 RCC in substructure CONC-M50A20
980 Superstruct 3681 M30 RCC in Superstucture CONC-M30A20
980 Superstruct 3682 M 50 RCC Slab & cross girder CONC-M50A20
1060 Finishing W 3921 Compacted sand bed below foundation for FILL-SAND
1060 Finishing W 3922 Rigid Floor apron 450 mm thk FILL-SCNDAR
1060 Finishing W 3923 Curtain wall PCC M20 in steps at u/s an CONC-M20A20
1060 Finishing W 3924 Drilling of Holes in Deck slab for CB re DRL-EXPHOL
1080 Drain 3961 Excavation EXC-SOIL
1080 Drain 3962 PCC- M15 CONC-M15A20
1080 Drain 3963 Concrete- M-20 CONC-M20A20
1080 Drain 3964 Reinforcement REIN-FE500
1080 Drain 4011 Total Length of Pipes OTH
1080 Drain 4012 Total PCC M20 Head wall Qty OTH
1080 Drain 4013 Total Granualar/ M15 PCC Bedding OTH
1080 Drain 4014 Total Volume of RCC M20 of catchpit OTH
1080 Drain 4015 TotaReinforcement for Catchpit OTH
5750 Well Concre 1951 M 35 RCC PILE Cap CONC-M35A20
5750 Well Concre 1952 M 35 Bored cast in situ piles :1200 mm d CONC-M35A20
5750 Well Concre 1953 Initial load test (INCL reinf,anchor pil PILE-TEST
5750 Well Concre 1954 M.S Liner 6 mm thk for piles STRSTL-LINER
5760 Drain Cross 2471 Total Length of Pipes HP-300
5760 Drain Cross 2472 Total PCC M20 Head wall Qty CONC-M20A20
5760 Drain Cross 2473 Total Granualar/ M15 PCC Bedding CONC-M15A20
5760 Drain Cross 2474 Total Volume of RCC M20 of catchpit CONC-M20A20
5760 Drain Cross 2475 TotaReinforcement for Catchpit REIN-FE500
5770 TMT Fe 500 3511 M 35 RCC PILE Cap CONC-M35A20
5770 TMT Fe 500 3512 M 35 Bored cast in situ piles :1200 mm d CONC-M35A20
5770 TMT Fe 500 3513 Initial load test (INCL reinf,anchor pil PILE-TEST
5770 TMT Fe 500 3514 M.S Liner 6 mm thk for piles STRSTL-LINER
50 Embankmen 1381 Embkmt with approved after slush removal EMB-BOR
80 WMM 1421 WMM with reuse material SB-WMM
740 Embankmen 3211 Embkmt with approved after slush removal EMB-BOR
770 WMM 3251 WMM with reuse material SB-WMM
5780 Value Engin 5790 Value Engineering+ve VALENGG
5780 Value Engin 5800 Value Engineering-ve VALENGG
1211 Road mainte 4481 Road maintenance of Isolux package OTH-MAINT
60 Subgrade 1411 Service Road -Sub grade EMB-SGBOR
750 Subgrade 3231 Service Road -Sub grade EMB-SGBOR
Work Front UOM BOQ Rate Base Object Unit Cost Jan-17 Feb-17 Mar-17

RW HAR 34438 0 1.1 6 6


DIS M3 1189 0 51.45 0
DBT M3 1255 0 518 518
DNB M3 146 0 1268.58 1268.58
DIS M 302 0 10
DIS M3 254 0 0
DIS NO 242 0 1 0.65
DIS NO 121 0 2 1.8
DIS NO 61 0 10 10
TRC NO 363 0 85.45
TRC NO 423 0
TRC NO 483 0 20.05
TRC NO 604 0 21.2
RW M3 71 0 4500 4622 11013.4
RW M3 313 0 11400 9800
RW M3 112 0 0
RW M3 303 0
RW M3 321 0 11512.1 43296.5 42552.14
M3 85 0
RW M3 2624 0 7015.2 12317.28 14793.6
RW M3 2932 0 5756.88 10807.4 13056.09
RW M2 40 0 21875 33425 78610
RW M2 19 0 21875 33425 78610
RW M2 16 0 0 0 0
RW M3 11546 0 1640.62 2506.88 5895.75
RW M3 11225 0 0 0 525
RW M3 12904 0 0 0 0
M3 9706 0
RW M3 12015 0 0 0 0
M2 221 0
M3 77 0
STR M3 5640 0 0 0 26.43
STR M 11081 0 0 35.27
STR M3 77 0 83.37 184.57 153.26
STR M3 238 0 59.76 107.83 97.06
STR M3 5203 0 9.63 19.75 15.75
STR M3 6798 0 75.38 145.33 116.7
STR TO 76400 0 5.52 11.89 10.27
STR M3 2264 0 26.5 26.5 26.5
STR M3 4038 0 2.9 7.99
STR M3 77 0 67.1
STR M3 277 0 0 0 0
STR M3 6229 0
STR M3 6798 0 0 0 61.98
STR M3 7650 0
STR M3 2642 0 0 3.56 15.37
STR M3 2642 0 0 30.27 81.4
STR M3 1661 0 0 43.11 53.59
STR M 121 0 22.05
STR NO 1509 0
STR M2 182 0 0 3.12 8.77
STR M 16296 0
PNT M2 363 0
PNT NO 182 0
STR M 4878 0 0 3.56 11.17
BRD M2 855 0 0 332.1 416.15
STR M3 77 0 0 1330.68 2238.32
STR M3 239 0 0 0 224.57
M3 1159 0
STR M3 5076 0 0 41.97 121.03
BRD M3 6352 0
BRD TO 112798 0
BRD TO 76491 0 0 38.05 44.23
BRD M 23011 0
BRD M 26026 0
BRD M 29040 0
BRD M 40908 0
BRD M 46267 0
BRD M 51627 0
Cur M3 6569 0
STN M3 6427 0
STR M3 5605 0
STR M3 5605 0
WCP M3 5992 0
SBC M3 6087 0
SSC M3 6319 0
SBC M3 6569 0 0 39 353.37
RSB TO 76491 0 0 6.13 48.13
SSC M3 8576 0
SSC M3 7707 0 0 130.2 0
RSS TO 76491 0 0 9.74 7.29
BRD TO 132085 0 0 0 0
BRD NO 83070 0
BRD NO 90634 0
BRD NO 28773 0
CCM 1 0
BRD M2 182 0 20.5 28
BRD M 5811 0
BRD M 1690 0 22 37.1
BRD M 5811 0
STR M3 5203 0 0 0 37.5
BRD M3 10904 0 0 0 71.2
BRD M2 1300 0 0 0 0
BRD M 5866 0 0 0 133.09
BRD M 4306 0 0 0 25
OTH M 615 0
OTH NO 121 0 65.5 176.2 147.8
PNT M2 182 0 0 0 0
PNT NO 182 0 0 0 0
BSP M3 1369 0 0 0 0
OTH M3 2264 0
OTH M3 2399 0 0 0 0
OTH M3 2399 0 0 0 126.9
STR NO 1509 0 0 0 20
REP NO 42248 0
DPC NO 61 0
VUP M3 77 0
VUP M3 5203 0
VUP M3 5979 0
VUP M3 5203 0
VUP M3 5991 0
VUP TO 76515 0
BRD M2 1301 0
BRD M 6190 0
VUP M 18576 0
VUP NO 1509 0
VUP NO 182 0
VUP M2 483 0
VUP M2 4427 0 1120
CDW M 64 0
CDW M 1773 0
CDW M3 77.14 0 673.31 1211.96 673.31
CDW M3 5203 0 89.67 161.4 89.67
CDW M3 5900 0 355.7 640.26 355.7
CDW TO 76400 0 14.88 26.78 14.88
CDW M3 5900 0
CDW M3 1661 0
CDW M3 5076 0
CDW M3 2399 0
CDW NO 7243 0
CDW M 2002 0
CDW NO 1509 0
CDW M2 31 0
CDW NO 32057 0
CDW NO 906 0
CDW M 2423 0
CDW M 2193 0
CDW M 3177 0
TP M3 4680 0
TP M3 7601 0
TP LS 33318764 0
TP1 LS 30518245 0
TP2 LS 28526507 0
TP3 NO 1810602 0
TP4 NO 1207068 0
TP5 LS 7843435 0
OTH LS 38423358 0
RW M2 1139 0
RW M 645 0 2770 5200 6280
RW M 851 0
RW M2 541 0
S1 M2 7265 0
S2 NO 3487 0
S3 NO 3487 0
S4 NO 3234 0
S5 NO 3655 0
S6 NO 3889 0
S7 NO 5760 0
S8 NO 3571 0
S9 NO 1873 0
S10 NO 2126 0
S11 NO 228 0
S12 NO 739 0
S13 NO 152276 0
S14 NO 1029146 0
F1 NO 1014 0
F2 NO 278 0
F3 NO 894 0
F4 NO 1280 0
F5 NO 2682 0
F6 M 6171 0
O1 NO 154032 0
O2 NO 1031189 0
O3 NO 1031189 0
O4 NO 138 0
O5 NO 69 0
O6 SET 34373 0
O7 NO 934 0
O8 KM 67279 0
OTH M3 71 0 642.36 642.36
OTH M3 2791 0 256.94 256.94
OTH M2 297 0 1284.72 1284.72
OTH M2 626 0
RW HAR 34438 0
DIS M3 1189 0
DBT M3 1255 0
DNB M3 146 0
DIS M 302 0
DIS M3 254 0
DIS NO 242 0
DIS NO 121 0
DIS NO 61 0
TRC NO 363 0
TRC NO 423 0
TRC NO 483 0
TRC NO 604 0
RW M3 71 0
RW M3 313 0 0 0 0
RW M3 112 0
RW M3 303 0
RW M3 321 0 0 0 0
M3 85 0
RW M3 2624 0 0 0 0
RW M3 2932 0 0 0 0
RW M2 40 0 0 0 0
RW M2 19 0 0 0 0
RW M2 16 0 0 0 0
RW M3 11546 0 0 0 0
RW M3 11225 0 0 0 0
RW M3 12904 0 0 0 0
M3 9706 0
RW M3 12015 0 0 0 0
M2 221 0
M3 77 0
STR M3 5640 0 0 0 0
STR M 11081 0 0 0 0
STR M3 77 0 0 0 0
STR M3 238 0 0 0 0
STR M3 5203 0 0 0 0
STR M3 6798 0 0 0 0
STR TO 76400 0 0 0 0
STR M3 2264 0
STR M3 4038 0
STR M3 77 0 0 249.78 293.22
STR M3 239 0 0 0 0
STR M3 1159 0 0 0 0
STR M3 5076 0 0 0 8
BRD M3 6352 0 0 0 0
BRD TO 112798 0
RF TO 76491 0 0 59.53 59.53
BRD M 23011 0
BRD M 26026 0
BRD M 0 0
BRD M 40908 0
BRD M 46267 0
BRD M 51627 0
Cur M3 6569 0
STN M3 6427 0
BRD M3 5605 0
BRD M3 5605 0
WCP M3 5992 0
SBC M3 6087 0 0 0 0
SBC M3 6319 0 0 0 0
SBC M3 6569 0 0 0 0
RSB TO 76491 0 0 0 0
PSC M3 8576 0
SSC M3 7707 0
RSS TO 76491 0 0 0 0
BRD TO 132085 0
BRD NO 0 0
BRD NO 0 0
BRD NO 0 0
BRD CCM 1 0
BRD M2 182 0
BRD M 0 0
BRD M 1690 0
BRD M 5811 0
STR M3 5203 0 0 0 0
BRD M3 10904 0 0 0 0
BRD M2 1300 0
BRD M 5866 0 0 0 0
BRD M 4306 0
OTH M 0 0
OTH NO 121 0 0 0 0
PNT M2 182 0
PNT NO 182 0
BSP M3 0 0
BSP M3 2264 0
OTH M3 2399 0
OTH M3 2399 0
STR NO 1509 0 0 0 0
NO 0 0
NO 0 0
CDW M 64 0
M 1773 0
CDW M3 77.14 0 451.3 541.56 812.34
CDW M3 5203 0 79.78 95.74 143.6
CDW M3 5900 0 303.76 364.52 546.77
CDW TO 76400 0 12.62 15.14 22.71
CDW M3 5900 0
CDW M3 1661 0
CDW M3 5076 0
CDW M3 2399 0
CDW NO 7243 0
CDW M 2002 0
CDW NO 1509 0
CDW M2 31 0
CDW NO 32057 0
CDW NO 906 0
CDW M 2423 0
OTH M 2193 0
OTH M 3177 0
OTH LS 38423358 0
RW M2 1139 0
RW M 645 0 0 0 0
RW M 851 0
RW M2 541 0
S1 M2 7265 0
S2 NO 3487 0
S3 NO 3487 0
S4 NO 3234 0
S5 NO 3655 0
S6 NO 3889 0
S7 NO 5760 0
S8 NO 3571 0
S9 NO 1873 0
S10 NO 2126 0
S11 NO 228 0
S12 NO 739 0
S13 NO 152276 0
S14 NO 1029146 0
F1 NO 1014 0
F2 NO 278 0
F3 NO 894 0
F4 NO 1280 0
F5 NO 2682 0
F6 M 6171 0
O1 NO 154032 0
O4 NO 138 0
O5 NO 69 0
O6 SET 34373 0
O7 NO 934 0
O8 KM 67279 0
OTH M3 71 0
OTH M3 2791 0
OTH M2 297 0
OTH M2 626 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
UTS LS 100 0
RW M3 321 0
STR M3 5203 0 0 41.67
STR M3 5900 0 0 4.4
STR TO 76400 0 0 0.29
STR M3 6229 0 31.71 99.19 98.97
STR M3 5203 0 0 0 54.47
STR M3 7650 0 0 8.21 20.32
STR TO 76400 0 0 0.57 3.01
FDC H 5605 0
FDC M3 6569 0 0 36.65 124.35
BRD M3 5900 0 0 309.35 650.65
SBC M3 7400 0 0 0 0
SBC M3 76491 0
SSC M3 7707 0 0 0 116.4
SSC M3 8576 0 0 0 0
M3 425 0
M3 5000 0
BRD M3 5900 0
BRD M 20000 0 0 0 9
BRD NO 122903 0
VUP NO 121 0
VUP M3 2399 0
CDW M3 77 0
CDW M3 5203 0
MDW M3 5900 0
CDW M3 76400 0
STR M3 5203 0 0 0 0
CDW M3 5900 0 0 0 0
STR TO 76400 0 0 0 0
STR M3 6229 0 0 0 0
BRD M3 5605 0
FDC M3 6569 0
BRD M3 5900 0 0 0 0
SBC M3 7000 0 0 0 0
SBC M3 7400 0
SSC M3 7000 0 0 0 0
SSC M3 7400 0 0 0 0
BRD M3 425 0
BRD M3 5000 0
BRD M3 5900 0
BRD M 20000 0
CDW M3 77 0 0 0 0
CDW M3 5203 0 0 0 0
CDW M3 5900 0 0 0 0
CDW TO 76400 0 0 0 0
MDW H 9081 0
MDW H 5640 0
MDW H 5203 0
MDW H 5640 0
MDW H 76400 0
WCP M3 6569 0 113 113
PCN M 16000 0 0 100.8 43.2
PIL NO 1157201 0 1
PIL TO 111992 0
MDW M 9081 0
MDW M3 5640 0
MDW M3 5203 0
MDW M3 5640 0
MDW TO 76400 0
PCP M3 6569 0
PCN M 16000 0 187.6 187.6
PIL NO 1157201 0
PIL TO 111992 0 4.69
NEW M3 313 0 5000
NEW M3 700 0
NEW M3 313 0
NEW M3 700 0
VLP LS 100000 0
H -100000 0
LS 100 0
SRN M3 321 0
SRJ M3 321 0
Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17

3.2
0 0 0 0 0 0 150 145
518 518 518 518
1268.58 1268.58 1268.58 1268.58
10 8.97 10 10 10 11.23 0
10 20 80 13.5
7
2 2 2
10 10 10

0 0 0 0 0 0 30967.3 27942.82
9670 9670 5400
2074.35 6598.77 9453.4 8822.68
10000 10000 10000
42550.04 12660.35 0 0 0 2725 50051.71 44757.78 36546.02

6989.6 4064 3048 3048 772.16 0 14515.6 15283.68 14641.15


7829.25 2085 2085 2085 2085 0 7370.06 9503.38 10842.75
38555 0 0 0 0 66762.5 40121.67 52524.84 44263.33
38555 0 0 0 0 66762.5 40121.67 46541.83 44263.33
0 0 0 0 0 0 60725 79031.75 33775
2891.62 0 0 0 5007.19 3009.12 3490.64 3319.75
561.75 0 0 0 0 953.75 537.5 350 1062.5
0 0 0 0 0 0 2429 3343 0

0 0 0 0 0 0 0 479.5 844.38

0 62.62 14.91 0 0
122.77 25 0
206.4 138.82 189.75 33.79 0 0 0 0 0
136.38 112.55 179.48 18.26 0 0 0 0 0
22 16.2 22.21 3.46 0 0 0 0 0
165.86 136.14 194.1 24.93 0 0 0 0 0
13.62 10.19 13.97 2.18 0 0 0 0 0
26.5 26.5 26.5 26.5
15.08 15.08 0 0 0 0 0 0 0
88.34 88.34
0 0 0 0 0 0 0 0 0
146.75 146.75 0 0 0 0 0 0 0

40.46 40.46 0 0 0 0 0 0 0
54.56 54.56 0 0 0 0 0 0 0
42.64 42.64 0 0 0 0 0 0 0
58.05 58.05

20.97 20.97 0 0 0 0 0 0 0

28 28 0 0 0 0 0 0 0
280.85 280.85 0 0 0 0 0 0 0
0 0 0 0 0 1110.6 740.4 522.5 522.5
313.43 90 0 0 0 0 0 0 0
0 0 0
0 0 0 0 0 38.4 25.6 0 0

2.92 2.92
0 0 0 0 0 0 0 12.65 25.31
20
20

20

88.5 88.5
333.29 666.57

156.26 33.37 0 0 0 0 0 0 0
22.41 7.89 0 0 0 0 0 0 0

98.9 162.9 0 0 0 0 0 0 0
30.22 17.31 0 0 0 0 0 9.26 21.62
0 0 0 0 0 0 0 0 6.79
8 16
1 2
1 2

49.5 84.7 21.3 0 0 0 0 0


66.9 100.15 24.15

44.8 5.7 0 0 0 0 0 0 12
52.7 43.1 0 0 0 0 0 0 23
230.5 230.5 0 895 0 0 0 706 706
200.3 126.4 50 0 0 0 0 0 77.2
0 111 42 84 0 0 0 0 0

37.5 0 0 0 0 0 0 0 0
0 375 0 338 0 0 0 236 100
0 3 0 1 0 0 0 1 0
120.5 126.5 0 69 0 0 0 0 0

49 51 0 31 0 0 0 0 0
166.6 57.5 0 0 0 0
22 0 0 0 0 0 0 0 5

39.2
535.5 400.76

32.54 29.58

560 560 560 560 560 560 1120


2883.83 2883.83 2883.83 2883.83 2883.83 2883.83

1077.3 1077.3 673.31 538.65 0 0 0 0 0


143.47 143.47 89.67 71.73 0 0 0 0 0
569.12 569.12 355.7 284.56
23.8 23.8 14.88 11.9
226.67 226.67 226.67 226.67
423.08 423.08 423.08 423.08
0.17 0.17 0.17 0.17

3770 1010 1010 1010 1010 0 6580 8114.2 7890


642.36
256.94
1284.72

10 10 10
85.51 85.51

9.64 9.64
16.97 16.97
0.71 0.71
2.86 2.86
14.29 14.29
52.95 52.95
39.74 39.74
26.52 26.52
13.22 13.22
1369 16000 30000
0 0 0 0 0 0 0 15946.05 58954.91
7596.8

0 0 0 0 0 0 0 0 20322.89

0 0 0 0 0 0 0 0 4624
0 0 0 0 0 0 0 0 1326.8
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 9.02 10.82 9.02 9.02 18.04 18.04


0 0 0 19.16 22.99 19.16 19.16 38.32 38.32
0 0 0 146.87 195.75 109.81 254.68 297.83 307.26
0 0 0 127.15 144.56 34.68 174.33 224.99 212.52
0 0 0 15.13 21.19 19.39 28.34 33.29 35.15
0 0 0 111.21 159.37 138.41 225.05 265.46 277.51
0 0 0 10.24 13.46 12.14 17.32 20.67 20.92
0 0 0 0 0 0 0 486.33 1541.35
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 364.16
8 0 0 0 0 0 0 0 91.68
0 0 0 0 0 0 0 0 248.84

0 0 0 0 0 0 0 0 39.25

0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 56
0 0 0 0 0 0 0 13.23 11.04

0 0 0 0 0 0 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0

902.6 1083.11 1083.11 1444.15 1353.89 1444.15 1083.11 812.34 812.34


159.56 191.47 191.47 255.3 239.34 255.3 191.47 143.6 143.6
607.53 729.03 729.03 972.04 911.29 972.04 729.03 546.77 546.77
25.23 30.28 30.28 40.37 37.85 40.37 30.28 22.71 22.71

0 0 0 0 0 0 0 0 637.58
1500 1500 2500 2500 2500 2500 10000 10000 11284
140.86 28.66 0
11 2.2 0
0.72 0.14 0
111.94 59.24 71.58 21.7 0 0 0 0 0
140.31 140.31 0 0 0 0 0 0 0
39.36 39.36 0 0 0 0 0 0 0
6.71 6.71 0 0 0 0 0 0 0

0 0 0 0 0
0 0 0 0 0 0 0 0 0
5.41 4.8 0 0 0 0 0 0 0

350 68.6 0 0 0 0 0 0
0 0 0 0 0 0 0 62.05 151.92

0 42 10 35
274.86 169.14

1143.27 1143.27 1143.27 1143.27 1143.27


83.19 83.19 83.19 83.19 83.19
282.88 282.88 282.88 282.88 282.88
11.88 11.88 11.88 11.88 11.88
0 0 0 28.27 33.92 28.27 28.27 56.53 56.53
0 0 0 2.2 2.64 2.2 2.2 4.4 4.4
0 0 0 0.14 0.17 0.14 0.14 0.29 0.29
0 0 0 104.81 114.56 96.66 118.96 142.98 127.57
0 0 0 0 0 0

0 0 0 0 0 0 0 0 545.52
0 0 0 0 0 0 0 0 7

0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 226 0 0
0 0 0 0 0 0 0 0 0

129.3 129.3 129.3


138.56 138.56 138.56
51.72 51.72 51.72
6.11 6.11 6.11
0.37 0.37 0.37
339
160.8
1

5000 5000 8500 7500 7500


0 0 0 0 0 5359.75 5359.75 5359.75
6918.8 6918.8 6918.8
0
Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18

518 518 518 518 518 899.96


1268.58 1268.58 1268.58 1268.58 1268.58 1268.58
0 0 0

2 1 8
10 44

34205.45 12235 0 0 0 0 0 0 0

7909.69 8824.73 0 0 0 0
10996 20000
25525.66 14151.62 12091.8

11503.17 13468.2 5442.89


10960.65 5735.3 5273.82
69023.33 52673.33 33443.33 0
69023.33 52673.33 23443.33 0 0 0 0 0 0
124232.56 106168.17 81562.5 0 0 0 0 0 0
5176.75 3950.5 1758.25
768 804 570 0 0 0
4085 4780.5 3262.5 0 0 0 0 0 0

997.5 0 0 0 0 0 0 0 0

29.64 59.28 29.64


24.9 49.81 24.9
3.26 6.52 3.26
27.11 54.22 27.11
2 4.01 2
26.5
0 0 10.92 10.92 0 0 0

0 0 97.93 97.93 0
0 0 138.73 138.73 0 0

0 0 17.96 17.96
0 0 13.48 13.48
0 0 6.93 6.93 0 0

0 0 13.3 13.3

0 0 15.41 15.41
0 0 65.5 65.5
0

0 0
0 0 0 0 0 0 0 0 0

37.84 18.7 10.48 6.99

19.8
20
20 20
4.04

996.53 400.61
161 322

92 276 184

0 0 73.44 220.31 146.87


0 0 11.66 38.27 28.09
25

0 409.16 0

0 0 38.6 0 0 0

0 154.4 0
0 175 696
0 455.36 0

0 96.25 0

18
46.2

455.4
82.8
1500
8
2

1120 1120 382


2883.83 2883.83 2883.83 2883.83 2883.83 2883.83

0 0 0 0 0 0

289.37 289.37
470.04 470.04
111.58 111.58
5.32 5.32
47.53 47.53
5.18 5.18
11087.16 11087.16
5.53 5.53
91.7 91.7
31.36 31.36
987.42 987
4127.2 4127.2
226.67 226.67 453.33 453.33 453.33
423.08 423.08 846.17 846.17 846.17
0.17 0.15
0.17 0.17 0.17 0.17 0.17
0.17 0.17 0.17 0.17 0.17

6770 8500 6890 1678 0 0 0 0 0

2000

1
162.5
65
325

10 0 0 0 0 0 0 0 0
37.04 0 0 0 0 0 0 0 0
0 0 0 1248.99 1058.01 529.01
0 0 0 3152.82 3152.82 1576.41
4.18 0 0 0 0 0 0 0 0
7.35 0 0 0 0 0 0 0 0
0.31 0 0 0 0 0 0 0 0
1.24 0 0 0 0 0 0 0 0
6.19 0 0 0 0 0 0 0 0
22.93 0 0 0 0 0 0 0 0
17.21 0 0 0 0 0 0 0 0
11.49 0 0 0 0 0 0 0 0
5.72 0 0 0 0 0 0 0 0
30805 19007.62 0 0 0 0
28856.51 42225.38 86146.98 47441.23 0 0 0 0 0
5088.19 9669.64 3536.35
10000 5000
15308.05 32615.84 4604.3 24760.7 18566.3 17417.5 15111 3277.87 10951.74

7344 15095.68 7793.12 4080 5586.65 9039.92 6159.98 8486.4 12294.4


2211.33 7430.32 7835.19 3750 3750 2557.6 3602.6 1996.38 4931.44
14875 20533.33 70968.33 17333.34 9333.33 0 0 0 54755.84
14875 20533.33 70968.33 9333.33 9333.33 0 0 0 62533.33
0 18483.51 11375 7491.75 7491.75 0 5740 15540 17500
1115.62 1540 5322.62 700 700 0 0 0 4690
0 0 297.5 0 0 0 287 777 0
0 0 0 0 0 0 0 0 0

0 962.5 135.62 437.5 437.5 0 0 0 437.5

18.04 9.02 12.63 10.82


38.32 19.16 26.82 22.99 0 0 0 0 0
268.39 206.22 78 0
184.67 149.34 50.42
30.74 23.25 8.96
242.07 184.93 72.37 0
18.15 14.05 5.25
2662.32 0 0 0 0 0 0 0 0
0 515.9 1006.5 336.6 0 0 0
988.34 334.5 0 0 0
105.52 22.8 0 0 0 0 0 0 0
319.96 73.2 0 0 0

50.16 11.54 0 0 0

157.5 161.1 47.4 0 0


188.4 204 60.6
104 0 0 0 0 0
60.21 36.97 10.07 0 0 0 0

0 42.83 46.46 5.22 0 0 0


0 0 0 0 0 0 0 12.79 0

25.9 19.9 7 0

22.4 9.6 74
37.5
0 11.9 63.3 19.8 0
0 23.1 120.4 37.5 0 0 0 0 0
459 1619.6 0
0 60.9 309.3 64.8 0
44 142

255.2 268.9 42.9 0 0

1 3
304 918
188 798.25
158 305.36
0 2 18 6 0

4658.5

812.34 812.34 451.3 451.3 451.3 451.3 451.3 902.6 0


143.6 143.6 79.78 79.78 79.78 79.78 79.78 159.56 0
546.77 546.77 303.76 303.76 303.76 303.76 303.76 607.53
22.71 22.71 12.62 12.62 12.62 12.62 12.62 25.23

1062.63 3570.55 3765.11 4500 4300 1229.02 1731.19 2159.34 8340


200 400
1 1
12.26 24.53 12.26 0 0 0 0 0 0
0 0 14.84 14.84 0 0 0 0 0
0 0 30.47 30.47
0 0 2.08 2.08

20.66 13.77
16.24

0
266.28
0 2286.54 2286.54 1692.04
0 166.38 166.38 123.12
0 565.76 565.76 418.66
0 23.76 23.76 17.58
56.53 28.27 39.57 33.92
4.4 2.2 3.08 2.64
0.29 0.14 0.2 0.17
110.08 89.07 27.78 0
0 0 0 0 0 127.98 160.52 37.5 0

354.88 15.6 0 0 0 0 0 0 0
13 0 0 0 0 0

0 198.1 245.9 69 0 0 0
0 195.36 195.36 0 0 0 0 0 0

89 237

15 40
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0

0 0 0 0 0
0 0

129.3 129.3
138.56 138.56
51.72 51.72
6.11 6.11
0.37 0.37

11364
4428.75
6918.8 6918.8
0 9164 2291 2291 2291

18590 18590 2619.5 8450 8450 0 0 0 8450


Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Total Qty

16.30
346.45
6597.96
15222.96
70.20
123.50
8.65
20.80
104.00
85.45
0.00
20.05
21.20
0 0 0 125485.97
45940.00
43683.62
60996.00
338420.72
0.00
126902.53
95475.58
531277.33
0 0 0 0 0 0 0 515294.32
26250 0 0 0 0 0 0 511744.98
38647.07
0 6132.50
1050 18950.00
0.00
2321.38
0.00
0.00
103.96
183.04
1108.52
810.93
122.04
966.88
75.65
212.00
62.89
243.78
195.86
0.00
632.94
0.00
135.77
247.75
195.84
138.15
0.00
80.43
0.00
0.00
0.00
101.55
1440.95
6465.00
628.00
0.00
0 0 0 227.00
0.00
5.84
194.25
20.00
20.00
19.80
40.00
40.00
4.04
177.00
2397.00
483.00
0.00
552.00
0.00
0.00
1022.62
162.58
0.00
66.26 77.3 77.3 612.86
95.44
19.95 19.95 19.95 66.64
20 44.00
5 8.00
5 8.00
0.00
204.00
0.00
250.30
75 100.00
13 113.00
24 214.00
2210 5387.16
421 1007.99
204 504.60
0.00
10 10 447.00
2 1205.40
502 1378.00
222 993.36
0.00
111 338.25
351.00
21 20 88.00
0.00
0.00
0.00
39.20
936.26
18.00
46.20
62.12
455.40
82.80
1500.00
8.00
2.00
0.00
8222.00
34605.96
0.00
5925.14
789.08
3130.16
130.92
0.00
289.37 289.37 1157.48
470.04 470.04 1880.16
650 750 580 690 2893.16
5.32 5.32 21.28
47.53 47.53 190.12
10.36
11087.16 11087.16 44348.64
5.53 5.53 22.12
91.7 91.7 366.80
31.36 31.36 125.44
1857.29 1150 1150 1857.29 2011 10000.00
4127.2 4127.2 16508.80
2720.01
5076.99
1.00
0.15 1.00
0.15 1.00
1 1.00
1 1.00
1 1.00
0.12 0.12 0.12 0.36
0.00
0 0 0 0 0 0 68482.20
0.00
4000 4000 4000 3000 1999.58 2435 21434.58
5 4.9 7 16.90
16 16 32.00
8 7.6 15.60
25 21 46.00
25 17 42.00
100 109 80.4 289.40
25 25 50.00
2 2.00
35 35.00
25 25.00
14168.47 14168.47
597.8 597.80
4 4.00
2 2.00
100 160 260.00
50 50 108 208.00
7 15 19.6 41.60
5 5.4 10.40
200 200 200 200.8 800.80
23 40 40 40 143.00
1 1 2 4 4 3 16.00
0.5 0.5 1.00
0.5 0.5 1.00
50 50 95 195.00
40 57.5 97.50
4 4 4 4 3.5 19.50
400 450 550 550 1950.00
3 3 4 7.82 17.82
162.5 162.5 162.5 162.5 650 3389.58
65 65 65 65 260 1355.82
325 325 325 325 1300 6779.16
0.00
0 0 0 0 0 0 0 0 40.00
403.07 0 0 0 0 0 0 0 611.13
529.01 529.01 529.01 1248.99 1058.01 0 6730.04
1576.41 1576.41 3039.95 3152.82 3152.82 0 20380.46
0 0 0 0 0 0 0 0 23.46
0 0 0 0 0 0 0 0 41.29
0 0 0 0 0 0 0 0 1.73
0 0 0 0 0 0 0 0 6.96
0 0 0 0 0 0 0 0 34.77
0 0 0 0 0 0 0 0 128.83
0 0 0 0 0 0 0 0 96.69
0 0 0 0 0 0 0 0 64.53
0 0 0 0 0 0 0 0 32.16
18847.67 13648.72 0 0 0 0 129678.01
0 0 0 0 279571.06
25890.98
16347 31347.00
2599.33 21927.49 20226.69 0 0 0 207689.70
0.00
4896 6604 9123.68 0 0 0 101127.83
5976.06 1028.6 5148 51544.32
84525 0 0 67725 0 0 340049.17
78925 0 0 117356.03 0 0 383857.68
95935 68075 16800 115877.5 33862.5 0 414172.01
5919.38 0 0 5079.38 0 0 25067.00
343 0 840 714.5 0 3259.00
2723 2723 0 4063.5 1354.5 0 10864.00
0.00
525 0 0 0 0 0 2935.62
0.00
0.00
124.47
0 264.40
1864.81
1302.66
215.44
1676.38
132.20
0.00
0.00
0 0 0 0 0 5233.00
1859.00
1687.00
0 0 0 236.00
642.00
0.00
220.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
366.00
453.00
160.00
131.52
0.00
0.00
94.51
0 0 0 0 0 0 0 0 12.79
0.00
0.00
0.00
0.00
52.80
0.00
106.00
37.50
95.00
0 0 0 0 181.00
2078.60
435.00
186.00
0.00
567.00
0.00
4.00
0.00
1222.00
986.25
463.36
26.00
0.00
0.00
4658.5 4658.5 4658.5 18634.00
0.00
0 0 16607.78
0 0 0 2935.89
11178.45
464.30
0.00
85.03 289.37 289.37 578.75 1242.52
470.04 470.04 470.04 940.09 2350.21
111.58 395.26 650 650 1806.84
5.32 5.32 5.32 10.64 26.60
47.53 47.53 47.53 67.29 209.88
5.18 9.46 14.64
11087.16 11087.16 11087.16 22174.32 55435.80
5.53 5.53 5.53 11.06 27.65
91.7 91.7 91.7 183.4 458.50
31.36 31.36 31.36 62.72 156.80
0.00
1541 1541 1541 5668.2 10291.20
0.17 0.17 0.14 0.17 0.65
0.00
9120 9850 7960 0 0 0 0 58225.42
0.00
11541.7 11541.70
9.1 9.10
26 26.00
8.4 8.40
22 22.00
25 25.00
145.6 145.60
50 50.00
2 2.00
10 10.00
6 6.00
9058.53 9058.53
382.2 382.20
4 4.00
2 2.00
140 140.00
112 112.00
22.4 22.40
5.6 5.60
431.2 431.20
77 77.00
8 8.00
105 105.00
52.5 52.50
10.5 10.50
400 500 500 499 2499.00
1 3 3 3 12.00
642.36 642.36 825.69 2110.41
256.94 256.94 330.28 844.16
1284.72 1284.72 1651.39 4220.83
185.36 185.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44284.00
211.19
17.60
1.15
0 0 0 0 0 543.38
0 0 0 0 0 364.77
168.19
21.16
0.00
161.00
960.00
44.64
16.24
535.00
491.7 573.65 573.65 1852.97
0.00
0.00
0.00
96.00
0.00
444.00
266.28
11981.47
871.83
2964.58
124.50
390.08
30.36
1.97
932.47
0 0 0 0 0 0 0 0 326.00
0.00
0 0 0 916.00
20.00
0.00
513.00
390.72
0.00
326.00
0.00
55.00
0 4970.66 6627.55 11598.21
0 346.88 462.51 809.39
0 1109.54 1479.38 2588.92
0 46.6 62.13 108.73
130.5 130.50
0.00
0.00
0.00
0.00
452.00
144.00
1.00
0.00
130.5 777.00
113.74 806.54
52.2 310.80
10.18 40.73
0.61 2.46
339.00
536.00
1.00
4.69
49864.00
20508.00
34594.00
6873 4582 27492.00
2729.73 2729.73
0.00
0.00
0.00
16173.3 81322.80
Total Amount(Lacs) ESC Indicator Escalation %

5.61 ESC-1 0.00%


4.12 ESC-1 0.00%
82.80 ESC-1 0.00%
22.23 ESC-1 0.00%
0.21 ESC-1 0.00%
0.31 ESC-1 0.00%
0.02 ESC-1 0.00%
0.03 ESC-1 0.00%
0.06 ESC-1 0.00%
0.31 ESC-1 0.00%
0.00 ESC-1 0.00%
0.10 ESC-1 0.00%
0.13 ESC-1 0.00%
89.10 ESC-1 0.00%
143.79 ESC-1 0.00%
48.93 ESC-1 0.00%
184.82 ESC-1 0.00%
1086.33 ESC-1 0.00%
0.00 ESC-1 0.00%
3329.92 ESC-1 0.00%
2799.34 ESC-1 0.00%
212.51 ESC-1 0.00%
97.91 ESC-1 0.00%
81.88 ESC-1 0.00%
4462.19 ESC-1 0.00%
688.37 ESC-1 0.00%
2445.31 ESC-1 0.00%
0.00 ESC-1 0.00%
278.91 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
5.86 ESC-1 0.00%
20.28 ESC-1 0.00%
0.85 ESC-1 0.00%
1.93 ESC-1 0.00%
6.35 ESC-1 0.00%
65.73 ESC-1 0.00%
57.80 ESC-1 0.00%
4.80 ESC-1 0.00%
2.54 ESC-1 0.00%
0.19 ESC-1 0.00%
0.54 ESC-1 0.00%
0.00 ESC-1 0.00%
43.03 ESC-1 0.00%
0.00 ESC-1 0.00%
3.59 ESC-1 0.00%
6.55 ESC-1 0.00%
3.25 ESC-1 0.00%
0.17 ESC-1 0.00%
0.00 ESC-1 0.00%
0.15 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
4.95 ESC-1 0.00%
12.32 ESC-1 0.00%
4.98 ESC-1 0.00%
1.50 ESC-1 0.00%
0.00 ESC-1 0.00%
11.52 ESC-1 0.00%
0.00 ESC-1 0.00%
6.59 ESC-1 0.00%
148.58 ESC-1 0.00%
4.60 ESC-1 0.00%
5.21 ESC-1 0.00%
5.75 ESC-1 0.00%
16.36 ESC-1 0.00%
18.51 ESC-1 0.00%
2.09 ESC-1 0.00%
11.63 ESC-1 0.00%
154.06 ESC-1 0.00%
27.07 ESC-1 0.00%
0.00 ESC-1 0.00%
33.08 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
67.18 ESC-1 0.00%
124.36 ESC-1 0.00%
0.00 ESC-1 0.00%
47.23 ESC-1 0.00%
73.00 ESC-1 0.00%
88.02 ESC-1 0.00%
36.55 ESC-1 0.00%
7.25 ESC-1 0.00%
2.30 ESC-1 0.00%
0.00 ESC-1 0.00%
0.37 ESC-1 0.00%
0.00 ESC-1 0.00%
4.23 ESC-1 0.00%
5.81 ESC-1 0.00%
5.88 ESC-1 0.00%
23.33 ESC-1 0.00%
70.03 ESC-1 0.00%
59.13 ESC-1 0.00%
21.73 ESC-1 0.00%
0.00 ESC-1 0.00%
0.54 ESC-1 0.00%
2.19 ESC-1 0.00%
2.51 ESC-1 0.00%
13.60 ESC-1 0.00%
0.00 ESC-1 0.00%
8.11 ESC-1 0.00%
8.42 ESC-1 0.00%
1.33 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
2.04 ESC-1 0.00%
55.98 ESC-1 0.00%
0.94 ESC-1 0.00%
2.77 ESC-1 0.00%
47.53 ESC-1 0.00%
5.92 ESC-1 0.00%
5.13 ESC-1 0.00%
278.64 ESC-1 0.00%
0.12 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
363.99 ESC-1 0.00%
22.15 ESC-1 0.00%
0.00 ESC-1 0.00%
4.57 ESC-1 0.00%
41.06 ESC-1 0.00%
184.68 ESC-1 0.00%
100.02 ESC-1 0.00%
0.00 ESC-1 0.00%
19.23 ESC-1 0.00%
95.44 ESC-1 0.00%
69.41 ESC-1 0.00%
1.54 ESC-1 0.00%
3.81 ESC-1 0.00%
0.16 ESC-1 0.00%
13.75 ESC-1 0.00%
7.09 ESC-1 0.00%
3.32 ESC-1 0.00%
3.04 ESC-1 0.00%
219.30 ESC-1 0.00%
524.48 ESC-1 0.00%
127.30 ESC-1 0.00%
385.90 ESC-1 0.00%
333.19 ESC-1 0.00%
305.18 ESC-1 0.00%
285.27 ESC-1 0.00%
18.11 ESC-1 0.00%
12.07 ESC-1 0.00%
78.43 ESC-1 0.00%
138.32 ESC-1 0.00%
0.00 ESC-1 0.00%
441.71 ESC-1 0.00%
0.00 ESC-1 0.00%
115.96 ESC-1 0.00%
1.23 ESC-1 0.00%
1.12 ESC-1 0.00%
0.54 ESC-1 0.00%
1.49 ESC-1 0.00%
1.54 ESC-1 0.00%
11.25 ESC-1 0.00%
2.88 ESC-1 0.00%
0.07 ESC-1 0.00%
0.66 ESC-1 0.00%
0.53 ESC-1 0.00%
32.30 ESC-1 0.00%
4.42 ESC-1 0.00%
6.09 ESC-1 0.00%
20.58 ESC-1 0.00%
2.64 ESC-1 0.00%
0.58 ESC-1 0.00%
0.37 ESC-1 0.00%
0.13 ESC-1 0.00%
21.48 ESC-1 0.00%
8.82 ESC-1 0.00%
24.65 ESC-1 0.00%
10.31 ESC-1 0.00%
10.31 ESC-1 0.00%
0.27 ESC-1 0.00%
0.07 ESC-1 0.00%
6.70 ESC-1 0.00%
18.21 ESC-1 0.00%
11.99 ESC-1 0.00%
2.41 ESC-1 0.00%
37.84 ESC-1 0.00%
20.13 ESC-1 0.00%
0.00 ESC-1 0.00%
13.78 ESC-1 0.00%
7.27 ESC-1 0.00%
84.46 ESC-1 0.00%
29.76 ESC-1 0.00%
0.07 ESC-1 0.00%
0.10 ESC-1 0.00%
0.00 ESC-1 0.00%
0.01 ESC-1 0.00%
0.02 ESC-1 0.00%
0.47 ESC-1 0.00%
0.41 ESC-1 0.00%
0.31 ESC-1 0.00%
0.19 ESC-1 0.00%
92.07 ESC-1 0.00%
875.06 ESC-1 0.00%
29.00 ESC-1 0.00%
94.98 ESC-1 0.00%
666.68 ESC-1 0.00%
0.00 ESC-1 0.00%
2653.59 ESC-1 0.00%
1511.28 ESC-1 0.00%
136.02 ESC-1 0.00%
72.93 ESC-1 0.00%
66.27 ESC-1 0.00%
2894.24 ESC-1 0.00%
365.82 ESC-1 0.00%
1401.89 ESC-1 0.00%
0.00 ESC-1 0.00%
352.71 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
7.02 ESC-1 0.00%
29.30 ESC-1 0.00%
1.44 ESC-1 0.00%
3.10 ESC-1 0.00%
11.21 ESC-1 0.00%
113.96 ESC-1 0.00%
101.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
4.03 ESC-1 0.00%
4.44 ESC-1 0.00%
19.55 ESC-1 0.00%
11.98 ESC-1 0.00%
40.78 ESC-1 0.00%
0.00 ESC-1 0.00%
168.29 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
22.28 ESC-1 0.00%
28.63 ESC-1 0.00%
10.51 ESC-1 0.00%
100.60 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
72.29 ESC-1 0.00%
16.89 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.10 ESC-1 0.00%
0.00 ESC-1 0.00%
1.79 ESC-1 0.00%
2.18 ESC-1 0.00%
4.94 ESC-1 0.00%
19.74 ESC-1 0.00%
27.02 ESC-1 0.00%
25.52 ESC-1 0.00%
8.01 ESC-1 0.00%
0.00 ESC-1 0.00%
0.69 ESC-1 0.00%
0.00 ESC-1 0.00%
0.01 ESC-1 0.00%
0.00 ESC-1 0.00%
27.67 ESC-1 0.00%
23.66 ESC-1 0.00%
11.12 ESC-1 0.00%
0.39 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
11.93 ESC-1 0.00%
0.00 ESC-1 0.00%
12.81 ESC-1 0.00%
152.75 ESC-1 0.00%
659.53 ESC-1 0.00%
354.73 ESC-1 0.00%
0.00 ESC-1 0.00%
20.64 ESC-1 0.00%
119.30 ESC-1 0.00%
43.35 ESC-1 0.00%
1.93 ESC-1 0.00%
4.20 ESC-1 0.00%
0.22 ESC-1 0.00%
17.19 ESC-1 0.00%
8.86 ESC-1 0.00%
4.15 ESC-1 0.00%
3.80 ESC-1 0.00%
0.00 ESC-1 0.00%
326.95 ESC-1 0.00%
249.75 ESC-1 0.00%
0.00 ESC-1 0.00%
375.55 ESC-1 0.00%
0.00 ESC-1 0.00%
62.44 ESC-1 0.00%
0.66 ESC-1 0.00%
0.91 ESC-1 0.00%
0.29 ESC-1 0.00%
0.71 ESC-1 0.00%
0.91 ESC-1 0.00%
5.66 ESC-1 0.00%
2.88 ESC-1 0.00%
0.07 ESC-1 0.00%
0.19 ESC-1 0.00%
0.13 ESC-1 0.00%
20.65 ESC-1 0.00%
2.82 ESC-1 0.00%
6.09 ESC-1 0.00%
20.58 ESC-1 0.00%
1.42 ESC-1 0.00%
0.31 ESC-1 0.00%
0.20 ESC-1 0.00%
0.07 ESC-1 0.00%
11.56 ESC-1 0.00%
4.75 ESC-1 0.00%
12.32 ESC-1 0.00%
0.14 ESC-1 0.00%
0.04 ESC-1 0.00%
3.61 ESC-1 0.00%
23.34 ESC-1 0.00%
8.07 ESC-1 0.00%
1.50 ESC-1 0.00%
23.56 ESC-1 0.00%
12.54 ESC-1 0.00%
1.16 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
142.15 ESC-1 0.00%
10.99 ESC-1 0.00%
1.04 ESC-1 0.00%
0.88 ESC-1 0.00%
33.85 ESC-1 0.00%
18.98 ESC-1 0.00%
12.87 ESC-1 0.00%
16.17 ESC-1 0.00%
0.00 ESC-1 0.00%
10.58 ESC-1 0.00%
56.64 ESC-1 0.00%
3.30 ESC-1 0.00%
12.42 ESC-1 0.00%
41.23 ESC-1 0.00%
158.91 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
19.20 ESC-1 0.00%
0.00 ESC-1 0.00%
0.54 ESC-1 0.00%
6.39 ESC-1 0.00%
9.23 ESC-1 0.00%
45.36 ESC-1 0.00%
174.91 ESC-1 0.00%
95.12 ESC-1 0.00%
20.30 ESC-1 0.00%
1.79 ESC-1 0.00%
1.51 ESC-1 0.00%
58.08 ESC-1 0.00%
18.27 ESC-1 0.00%
0.00 ESC-1 0.00%
54.04 ESC-1 0.00%
1.40 ESC-1 0.00%
0.00 ESC-1 0.00%
35.91 ESC-1 0.00%
28.91 ESC-1 0.00%
0.00 ESC-1 0.00%
16.30 ESC-1 0.00%
0.00 ESC-1 0.00%
11.00 ESC-1 0.00%
8.93 ESC-1 0.00%
42.11 ESC-1 0.00%
152.75 ESC-1 0.00%
83.07 ESC-1 0.00%
11.85 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
29.69 ESC-1 0.00%
23.04 ESC-1 0.00%
11.57 ESC-1 0.00%
0.00 ESC-1 0.00%
70.56 ESC-1 0.00%
45.49 ESC-1 0.00%
16.17 ESC-1 0.00%
2.30 ESC-1 0.00%
1.88 ESC-1 0.00%
22.27 ESC-1 0.00%
85.76 ESC-1 0.00%
11.57 ESC-1 0.00%
5.25 ESC-1 0.00%
156.07 ESC-1 0.00%
143.56 ESC-1 0.00%
108.28 ESC-1 0.00%
192.44 ESC-1 0.00%
2729.73 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 ESC-1 0.00%
0.00 0 0.00%
261.05 162906.647 0.00%
PHASE-l
Description UOM Total Quantity
A- Widening and strengthening of existing road
including Reconstruction
(1) Embankment Filling M3
(2) Subgrade 500 mm M3 73229
(3) GSB 200 mm M3 27992
(4) Dry Lean Concrete 150 mm M3 16430
(5) Pavement Quality Concrete 280 mm M3 26968
(6) Box culvert M3
(7) Minor Bridge M3
(8) Major Bridge M3

(6) PCC M15 M3 2188.049


(7) RCC M20 M3 3278.03
(8) RCC M25 M3
(9) RCC M30 M3 10121.879
(10) RCC M35 M3
(11) RCC M40 M3 676.98
Reinforcement MT 2720
Total

Culverts
Minor Bridge
Major Bridge
MJB-Foundation
MJB-Sub Strucutre
MJB- Super Strucutre
Service Drain
Service Road
Total Amount Oct-18 Nov-18 Dec-18
Qty Amount Qty Amount Qty Amount

32953050 12204.8333 5492175 12204.8333 5492175 12204.8333 5492175


189942085.9286 4665.33333 31657014.3 4665.33333 31657014.3 4665.33333 31657014.3
63342521.117281 4665.33333 31657014.3 4665.33333 31657014.3 4665.33333 31657014.3
246889310.5114 4665.33333 31657014.3 4665.33333 31657014.3 4665.33333 31657014.3

12629418.828 364.674833 2104903.14 364.674833 2104903.14 364.674833 2104903.14


18920789.16 546.338333 3153464.86 546.338333 3153464.86 546.338333 3153464.86

58423485.588 1686.97983 9737247.6 1686.97983 9737247.6 1686.97983 9737247.6

3907528.56 112.83 651254.76 112.83 651254.76 112.83 651254.76


163200000 453.333333 27200000 453.333333 27200000 453.333333 27200000
143310088 143310088 143310088
Jan-19 Feb-19 Mar-19 Apr-19
Qty Amount Qty Amount Qty Amount Qty Amount

12204.8333 5492175 12204.8333 5492175 12204.8333 5492175


4665.33333 31657014.3 4665.33333 31657014.3 4665.33333 31657014.3
4665.33333 31657014.3 4665.33333 31657014.3 4665.33333 31657014.3
4665.33333 31657014.3 4665.33333 31657014.3 4665.33333 31657014.3

364.674833 2104903.14 364.674833 2104903.14 364.674833 2104903.14


546.338333 3153464.86 546.338333 3153464.86 546.338333 3153464.86

1686.97983 9737247.6 1686.97983 9737247.6 1686.97983 9737247.6

112.83 651254.76 112.83 651254.76 112.83 651254.76


453.333333 27200000 453.333333 27200000 453.333333 27200000
143310088 143310088 143310088
May-19 Jun-19 Jul-19 Aug-19
Qty Amount Qty Amount Qty Amount Qty Amount
Sep-19 Oct-19 Nov-19 Total Qty
Qty Amount Qty Amount Qty Amount
Total Amount(Lacs)
Description UOM Total Quantity
A- Widening and strengthening of existing road
including Reconstruction
(1) Embankment Filling M3
(2) Subgrade 500 mm M3 73229
(3) GSB 200 mm M3 27992
(4) Dry Lean Concrete 150 mm M3 16430
(5) Pavement Quality Concrete 280 mm M3 26968
(6) PCC M15 M3
(7) RCC M20 M3
(8) RCC M25 NO
(9) RCC M30 M3
(10) RCC M35 M3
(11) RCC M40 M3

Total
Total Amount Oct-18 Nov-18 Dec-18 Jan-19
Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3 Wk4

189942085.9286
63342521.117281
246889310.5114
Feb-19 Mar-19
Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3 Wk4
Karnataka Goa Border Road Project Item Wise Work Programme for FY-18-19
S.No Particulars UOM Scope Oct-16 Nov-16 Dec-16 Jan-17

1 Embankment Filling Cum 42644 42690 42720 42736


2 Subgrade 500 mm Cum 2.5 3 3 4
3 GSB 200 mm Cum 2.4 1.6 4 5
4 Dry Lean Concrete 150 mm Cum 2 4.5 4 5
5 Pavement Quality Concrete 280 mm Cum 3.09 4.5 5 5
6 Concrete Cum 2 5 6 7
7 Reinforcement MT 0.1 0.2 0.3 0.3
Estimated by
Feb-17 Mar-17
end of Mar-17
42767 42795 256352
6 6 24.5
5 6 24
6 6 28
5 4 27
7 7 34
0.3 0.3 2
Dilip Buildcon Ltd (DBL)

2 Laning with Paved Shoulder from Km 30+800 to Km 70+800 and 2 Laning without Paved Shoulder from Km 70+800 to Karnataka/Goa

Itemwise Workplan
Scope
S.No Particulars UOM Ph1 + Ph2 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19
+ Ph3
Ph1 Ph1 Ph1 Ph2 Ph1 Ph2 Ph2 Ph2 Ph3 Ph2 Ph3 Ph3 Ph3

1 Embankment Filling & Subgrade 500 mm Km 52.3 4.0 6.0 4.0 2.0 - 6.0 6.0 1.5 4.5 - 5.0 5.0 - - -

2 GSB 200 mm Km 52.3 3.0 6.0 5.0 1.0 - 6.0 6.0 2.5 3.5 - 6.0 6.0 - - -

3 Dry Lean Concrete 150 mm Km 52.3 - 7.0 7.0 - - 7.0 7.0 1.5 5.5 - 6.0 6.0 - - -

Pavement Quality Concrete 280 mm Km


4 52.3 - 6.0 6.0 - 2.0 4.0 6.0 5.5 0.5 - 6.0 5.0 - - -

5 Box Culverts No 120.0 15.0 15.0 15.0 - 5.0 10.0 15.0 15.0 1.0 14.0 15.0 - - -

6 Pipe Culverts No 24.0 1.0 - 2.0 1.0 4.0 9.0 - 2.0 3.0 - - -

7 Minor Bridge Nos 5.0 - - - - 1.0 1.0 - 1.0 1.0 - - -

8 Major Bridge ( Ph3) Nos 1.0 - 1.0 - - - - - - - - - -

9 ROB Nos 2.0 - - - 1.0 - - 1.0 - - - - -

10 Elephant Underpass Nos 5.0 - - 1.0 - - 1.0 - 1.0 - - - -

11 VUP Nos 1.0 - - - - - - - 1.0 - - - -

12 LVUP Nos 2.0 - - - - - - - 1.0 - - - -

13 RE Wall M3 448.0 - 448.0 - - - - - - - - - -

14 Busbay With shelter Nos 4.0 - - - - - 1.0 1.0 2.0 - - - - -

15 Bus Shelter Nos 3.0 1.0

16 Toll Plazza No - - - - - - TollPlazza 1 no Ph2 - - -

Road Safety And Appurtenances


17
Road Studs & Sign Boards & Delineators

18 Misc.
Buildcon Ltd (DBL)

lder from Km 70+800 to Karnataka/Goa Border (km 84+120) of NH-4A in the State of Karnataka on EPC mode

mwise Workplan

Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 FY 18-19 FY 19-20

Ph3 Ph3 Ph3 Ph2 Ph2 Ph2 Ph2 Ph2 Ph2 Ph2 Ph2 Ph2 Ph2

5.0 3.3 - 34.0 18.3

5.0 2.3 - 33.0 19.3

5.3 - - 35.0 17.3

5.3 6.0 - 30.0 22.3

- - - 90.0 30.0

2.0 - - 17.0 7.0

- 1.0 - 2.0 3.0

- - - 1.0 -

- - - 2.0 -

1.0 1.0 - 2.0 3.0

- - - - 1.0

1.0 - - - 2.0

- - - 448.0 -

- - 2.0 2.0

1.0 1.0

- -

Road Safety And Appurtenances Road Studs & Sign Boards & Delineators

Misc.
Dilip Buildcon Ltd (DBL)

2 Laning with Paved Shoulder from Km 30+800 to Km 70+800 and 2 Laning without Paved Shoulder from Km 70+800 to Karnataka/Goa Border (km 84+120) of NH-4A in the State of
Karnataka on EPC mode
Location 81+905 81+600 80+945 80+628 80+456 80+333 80+160 80+050 79+985 79+699 79+337 79+135 78+895 78+748 78+598
Span Size 1x1.5 1x3.0 1x2.0 1x2.5 1x3.0 1x3.0 1x2.0 1x3.0 1x1.5 1x2.0 1x2.5 1x2.5 1x1.5 1x2.5 1x2.5
Type of Construction RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC
Length 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
Casting of Precast Box culvert 11/11/2018 11/13/2018 11/15/2018 11/17/2018 11/19/2018 11/21/2018 11/23/2018 11/25/2018 11/27/2018 11/29/2018 12/1/2018 12/3/2018 12/5/2018 12/7/2018 12/9/2018
Dismantling 11/15/2018 11/17/2018 11/19/2018 11/21/2018 11/23/2018 11/25/2018 11/27/2018 11/29/2018 12/1/2018 12/3/2018 12/5/2018 12/7/2018 12/9/2018 12/11/2018 12/13/2018
Layout & Excavation 11/16/2018 11/18/2018 11/20/2018 11/22/2018 11/24/2018 11/26/2018 11/28/2018 11/30/2018 12/2/2018 12/4/2018 12/6/2018 12/8/2018 12/10/2018 12/12/2018 12/14/2018
PCC & layout 11/19/2018 11/21/2018 11/23/2018 11/25/2018 11/27/2018 11/29/2018 12/1/2018 12/3/2018 12/5/2018 12/7/2018 12/9/2018 12/11/2018 12/13/2018 12/15/2018 12/17/2018
BoxCulvert Erection 11/20/2018 11/22/2018 11/24/2018 11/26/2018 11/28/2018 11/30/2018 12/2/2018 12/4/2018 12/6/2018 12/8/2018 12/10/2018 12/12/2018 12/14/2018 12/16/2018 12/18/2018
Shear key 11/22/2018 11/24/2018 11/26/2018 11/28/2018 11/30/2018 12/2/2018 12/4/2018 12/6/2018 12/8/2018 12/10/2018 12/12/2018 12/14/2018 12/16/2018 12/18/2018 12/20/2018
Curtainwall / Catch Pit 11/23/2018 11/25/2018 11/27/2018 11/29/2018 12/1/2018 12/3/2018 12/5/2018 12/7/2018 12/9/2018 12/11/2018 12/13/2018 12/15/2018 12/17/2018 12/19/2018 12/21/2018
Carash Barrier 11/25/2018 11/27/2018 11/29/2018 12/1/2018 12/3/2018 12/5/2018 12/7/2018 12/9/2018 12/11/2018 12/13/2018 12/15/2018 12/17/2018 12/19/2018 12/21/2018 12/23/2018

Location 78+463 77+733 77+655 77+555 77+428 77+279 77+048 76+772 76+632 76+305 75+968 75+823 75+615 45+491 75+220
Span Size 1x2.0 1x3.0 1x2.0 1x1.5 1x2.0 1x1.5 1x3.0 1x3.0 1x1.5 1x2.0 1x1.5 1x2.0 1x2.0 1x1.5 1x1.5
Type of Construction RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC
Length 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
Casting of Precast Box culvert 12/11/2018 12/13/2018 12/15/2018 12/17/2018 12/19/2018 12/21/2018 12/23/2018 12/25/2018 12/27/2018 12/29/2018 12/31/2018 1/2/2019 1/4/2019 1/6/2019 1/8/2019
Dismantling 12/15/2018 12/17/2018 12/19/2018 12/21/2018 12/23/2018 12/25/2018 12/27/2018 12/29/2018 12/31/2018 1/2/2019 1/4/2019 1/6/2019 1/8/2019 1/10/2019 1/12/2019
Layout & Excavation 12/16/2018 12/18/2018 12/20/2018 12/22/2018 12/24/2018 12/26/2018 12/28/2018 12/30/2018 1/1/2019 1/3/2019 1/5/2019 1/7/2019 1/9/2019 1/11/2019 1/13/2019
PCC & Layout 12/19/2018 12/21/2018 12/23/2018 12/25/2018 12/27/2018 12/29/2018 12/31/2018 1/2/2019 1/4/2019 1/6/2019 1/8/2019 1/10/2019 1/12/2019 1/14/2019 1/16/2019
BoxCulvert Erection 12/20/2018 12/22/2018 12/24/2018 12/26/2018 12/28/2018 12/30/2018 1/1/2019 1/3/2019 1/5/2019 1/7/2019 1/9/2019 1/11/2019 1/13/2019 1/15/2019 1/17/2019
Shear key 12/22/2018 12/24/2018 12/26/2018 12/28/2018 12/30/2018 1/1/2019 1/3/2019 1/5/2019 1/7/2019 1/9/2019 1/11/2019 1/13/2019 1/15/2019 1/17/2019 1/19/2019
Curtainwall / Catch Pit 12/23/2018 12/25/2018 12/27/2018 12/29/2018 12/31/2018 1/2/2019 1/4/2019 1/6/2019 1/8/2019 1/10/2019 1/12/2019 1/14/2019 1/16/2019 1/18/2019 1/20/2019
Crash Barrier 12/25/2018 12/27/2018 12/29/2018 12/31/2018 1/2/2019 1/4/2019 1/6/2019 1/8/2019 1/10/2019 1/12/2019 1/14/2019 1/16/2019 1/18/2019 1/20/2019 1/22/2019

Location 74+995 74+868 74+697 74+522 74+110 73+778 73+408 72+879 72+642 72+443 72+140 71+672 71+305 70+750 70+561
Span Size 1x1.5 2x2.0 1x1.5 1x1.5 1x1.5 1x1.5 1x1.5 1x1.5 2x2.0 1x1.5 1x1.5 1x1.5 1x1.5 1x1.5 1x1.5
Type of Construction RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC
Length 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
Casting of Precast Box Culvert 1/10/2019 1/12/2019 1/14/2019 1/16/2019 1/18/2019 1/19/2019 1/21/2019 1/23/2019 1/25/2019 1/27/2019 1/29/2019 1/31/2019 2/2/2019 2/4/2019 2/6/2019
Dismantling 1/14/2019 1/16/2019 1/18/2019 1/20/2019 1/22/2019 1/23/2019 1/25/2019 1/27/2019 1/29/2019 1/31/2019 2/2/2019 2/4/2019 2/6/2019 2/8/2019 2/10/2019
Layout & Excavation 1/15/2019 1/17/2019 1/19/2019 1/21/2019 1/23/2019 1/24/2019 1/26/2019 1/28/2019 1/30/2019 2/1/2019 2/3/2019 2/5/2019 2/7/2019 2/9/2019 2/11/2019
PCC & Layout 1/18/2019 1/20/2019 1/22/2019 1/24/2019 1/26/2019 1/27/2019 1/29/2019 1/31/2019 2/2/2019 2/4/2019 2/6/2019 2/8/2019 2/10/2019 2/12/2019 2/14/2019
BoxCulvert Erection 1/19/2019 1/21/2019 1/23/2019 1/25/2019 1/27/2019 1/28/2019 1/30/2019 2/1/2019 2/3/2019 2/5/2019 2/7/2019 2/9/2019 2/11/2019 2/13/2019 2/15/2019
Shear key 1/21/2019 1/23/2019 1/25/2019 1/27/2019 1/29/2019 1/30/2019 2/1/2019 2/3/2019 2/5/2019 2/7/2019 2/9/2019 2/11/2019 2/13/2019 2/15/2019 2/17/2019
Curtainwall 1/22/2019 1/24/2019 1/26/2019 1/28/2019 1/30/2019 1/31/2019 2/2/2019 2/4/2019 2/6/2019 2/8/2019 2/10/2019 2/12/2019 2/14/2019 2/16/2019 2/18/2019
Crash Barrier 1/24/2019 1/26/2019 1/28/2019 1/30/2019 2/1/2019 2/2/2019 2/4/2019 2/6/2019 2/8/2019 2/10/2019 2/12/2019 2/14/2019 2/16/2019 2/18/2019 2/20/2019

Location 69+353 69+135 68+933 68+669 68+440 67+071 67+560 67+445 67+193 66+791 66+658 66+501 65+971 65+801 65+601
Span Size 1x1.5 1x1.5 2x2.0 1x1.5 1x1.5 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2
Type of Construction RC RC RC RC NC NC RC NC NC RC NC RC NC NC RC
Length 9 9 9 9 9 13 13 13 13 13 13 13 13 13 13
Casting of Precast Box Culvert 2/8/2019 2/10/2019 2/12/2019 2/14/2019 2/16/2019 2/18/2019 2/20/2019 2/22/2019 2/24/2019 2/26/2019 2/28/2019 3/2/2019 3/4/2019 3/6/2019 3/8/2019
Dismantling 2/12/2019 2/14/2019 2/16/2019 2/18/2019 2/20/2019 2/22/2019 2/24/2019 2/26/2019 2/28/2019 3/2/2019 3/4/2019 3/6/2019 3/8/2019 3/10/2019 3/12/2019
Layout & Excavation 2/13/2019 2/15/2019 2/17/2019 2/19/2019 2/21/2019 2/23/2019 2/25/2019 2/27/2019 3/1/2019 3/3/2019 3/5/2019 3/7/2019 3/9/2019 3/11/2019 3/13/2019
PCC & Layout 2/16/2019 2/18/2019 2/20/2019 2/22/2019 2/24/2019 2/26/2019 2/28/2019 3/2/2019 3/4/2019 3/6/2019 3/8/2019 3/10/2019 3/12/2019 3/14/2019 3/16/2019
BoxCulvert Erection 2/17/2019 2/19/2019 2/21/2019 2/23/2019 2/25/2019 2/27/2019 3/1/2019 3/3/2019 3/5/2019 3/7/2019 3/9/2019 3/11/2019 3/13/2019 3/15/2019 3/17/2019
Shear key 2/19/2019 2/21/2019 2/23/2019 2/25/2019 2/27/2019 3/1/2019 3/3/2019 3/5/2019 3/7/2019 3/9/2019 3/11/2019 3/13/2019 3/15/2019 3/17/2019 3/19/2019
Curtainwall 2/20/2019 2/22/2019 2/24/2019 2/26/2019 2/28/2019 3/2/2019 3/4/2019 3/6/2019 3/8/2019 3/10/2019 3/12/2019 3/14/2019 3/16/2019 3/18/2019 3/20/2019
Crash Barrier 2/22/2019 2/24/2019 2/26/2019 2/28/2019 3/2/2019 3/4/2019 3/6/2019 3/8/2019 3/10/2019 3/12/2019 3/14/2019 3/16/2019 3/18/2019 3/20/2019 3/22/2019
Location 65+059 64+015 63+840 63+325 62+941 62+829 62+669 62+519 62+344 62+113 61+915 61+658 61+480 61+074 60+728
Span Size 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+3.0+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2
Type of Construction NC NC NC NC RC NC NC NC RC RC NC NC NC NC NC
Length 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
Casting of Precast Box Culvert 3/10/2019 3/12/2019 3/14/2019 3/16/2019 3/18/2019 3/20/2019 3/22/2019 3/24/2019 3/26/2019 3/28/2019 3/30/2019 4/1/2019 4/3/2019 4/5/2019 4/7/2019
Dismantling 3/14/2019 3/16/2019 3/18/2019 3/20/2019 3/22/2019 3/24/2019 3/26/2019 3/28/2019 3/30/2019 4/1/2019 4/3/2019 4/5/2019 4/7/2019 4/9/2019 4/11/2019
Layout & Excavation 3/15/2019 3/17/2019 3/19/2019 3/21/2019 3/23/2019 3/25/2019 3/27/2019 3/29/2019 3/31/2019 4/2/2019 4/4/2019 4/6/2019 4/8/2019 4/10/2019 4/12/2019
PCC & Layout 3/18/2019 3/20/2019 3/22/2019 3/24/2019 3/26/2019 3/28/2019 3/30/2019 4/1/2019 4/3/2019 4/5/2019 4/7/2019 4/9/2019 4/11/2019 4/13/2019 4/15/2019
BoxCulvert Erection 3/19/2019 3/21/2019 3/23/2019 3/25/2019 3/27/2019 3/29/2019 3/31/2019 4/2/2019 4/4/2019 4/6/2019 4/8/2019 4/10/2019 4/12/2019 4/14/2019 4/16/2019
Shear key 3/21/2019 3/23/2019 3/25/2019 3/27/2019 3/29/2019 3/31/2019 4/2/2019 4/4/2019 4/6/2019 4/8/2019 4/10/2019 4/12/2019 4/14/2019 4/16/2019 4/18/2019
Curtainwall 3/22/2019 3/24/2019 3/26/2019 3/28/2019 3/30/2019 4/1/2019 4/3/2019 4/5/2019 4/7/2019 4/9/2019 4/11/2019 4/13/2019 4/15/2019 4/17/2019 4/19/2019
Crash Barrier 3/24/2019 3/26/2019 3/28/2019 3/30/2019 4/1/2019 4/3/2019 4/5/2019 4/7/2019 4/9/2019 4/11/2019 4/13/2019 4/15/2019 4/17/2019 4/19/2019 4/21/2019

Location 60+011 59+792 59+353 58+857 58+350 57+987 57+970 57+524 57+310 57+225 56+675 56+261 55+669 55+468 54+526
Span Size 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+3.0+2 2+1.5+2 2+1.5+2 2+1.5+2 2+5.0+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2
Type of Construction RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC
Length 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
Casting of Precast Box Culvert 4/9/2019 4/11/2019 4/13/2019 4/15/2019 4/17/2019 4/19/2019 4/21/2019 4/23/2019 4/25/2019 4/27/2019 4/29/2019 5/1/2019 5/3/2019 5/5/2019 5/7/2019
Dismantling 4/13/2019 4/15/2019 4/17/2019 4/19/2019 4/21/2019 4/23/2019 4/25/2019 4/27/2019 4/29/2019 5/1/2019 5/3/2019 5/5/2019 5/7/2019 5/9/2019 5/11/2019
Layout & Excavation 4/14/2019 4/16/2019 4/18/2019 4/20/2019 4/22/2019 4/24/2019 4/26/2019 4/28/2019 4/30/2019 5/2/2019 5/4/2019 5/6/2019 5/8/2019 5/10/2019 5/12/2019
PCC & Layout 4/17/2019 4/19/2019 4/21/2019 4/23/2019 4/25/2019 4/27/2019 4/29/2019 5/1/2019 5/3/2019 5/5/2019 5/7/2019 5/9/2019 5/11/2019 5/13/2019 5/15/2019
BoxCulvert Erection 4/18/2019 4/20/2019 4/22/2019 4/24/2019 4/26/2019 4/28/2019 4/30/2019 5/2/2019 5/4/2019 5/6/2019 5/8/2019 5/10/2019 5/12/2019 5/14/2019 5/16/2019
Shear key 4/20/2019 4/22/2019 4/24/2019 4/26/2019 4/28/2019 4/30/2019 5/2/2019 5/4/2019 5/6/2019 5/8/2019 5/10/2019 5/12/2019 5/14/2019 5/16/2019 5/18/2019
Curtain Wall 4/21/2019 4/23/2019 4/25/2019 4/27/2019 4/29/2019 5/1/2019 5/3/2019 5/5/2019 5/7/2019 5/9/2019 5/11/2019 5/13/2019 5/15/2019 5/17/2019 5/19/2019
Crash Barrier 4/23/2019 4/25/2019 4/27/2019 4/29/2019 5/1/2019 5/3/2019 5/5/2019 5/7/2019 5/9/2019 5/11/2019 5/13/2019 5/15/2019 5/17/2019 5/19/2019 5/21/2019

Location 54+050 49+839 47+275 46+445 46+246 45+581 45+020 43+897 43+544 43+280 42+740 42+127 41+429 40+865 39+750
Span Size 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2
Type of Construction RC RC RC RC RC RC NC RC RC RC RC RC RC RC RC
Length 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
Casting of Precast Box Culvert 5/9/2019 5/11/2019 5/13/2019 5/15/2019 5/17/2019 5/19/2019 5/21/2019 5/23/2019 5/25/2019 5/27/2019 5/29/2019 5/31/2019 6/2/2019 6/4/2019 6/6/2019
Dismantling 5/13/2019 5/15/2019 5/17/2019 5/19/2019 5/21/2019 5/23/2019 5/25/2019 5/27/2019 5/29/2019 5/31/2019 6/2/2019 6/4/2019 6/6/2019 6/8/2019 6/10/2019
Layout & Excavation 5/14/2019 5/16/2019 5/18/2019 5/20/2019 5/22/2019 5/24/2019 5/26/2019 5/28/2019 5/30/2019 6/1/2019 6/3/2019 6/5/2019 6/7/2019 6/9/2019 6/11/2019
PCC & Layout 5/17/2019 5/19/2019 5/21/2019 5/23/2019 5/25/2019 5/27/2019 5/29/2019 5/31/2019 6/2/2019 6/4/2019 6/6/2019 6/8/2019 6/10/2019 6/12/2019 6/14/2019
BoxCulvert Erection 5/18/2019 5/20/2019 5/22/2019 5/24/2019 5/26/2019 5/28/2019 5/30/2019 6/1/2019 6/3/2019 6/5/2019 6/7/2019 6/9/2019 6/11/2019 6/13/2019 6/15/2019
Shear key 5/20/2019 5/22/2019 5/24/2019 5/26/2019 5/28/2019 5/30/2019 6/1/2019 6/3/2019 6/5/2019 6/7/2019 6/9/2019 6/11/2019 6/13/2019 6/15/2019 6/17/2019
Curtainwall 5/21/2019 5/23/2019 5/25/2019 5/27/2019 5/29/2019 5/31/2019 6/2/2019 6/4/2019 6/6/2019 6/8/2019 6/10/2019 6/12/2019 6/14/2019 6/16/2019 6/18/2019
Crash Barrier 5/23/2019 5/25/2019 5/27/2019 5/29/2019 5/31/2019 6/2/2019 6/4/2019 6/6/2019 6/8/2019 6/10/2019 6/12/2019 6/14/2019 6/16/2019 6/18/2019 6/20/2019

Location 36+670 36+076 35+490 34+632 34+372 33+489 32+271 32+121 31+421 31+342 31+207 31+004 30+721 30+437 30+103
Span Size 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2 2+1.5+2
Type of Construction NC NC NC RC RC NC RC RC RC RC RC RC RC RC RC
Length 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
Casting Of Precast Box Culvert 5/9/2019 5/11/2019 5/13/2019 5/15/2019 5/17/2019 5/19/2019 5/21/2019 5/23/2019 5/25/2019 5/27/2019 5/29/2019 5/31/2019 6/2/2019 6/4/2019 6/6/2019
Dismantling 5/13/2019 5/15/2019 5/17/2019 5/19/2019 5/21/2019 5/23/2019 5/25/2019 5/27/2019 5/29/2019 5/31/2019 6/2/2019 6/4/2019 6/6/2019 6/8/2019 6/10/2019
Layout & Excavation 5/14/2019 5/16/2019 5/18/2019 5/20/2019 5/22/2019 5/24/2019 5/26/2019 5/28/2019 5/30/2019 6/1/2019 6/3/2019 6/5/2019 6/7/2019 6/9/2019 6/11/2019
PCC & Layout 5/17/2019 5/19/2019 5/21/2019 5/23/2019 5/25/2019 5/27/2019 5/29/2019 5/31/2019 6/2/2019 6/4/2019 6/6/2019 6/8/2019 6/10/2019 6/12/2019 6/14/2019
BoxCulvert Erection 5/18/2019 5/20/2019 5/22/2019 5/24/2019 5/26/2019 5/28/2019 5/30/2019 6/1/2019 6/3/2019 6/5/2019 6/7/2019 6/9/2019 6/11/2019 6/13/2019 6/15/2019
Shear Key 5/20/2019 5/22/2019 5/24/2019 5/26/2019 5/28/2019 5/30/2019 6/1/2019 6/3/2019 6/5/2019 6/7/2019 6/9/2019 6/11/2019 6/13/2019 6/15/2019 6/17/2019
Curtainwall 5/21/2019 5/23/2019 5/25/2019 5/27/2019 5/29/2019 5/31/2019 6/2/2019 6/4/2019 6/6/2019 6/8/2019 6/10/2019 6/12/2019 6/14/2019 6/16/2019 6/18/2019
Crash Barrier 5/23/2019 5/25/2019 5/27/2019 5/29/2019 5/31/2019 6/2/2019 6/4/2019 6/6/2019 6/8/2019 6/10/2019 6/12/2019 6/14/2019 6/16/2019 6/18/2019 6/20/2019

Location 31+342 31+207 31+004 30+721 30+437 30+103


Span Size 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0
Type of Construction RC RC RC RC RC RC
Length
Casting Of Precast Box Culvert 6/8/2019 6/10/2019 6/12/2019 6/14/2019 6/16/2019 6/18/2019
Dismantling 6/12/2019 6/14/2019 6/16/2019 6/18/2019 6/20/2019 6/22/2019
Layout & Excavation 6/13/2019 6/15/2019 6/17/2019 6/19/2019 6/21/2019 6/23/2019
PCC & Layout 6/16/2019 6/18/2019 6/20/2019 6/22/2019 6/24/2019 6/26/2019
BoxCulvert Erection 6/17/2019 6/19/2019 6/21/2019 6/23/2019 6/25/2019 6/27/2019
Shear Key 6/19/2019 6/21/2019 6/23/2019 6/25/2019 6/27/2019 6/29/2019
Curtain Wall 6/20/2019 6/22/2019 6/24/2019 6/26/2019 6/28/2019 6/30/2019
Crash Barrier 6/22/2019 6/24/2019 6/26/2019 6/28/2019 6/30/2019 7/2/2019
2 Laning with Paved Shoulder from Km 30+800 to Km 70+800) and 2 Laning without Paved Shoulder from K
4A in the State Of Karnatka
Structure List
Schedule Schedule
Sl. No. Proposed Phase Final Chainage
Chainage Number
### Phase-1 81+886 82/2. 81+905
### Phase-1 81+582 82/1. 81+600
### Phase-1 80+927 81/6. 80+945
### Phase-1 80+611 81/5. 80+628
### Phase-1 80+443 81/4. 80+456
### Phase-1 80+318 81/3. 80+333
### Phase-1 80+147 81/2. 80+160
### Phase-1 80+037 81/1. 80+050
### Phase-1 79+973 80/4. 79+985
### Phase-1 79+686 80/3. 79+699
### Phase-1 79+325 80/2. 79+337
### Phase-1 79+125 80/1. 79+135
### Phase-1 78+885 79/4. 78+895
### Phase-1 78+739 79/3. 78+748
### Phase-1 78+590 79/2. 78+598
### Phase-1 78+457 79/1. 78+463
### Phase-1 77+727 78/6. 77+733
### Phase-1 77+650 78/5. 77+655
### Phase-1 77+550 78/4. 77+555
### Phase-1 77+422 78/3. 77+428
### Phase-1 77+274 78/2. 77+279
### Phase-1 77+045 78/1. 77+048
### Phase-1 76+769 77/3. 76+772
### Phase-1 76+629 77/2. 76+632
### Phase-1 76+303 77/1. 76+305
### Phase-1 75+966 76/5. 75+968
### Phase-1 75+823 76/4. 75+823
### Phase-1 75+615 76/3. 75+615
### Phase-1 75+492 76/2. 45+491
### Phase-1 75+221 76/1. 75+220
### Phase-1 75+061 75/5. 74+995
### Phase-1 74+867 75/4. 74+868
### Phase-1 74+696 75/3. 74+697
### Phase-1 74+518 75/2. 74+522
### Phase-1 74+112 75/1. 74+110
### Phase-1 73+784 74/2. 73+778
### Phase-1 73+404 74/1. 73+408
### Phase-1 72+880 73/4. 72+879
### Phase-1 72+643 73/3. 72+642
### Phase-1 72+439 73/2. 72+443
### Phase-1 72+140 73/1. 72+140
### Phase-1 71+674 72/3. 71+672
### Phase-1 71+290 72/2. 71+305
### Phase-1 70+753 71/3. 70+750
### Phase-1 70+566 71/2. 70+561
### Phase-1 69+357 70/2. 69+353
### Phase-1 69+139 70/1. 69+135
### Phase-1 68+938 69/5. 68+933
### Phase-1 68+673 69/4. 68+669
### Phase-1 68+450 69/3. 68+440
### Phase-2 68+070 69/1. 67+071
### Phase-2 67+559 68/4. 67+560
### Phase-2 67+440 68/2. 67+445
### Phase-2 67+190 68/1. 67+193
### Phase-2 66+789 67/4. 66+791
### Phase-2 66+660 67/3. 66+658
### Phase-2 66+503 67/2. 66+501
### Phase-2 65+970 66/5. 65+971
### Phase-2 65+800 66/4. 65+801
### Phase-2 65+620 66/3. 65+601
### Phase-2 64+940 66/1. 65+059
### Phase-2 64+014 65/1. 64+015
### Phase-2 63+842 64/3. 63+840
### Phase-2 63+325 64/1. 63+325
### Phase-2 62+940 63/6. 62+941
### Phase-2 62+830 63/5. 62+829
### Phase-2 62+670 63/4. 62+669
### Phase-2 62+520 63/3. 62+519
### Phase-2 62+345 63/2. 62+344
### Phase-2 62+115 63/1. 62+113
### Phase-2 61+915 62/4. 61+915
### Phase-2 61+660 62/3. 61+658
### Phase-2 61+500 62/2. 61+480
### Phase-2 61+076 62/1. 61+074
### Phase-2 60+730 61/2. 60+728
### Phase-2 60+013 61/1. 60+011
### Phase-2 59+789 60/2. 59+792
### Phase-2 59+354 60/1. 59+353
### Phase-2 58+858 59/2. 58+857
### Phase-2 58+353 59/1. 58+350
### Phase-2 57+990 58/6. 57+987
### Phase-2 57+942 58/5. 57+970
### Phase-2 57+525 58/3. 57+524
### Phase-2 57+313 58/2. 57+310
### Phase-2 57+220 58/1. 57+225
### Phase-2 56+668 57/2. 56+675
### Phase-2 56+262 57/1. 56+261
### Phase-2 55+671 56/2. 55+669
### Phase-2 55+470 56/1. 55+468
### Phase-2 54+526 55/2. 54+526
### Phase-2 54+054 55/1. 54+050
### Phase-3 49+826 50/2. 49+839
### Phase-3 47+264 48/1. 47+275
### Phase-3 46+433 47/2. 46+445
### Phase-3 46+236 47/1. 46+246
### Phase-3 45+571 46/2. 45+581
### Phase-3 45+023 46/1. 45+020
### Phase-3 43+892 44/3. 43+897
### Phase-3 43+536 44/2. 43+544
### Phase-3 43+274 44/1. 43+280
### Phase-3 42+733 43/3. 42+740
### Phase-3 42+066 43/1. 42+127
### Phase-3 41+422 42/1. 41+429
### Phase-3 40+858 41/1. 40+865
### Phase-3 39+747 40/3. 39+750
### Phase-3 36+740 37/2. 36+670
### Phase-3 36+076 37/1. 36+076
### Phase-3 35+490 36/2. 35+490
### Phase-3 34+631 35/2. 64+632
### Phase-3 34+372 35/1. 34+372
### Phase-3 33+497 34/1. 33+489
### Phase-3 32+272 33/2. 32+271
### Phase-3 32+120 33/1. 32+121
### Phase-3 31+420 32/4. 31+421
### Phase-3 31+342 32/3. 31+342
### Phase-3 31+207 32/2. 31+207
### Phase-3 31+004 32/1. 31+004
### Phase-3 30+720 31/3. 30+721
### Phase-3 30+437 31/2. 30+437
1 Phase-3 30+103 31/1. 30+103
Crashbarrier

32.7 32.45
35.2 34.9
39.6 37.85
42.8 42.1
48.4 47.35
52.3 51.35
65.6 65
67.9 67.3
71.55 70.095

Drain
TCS 9 78+000 75+300
TCS 9A 78+000 82+300
TCS 6 37+860 39+600
51+350 52+300

RE Wall
TCS6 39+600 37+860
52+300 51+350
TCS7 48+200 47+700
65+600 65+000
TCS7A 32+700 32+450
35+200 34+900
42+800 42+100
47+700 47+350
48+400 48+200
67+900 67+300
TCS7B 71+600 71+000
Laning without Paved Shoulder from Km 70+800 to Karnataka/Goa Border (km 84+120) of NH-
4A in the State Of Karnatka

Recommendation Type of Structure Cell Width (P&P R0)


RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x3.0
RECONSTRUCTION BOX 1x2.0
RECONSTRUCTION BOX 1x2.5
RECONSTRUCTION BOX 1x3.0
RECONSTRUCTION BOX 1x3.0
RECONSTRUCTION BOX 1x2.0
RECONSTRUCTION BOX 1x3.0
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x2.0
RECONSTRUCTION BOX 1x2.5
RECONSTRUCTION BOX 1x2.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x2.5
RECONSTRUCTION BOX 1x2.5
RECONSTRUCTION BOX 1x2.0
RECONSTRUCTION BOX 1x3.0
RECONSTRUCTION BOX 1x2.0
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x2.0
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x3.0
RECONSTRUCTION BOX 1x3.0
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x2.0
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x2.0
RECONSTRUCTION BOX 1x2.0
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 2x2.0
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 2x2.0
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 1x1.5
RECONSTRUCTION BOX 2x2.0
RECONSTRUCTION BOX 1x1.5
NEW CONSTRUCTION BOX 1x1.5
NEW CONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+3.0+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+3.0+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+5.0+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
NEW CONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2
RECONSTRUCTION BOX 2+1.5+2

BOX 120
HPC 24
BRIDGE (MNB) 5
Major Bridge 1
ROB 2
Elephant Under Pass 5
LVUP 2
VUP 1
TOTAL 160
250 250
300 300
1750 1750
700 700
1050 960.08
950 911.52
600 600
600 600
1455 1455
7526.6
15053.2

2.7 2.7
4.3 4.3
1.74 3.48
0.95 1.9

1.74 3.48
0.95 1.9
0.5 1
0.6 1.2
0.25 0.5
0.3 0.6
0.7 1.4
0.35 0.7
0.2 0.4
0.6 1.2
0.6 1.2
BOX 120 494
HPC 24 38.4
BRIDGE (MNB) 5 181
Major Bridge 1 199.98
ROB 2 127.16
Elephant Under Pass 5 290
LVUP 2 24
VUP 1 20

50.526
Dilip Buildcon Ltd (DBL)

2 Laning with Paved Shoulder from Km 30+800 to Km 70+800 and 2 Laning without Paved Shoulder from Km 70+800 to Karnataka/Goa Border (km 84+120) of NH-4A in the State of Karnataka on EPC mode

Itemwise Workplan
Scope
S.No Particulars UOM Ph1 + Ph2 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 FY 18-19 FY 19-20
+ Ph3
Ph2 Ph2 Ph2 Ph1 Ph2 Ph1 Ph1 Ph2 Ph1 Ph3 Ph1 Ph3 Ph1 Ph3 Ph3 Ph3 Ph3 Ph3 Ph3
Embankment Filling & Subgrade
1 Km 52.3 5.0 6.0 4.5 1.5 - 6.0 6.0 - 0.5 5.5 - 5.0 - 5.0 - - - - 5.0 2.3 - - 35.0 17.3
500 mm

2 GSB 200 mm Km 52.3 4.0 6.0 5.5 0.5 - 6.0 6.0 - 1.5 3.5 - 6.0 - 6.0 - - - - 5.0 2.3 - - 33.0 19.3

3 Dry Lean Concrete 150 mm Km 52.3 - 7.0 7.0 - - 7.0 7.0 1.5 4.5 - 6.0 - 5.0 3.0 - - - 4.3 - - - 34.0 18.3

Pavement Quality Concrete 280 Km


4 mm 52.3 - 6.0 6.0 - 5.0 - 3.5 1.5 5.0 - 5.0 - 0.5 4.5 4.0 - - - 5.0 5.0 4.3 - 27.0 28.3

5 Box Culverts No 120.0 9.0 15.0 15.0 - 2.0 13.0 15.0 15.0 7.0 8.0 15.0 - - - - 6.0 - - - 84.0 36.0

6 Pipe Culverts No 24.0 4.0 2.0 1.0 - 1.0 - 5.0 5.0 - - - - 6.0 - - - 8.0 16.0

7 Minor Bridge Nos 5.0 1.0 - 1.0 - - - - 1.0 - - - - - 1.0 1.0 - - 2.0 3.0

8 Major Bridge ( Ph3) Nos 1.0 - 1.0 - - - - - - - - - - - - - - - 1.0 -

9 ROB Nos 2.0 - - 1.0 - - - - 1.0 - - - - - - - - - - 2.0 -

10 Elephant Underpass Nos 5.0 - - 1.0 - - 1.0 2.0 - - - - - 1.0 - - - 2.0 3.0

11 VUP Nos 1.0 - - - - - - - - - - - - - 1.0 - - - - 1.0

12 LVUP Nos 2.0 - - - - - - - 2.0 - - - - - - - - - - 2.0

13 RE Wall M 3
448.0 - 448.0 - - - - - - - - - - - - - - - 448.0 -
Dilip Buildcon Ltd (DBL)

2 Laning with Paved Shoulder from Km 30+800 to Km 70+800 and 2 Laning without Paved Shoulder from Km 70+800 to Karnataka/Goa Border (km 84+120) of NH-4A in the State of Karnataka on EPC mode

Itemwise Workplan
Scope
S.No Particulars UOM Ph1 + Ph2 + Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 FY 18-19 FY 19-20
Ph3

Ph1 Ph1 Ph1 Ph2 Ph1 Ph2 Ph2 Ph2 Ph3 Ph2 Ph3 Ph3 Ph3 Ph3 Ph3 Ph3 Ph3 Qty( K
Ph1 Ph1 Ph1 Ph2 Ph1 Ph2 Ph2 Ph2 Ph3 Ph2 Ph3 Ph3 Ph3 Ph3 Ph3 Ph3 Ph3 Ph3 Qty ( M3) Qty( Km) Qty ( M3)
Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) Qty( M3) m)

Embankment Filling &


1 Km 52.30 4.0 6.0 4.0 2.0 - 6.0 6.0 1.5 4.5 - 5.0 5.0 - - - 5.0 3.3 - - - 34.0 - 18.3 -
Subgrade 500 mm

2 GSB 200 mm Km 52.30 3.0 6,600.0 6.0 13,200.0 5.0 11,000.0 1.0 2,200.0 - 6.0 14,400.0 6.0 14,400.0 2.5 6,000.0 3.5 7,700.0 - 6.0 13,200.0 6.0 13,200.0 - - - 5.0 11,000.0 2.3 5,060.0 - - - - 33.0 75,500.0 19.3 42,460.0

3 Dry Lean Concrete 150 Km 52.30 - - 7.0 8,400.0 7.0 8,400.0 - - - 7.0 8,400.0 7.0 11,550.0 1.5 2,475.0 5.5 9,075.0 - - 6.0 9,900.0 6.0 9,900.0 - - - - 5.3 7,485.0 - - - - - - - 35.0 48,300.0 17.3 27,285.0

Pavement Quality Km
4 Concrete 280 mm 52.30 - - 6.0 11,760.0 6.0 11,760.0 - 2.0 3,920.0 4.0 8,176.0 6.0 16,800.0 5.5 15,400.0 0.5 - - 6.0 14,826.0 5.0 14,000.0 - - - - 5.3 12,488.0 6.0 16,800.0 - - - - - 30.0 67,816.0 22.3 58,114.0

5 Box Culverts No 120.00 15.0 1,349.8 15.0 1,349.8 15.0 1,349.8 - 5.0 449.9 10.0 899.8 15.0 1,349.8 15.0 1,349.8 - 1.0 90.0 14.0 1,259.8 15.0 1,349.8 - - - - - - - - - 90.0 8,098.5 30.0 2,699.5

6 Pipe Culverts No 24.00 - - - - 1.0 10.5 - - 2.0 21.1 1.0 10.5 4.0 42.2 9.0 94.9 - 2.0 21.1 3.0 31.6 - - - 2.0 21.1 - - - - 17.0 179.2 7.0 52.7

7 Minor Bridge Nos 5.00 - - - - - 1.0 1,000.9 - 1.0 1,000.9 - - 1.0 749.4 1.0 749.4 - - - - 1.0 630.3 - - - 2.0 2,001.7 3.0 2,129.1

8 Major Bridge ( Ph3) Nos 1.00 - 1.0 5,798.6 - - - - - - - - - - - - - - - - - - 1.0 5,798.6 - -

9 ROB Nos 2.00 - - - 1.0 1,166.5 - - - - 1.0 2,106.6 - - - - - - - - - - - 2.0 3,273.1 - -

10 Elephant Underpass Nos 5.00 - - - - 1.0 1,215.0 - - 1.0 1,273.8 - - 1.0 1,727.7 - - - - 1.0 1,727.7 1.0 1,727.7 - - - 2.0 2,488.7 3.0 3,455.4

11 VUP Nos 1.00 - - - - - - - - - - 1.0 1,105.0 - - - - - - - - - - - 1.0 1,105.0

12 LVUP Nos 2.00 - - - - - - - - - - 1.0 734.6 - - - - 1.0 734.6 - - - - - - 2.0 734.6

13 RE Wall M3 448.00 - - 448.0 - - - - - - - - - - - - - - - - - - - 448.0 - -


Schedule Description
Schedule - A Site of the project
Annex - I Site
Annex - II Dates for providing Right of way
Annex - III Alignment Plans
Annex - IV Environment Clearences
Schedule - B Development of the Project Highway
Annex - I Description of Four- laning with paved shoulder
Schedule - C Project Facilities
Schedule - D Specifications and Standards
Annex - I Specifications and Standards for construction
Schedule - E Maintanence Requirements
Annex - I Repair/rectification of Defects and deficiencies
Schedule - F Applicable Permits
Schedule - G Form of Bank Guarantee
Annex - I Performance Security
Annex - II Form for Guarantee for withdrawal of Retention Money
Annex - III Form for Guarantee for Advance Payment
Schedule - H Contract Price Weightages
Schedule - I Drawings
Annex - I List of Drawings
Schedule - J Project Completion Schedule
Schedule - K Tests on Completion
Schedule - L Provisional Certificate, Completion Certificate
Schedule - M Payment Reduction for Non-compliance
Schedule - N Selection of Authority's Engineer
Annex - I Terms of reference for Authority's Engineer
Schedule - O Forms of Payment Statements
Schedule - P Insurance
Stage Payment terms aof Main Contract
CV 38007

Weightage in
Value as
percentage to Percentage
Item Stage for Payment Weightage
the Contract weightage
of Contract
Price

In Lacs
Road works including culverts, widening 54.81% A- Widening/strengthening/Reconstruction & Raising of
and repair of culverts existing road 20831.6367

Minor Bridges/ Underpasses/ Over asses 24.81% A.I- Widening and Repair of Minor bridges (Iength> 6 m and
<60 m) 9429.5367
Major Bridge(length>60m.) works and 11.01% A.1 Widening and repairs of Major Bridges
ROB/RUB/ elevated sections/ Flyovers
including viaducts, if any
4184.5707
Other works 9.36%
a) Bus bays
b) Truck lay byes
c) Rest areas 3557.46
d) others

Total 38007

3800700000
72671128.1070746
1017395793.49904 1
1126402485.65966 2
1656901720.8413 3

1017395793.49904
1126402485.65966
1656901720.8413
Dilip Buildcon Ltd (DBL)

2 Laning with Paved Shoulder from Km 30+800 to Km 70+800 and 2 Laning without Paved Shoulder from Km 70+800 to Karnataka/Goa Border (km 84+120) of NH-4A in the State of Karnataka on EPC mode

Itemwise Workplan
Scope
S.No Particulars UOM Ph1 + Ph2 + Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 FY 18-19 FY 19-20
Ph3
Ph2 Ph2 Ph2 Ph1 Ph2 Ph1 Ph1 Ph1 Ph3 Ph1 Ph3 Ph3 Ph3 Ph3 Ph3 Ph3 Ph3
Embankment Filling & Subgrade
1 M 3
- - - - -
500 mm

2 GSB 200 mm M3 - - - - -

3 Dry Lean Concrete 150 mm M3 - - - - -

Pavement Quality Concrete 280


4 mm M3 - - - - -

5 Box Culverts - - - - -

PCC M3 2,188.0 - - -

RCC M3 14,049.0 - - -

6 Pipe Culverts - - - - -

PCC M3 47.0 - - -

RCC M3 206.0 - - -

7 Minor Bridge Nos - - - - -

PCC M3 - - -

RCC M3 - - -

8 Major Bridge ( Ph3) Nos - - - - -

PCC M3 47.0 47.0 - - -

RCC M3 5,798.561 5,798.561 - - -

9 ROB Nos - - - - -

PCC M3 - - -

RCC M3 - - -

10 Elephant Underpass Nos - - - - -

PCC M3 - - -

RCC M3 - - -

11 VUP Nos - - - - -

PCC M3 - - -

RCC M3 - - -

12 LVUP Nos - - - - -

PCC M3 - - -

RCC M3 - - -

13 RE Wall M3 448.0 - - - - -
Dilip Buildcon Ltd (DBL)

2 Laning with Paved Shoulder from Km 30+800 to Km 70+800 and 2 Laning without Paved Shoulder
from Km 70+800 to Karnataka/Goa Border (km 84+120) of NH-4A in the State of Karnataka on EPC
mode

S.No Particulars Ph1 Ph2 Ph3 Total

1 VUP 0 0 1 1

2 LVUP 0 0 2 2

3 Elephant Underpass 1 1 3 5

4 ROB 0 1 1 2

5 Major Bridge 0 0 1 1

6 Minor Bridge 0 2 3 5

7 HPC 1 6 18 25

8 Box Culvert 50 41 29 120


Dilip Buildcon Ltd (DBL)

2 Laning with Paved Shoulder from Km 30+800 to Km 70+800 and 2 Laning without Paved Shoulder from Km 70+8
State of Karnataka on EPC mode

S.No Particulars UOM Ph1


1 VUP Nos -
2 LVUP Nos -
3 Elephant Underpass Nos 1.0
4 ROB Nos -
5 Major Bridge Nos -
6 Minor Bridge Nos -
7 HPC Nos 1.0
8 Box Culvert Nos 50.0
9 Toll Plaza Nos -
10 Bus Shelter Nos -
11 Bus Bay with Shelter Nos -
12 Landscaping and tree Plantation Nos -

13 Highway Lighting -

14 Roadside Furniture
i Traffic Signs Entire Project Highway
ii Pavement Marking Entire Project Highway
iii LED Traffic Blinkers Entire Project Highway

iv Crash barrier/ Double beam crash barrier At high embankment location / entire project highw

v Delineators Entire Project Highway


vi Boundary stones Entire Project Highway
vii Hectometer/ Kilometer stones Entire Project Highway
15 Pedestrian facilities -
16 Overhead full gantry At start and end of the projec

17 Overhead half gantry -

18 Traffic aid post -

19 Medial aid post -

Highway Traffic Management Systems


20 -
(HTMS)
21 Mirror at blind curve Entire Project Highway
22 Cat eye Entire Project Highway
Thermoplastic rumble strips for speed
23 Entire Project Highway
restriction measures
24 Sub-surface drainage Entire Project Highway
ip Buildcon Ltd (DBL)

without Paved Shoulder from Km 70+800 to Karnataka/Goa Border (km 84+120) of NH-4A in the
of Karnataka on EPC mode

Ph2 Ph3 Total


- 1.0 1.0
- 2.0 2.0
1.0 3.0 5.0
1.0 1.0 2.0
- 1.0 1.0
2.0 3.0 5.0
6.0 18.0 25.0
41.0 29.0 120.0
1.0 - 1.0
- 3.0 3.0
4.0 - 4.0
1.0 - 1.0
At toll plaza, grade separated structure, Major
intersection
and Bus stop location

Entire Project Highway


Entire Project Highway
Entire Project Highway

ankment location / entire project highway along the valley side

Entire Project Highway


Entire Project Highway
Entire Project Highway
At bus shelter location
At start and end of the project

At toll plaza, grade separated structure, intersection


and Bus stop location

At toll plaza location

At toll plaza location

Entire Project Highway


- -
- -
- -
- -
54 56.6 b 2.6 5.2
56.6 57.8 l 1.2 1.2
57.8 65.6 b 7.8 15.6
65.6 66.2 l 0.6 0.6
66.4 68.3 b 1.9 3.8
68.3 70.8 b 2.5 5
77.4 80 l 2.6 2.6
80 82.12 r 2.12 2.12
Dilip Buildcon Ltd (DBL)

2 Laning with Paved Shoulder from Km 30+800 to Km 70+800 and 2 Laning without Paved Shoulder from Km 70+8
State of Karnataka on EPC mode

S.No Particulars UOM Ph1


1 VUP Nos -
2 LVUP Nos -
3 Elephant Underpass Nos 1.0
4 ROB Nos -
5 Major Bridge Nos -
6 Minor Bridge Nos -
7 HPC Nos 1.0
8 Box Culvert Nos 50.0
9 Roadside Drain Earthen Nos 5.0
10 Roadside Drain CC Nos 4.7
11 Toll Plaza Nos -
12 Bus Shelter Nos -
13 Bus Bay with Shelter Nos -
14 Landscaping and tree Plantation Nos -

15 Highway Lighting -

16 Roadside Furniture
i Traffic Signs Entire Project Highway
ii Pavement Marking Entire Project Highway
iii LED Traffic Blinkers Entire Project Highway

iv Crash barrier/ Double beam crash barrier At high embankment location / entire project highw

v Delineators Entire Project Highway


vi Boundary stones Entire Project Highway
vii Hectometer/ Kilometer stones Entire Project Highway
17 Pedestrian facilities -
18 Overhead full gantry At start and end of the projec

19 Overhead half gantry -

20 Traffic aid post -

21 Medial aid post -

Highway Traffic Management Systems


22 -
(HTMS)
23 Mirror at blind curve Entire Project Highway
24 Cat eye Entire Project Highway
Thermoplastic rumble strips for speed
25 Entire Project Highway
restriction measures
26 Sub-surface drainage Entire Project Highway
ip Buildcon Ltd (DBL)

without Paved Shoulder from Km 70+800 to Karnataka/Goa Border (km 84+120) of NH-4A in the
of Karnataka on EPC mode

Ph2 Ph3 Total


- 1.0 1.0
- 2.0 2.0
1.0 3.0 5.0
1.0 1.0 2.0
- 1.0 1.0
2.0 3.0 5.0
6.0 18.0 25.0
41.0 29.0 120.0
26.4 - 31.4
- - 4.7
1.0 - 1.0
- 3.0 3.0
4.0 - 4.0
1.0 - 1.0
At toll plaza, grade separated structure, Major
intersection
and Bus stop location

Entire Project Highway


Entire Project Highway
Entire Project Highway

ankment location / entire project highway along the valley side

Entire Project Highway


Entire Project Highway
Entire Project Highway
At bus shelter location
At start and end of the project

At toll plaza, grade separated structure, intersection


and Bus stop location

At toll plaza location

At toll plaza location

Entire Project Highway


- -
- -
- -
- -
54 56.6 b 2.6 5.2
56.6 57.8 l 1.2 1.2
57.8 65.6 b 7.8 15.6
65.6 66.2 l 0.6 0.6
66.4 68.3 b 1.9 3.8
68.3 70.8 b 2.5 5
77.4 80 l 2.6 2.6
80 82.12 r 2.12 2.12
Location 54+045 54+521 55+463 55+664 56+256
Span Size 3x18 1.2 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0
Type of Construction RC RC RC RC RC
Length
Casting of Precast Box culvert 60
Dismantling 10/7/2018 10/8/2018 10/9/2018 10/10/2018 10/11/2018
Layout & Excavation 10/10/2018 10/11/2018 10/12/2018 10/13/2018 10/14/2018
PCC & layout 10/12/2018 10/13/2018 10/15/2018 10/15/2018 10/16/2018
RCC Raft 10/15/2018 10/16/2018 10/18/2018 10/18/2018 10/19/2018
BoxCulvert Erection 10/18/2018 10/19/2018 10/21/2018 10/22/2018 10/22/2018
Curtainwall 10/20/2018 10/21/2018 10/23/2018 10/24/2018 10/24/2018
Wingwall 10/22/2018 10/23/2018 10/25/2018 10/26/2018 10/26/2018

Location 57+965 57+982 58+346 58+852 59+348


Span Size 2.0x5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0
Type of Construction RC RC RC RC RC
Length
Casting of Precast Box culvert
Dismantling 11/1/2019 11/2/2019 11/3/2019 11/4/2019 11/5/2019
Layout & Excavation 11/4/2019 11/5/2019 11/6/2019 11/7/2019 11/8/2019
PCC & Layout 11/6/2019 11/7/2019 11/8/2019 11/9/2019 11/10/2019
RCC Raft 11/9/2019 11/10/2019 11/11/2019 11/12/2019 11/13/2019
BoxCulvert Erection 11/12/2019 11/13/2019 11/14/2019 11/15/2019 11/16/2019
Curtainwall 11/14/2019 11/15/2019 11/16/2019 11/17/2019 11/18/2019
Wingwall 11/16/2019 11/17/2019 11/18/2019 11/19/2019 11/20/2019

Location 62+664 62+824 62+936 63+320 63+835


Span Size 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 2.0x3x2.0 1.2
Type of Construction NC NC RC NC NC
Length
Dismantling 12/1/2018 12/2/2018 12/3/2018 12/4/2018 12/5/2018
Layout & Excavation 12/4/2018 12/5/2018 12/6/2018 12/7/2018 12/8/2018
PCC & Layout 12/6/2018 12/7/2018 12/8/2018 12/9/2018 12/10/2018
RCC Raft 12/9/2018 12/10/2018 12/11/2018 12/12/2018 12/13/2018
BoxCulvert Erection 12/12/2018 12/13/2018 12/14/2018 12/15/2018 12/16/2018
Curtainwall 12/14/2018 12/15/2018 12/16/2018 12/17/2018 12/18/2018
Wingwall 12/16/2018 12/17/2018 12/18/2018 12/19/2018 12/20/2018

Location 67+555 68+066 68+440 68+664 68+928


Span Size 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 1.5 1.5
Type of Construction RC NC NC RC RC
Length
Dismantling 1/1/2019 1/2/2019 1/3/2019 1/4/2019 1/5/2019
Layout & Excavation 1/4/2019 1/5/2019 1/6/2019 1/7/2019 1/8/2019
PCC & Layout 1/6/2019 1/7/2019 1/8/2019 1/9/2019 1/10/2019
RCC Raft 1/9/2019 1/10/2019 1/11/2019 1/12/2019 1/13/2019
BoxCulvert Erection 1/12/2019 1/13/2019 1/14/2019 1/15/2019 1/16/2019
Curtainwall 1/14/2019 1/15/2019 1/16/2019 1/17/2019 1/18/2019
Wingwall 1/16/2019 1/17/2019 1/18/2019 1/19/2019 1/20/2019

Location 73+398 73+778 74+100 74+511 74+687


Span Size 1.5 1.5 1.5 1.5 1.5
Type of Construction RC RC RC RC RC
Length
Dismantling 2/1/2019 2/2/2019 2/3/2019 2/4/2019 2/5/2019
Layout & Excavation 2/4/2019 2/5/2019 2/6/2019 2/7/2019 2/8/2019
PCC & Layout 2/6/2019 2/7/2019 2/8/2019 2/9/2019 2/10/2019
RCC Raft 2/9/2019 2/10/2019 2/11/2019 2/12/2019 2/13/2019
BoxCulvert Erection 2/12/2019 2/13/2019 2/14/2019 2/15/2019 2/16/2019
Curtainwall 2/14/2019 2/15/2019 2/16/2019 2/17/2019 2/18/2019
Wingwall 2/16/2019 2/17/2019 2/18/2019 2/19/2019 2/20/2019

Location 77+037 77+268 77+417 77+544 77+644


Span Size 3 3 1.5 2 1.5
Type of Construction RC RC RC RC RC
Length
Dismantling 3/1/2019 3/2/2019 3/3/2019 3/4/2019 3/5/2019
Layout & Excavation 3/4/2019 3/5/2019 3/6/2019 3/7/2019 3/8/2019
PCC & Layout 3/6/2019 3/7/2019 3/8/2019 3/9/2019 3/10/2019
RCC Raft 3/9/2019 3/10/2019 3/11/2019 3/12/2019 3/13/2019
BoxCulvert Erection 3/12/2019 3/13/2019 3/14/2019 3/15/2019 3/16/2019
Wingwall 3/14/2019 3/15/2019 3/16/2019 3/17/2019 3/18/2019
Curtainwall 3/16/2019 3/17/2019 3/18/2019 3/19/2019 3/20/2019

Location 80+148 80+320 80+443 80+615 80+932


Span Size 3 2 3 3 2.5
Type of Construction RC RC RC RC RC
Length
Dismantling 4/1/2019 4/2/2019 4/3/2019 4/4/2019 4/5/2019
Layout & Excavation 4/4/2019 4/5/2019 4/6/2019 4/7/2019 4/8/2019
PCC & Layout 4/6/2019 4/7/2019 4/8/2019 4/9/2019 4/10/2019
RCC Raft 4/9/2019 4/10/2019 4/11/2019 4/12/2019 4/13/2019
BoxCulvert Erection 4/12/2019 4/13/2019 4/14/2019 4/15/2019 4/16/2019
Wingwall 4/14/2019 4/15/2019 4/16/2019 4/17/2019 4/18/2019
Curtainwall 4/16/2019 4/17/2019 4/18/2019 4/19/2019 4/20/2019

Location 53+504 66+230


Span Size 3X18 3X10
Type of Construction
Layout/ RC RC
Excavation/ 10/5/2018 11/1/2018
level
PCC
A1 10/10/2018 11/6/2018
A2 10/15/2018 11/12/2018
P1 10/19/2018 11/16/2018
P2 10/23/2018 11/21/2018
Raft
A1 10/15/2018 11/12/2018
A2 10/21/2018 11/18/2018
P1 10/23/2018 11/21/2018
P2 10/28/2018 11/26/2018
Wall
A1 1st Lift 10/18/2018 11/16/2018
A1-2nd Lift 10/22/2018 11/20/2018
A1-3rd Lift 10/26/2018 11/24/2018
A1 Final Lift 10/30/2018 11/28/2018
A2 1st Lift 10/25/2018 11/22/2018
A2-2nd Lift 10/29/2018 11/26/2018
A2-3rd Lift 11/2/2018 11/30/2018
A2 Final Lift 11/6/2018 12/3/2018

P1 1st lift 10/26/2018 11/24/2018


P1 2nd lift 10/29/2018 11/27/2018
P1 3rd lift & Final Lift 11/1/2018 11/30/2018
P2 1st Lift 11/1/2018 11/30/2018
P2 2nd lift 11/4/2018 12/3/2018
P2 3rd lift & Final Lift 11/8/2018 12/6/2018

ABT-CAP & PIER-CAP


A1 11/5/2018 12/3/2018
A2 11/11/2018 12/9/2018
P1 11/9/2018 11/9/2018
P2 11/17/2018 11/15/2018
PEDESTAL
A1-A2 11/15/2018 11/15/2018
P1-P2 11/20/2018 11/20/2018
RCC GIRDER LAUNCHING
A1-P1 12/5/2018
P1-P2 12/9/2018
P2-A2 12/12/2018
DIAPHARAM
A1-P1 12/9/2018
P1-P2 12/13/2018
P2-A2 12/17/2018
DECK SLAB
A1-P1 12/22/2018 12/28/2018
P1-P2 12/27/2018 1/4/2019
P2-A2 1/2/2019 1/10/2019
DIRT WALL/ Bracket
A1 12/24/2018 1/13/2019
A2 1/4/2019 1/15/2019
MISCELLANEOUS WORK
Crash Barrier 1/10/2019 1/20/2019
APPROACH SLAB 1/15/2019 1/22/2019
56+670 57+220 57+306 57+519
2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0
RC RC RC RC

10/12/2018 10/13/2018 10/15/2018 10/16/2018


10/15/2018 10/16/2018 10/18/2018 10/19/2018
10/17/2018 10/18/2018 10/20/2018 10/21/2018
10/20/2018 10/22/2018 10/23/2018 10/24/2018
10/23/2018 10/25/2018 10/26/2018 10/27/2018
10/25/2018 10/27/2018 10/28/2018 10/29/2018
10/27/2018 10/29/2018 10/30/2018 10/31/2018

59+787 60+006 60+723 61+069 61+475 61+653 61+908 62+109


2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0 2.0x1.5x2.0
RC RC NC NC NC NC NC RC

11/6/2019 11/7/2019 11/8/2019 11/9/2019 11/10/2019 11/11/2019 11/12/2019 11/13/2019


11/9/2019 11/10/2019 11/11/2019 11/12/2019 11/13/2019 11/14/2019 11/15/2019 11/16/2019
11/11/2019 11/12/2019 11/13/2019 11/14/2019 11/15/2019 11/16/2019 11/17/2019 11/18/2019
11/14/2019 11/15/2019 11/16/2019 11/17/2019 11/18/2019 11/19/2019 11/20/2019 11/21/2019
11/17/2019 11/18/2019 11/19/2019 11/20/2019 11/21/2019 11/22/2019 11/23/2019 11/24/2019
11/19/2019 11/20/2019 11/21/2019 11/22/2019 11/23/2019 11/24/2019 11/25/2019 11/26/2019
11/21/2019 11/22/2019 11/23/2019 11/24/2019 11/25/2019 11/26/2019 11/27/2019 11/28/2019

64+010 65+054 65+597 65+797 65+967 66+497 66+654 66+787


2.0x1.5x2.0 1.2 1x37.240 2.0x1.5x2.0 2.0x1.5x2.0 3x10 2.0x1.5x2.0 2.0x1.5x2.0
NC NC RC NC NC RC NC RC

12/6/2018 12/7/2018 12/8/2018 12/9/2018 12/10/2018 12/11/2018 12/12/2018 12/13/2018


12/9/2018 12/10/2018 12/11/2018 12/12/2018 12/13/2018 12/14/2018 12/15/2018 12/16/2018
12/11/2018 12/12/2018 12/13/2018 12/14/2018 12/15/2018 12/16/2018 12/17/2018 12/18/2018
12/14/2018 12/15/2018 12/16/2018 12/17/2018 12/18/2018 12/19/2018 12/20/2018 12/21/2018
12/17/2018 12/18/2018 12/19/2018 12/20/2018 12/21/2018 12/22/2018 12/23/2018 12/24/2018
12/19/2018 12/20/2018 12/21/2018 12/22/2018 12/23/2018 12/24/2018 12/25/2018 12/26/2018
12/21/2018 12/22/2018 12/23/2018 12/24/2018 12/25/2018 12/26/2018 12/27/2018 12/28/2018

69+130 69+348 70+557 70+744 71+294 71+662 72+130 72+433


2 1.5 1.5 1.5 20+20+20 1.5 1.5 1.5
RC RC RC RC RC RC RC RC
1/6/2019 1/7/2019 1/8/2019 1/9/2019 1/10/2019 1/11/2019 1/12/2019 1/13/2019
1/9/2019 1/10/2019 1/11/2019 1/12/2019 1/13/2019 1/14/2019 1/15/2019 1/16/2019
1/11/2019 1/12/2019 1/13/2019 1/14/2019 1/15/2019 1/16/2019 1/17/2019 1/18/2019
1/14/2019 1/15/2019 1/16/2019 1/17/2019 1/18/2019 1/19/2019 1/20/2019 1/21/2019
1/17/2019 1/18/2019 1/19/2019 1/20/2019 1/21/2019 1/22/2019 1/23/2019 1/24/2019
1/19/2019 1/20/2019 1/21/2019 1/22/2019 1/23/2019 1/24/2019 1/25/2019 1/26/2019
1/21/2019 1/22/2019 1/23/2019 1/24/2019 1/25/2019 1/26/2019 1/27/2019 1/28/2019

74+858 75+048 75+210 75+481 75+604 75+813 75+957 76+294


1.5 2 1.5 1.5 1.5 2 2 1.5
RC RC RC RC RC RC RC RC

2/6/2019 2/7/2019 2/8/2019 2/9/2019 2/10/2019 2/11/2019 2/12/2019 2/13/2019


2/9/2019 2/10/2019 2/11/2019 2/12/2019 2/13/2019 2/14/2019 2/15/2019 2/16/2019
2/11/2019 2/12/2019 2/13/2019 2/14/2019 2/15/2019 2/16/2019 2/17/2019 2/18/2019
2/14/2019 2/15/2019 2/16/2019 2/17/2019 2/18/2019 2/19/2019 2/20/2019 2/21/2019
2/17/2019 2/18/2019 2/19/2019 2/20/2019 2/21/2019 2/22/2019 2/23/2019 2/24/2019
2/19/2019 2/20/2019 2/21/2019 2/22/2019 2/23/2019 2/24/2019 2/25/2019 2/26/2019
2/21/2019 2/22/2019 2/23/2019 2/24/2019 2/25/2019 2/26/2019 2/27/2019 2/28/2019

77+722 78+452 78+587 78+736 78+884 79+123 79+326 79+687


2 3 2 2.5 2.5 1.5 2.5 2.5
RC RC RC RC RC RC RC RC

3/6/2019 3/7/2019 3/8/2019 3/9/2019 3/10/2019 3/11/2019 3/12/2019 3/13/2019


3/9/2019 3/10/2019 3/11/2019 3/12/2019 3/13/2019 3/14/2019 3/15/2019 3/16/2019
3/11/2019 3/12/2019 3/13/2019 3/14/2019 3/15/2019 3/16/2019 3/17/2019 3/18/2019
3/14/2019 3/15/2019 3/16/2019 3/17/2019 3/18/2019 3/19/2019 3/20/2019 3/21/2019
3/17/2019 3/18/2019 3/19/2019 3/20/2019 3/21/2019 3/22/2019 3/23/2019 3/24/2019
3/19/2019 3/20/2019 3/21/2019 3/22/2019 3/23/2019 3/24/2019 3/25/2019 3/26/2019
3/21/2019 3/22/2019 3/23/2019 3/24/2019 3/25/2019 3/26/2019 3/27/2019 3/28/2019

81+586 81+892
2 3
RC RC

4/6/2019 4/7/2019
4/9/2019 4/10/2019
4/11/2019 4/12/2019
4/14/2019 4/15/2019
4/17/2019 4/18/2019
4/19/2019 4/20/2019
4/21/2019 4/22/2019
62+339 62+514
2.0x1.5x2.0 2.0x1.5x2.0
RC NC

60
11/14/2019 11/15/2019
11/17/2019 11/18/2019
11/19/2019 11/20/2019
11/22/2019 11/23/2019
11/25/2019 11/26/2019
11/27/2019 11/28/2019
11/29/2019 11/30/2019

67+189 67+440
2.0x1.5x2.0 2.0x1.5x2.0
NC NC

12/14/2018 12/15/2018
12/17/2018 12/18/2018
12/19/2018 12/20/2018
12/22/2018 12/23/2018
12/25/2018 12/26/2018
12/27/2018 12/28/2018
12/29/2018 12/30/2018

72+631 72+868
1.5 2
RC RC
1/14/2019 1/15/2019
1/17/2019 1/18/2019
1/19/2019 1/20/2019
1/22/2019 1/23/2019
1/25/2019 1/26/2019
1/27/2019 1/28/2019
1/29/2019 1/30/2019

76+621 76+762
2 1.5
RC RC

2/14/2019 2/15/2019
2/17/2019 2/18/2019
2/19/2019 2/20/2019
2/22/2019 2/23/2019
2/25/2019 2/26/2019
2/27/2019 2/28/2019
3/1/2019 3/2/2019

79+972 80+038
2 1.5
RC RC

3/14/2019 3/15/2019
3/17/2019 3/18/2019
3/19/2019 3/20/2019
3/22/2019 3/23/2019
3/25/2019 3/26/2019
3/27/2019 3/28/2019
3/29/2019 3/30/2019
Dilip Buildcon Ltd (DBL)

2 Laning with Paved Shoulder from Km 30+800 to Km 70+800 and 2 Laning without Paved Shoulder from Km 70+800 to Karnataka/Goa Border (km
84+120) of NH-4A in the State of Karnataka on EPC mode
Location 67+600 67+600 71+100 71+100 71+100 71+100
Pier A1 Pier A2 Pier A2 Pier P2 Pier P1 Pier A1
Span Size 1x50 1x50 60+60+60 60+60+60 60+60+60 60+60+60
Type of Construction NC NC NC NC NC NC
S F S F S F S F S F S F
Layout
2/1/2019 2/1/2019 2/5/2019 2/5/2019 1/18/2019 1/18/2019 1/21/2019 1/21/2019 1/24/2019 1/24/2019 1/27/2019 1/27/2019

Excavation 2/2/2019 2/3/2019 2/6/2019 2/7/2019 1/19/2019 1/20/2019 1/22/2019 1/23/2019 1/25/2019 1/26/2019 1/28/2019 1/29/2019
PCC 2/4/2019 2/4/2019 2/8/2019 2/8/2019 1/21/2019 1/21/2019 1/24/2019 1/24/2019 1/27/2019 1/27/2019 1/30/2019 1/30/2019
Footing
R/F fixing 2/5/2019 2/12/2019 2/9/2019 2/16/2019 1/22/2019 1/29/2019 1/25/2019 2/1/2019 1/28/2019 2/4/2019 1/31/2019 2/7/2019
Concreting 2/13/2019 2/13/2019 2/17/2019 2/17/2019 1/30/2019 1/30/2019 2/2/2019 2/2/2019 2/5/2019 2/5/2019 2/8/2019 2/8/2019
Deshuttering 2/14/2019 2/15/2019 2/18/2019 2/19/2019 1/31/2019 2/1/2019 2/3/2019 2/4/2019 2/6/2019 2/7/2019 2/9/2019 2/10/2019
Backfilling 2/16/2019 2/16/2019 2/20/2019 2/20/2019 2/2/2019 2/2/2019 2/5/2019 2/5/2019 2/8/2019 2/8/2019 2/11/2019 2/11/2019
Starter/ Shearkey steel fixing 2/15/2019 2/15/2019 2/19/2019 2/19/2019 2/1/2019 2/1/2019 2/4/2019 2/4/2019 2/7/2019 2/7/2019 2/10/2019 2/10/2019
Starter/ Shearkey shuttering 2/16/2019 2/16/2019 2/20/2019 2/20/2019 2/2/2019 2/2/2019 2/5/2019 2/5/2019 2/8/2019 2/8/2019 2/11/2019 2/11/2019
Starter/ Shearkey concreting 2/17/2019 2/17/2019 2/21/2019 2/21/2019 2/3/2019 2/3/2019 2/6/2019 2/6/2019 2/9/2019 2/9/2019 2/12/2019 2/12/2019
Pier
Stagging for Pier R/f fixing 2/18/2019 2/19/2019 2/22/2019 2/23/2019 2/4/2019 2/5/2019 2/7/2019 2/8/2019 2/10/2019 2/11/2019 2/13/2019 2/14/2019
R/f fixing 2/20/2019 2/23/2019 2/24/2019 2/28/2019 2/6/2019 2/11/2019 2/9/2019 2/14/2019 2/12/2019 2/17/2019 2/15/2019 2/20/2019
Destagging 2/24/2019 2/24/2019 3/1/2019 3/1/2019 2/12/2019 2/12/2019 2/15/2019 2/15/2019 2/18/2019 2/18/2019 2/21/2019 2/21/2019
Stagging for Pier shuttering fixing 2/25/2019 2/25/2019 3/2/2019 3/2/2019 2/13/2019 2/13/2019 2/16/2019 2/16/2019 2/19/2019 2/19/2019 2/22/2019 2/22/2019
shuttering 2/26/2019 2/28/2019 3/3/2019 3/5/2019 2/14/2019 2/16/2019 2/17/2019 2/19/2019 2/20/2019 2/22/2019 2/23/2019 2/25/2019
concreting 3/1/2019 3/1/2019 3/6/2019 3/6/2019 2/17/2019 2/17/2019 2/20/2019 2/20/2019 2/23/2019 2/23/2019 2/26/2019 2/26/2019
Deshuttering 3/3/2019 3/4/2019 3/8/2019 3/9/2019 2/19/2019 2/20/2019 2/22/2019 2/23/2019 2/25/2019 2/26/2019 2/28/2019 3/1/2019
Pier cap
Stagging 3/5/2019 3/7/2019 3/10/2019 3/12/2019 2/21/2019 2/23/2019 2/24/2019 2/26/2019 2/27/2019 3/1/2019 3/2/2019 3/4/2019
bottom shuttering 3/8/2019 3/10/2019 3/13/2019 3/15/2019 2/24/2019 2/26/2019 2/27/2019 3/1/2019 3/2/2019 3/4/2019 3/5/2019 3/7/2019
R/f fixing 3/11/2019 3/13/2019 3/16/2019 3/18/2019 2/27/2019 3/1/2019 3/2/2019 3/4/2019 3/5/2019 3/7/2019 3/8/2019 3/10/2019
side shuttering 3/14/2019 3/16/2019 3/19/2019 3/21/2019 3/2/2019 3/4/2019 3/5/2019 3/7/2019 3/8/2019 3/10/2019 3/11/2019 3/13/2019
concreting 3/16/2019 3/16/2019 3/21/2019 3/21/2019 3/4/2019 3/4/2019 3/7/2019 3/7/2019 3/10/2019 3/10/2019 3/13/2019 3/13/2019
Bearing Pedestal Concreting 3/19/2019 3/19/2019 3/24/2019 3/24/2019 3/7/2019 3/7/2019 3/10/2019 3/10/2019 3/13/2019 3/13/2019 3/16/2019 3/16/2019
side shutter deshuttering 3/20/2019 3/20/2019 3/25/2019 3/25/2019 3/8/2019 3/8/2019 3/11/2019 3/11/2019 3/14/2019 3/14/2019 3/17/2019 3/17/2019
bottom shutter deshuttering 3/31/2019 3/31/2019 4/4/2019 4/4/2019 3/18/2019 3/18/2019 3/21/2019 3/21/2019 3/24/2019 3/24/2019 3/27/2019 3/27/2019

Destagging 4/1/2019 4/1/2019 4/5/2019 4/5/2019 3/19/2019 3/19/2019 3/22/2019 3/22/2019 3/25/2019 3/25/2019 3/28/2019 3/28/2019
Bearing fixing 3/29/2019 3/29/2019 4/3/2019 4/3/2019 3/17/2019 3/17/2019 3/20/2019 3/20/2019 3/23/2019 3/23/2019 3/26/2019 3/26/2019
Deckslab Shuttering 3/30/2019 4/1/2019 4/4/2019 4/6/2019 3/18/2019 3/20/2019 3/21/2019 3/23/2019 3/24/2019 3/26/2019 3/27/2019 3/29/2019
Deckslab Reinf. 4/2/2019 4/4/2019 4/7/2019 4/9/2019 3/21/2019 3/23/2019 3/24/2019 3/26/2019 3/27/2019 3/29/2019 3/30/2019 4/1/2019
Deckslab concreting 4/4/2019 4/4/2019 4/9/2019 4/9/2019 3/23/2019 3/23/2019 3/26/2019 3/26/2019 3/29/2019 3/29/2019 4/1/2019 4/1/2019
Sl.No. Description Unit Location
47+980 65+165
1 Cost of bridge Cr.
2 Date of start 12/1/2018
3 Date of completion 2/24/2020
4 Duration of completion Month 15
5 Length of bridge Rmt in two lane 89.92 37.24
6 No of span Nos 19.240+51.440+19.240 1x37.24
7 Type of foundation Pile
8 No of foundation Nos
9 No of Pile & dia Nos/dia
10 Quantity of Pile Rmt
11 Type of Bearing
12 Type of expansion joint
13 Superstructure Steel composite girder
14 No of steel girder Nos
15 Quantity of steel girders MT
16 Quantity of HT strands MT
17 Total Qty.of concrete Cum
18 Quantity of Steel MT
19 Quantity of RE Wall Sqm
20 Drilling of holes Rmt
21 Cement grouting MT
22 Excavation of hard rock Cum
Dilip Buildcon Ltd (DBL)

2 Laning with Paved Shoulder from Km 30+800


to Km 70+800 and 2 Laning without Paved
Shoulder from Km 70+800 to Karnataka/Goa
Border (km 84+120) of NH-4A in the State of
Karnataka on EPC mode

Location MNB 53+504 66+230


Span Size 3X18 3X10
Type of Construction
Layout/ RC RC
Excavation/ 10/5/2018 11/1/2018
level
PCC
A1 10/10/2018 11/6/2018
A2 10/15/2018 11/11/2018
P1 10/19/2018 11/15/2018
P2 10/23/2018 11/19/2018
Raft
A1 10/15/2018 11/12/2018
A2 10/20/2018 11/18/2018
P1 10/24/2018 11/20/2018
P2 10/28/2018 11/25/2018
Wall
A1 1st Lift 10/18/2018 11/16/2018
A1-2nd Lift 10/21/2018 11/20/2018
A1-3rd Lift 10/24/2018 11/24/2018
A1 Final Lift 10/27/2018 11/28/2018
A2 1st Lift 10/23/2018 11/21/2018
A2-2nd Lift 10/26/2018 11/25/2018
A2-3rd Lift 10/29/2018 11/29/2018
A2 Final Lift 11/1/2018 12/3/2018

P1 1st lift 10/27/2018 11/24/2018


P1 2nd lift 10/30/2018 11/27/2018
P1 3rd lift & Final Lift 11/2/2018 11/30/2018
P2 1st Lift 10/31/2018 11/29/2018
P2 2nd lift 11/3/2018 12/2/2018
P2 3rd lift & Final Lift 11/6/2018 12/6/2018

ABT-CAP & PIER-CAP


A1 10/31/2018 12/2/2018
A2 11/5/2018 12/7/2018
P1 11/10/2018 12/8/2018
P2 11/14/2018 12/14/2018
PEDESTAL
A1-A2 11/7/2018 12/9/2018
P1-P2 11/16/2018 12/16/2018
RCC Girder casting Start 10/10/2018
RCC Girder casting End 11/24/2018
RCC GIRDER LAUNCHING
A1-P1 12/8/2018
P1-P2 12/12/2018
P2-A2 12/15/2018

DIAPHARAM
A1-P1 12/10/2018
P1-P2 12/14/2018
P2-A2 12/17/2018
DECK SLAB
A1-P1 12/22/2018 12/19/2018
P1-P2 12/27/2018 12/26/2018
P2-A2 1/1/2019 1/5/2019
DIRT WALL/ Bracket
A1 12/25/2018 12/22/2018
A2 1/4/2019 1/8/2019
MISCELLANEOUS WORK
Crash Barrier 1/10/2019 1/14/2019
APPROACH SLAB 1/15/2019 1/19/2019
NEW CONSTRUCTION / RECONSTRUCTION STRETCHHES
7.2 Culverts
7.2.2 Reconstruction of existing culverts
Deductions of structures
Sl. No. Chainage Recommendation Str. Type No's
1 38120 LVUP 1
2 39400 LVUP 1
3 51950 VUP 1
4 32626 Viaduct 1
5 35023 Viaduct 1
6 42400 Viaduct 1
Steel Composite
7 67460 Girder 1
8 71100 Viaduct 1

Sl. No. Proposed Recommendation


Chainage Type of Str. Span/No. Of Rows
1 30103 RECONSTRUCTION BOX 3
2 30437 RECONSTRUCTION BOX 3
3 30720 RECONSTRUCTION BOX 3
4 31004 RECONSTRUCTION BOX 3
5 31207 RECONSTRUCTION BOX 3
6 31342 RECONSTRUCTION BOX 3
7 31420 RECONSTRUCTION BOX 3
8 32120 RECONSTRUCTION BOX 3
9 32272 RECONSTRUCTION BOX 3
10 34372 RECONSTRUCTION BOX 3
11 34631 RECONSTRUCTION BOX 3
12 39747 RECONSTRUCTION BOX 3
13 40858 RECONSTRUCTION BOX 3
14 41422 RECONSTRUCTION BOX 3
15 42066 RECONSTRUCTION BOX 3
16 42733 RECONSTRUCTION BOX 3
17 43274 RECONSTRUCTION BOX 3
18 43536 RECONSTRUCTION BOX 3
19 43892 RECONSTRUCTION BOX 3
20 45571 RECONSTRUCTION BOX 3
21 46236 RECONSTRUCTION BOX 3
22 46433 RECONSTRUCTION BOX 3
23 47264 RECONSTRUCTION BOX 3
24 49826 RECONSTRUCTION BOX 3
25 54054 RECONSTRUCTION BOX 3
26 54526 RECONSTRUCTION BOX 3
27 55470 RECONSTRUCTION BOX 3
28 55671 RECONSTRUCTION BOX 3
29 56262 RECONSTRUCTION BOX 3
30 56668 RECONSTRUCTION BOX 3
31 57220 RECONSTRUCTION BOX 3
32 57313 RECONSTRUCTION BOX 3
33 57525 RECONSTRUCTION BOX 3
34 57942 RECONSTRUCTION BOX 3
35 57990 RECONSTRUCTION BOX 3
36 58353 RECONSTRUCTION BOX 3
37 58858 RECONSTRUCTION BOX 3
38 59354 RECONSTRUCTION BOX 3
39 59789 RECONSTRUCTION BOX 3
40 60013 RECONSTRUCTION BOX 3
41 62115 RECONSTRUCTION BOX 3
42 62345 RECONSTRUCTION BOX 3
43 62940 RECONSTRUCTION BOX 3
44 65620 RECONSTRUCTION BOX 3
45 66503 RECONSTRUCTION BOX 3
46 66789 RECONSTRUCTION BOX 3
47 67559 RECONSTRUCTION BOX 3
48 68673 RECONSTRUCTION BOX 1
49 68938 RECONSTRUCTION BOX 2
50 69139 RECONSTRUCTION BOX 1
51 69357 RECONSTRUCTION BOX 1
52 70566 RECONSTRUCTION BOX 1
53 70753 RECONSTRUCTION BOX 1
54 71290 RECONSTRUCTION BOX 1
55 71674 RECONSTRUCTION BOX 1
56 72140 RECONSTRUCTION BOX 1
57 72439 RECONSTRUCTION BOX 1
58 72643 RECONSTRUCTION BOX 2
59 72880 RECONSTRUCTION BOX 1
60 73404 RECONSTRUCTION BOX 1
61 73784 RECONSTRUCTION BOX 1
62 74112 RECONSTRUCTION BOX 1
63 74518 RECONSTRUCTION BOX 1
64 74696 RECONSTRUCTION BOX 1
65 74867 RECONSTRUCTION BOX 2
66 75061 RECONSTRUCTION BOX 1
67 75221 RECONSTRUCTION BOX 1
68 75492 RECONSTRUCTION BOX 1
69 75615 RECONSTRUCTION BOX 1
70 75823 RECONSTRUCTION BOX 1
71 75966 RECONSTRUCTION BOX 1
72 76303 RECONSTRUCTION BOX 1
73 76629 RECONSTRUCTION BOX 1
74 76769 RECONSTRUCTION BOX 1
75 77045 RECONSTRUCTION BOX 1
76 77274 RECONSTRUCTION BOX 1
77 77422 RECONSTRUCTION BOX 1
78 77550 RECONSTRUCTION BOX 1
79 77650 RECONSTRUCTION BOX 1
80 77727 RECONSTRUCTION BOX 1
81 78457 RECONSTRUCTION BOX 1
82 78590 RECONSTRUCTION BOX 1
83 78739 RECONSTRUCTION BOX 1
84 78885 RECONSTRUCTION BOX 1
85 79125 RECONSTRUCTION BOX 1
86 79325 RECONSTRUCTION BOX 1
87 79686 RECONSTRUCTION BOX 1
88 79973 RECONSTRUCTION BOX 1
89 80037 RECONSTRUCTION BOX 1
90 80147 RECONSTRUCTION BOX 1
91 80318 RECONSTRUCTION BOX 1
92 80443 RECONSTRUCTION BOX 1
93 80611 RECONSTRUCTION BOX 1
94 80927 RECONSTRUCTION BOX 1
95 81582 RECONSTRUCTION BOX 1
96 81886 RECONSTRUCTION BOX 1

7.2.4 New Culverts

1 33497 NEW CONSTRUCTION BOX 3


2 35490 NEW CONSTRUCTION BOX 3
3 36076 NEW CONSTRUCTION BOX 3
4 36740 NEW CONSTRUCTION BOX 3
5 37800 NEW CONSTRUCTION HPC 1
6 38340 NEW CONSTRUCTION HPC 2
7 38600 NEW CONSTRUCTION HPC 1
8 38840 NEW CONSTRUCTION HPC 2
9 39020 NEW CONSTRUCTION HPC 1
10 39100 NEW CONSTRUCTION HPC 2
11 39420 NEW CONSTRUCTION HPC 1
12 44300 NEW CONSTRUCTION HPC 1
13 45023 NEW CONSTRUCTION BOX 3
14 48200 NEW CONSTRUCTION HPC 1
15 48880 NEW CONSTRUCTION HPC 2
16 49574 NEW CONSTRUCTION HPC 1
17 50213 NEW CONSTRUCTION HPC 1
18 50510 NEW CONSTRUCTION HPC 1
19 51100 NEW CONSTRUCTION HPC 2
20 51290 NEW CONSTRUCTION HPC 1
21 51640 NEW CONSTRUCTION HPC 1
22 52100 NEW CONSTRUCTION HPC 2
23 52220 NEW CONSTRUCTION HPC 1
24 53040 NEW CONSTRUCTION HPC 2
25 53220 NEW CONSTRUCTION HPC 1
26 53400 NEW CONSTRUCTION HPC 2
27 53860 NEW CONSTRUCTION HPC 1
28 60730 NEW CONSTRUCTION BOX 3
29 61076 NEW CONSTRUCTION BOX 3
30 61500 NEW CONSTRUCTION BOX 3
31 61660 NEW CONSTRUCTION BOX 3
32 61915 NEW CONSTRUCTION BOX 3
33 62520 NEW CONSTRUCTION BOX 3
34 62670 NEW CONSTRUCTION BOX 3
35 62830 NEW CONSTRUCTION BOX 3
36 63325 NEW CONSTRUCTION BOX 3
37 63543 NEW CONSTRUCTION HPC 1
38 63842 NEW CONSTRUCTION BOX 3
39 64014 NEW CONSTRUCTION BOX 3
40 64700 NEW CONSTRUCTION HPC 1
41 64940 NEW CONSTRUCTION BOX 3
42 65800 NEW CONSTRUCTION BOX 3
43 65970 NEW CONSTRUCTION BOX 3
44 66660 NEW CONSTRUCTION BOX 3
45 67190 NEW CONSTRUCTION BOX 3
46 67440 NEW CONSTRUCTION BOX 3
47 68070 NEW CONSTRUCTION BOX 3
48 68450 NEW CONSTRUCTION BOX 1

7.3 Bridges
7.3.1 re-construction
1 37460 RCC BOX Bridge 3
2 47620 RCC BOX Bridge 4
RCC I Girder with
3 50800 open foundation 3
RCC I Girder with
4 53510 open foundation 3
5 66230 RCC BOX Bridge 3

7.3.2 Additional New Bridges


1 52520 PSC Box 5

7.4 ROB
1 47980 Steel Composire Girder 1
2 65165 Steel Composire Girder 1

7.6 repair and strengthening of bridges and structures


1 68252 slab bridge on open foundation 3
2 70305 RCC girder bridge on open foundation 3
3 71885 slab bridge on open foundation 2
TRETCHHES

Span
12
12
20
60
60
60

50
60

Cell Width
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+3+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+3+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
1.5
2
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
2
1.5
1.5
1.5
1.5
1.5
1.5
2
1.5
1.5
1.5
2
2
1.5
2
1.5
3
3
1.5
2
1.5
2
3
2
2.5
2.5
1.5
2.5
2.5
2
1.5
3
2
3
3
2.5
2
3
1.5

2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
2+1.5+2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
1.2
2+1.5+2
2+1.5+2
1.2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
2+1.5+2
1.5

18
24

55

54
30
200

89.92
37.24

24.9
52.8
25.3