Project Title: GOLDEN SUCCESS COLLEGE RENOVATION AND EXPANSION WITH ADDITIONAL FLOORS
(Foundation to 3rd floor Column Dowels ONLY)
Background: Before building the new five storey structure, we are required to demolish the existing two
AAAAAAAAAstorey structure to build better and stronger foundation to support the massive load of this
AAAAAAAAAnew structure.
Scope of Works:
Working Time
Item # Description Time started Percentage (%)
Hours Ended
1 Demolition of slabs 12:00 hrs. 9:00 am 9:00 pm
2 Demolition of Walls 11:30 hrs. 9:30 am 9:00 pm
3 Removal of Ceiling 11:30 hrs. 9:30 am 9:00 pm
4 Removal of Electrical Wirings 8:00 hrs. 1:00 pm 9:00 pm
Accomplishment Report:
May 1, 2017
Demolition of slabs; in 12:00 hours of working ()% of the total slab area has been demolished.
Demolition of walls; in 11:30 hours of working ()% of the total wall area has been demolished.
Removal of ceiling; in 11:30 hours of working ()% of the total ceiling area has been removed.
Removal of Electrical Wiring; in 8 hours of working ()% of the total present electrical wiring has
been removed.
Remarks:
RSG Construction & Development
Address: Sitio Tambisan, Brgy. Tisa, Cebu City
Cellphone No.: 09206221433/09052144656
Project Title: GOLDEN SUCCESS COLLEGE RENOVATION AND EXPANSION WITH ADDITIONAL FLOORS
(Foundation to 3rd floor Column Dowels ONLY)
Background: Before building the new five storey structure, we are required to demolish the existing two
AAAAAAAAAstorey structure to build better and stronger foundation to support the massive load of this
AAAAAAAAAnew structure.
Scope of Works:
Working Time
Item # Description Time started Percentage (%)
Hours Ended
1 Demolition of Interior Walls 13:00 hrs. 8:00 am 9:00 pm
2 Demolition of Slab 13:00 hrs. 8:00 am 9:00 pm
3 Removal of Ceiling 13:00 hrs. 8:00 am 9:00 pm
4 Removal of Electrical Wirings 13:00 hrs. 8:00 am 9:00 pm
Accomplishment Report:
May 2, 2017
Demolition of Interior Walls; in 13:00 hours of working ()% of the total Interior Walls area has
been demolished.
Demolition of slab; in 13:00 hours of working ()% of the total slab area has been demolished.
Removal of ceiling; in 13:00 hours of working ()% of the total ceiling area has been removed.
Removal of Electrical Wiring; in 13:00 hours of working ()% of the total present electrical wiring
has been removed.
Remarks:
RSG Construction & Development
Address: Sitio Tambisan, Brgy. Tisa, Cebu City
Cellphone No.: 09206221433/09052144656
Project Title: GOLDEN SUCCESS COLLEGE RENOVATION AND EXPANSION WITH ADDITIONAL FLOORS
(Foundation to 3rd floor Column Dowels ONLY)
Background: Before building the new five storey structure, we are required to demolish the existing two
AAAAAAAAAstorey structure to build better and stronger foundation to support the massive load of this
AAAAAAAAAnew structure.
Scope of Works:
Working Time
Item # Description Time started Percentage (%)
Hours Ended
1 Demolition of Interior Walls 13:00 hrs. 8:00 am 9:00 pm
2 Demolition of Slab 13:00 hrs. 8:00 am 9:00 pm
3 Removal of Ceiling 13:00 hrs. 8:00 am 9:00 pm
4 Removal of Electrical Wirings 13:00 hrs. 8:00 am 9:00 pm
Accomplishment Report:
May 3, 2017
Demolition of Interior Walls; in 13:00 hours of working ()% of the total Interior Walls area has
been demolished.
Demolition of slab; in 13:00 hours of working ()% of the total slab area has been demolished.
Removal of ceiling; in 13:00 hours of working ()% of the total ceiling area has been removed.
Removal of Electrical Wiring; in 13:00 hours of working ()% of the total present electrical wiring
has been removed.
Remarks:
RSG Construction & Development
Address: Sitio Tambisan, Brgy. Tisa, Cebu City
Cellphone No.: 09206221433/09052144656
Project Title: GOLDEN SUCCESS COLLEGE RENOVATION AND EXPANSION WITH ADDITIONAL FLOORS
(Foundation to 3rd floor Column Dowels ONLY)
Background: Before building the new five storey structure, we are required to demolish the existing two
AAAAAAAAAstorey structure to build better and stronger foundation to support the massive load of this
AAAAAAAAAnew structure.
Scope of Works:
Working Time
Item # Description Time started Percentage (%)
Hours Ended
1 Demolition of Interior Walls 13:00 hrs. 8:00 am 9:00 pm
2 Demolition of Slab 13:00 hrs. 8:00 am 9:00 pm
3 Removal of Ceiling 13:00 hrs. 8:00 am 9:00 pm
4 Removal of Electrical Wirings 13:00 hrs. 8:00 am 9:00 pm
Accomplishment Report:
May 4, 2017
Demolition of Interior Walls; in 13:00 hours of working ()% of the total Interior Walls area has
been demolished.
Demolition of slab; in 13:00 hours of working ()% of the total slab area has been demolished.
Removal of ceiling; in 13:00 hours of working ()% of the total ceiling area has been removed.
Removal of Electrical Wiring; in 13:00 hours of working ()% of the total present electrical wiring
has been removed.
Remarks: