Escolar Documentos
Profissional Documentos
Cultura Documentos
Flat no B-05, Rajnish CHS LTD, Sector-15, Vashi, Navi Mumbai,9820434821 e-mail : subhan_maha@yahoo.com
AIM
May be headhunted as a logistics Professionals in the areas of operation (Surface, Sea, Air &Multimodal),
commercial of Project Logistics, Ship Chartering, Freight, NVOCC,3PL, Freight Forwarding, Warehousing, ICD,
CFS operation & EXIM etc.
OBJECTIVES
To provide end to end logistics solutions while partnering with transporters, Shipping Liners, Dry bulk
carriers, freight forwarders enabling optimum deliverables across the Logistics value chain.
To Implement logistics processes with sea, road logistics along with freight negotiation, contract finalisation
To market the Port’s logistics capabilities and facilities as a differentiator and responsible for Revenue and
Contract Management Road, Rail, Air & Multimodal, Inter Warehousing, Documentation
Negotiation -modal Logistics ICD, CFS & Dry Port Management
Commercial Freight Dry Bulk, Break Bulk Import & Export Clearances
Planning (Container /Liner) Licensing (DGFT), Authorisations,
Operation Project Logistics (ODC, HW & HL) Export Incentives, Freight Forwarding
Business Development Liaisoning Custom House Bonding/De-bonding
PROFILE
Providing commercial and operational solutions with application of Integrated Freight Management System,
Experience in Road Freight, Rail Freight , Air Freight , Ocean Freight , fixtures, COAs/CVC with Baltic Dry
Indices, Custom Clearance, Inbound & Outbound Logistics, Primary & Secondary Logistics, Fleet
Management, Warehouse / Depot Management, Dry Port/ICD/CFS Management.
Experience in contract lifecycle management, risk, reliability & compliance management, contract negotiation
/contract review/ Contract Drafting process and technical solution design and roll out.
Liaisoning with Railways (Zone/ Division),Customs, DGFT, (RTO & MVI), Port Authorities for priority port
services like berthing and concessional tariff, Transport Unions, CHA, Freight Forwarders, Shipping Companies.
Commercially fixing of a vessel analysing the age, derrick, hatch configuration, Gear, LOA, Beam, GRAB &
flag to judge that vessel offered fully meet requirement/responsibility for operations.
Negotiation, Finalization of Charter Parties and Cargo Fixtures/ Contracts seeing all post fixture matters.
Managing operational aspect of voyage from fixing till its completion and final settlement of lay time.
Air freight calculations, Unit Load Device charges-ULD Charges, Chargeable/volumetric weight, Consolidation,
Air Surcharges (Different for different air carriers and Airport Transit Points).
ROAD LOGISTICS AND FLEET MANAGEMENT
Primary/Secondary transportations Line-haul, Up country, Milk-run, Hub & Spoke, Reverse logistics.
Contract negotiation on cost sheet and reference benchmarks, market dynamics, impact of seasonality, port
cargo inventory, trucks demand/supply ensuring the effective implantation of the contract's terms (risk
mitigation/reliability/performance) and revision of rate based on diesel price revision.
Use of Multi-axle, high carrying capacity vehicles optimizing freight cost, optimising logistic Parcel size and
optimum Load Planning vs Vehicle Size with a reduction in integrated logistics cost i.e Rs/Mt.
Responsible for quick turnaround with route planning, route mapping, networking, placement of vehicles,
Liaising with Commercial and Operation for Rake Booking, Rake Placement, Commercial issues like Punitive,
warfage, Demurrage clearances, Concessional Tariff Fixation, Discounts, Settlements of tariff, Penalty and
other disputes EOL,WIS, LWIS, TIEL, SFTO.
Familiar with the Railway policies, Knowledge in railway operations, railway freight procedures, policy updated
from time to time.
CAREER HIGHLIGHTS
GVK Power & Infra. Head Fuel Management (Coal) 2017 till date
Inventa tech. Ltd,mumbai Resident GM(logistics) 2015-2017
& Consultant (STEEL),Govt of Odisha & KPMG Consulting
Adani port & SEZ Ltd, Head Port Business Development 2014- 2015
Jindal Stainless Ltd, Jajpur GM (Integrated Logistics) 2013-2014
ESSAR SHIPPING & PORT Mumbai Dy General Manager- Logistics 2010-2013
Tata Projects (EPC Div), Mumbi Sr. Manager ( Logistics/Stores) 2009-2010
Ispat Industries Ltd, Dolvi, Mumbai Sr. Manager (Integrated Logistics) 2004-2008
Vedanta Group Dy Manager (Logistics) 2001–2004
Nelanchal Ispat Nigam(deputed to MMTC) Asst. Manager(Commercial) 1997-2001
Ispat Industries, Mumbai Sr. Officer – Logistics 1995-2001
Securing annually 3 million MT coal budgeted Rs. 1400 Cr. for GVK Power (Goindwal Sahib in Punjab) through
Road cum Rail mode from CIL collieries (80%)states of Jharkhand and MP and balance import of Rb2,Rb3
Grades from South Africa & Indonesia at Mundra, Kandla port and beyond by port Rail
Strategize of a diversified portfolio of three rail zones and seven multilocational rail siding with total warehousing
capacity of over 1.5 lakh sq ft and optimisation of vehicle TAT and Route Planning, Trip Maximisation, fleet
management with GPS tracking.
Achieved 25% increase in daily coal movement from mines to rail siding and rail rake availability from railways
was increased by 40% enabled us to move 2 takes (8000 Mt) of coal on daily basis on Road cum Rail mode
with plant coal inventory getting optimised. (A 7 days plant coal stock raised upto 15 days, a jump of 100%).
DEPT. OF STEEL & MINES AND KPMG (SPV). ROLE SR. CONSULTANT (STEEL SCM).
• Rake availability(ECoR), controlling transport union on freight and vehicle availability to steel and power plants
and no-entry time adjustment/rescheduling, route and network planning for smooth logistics flow of trucks.
• Logistics Road Map of Raw Material and finished goods for Mission of 300MT annual steel by year 2025.
• Projects like multimodal Logistics Parks, Logistics Corridors, Setting up ICDs, Specific Study on East Coast
and East- West corridor for assessment of gaps in feeder Road and Rail Transport infrastructure.
• Assessment & Feasibility of Inland Waterways and interconnection of Paradip & Dhamra ports and ICDS/CFS.
Successfully brought part of spill over Coastal Coal Cargo from neighboring competing Paradeep Port from
(Southern State Power Plants: NTECL, TANGENCO, APGNCO) on basis of quick turn-around of inward coal
from mines, loading of high DWT coastal vessels on higher draft with sea freight economy.
Surplus capacity at export berth was utilized by self geared import vessels for Rashmi metallics, Usha
Martin,JSPL and others for coal, coke, pig iron,Pellet, flux cargo gave additional volume of 2 MTPA, revenue
of Rs.120Cr. (berthing, discharging, storage & evacuation) .
Feasibility study for a fertilizer berth(Initially for 2.5MTPA) with bagging and covered storage facilities after
assessing demand, current importation and distribution from Zuari Agro, IFFCO,Corromondol Fertilizers,Tata
Chemicals. Jai Shree Chemicals (Bangur)..
• Preparation of feasibility and Master plan for Multiple Cargo handling facility of more than 125 MMT cargo
volume with plan to develop Dhamra as Eastern maritime Gateway for India-Nepal-Bangladesh-Myanmar.
Overall port cargo volume jumped from 14.5 MMTPA to over 18 MMTA (28% yoy)dry bulk cargo coal, lime
stone, Pellets etc for Tata, SAIL, JSPL, BSL(Coal, coke, slag), Adani Enterprises Ltd( Coal business) etc.
Take or Pay contract, Minimum Rakes Indent & Storage Space area stipulations , Shifting charges were
applied for Tata Steel and negotiated and settled Rs.26cr.pending for storage& shifting beyond free period.
Introduced freight rail operators CONCOR & TRANS-RAIL for bulk movement of finished goods from eastern
part to western hubs like Kalomboli and Vadodara and distribution thereafter to overcame irregular truck
availability & Finished goods inventory piling up. Saving in freight 20% & saving in delivery time 40%.
Outbound/inbound logistic(1 MMT of Outbound,2 MMT of inbound PAN India Cargo with Annual Logistics
Spend of 500 Cr & Monthly container export of 1500 Nos TEUs(Partnering DAMCO) PM through Vizag, Haldia.
Triangulation Triangulation( Reverse Logistics) Service : All Maersk line inward containers are used for
export by service provider/freight forwarder DAMCO. i.e. Import to Export Conversion over 500 TEUs.
Liner freight based on log term & negotiated even on spot basis based on prevailing rate for freight corridors
A 15% dead freight saving in containerisation from Heavy duty to Normal duty TEUs by avoiding dead freight.
• Re-Negotiation of Pan India surface Transportation Contract with 3 transporters instead of 17transporters PAN
India viz DARCL, Union Roadways, ARC assigning regional logistics geographies landscape.
ESSAR SHIPPING AND PORT LOGISTICS LTD ROLE : DY. GENERAL MANAGER (LOGISTICS)
Contributed in strategic transformation of Essar Shipping into an integrated logistics provider (Networked
assets of 25 ships, 15 mbcs , 10 ports and off-shores, 1000+ equipment owning/hiring, fleet of 2500
trailers/4 locomotives /industrial warehouses, 50 Railheads,150 PAN India and Global destinations.
Operationalized a highly interactive information sharing system, to provide real-time visibility of cargo.
Intra-plant logistics operations, load consolidation, saving the loss of idle freight and loss from demurrages.
Designed end to end multi modal Road-Sea-Road logistics solution of finished goods of 2 MMTA to
Maharashtra and South India.( 30% Saving in freight Cost and 40 % Saving in Delivery time).
A 1200-1500 no of TEUs PM were moved to JNPT Port through Dhamramtar port node resulted saving in
inland freight cost by 20% and TEUs missing liners were reduced by 40% with Savings in Buffer storage cost.
Handling of Dry Bulk- Coal, Ore, Pellets, Finished Goods under Import, export & Coastal movements through
Mechanized/Non-Mechanized)means at minor Ports at Dighi, Dharamtar to avoid Mumbai port congestion
Successfully delivered 18 Over dimensional project items(85 Mt–125 Mt)on hydraulic axles.
Achieved on Time Deliveries of 97% and achieved Vehicle Placement of 95% with respect to set targets.
ESSAR PORT - MULTI USER COAL TERMINAL,20MMTA, COST 5000 CR.( BEIRA PORT,MOZAMBIQUE)
Prepare the project documents (Port Terminal concession agreements, Port Agency Contract, EPC contract,
O&M contracts and debt financing agreements)finance modelling(IRR,NPV,DSCR) for the risk allocation.
Prepared feasibility Report on port traffic, coal cargo projections, proposal of cargo handling facilities and
logistics model, mines to port Sena corridor capacity assessment.
Networked with local Transporters, freight forwarders, vessel owners, vessel agents, clearing agents for
shipment from Mozambique port like. e.g Greenrod, Mocargo, LBH, Manica, Saraf Shipping.
TATA PROJECTS–HYDERABAD ROLE : SR. MANAGER (MATERIALS AND STORES)
• Empanelment of DHL, Air-Freight, Fed-Ex for air cargo under IATA-Guidelines with contract Negotiation of
Pan India surface Transportation region wise Contract with 3 transporters DARCL, Union Roadways, ARC.
• Moved about 5000 TEUs from different European Ports(Antwerp, Hamburg, Rotterdam) for SAIL-RSP’s 5th BF
through shipper Tata Corus-EU, Freight Forwarder JM Baxi and NYK line was the liners at Haldia port.
Managed 17 multilocational stores including main stores and site stores with goods movement networked.
End to end Logistics solutions for over 2000 KM erection of transmission line towers substation structures.
ISPAT INDUSTRIES LTD., DOLVI-MUMBAI, ROLE SR. MANAGER (SCM/LOGISTICS).
Dispatches of finished steel Coils on pan India basis(4.5 MMTA finished goods (Steel & DRI) outbound in Ispat
Dolvi before acquisition by JSW .
• IMPORT CARGO : End to End Logistics charter party and freight negotiation of & Operation about 80 Cape/
Supramx/Handimax vessels per annum from ship owners worldwide via a global/Indian broking network.
• The portfolio of fleets cape, Panamax, Supramax and Handy size vessels on both time charter and voyage
basis that moves cargos from India to Thailand, Europe, Pacific, Atlantic and Far East and coastal states.
• Reverse auction mechanism ,prequalification of transporters, transparent freight reduction upto 10%achieved.
• Daily about 400 numbers of trailors were planned, placed, loaded, documentation, weighment and exit
review was done a 4 hrs of logistics operation(TAT) was reduced to 1 hr.(75% reduction). scale up truck
utilisation time and offered 5 %to 10% freight reduction on PAN India route basis on re-negotiation.
Trip Optimisation by consolidation, route planning in milk run shipment and drop/collection of goods, and
Marital Status : Married Languages Known: Hindi, Odia, English, Gujarati, Marathi, Bengali
All Particulars mentioned above are true to best of my knowledge and belief.
(SUBHANKAR MAHAPATRA)